Attachment 5 Government Property Report (AHALEY).doc
DOC document 58 KB Posted
- Attached to
- DOCKSIDE REPAIRS USCGC ALEX HALEY (WMEC 39)
- Solicitation number
- 70Z08521RP4503200
About this file
This solicitation is for dockside repairs and maintenance services for the USCGC Alex Haley (WMEC 39). The required work includes items specified in Attachment 1 and a list of contract line items in Attachment 2. Proposals are due by 2:00 pm PST on November 27, 2020 and the contract is expected to be awarded on or about December 15, 2020. The period of performance consists of Phase 1 from February 1-March 2, 2021 and Phase 2 from May 17-July 15, 2021. The solicitation is set aside as a total small business and the NAICS code is 336611. Questions are due by November 13, 2020 and the Government will not pay costs associated with proposal preparation or response.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Page 2 A0003.docx | DOCX document | |
| SF 30 - A0003.pdf | ||
| ALEX HALEY (WMEC 282) DS RTO 21R2 (120720).pdf | ||
| ALEX HALEY (WMEC 282) DS RTO 21R1.pdf | ||
| SF 30 - A0002.pdf | ||
| Page 2 - A0002.docx | DOCX document | |
| SF 30 - A0001.pdf | ||
| PAGE 2 - A0001.docx | DOCX document | |
| Attachment 2 Schedule of Items-Prices (AHALEY).docx | DOCX document | |
| Attachment 4 Request for Clarifications (AHALEY).doc | DOC document | |
| Attachment 6 Notice to Protest.docx | DOCX document | |
| Attachment 7 Non-Disclosure Agreement (AHALEY).pdf | ||
| Attachment 1 ALEX HALEY (WMEC 282) DS RTO 21R0.pdf | ||
| Attachment 3 Clauses and Provisions (AHALEY).doc | DOC document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GOVERNMENT PROPERTY REPORT
The Contractor shall complete each column throughout the contract performance period with the assistance of the Government Property Administrator, as needed.
| contract number: |
| vessel: |
Contractor point of contact:
telephone number:
Contractor’s address:
The chart below is for use during the performance of the above listed contract. The Contractor shall complete each column of the chart with the assistance of the Government Property Administrator, as needed.
| 1 |
| 2 |
| 3 |
| 4 |
| 5 |
| 6 |
Type of property received (include name, description , nsn and serial #) value of property
| date received |
| date installed/ |
consumed Use this block to record :
1. current location of property in the possession of the Contractor for use during the availability or otherwise being temporarily held until being returned to/reinstalled on cutter.
2. disposition instructionsfor unused, serviceable, salvage or scrap property. state which apply.
date disposition carried out
| description |
| nsn\serial\p/n |
* Definitions (all property defined below will require disposition instructions):
Serviceable - defined as property that was pre-existing in a location that was, during the course of performance, replaced and which will be turned in by the Coast Guard for future use.
Salvage – defined as property that has no serviceable value, but that has some value in excess of its scrap value.
Scrap – defined as property having no value except for it basic material content.
The undersigned hereby certify that all property provided under referenced contract has been accounted for. That is property has either been consumed in the performance of the contract or disposition instructions, as listed above, have been provided.
PROPERTY ADMINISTRATOR DATE
(Sign at time disposition instructions are given)
________________________ ___________ CONTRACTOR SIGNATURE DATE (sign after execution of disposition instructions)
NOTE: The Contractor must carry out all disposition instructions as instructed above. This report must accompany the Contractor’s final invoice. (07/02)
ATTACHMENT 5
File details come from the government source that posted it. Updated .