Attachment 1 ALEX HALEY (WMEC 282) DS RTO 21R0.pdf
PDF 2 MB Posted
- Attached to
- DOCKSIDE REPAIRS USCGC ALEX HALEY (WMEC 39)
- Solicitation number
- 70Z08521RP4503200
About this file
This is a combined synopsis and solicitation for dockside repairs of the USCGC Alex Haley. The Coast Guard seeks firm fixed-price proposals for repairs including cleaning and inspection of fuel tanks, renewal of sea strainers and deck coverings, inspection and repair of anchor chains, and various other maintenance items. Proposals are due by November 27, 2020 and award is expected by December 15, 2020. The work must be completed within 90 days of vessel availability on February 1, 2021. The requirement is set aside for small businesses with a NAICS code of 336611 and size standard of 1250 employees. Questions are due by November 13 and the contractor must be registered in SAM. The solicitation includes attachments listing work items and pricing schedules.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Page 2 A0003.docx | DOCX document | |
| SF 30 - A0003.pdf | ||
| ALEX HALEY (WMEC 282) DS RTO 21R2 (120720).pdf | ||
| ALEX HALEY (WMEC 282) DS RTO 21R1.pdf | ||
| SF 30 - A0002.pdf | ||
| Page 2 - A0002.docx | DOCX document | |
| SF 30 - A0001.pdf | ||
| PAGE 2 - A0001.docx | DOCX document | |
| Attachment 2 Schedule of Items-Prices (AHALEY).docx | DOCX document | |
| Attachment 4 Request for Clarifications (AHALEY).doc | DOC document | |
| Attachment 6 Notice to Protest.docx | DOCX document | |
| Attachment 7 Non-Disclosure Agreement (AHALEY).pdf | ||
| Attachment 5 Government Property Report (AHALEY).doc | DOC document | |
| Attachment 3 Clauses and Provisions (AHALEY).doc | DOC document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC ALEX HALEY (WMEC 39)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2021
Developed By: Ryan T Ostrander
(Rev-0, 23 July 2020)
USCGC ALEX HALEY (WMEC-282) DOCKSIDE AVAILABILITY FY2021
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property .................................................................................. x Consolidated List of Critical Inspection Items ........................................................................................... xii Principal Characteristics ............................................................................................................................ xiii General Requirements WORK ITEM 1: Tanks (MP Fuel Service), Clean and Inspect WORK ITEM 2: Sea Strainers (All Sizes), Renew WORK ITEM 3: Helo Talon Grids, Inspect And Test WORK ITEM 4: Tanks (MP Fuel Service), Preserve “Partial” - Optional WORK ITEM 5: Temporary Services, Provide - Cutter WORK ITEM 6: Deck Covering (Interior Wet/Dry), Renew WORK ITEM 7: Deck Covering, Carpeting, Renew WORK ITEM 8: Deck Covering, Wet/ Dry, Seal WORK ITEM 9: Watertight Doors and Scuttles, Renew WORK ITEM 10: Anchor Chain and Ground Tackle, Inspect and Repair WORK ITEM 11: Reserve Feedwater Tank, Repair and Preserve WORK ITEM 12: Anchor Windlass, Service and Repairs WORK ITEM 13: Single Point Davit (Gen), Level 2 Inspect and Test WORK ITEM 14: Sewage Pump Room Bilge, Preserve “100%” WORK ITEM 15: Raw Water Piping, Repair WORK ITEM 16: Boiler Steam Piping, Repair WORK ITEM 17: Medical Shower Piping, Renew WORK ITEM 18: Refrigerant Piping, Renew WORK ITEM 19: Boiler, Tube Renewal - Partial WORK ITEM 20: Vane Axial Fan, Overhaul WORK ITEM 21: Heated Bridge Windows, Renew WORK ITEM 22: 35’ Whip Antennas, Renew WORK ITEM 23: Smokestack, Clean and Inspect WORK ITEM 24: Cofferdam, Install WORK ITEM 25: Bridge Wing Surfaces, Preserve WORK ITEM 26: Fantail Overhead Surfaces, Preserve WORK ITEM 27: Weather Decks, Repair WORK ITEM 28: Towing Bitts, Chocks, and Fairleads, Inspect and Test WORK ITEM 29: Fuel Valves, Overhaul or Renew WORK ITEM 30: Deck Drain, Repair WORK ITEM 31: Tank Vent and Vent Penetration, Renew iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 282-WMEC 100-003, Rev G, Shell Expansion
Coast Guard Drawing 282-WMEC 101-001, Rev D, Fore End Framing
Coast Guard Drawing 282-WMEC 102-001, Rev D, Double Bottom Amidships
Coast Guard Drawing 282-WMEC 111-001, Rev D, 02, 03, 04 Levels – 01, 02 & 03 Level Casings
Coast Guard Drawing 282-WMEC 112-003, Rev F, Foundations for Propulsion Pumps & Coolers
Coast Guard Drawing 282-WMEC 114-003, Rev G, Main Bulkheads (Aft)
Coast Guard Drawing 282-WMEC 114-004, Rev G, Main Bulkheads (Fwd)
Coast Guard Drawing 282-WMEC 123-008, Rev F, Schedule of Non-Ballistic Doors, Hatches & Scuttles
Coast Guard Drawing 282-WMEC 136-001, Rev D; Flight Deck Arrangement And Structural Details
Coast Guard Drawing 282-WMEC 145-001, Rev F, General Arrangement Outboard Profile
Coast Guard Drawing 282-WMEC 145-002, Rev F, General Arrangement Inboard Profile &
Superstructure
Coast Guard Drawing 282-WMEC 145-007, Rev E, Access Plan
Coast Guard Drawing 282-WMEC 145-008, Rev J, Access Plan 01 Level & Main Deck
Coast Guard Drawing 282-WMEC 145-009, Rev L, Access Plan 1st Platform & Hold
Coast Guard Drawing 282-WMEC 145-010, Rev D, Access Plan
Coast Guard Drawing 282-WMEC 150-003, Rev -, CG Conversion Mods to Pilothouse/Deckhouse A&D
Coast Guard Drawing 282-WMEC 205-001, Rev H, Main Engine Exhaust Uptake Arrangement
Coast Guard Drawing 282-WMEC 205-002, Rev F, Smokepipe
Coast Guard Drawing 282-WMEC 209-001, Rev A, SW Cooling System for Main Propulsion Engines
Coast Guard Drawing 282-WMEC 209-002, Rev G, Propulsion Cooling Arrangement
Coast Guard Drawing 282-WMEC 209-003, Rev A, SW Cooling System for Diesel Generators
Coast Guard Drawing 282-WMEC 209-010, Rev -, Jacket Water System Piping Mods Heat Recovery
System
Coast Guard Drawing 282-WMEC 245-002, Rev P, Main Propulsion Diesel Engine Cooling Water
System Diagram
Coast Guard Drawing 282-WMEC 245-003, Rev M, Propulsion Fuel Oil Diagram
Coast Guard Drawing 282-WMEC 401-004, Rev T, CG Conversion Mods to Arrgt of Pilothouse
Coast Guard Drawing 282-WMEC 401-005, Rev V, CG Modifications to Antenna Arrangement and
Details v (Rev-0)
Coast Guard Drawing 282-WMEC 500-004, Rev L, Details of Reserve Feed Tanks & Feed & Drain Tank
Coast Guard Drawing 282-WMEC 501-019, Rev -, Vent Mods Crew's Galley & Scullery Main Deck
Coast Guard Drawing 282-WMEC 501-037, Rev -, Working Drawing of AC, Heating & Ventilation
Arrangement 01 Level & Main Deck
Coast Guard Drawing 282-WMEC 505-004, Rev K, Arrangement of W.R Officer's Wr, Wc, & Shower
Coast Guard Drawing 282-WMEC 509-010, Rev -, Potable Water Piping Mod & Hot Water Heater
Relocation
Coast Guard Drawing 282-WMEC 510-003, Rev R, Plumbing Vents & Drains, Scuppers & Deck Drains
Starboard Profile Superstructure
Coast Guard Drawing 282-WMEC 510-006, Rev J, Space Deck Drain Fittings
Coast Guard Drawing 282-WMEC 514-001, Rev J, Diesel Fire Pump Exhaust Piping Arrangement
Coast Guard Drawing 282-WMEC 520-004, Rev A, Windlass Lubricating Diagram
Coast Guard Drawing 282-WMEC 520-013, Rev R, Deck Machinery Hydraulic Power System Piping
Arrangement (Windlass)
Coast Guard Drawing 282-WMEC 520-024, Rev B, Mods In Way Of Anchor Handling
Coast Guard Drawing 282-WMEC 520-032, Rev L, Arrangement of Anchor Windlass Room
Coast Guard Drawing 282-WMEC 520-051, Rev A, General Arrangement Windlass
Coast Guard Drawing 282-WMEC 520-052, Rev A, Windlass Brake Box Assembly
Coast Guard Drawing 282-WMEC 520-054, Rev A, Windlass Capstan Assembly
Coast Guard Drawing 282-WMEC 520-055, Rev A, Windlass Below Deck Assembly
Coast Guard Drawing 282-WMEC 545-014, Rev M, Diagram Ships Heating & Aux _Y Steam System
Coast Guard Drawing 282-WMEC 545-025, Rev M, Auxiliary Sea Water Services System Diagram
Coast Guard Drawing 282-WMEC 545-029, Rev K, Overflows, Air Escape & Sounding Arrgt for Oil
Tanks
Coast Guard Drawing 282-WMEC 545-031, Rev E, Diagram.-Chill/Freeze Refrigerant Piping
Coast Guard Drawing 282-WMEC 545-042, Rev F, Sea Water cooling Windlass Pack & Refrig Plant
Coast Guard Drawing 282-WMEC 581-001, Rev A, Anchor Windlass Replacement Elec Arr & Wiring
Details.
Coast Guard Drawing 282-WMEC 583-002, Rev B, Single Point Davit Hydraulic Piping Diagram and
Arrangement
Coast Guard Drawing 282-WMEC 583-003, Rev A, Single Point Davit Hydraulic Piping Diagram (SAE
J1780)
Coast Guard Drawing 282-WMEC 600-003, Rev C, Mooring Arrg & Dets
Coast Guard Drawing 282-WMEC 601-002, Rev H, Booklet of General Plans
Coast Guard Drawing 282-WMEC 601-002, Rev H, Booklet of General Plans
Coast Guard Drawing 282-WMEC 604-017, Rev C, 01 Level
Coast Guard Drawing 282-WMEC 607-001, Rev G, Insulation Arrg 02, 03, 04 Lvls
Coast Guard Drawing 282-WMEC 607-002, Rev K, Insulation Arrg 01 Lvl & Mn Deck
Coast Guard Drawing 282-WMEC 614-001, Rev N, Arrg of Medical Treatment Room
Coast Guard Drawing 282-WMEC 620-001, Rev J, Anchor Handling Arrg
Coast Guard Drawing 282-WMEC 625-001, Rev -, Elec. Heated WT. Wdo. Instl. Incid to Plths King Post
Pocket Removal
Coast Guard Drawing FL-588-003, Rev -, Talon Grid, Supporting Skirt & Cover Fabrication & Instl vi (Rev-0)
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual
Coast Guard Technical Publication (TP) 2754, 14-AUG-13, Hydraulic Power Unit (HPU)
Coast Guard Technical Publication (TP) 3271, Manufacturer's Instruction Book, SWBS Group(s) 503-513
Coast Guard Technical Publication (TP) 3368, Jul 2017, Talon Helicopter Landing Grid - Type 18-22-01
Multiple Class Cutters
Coast Guard Technical Publication (TP) 3485C, 05-SEP-13, Single Point Boat Davit – Model D5700CT
Coast Guard Technical Publication (TP) 3486D, SWBS 531, Jun 2012, Reverse Osmosis Desalination
Plant – Model RC7000
Coast Guard Technical Publication (TP) 3965, May 2011, Air Conditioning System, R-134A - Model
90RMC025-D-6-D005/MS1
Coast Guard Technical Publication (TP) 4803, 0951-LP-018-8010 - Auxiliary Boiler
Coast Guard Technical Publication (TP) 5272, SWBS 625, Nov 2003, S9625-A1-MMC-010 - Windows, Electric Heated & Non-Heated
Coast Guard Technical Publication (TP) S9512-BS-MMA-010, May 2011, Heating, Ventilating & Air
Conditioning.
Naval Sea Systems Command (NAVSEA) 0926-LP-020-3010, Windlass; Vol. 1
Naval Sea Systems Command (NAVSEA) 0926-LP-020-3014, Pub Amend 4 to Windlass; Vol. 1
Naval Sea Systems Command (NAVSEA) 0926-LP-020-3020, Windlass, Vol. 2 - CGC ALEX HALEY
Naval Sea Systems Command (NAVSEA) 0926-LP-020-3030, FORWARD Windlass, Vol. 1
NAVSEA Technical Manual TP: 0912-LP-000-8000, SWBS 625, Shipboard Window Wipers
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2018, Shipboard
Electrical Cable Test.
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2018, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 3100 (SFLC Std Spec 3100), 2018, Inspect, Test and Recondition AC Synchronous Machines In-Place
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2018, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2018, Install Interior
Deck Covering Systems
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2018, Temporary
Services
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2018, Temporary
Hull Accesses
Technical Standard 582, Rev A, Mooring and Towing vii (Rev-0)
OTHER REFERENCES
American Bureau of Shipping (ABS) Approved Chain, Accessory and Bar Manufacturing Facilities List, Oct 2016
American National Standards Institute (ANSI/ASA) S2.19, 2004, Mechanical Vibration - Balance Quality
Requirements of Rigid Rotors - Part 1: Determination of Permissible Residual Unbalance
American National Standards Institute (ANSI/EASA) AR100, 2006, Recommended Practice for the
Repair of Rotating Electrical Apparatus
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2002, Disinfection of Water-Storage Facilities
American Society of Mechanical Engineers (ASME) B16.34, 2013, Valves-Flanged, Threaded, and
Welding End
ASTM International (ASTM) A53, 2012, Standard Specification for Pipe, Steel, Black and Hot-Dipped, Zinc-Coated, Welded and Seamless
ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) D2475-01(2008), 2008, Standard Specification for Felt
ASTM International (ASTM) D5363, 2016, Standard Specification for Anaerobic Single-Component
Adhesives (AN)
ASTM International (ASTM) F467, May 2008, Standard Specification for Nonferrous Nuts for General
Use
ASTM International (ASTM) F468, May 2006, Standard Specification for Nonferrous Bolts, Hex Cap
Screws, and Studs for General Use
ASTM International (ASTM) F683, 2010, Standard Practice for Selection and Application of Thermal
Insulation for Piping and Machinery
ASTM International (ASTM) F992, 2011, Standard Specification for Valve Label Plates
Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health Standards for Shipyard Employment
Commercial Item Descriptions (CID) A-A-59316, Nov 2003; Abrasive Materials for Blasting
Federal Specification (Fed Spec) DDD-C-95, Mar 1972, Carpets and Rugs, Wool, Nylon, Acrylic, Modacrylic
Federal Specification (Fed Spec) RR-C-271, Rev E, Mar 2016, Chains and Attachments, Carbon and
Alloy Steel
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2013 Edition, Pressure Testing Of Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2011 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-69, 2003, Pipe
Hangers and Supports - Selection and Application
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 2010 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-89, 2003, Pipe
Hangers and Supports – Fabrication and Installation Practices
MIL-A-22262, Mar 1996, Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-A-46106, Jun 1992, Adhesive-Sealant, Silicone, RTV, One-Component viii (Rev-0)
MIL-C-12226, Aug 1993, Cover, Toxicological Agents Protective Gas Mask Hood, Cooling
MIL-C-24633, Oct 2014, Chain, Stud Link, Anchor, Low Alloy Steel, Flash Butt Welded
MIL-D-16791, Jan 1993, Detergents, General Purpose (Liquid, Nonionic)
MIL-DTL-1222, Dec 2000, Studs, Bolts, Screws and Nuts for Applications Where a High Degree of
Reliability Is Required
MIL-DTL-23549, May 2002, Grease, General Purpose
MIL-F-1183, May 1987; Fittings, Pipe, Cast Bronze, Silver-Brazing
MIL-G-24716, Apr 1993, Gaskets, Metallic-Flexible Graphite, Spiral Wound
MIL-PRF-1149D, Jun 1998, Gasket Materials, Synthetic Rubber, 50 and 65 Durometer Hardness
MIL-PRF-16173, 2017, Corrosion Preventive Compound, Solvent Cutback, Cold-Application
MIL-PRF-24613, Dec 1990, Deck Covering Materials, Interior, Cosmetic Polymeric
MIL-S-955, Nov 1964, Shower Heads and Outfits (Shipboard Use)
MIL-STD-1310, Jun 2009, Standard Practice for Shipboard Bonding, Grounding and other
MIL-STD-769
MIL-T-16420, Sept 1988; Tube, Copper-Nickel Alloy, Seamless and Welded (Copper Alloy Numbers
715 and 706)
Naval Sea Systems Command (NAVSEA) S0600-AA-PRO-160, 8/15/2008, Underwater Ship Husbandry
Manuals - Chapter 16 (Cofferdams)
Naval Ship's Technical Manual (NSTM) Chapter 581, Nov 1997, Anchoring
NAVSEA Drawing 803-1385850, Rev J, Piping, Instrument Pressure For All Service
NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation
Details
NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation For Compartments Installation
Details
NAVSEA Drawing 804-5959214, Rev-, Piping Insulation - Installation Details
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2019, Cork and
Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2014, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) QQS763, 1998, Steel, Corrosion Resistant, Bars, WIRE, Shapes, And Forgings (Noncurrent Feb 2003)
Techniques for Electromagnetic Compatibility and Safety
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 01 (SSPC-SP 1), 2016, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 03 (SSPC-SP 3), 2018, Power Tool Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 08 (SSPC-SP 8), 2004, Pickling
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No. 15 (SSPC-SP 15), 2013, Commercial Grade Power Tool Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Specification SSPC-SP 6/NACE No.3, 2015, Commercial Wet Abrasive Blast Cleaning ix (Rev-0)
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2004, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 12/NACE No.5, 2004, Surface Preparation and Cleaning of Steel & Other Hard
Materials by High and Ultrahigh Pressure Water Jetting x (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
2 N Plenty D-Type 8 in
Strainer
DXAB-0800A4-V 1 ea. 35,750.00
2 N Titan 1.5 in Duplex
Strainer
DS-695 1 ea. 4,526.00
3 N M16 Bolts 5305-01-393-1827 24 ea. 43.62
3 N M12 Bolts 5305-01-584-6095 12 ea. 27.41
3 N **Talon Grid
Stanchion Bolt
Assembly, Including
Locking Nut
5340-01-481-3786 60 ea. 28.70
9 N 26 x 45 Individually
Dogged Watertight
Door, Steel, 6-Dog, LH
Swing
JE261-DI-07 1 ea. 5904.00
9 N 26 x 45 Individually
Dogged Watertight
Door, Steel, 6-Dog, RH
Swing
JE261-DI-08 1 ea. 5904.00
9 N 26 x 45 Quick-Acting
Watertight Door, Steel, 8-Dog, LH Swing
JE268-DQ-07 1 ea. 6384.00
9 N 26 x 66 Quick-Acting
Watertight Door, Steel, 10-Dog, LH Swing
JE268-DQ-25 2 ea. 6384.00
10 N 1-5/8in Anchor Chain
Shot
4010-00-149-5607 6 ea. 17,082.59
13 N Wire Rope Assembly, Single Leg
4010-01-602-8365 1 ea 281.39
13 N Hook Release, Boat
Davit
4030-01-467-1005 1 ea 4,869.24
13 N Sheave Assembly 3020-01-406-2278 1 ea 1335.56
20 N Steam Heater, Model
T37H**
4520-00-273-1282 1 ea 4,554.00
21 N 26-3/8 x 20-3/8 Heated
Window w/ CC-1595
CC-1226 11 ea. 4985.00
21 N 26-3/8 x 20-3/8 Heated
Window w/ CC-1650
CC-1226 3 ea. 4985.00
21 N 26-3/4 x 20-3/4 Heated
Window w/ CC-1595
CC-1226 2 ea. 4985.00
21 N 20-3/8 x 20-3/8 Heated
Window w/ CC-1595
CC-1226 3 ea. 4460.00
21 N 20-3/8 x 20-3/8 Heated CC-1226 3 ea. 4460.00 xi (Rev-0)
Window w/ CC-1650
21 N Window Wiper CC-5086 5 ea. 1825.00
22 N ***CCEM-229B 5985-01-415-6880 2 ea. 50,000.00 *Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xii (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
3 Helo Talon Grids, Inspect And Test
10 Anchor Chain and Ground Tackle, Inspect and Repair
13 Single Point Davit (Gen), Level 2 Inspect and Test xiii (Rev-0)
PRINCIPAL CHARACTERISTICS
282' WMEC (CGC ALEX HALEY)
PHYSICAL
Length overall 282' 8"
Length between perpendiculars 264' 0"
Beam, extreme 50' 0"
Beam @ DWL 47' 0"
Depth, molded 24' 0"
Draft, mean @ full load displacement 15' 0"
Full load displacement 3088 long tons
Minimum operating displacement 2567 long tons
Light ship displacement 2058 long tons
HULL
Hull material Steel
MACHINERY
Main propulsion Diesel
Diesel engines Four Caterpillar 3516
Propeller 2 CPP 11' 9" diameter x 7' 4" pitch, 4 blade, bronze
Shore tie 440 VAC, 400 Amp
Shaft bearings, forward Orion Thrust
Shaft bearings, aft Thordon
Shaft Seals; fore & aft John Crane Type MX9
TANK CAPACITIES
Diesel oil 653.1 long tons
JP-5 (aviation) 79.5 long tons
Fresh water 131.3 long tons
Ballast 57.2 long tons
1 (Rev-0)
00000_0220_FLT
REC_00000_FLT_Commercial Project @ CG Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev-0)
3.2 Fire watch requirements. The Contractor shall refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec
0000, in accomplishing the following task:
Provide portable fire extinguishers for Coast Guard fire watch personnel. Coast Guard fire watch is in lieu of contractor personnel during the hours of 0800-1600, Monday through Friday, and limited to two Coast Guard fire watch personnel.
Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes
(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC
Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable
Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is a federal Large
Quantity Generator (LQG) of hazardous waste (EPA ID #AK9690330472) and is a RCRA-permitted hazardous waste management facility.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility
3 (Rev-0)
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste
Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the
Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the
Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix B, Requirements For
Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor shall be aware of the following:
3.5.6.1 No Contractor or Subcontractor shall have the authority to sign a Hazardous Waste Manifest using the
Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast
Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor shall prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor shall furnish the FRP when required for over-the-water liquids transfers to and from vessels, and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. None.
3.7 Split-phase scheduling of work. The following work items shall be completed during the second period of performance due to crew habitability concerns:
Work Item 11, Reserve Feedwater Tank, Repair and Preserve
Work Item 16, Boiler Steam Piping, Repair
Work Item 19, Boiler, Tube Renewal Partial
4 (Rev-0)
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
6 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK ITEM
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
7 (Rev-0)
QA-3A - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
TIME
8 (Rev-0)
QA-3B - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT QA
RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading
(mils)
Mean Reading (mils) IAW ASTM DD4417).
9 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK ITEM
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
10 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic
Pull-Off (Type I/Banana) Gauge Is
Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATION
1 AVG. BMR DEVIATION
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
11 (Rev-0)
12305_0420_FLT
REC_12311_FLT_282’ WMEC (39 CGC ALEX HALEY) only vessel in class (0717)
WORK ITEM 1: Tanks (MP Fuel Service), Clean and Inspect
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean and inspect the following tank(s):
TABLE 1 - FUEL SERVICE TANKS
TYPE OF TANK LOCATION
CAPACITY - 95%
(GALLONS)
LOW SUCTION
(GALLONS)
JP5 1-34-3-F 125 5
Diesel Service 2-24-2-F 355 40
Diesel Service 5-30-1-F 2,393 50
Diesel Service 5-30-2-F 2,393 50
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 282-WMEC 102-001, Rev D, Double Bottom Amidships
Coast Guard Drawing 282-WMEC 114-003, Rev G, Main Bulkheads (Aft)
Coast Guard Drawing 282-WMEC 114-004, Rev G, Main Bulkheads (Fwd)
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2018, Welding and Allied Processes
OTHER REFERENCES
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2019, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets
MIL-DTL-1222, Dec 2000, Studs, Bolts, Screws and Nuts for Applications Where a High Degree of Reliability Is Required
12 (Rev-0)
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a Critical Inspection Report as required by the following paragraphs:
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
Fuel
Piping
Tank access cover
3.1.4.1 The Contractor shall remove up to a total of 150 gallons of fuel. Document a complete chain of custody record of the removed tank contents from the vessel to the point of final destination or delivery.
Submit document to the COR upon completion of work.
3.1.4.2 Dispose of removed fluids in accordance with all applicable Federal, state, and local regulations
(see 4.2 (Tank content restoration)).
NOTE
Vessel may come in with less tank fluid contents than specified above.
3.1.5 Work coordination. If this work item is completed during Phase 1, one of the above listed diesel service tanks shall remain online to fuel the boilers.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.2 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast Guard
Personnel perform an initial operational test of the equipment listed below to demonstrate existing operational condition. Submit a CFR.
Designated tank TLIs
3.3 Plug log. The Contractor shall keep a written record of all plugs put in any tanks vents. A separate list shall be kept for each tank being entered.
13 (Rev-0)
3.3.1 Ensure that all plugs are removed from each tank upon completion of work in the tank.
3.3.2 Ensure the plug log is available to the Coast Guard inspector when the inspector is performing his close-out inspection on each tank.
NOTE
Initial and post repair operational tests apply only to tanks that possess TLIs.
3.4 Cleaning requirements. The Contractor shall remove tank cover(s) and clean tank interior surfaces free of all foreign materials, such as residual fuel or water, sediment, sludge, rust, or biological growth, taking care not to damage the coating system (if applicable). Remove cleaning media and residues continuously during the washing process. Remove any residual wash media; and wipe up residual moisture with clean lint-free cloths. The Contractor shall refer to Coast Guard Drawings 282 WMEC
102-001, 282 WMEC 114-003, and 282 WMEC 114-004 for guidance.
3.5 Tank content and waste disposal. The Contractor shall dispose of residual tank contents and any cleaning fluids in compliance with all applicable Federal, state, and local laws, ordinances and regulations. Document a complete chain of custody record of the removed tank contents and generated wastes, from the vessel to the point of final destination or delivery. Submit document to the COR upon completion of work.
3.6 Inspection. The Contractor shall accomplish the following tasks:
3.6.1 Visually inspect all tank interior surfaces, including, but not limited to bulkheads, floor and overhead plating, structural members, manhole cover surfaces, fasteners and gasket seating surfaces.
Submit a CFR including the following, as applicable:
Tank structural condition.
Inaccessible areas.
Condition of tank coating, including measurements taken, percentage, location, and type of coating failure (if tank interior surfaces are coated).
Tank level indicator (TLI) and/or float switch condition, as applicable.
Sounding/vent tube and striker plate condition.
Suction and discharge piping condition.
Fastener material and condition (correct fastener material is stainless steel).
3.7 Tank closing. The Contractor shall accomplish the following after completion of all KO-authorized repairs and/or preservation procedures:
3.7.1 For unpainted fuel tank(s) that are not ballasted, apply a heavy coat of lube oil to the entire tank interior(s).
3.7.2 Ensure that the tank(s) remain open for at least 24 hours. Notify the COR at least 24 hours prior to closing the tank(s). After satisfactory inspection by the Coast Guard Inspector and completion of all authorized repairs, close tank manhole cover(s) with new gasket material conforming to AMS-C-6183.
Chase threads on studs to ensure even installation of the access covers. Renew any damaged or missing fasteners. Use MIL-DTL-1222 as guidance. Existing undamaged fasteners may be reused. For purpose of bid, assume 10% of existing fasteners will require renewal. Renew all Nylock hex nuts.
14 (Rev-0)
NOTES
For cutters with unpainted fuel tanks, the 24 hour tank opening period begins after completing the lube oil coating.
Coast Guard personnel will operate all shipboard machinery and equipment.
3.8 Operational test, post repairs. After completion of work and in the presence of the Coast Guard
Inspector, the Contractor shall thoroughly test and demonstrate the equipment listed below to be in satisfactory operating condition. Submit a CFR.
Designated tank TLIs
Vent check valves
4. NOTES
4.1 Tank content removal. The Ship’s force will pump down the tanks to the maximum extent possible with the installed pumping system.
4.2 Tank content restoration. The Ship’s force will procure new fluids and refill all tanks at the appropriate time.
15 (Rev-0)
52040_0320_FLT
REC_52040_FLT_282’ WMEC (39 CGC ALEX HALEY) only vessel in class (1210)
WORK ITEM 2: Sea Strainers (All Sizes), Renew
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to renew the following sea strainer(s):
TABLE 1 – STRAINERS
SERVICE
SIZE
(INCHES)
TYPE
(DUPLEX/SIMPLEX)
QTY MANUFACTURER
MSW 8 in Duplex 1 Plenty
ASW 1.5 in Duplex 1 Titan
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
N Plenty D-Type 8 in Strainer DXAB-0800A4-V 1 ea. 35,750.00
N Titan 1.5 in Duplex Strainer DS-695 1 ea. 4,526.00
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 282-WMEC 245-002, Rev P, Main Propulsion Diesel Engine Cooling
Water System Diagram
Coast Guard Drawing 282-WMEC 601-002, Rev H, Booklet of General Plans
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3486D, SWBS 531, Jun 2012, Reverse Osmosis
Desalination Plant – Model RC7000
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2018, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2018, Requirements for Preservation of Ship Structures
ASTM International (ASTM) D1330, 2015, Standard Specification for Rubber Sheet Gaskets
16 (Rev-0)
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) G-6032, 2014, Grease, Plug Valve, Gasoline and Oil Resistant, NATO Code Number G-363, Metric
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces in the vicinity of the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below:
Deck plates and grating
Associated sea valve and waster pieces.
Piping
Deck plate supports
3.2 Renewal. The Contractor shall renew and test the designated strainers (see paragraph 1.1 (Intent)), shown on Coast Guard Drawings 282-WMEC 245-002. The Contractor shall accomplish the following for each sea strainer in accordance with manufacturer’s recommendations:
3.2.1 Removal. Secure, isolate, tag-out, and remove the designated sea strainers. Install blank flanges and gaskets over the piping system openings and secure with at least two bolts 180-degrees apart to provide a watertight seal. Ensure that the blank flanges are installed immediately after the sea strainers are removed and remain in-place until new strainers are installed. Turn over the removed strainers to the Coast Guard
Property Administrator for disposition.
3.2.2 Plug valve testing. Where applicable, lubricate the valves with plug valve grease conforming to
AMS-G-6032. Hydrostatically test the plug valves of all duplex strainers for each strainer chamber, at a test pressure of 12 psig. To determine leakage rate, the strainer shall have the outlet blanked and the unpressurized side top cover removed (two tests per duplex strainer). While maintaining the test pressure at the inlet side, the non-pressurized side shall not fill within twenty minutes. Provide a CFR which shall include, but is not limited to, the following information:
Grease type, including batch number and manufacturer.
17 (Rev-0)
Time elapsed for chamber to fill, if less than twenty minutes.
CAUTION
Ensure that the drain valve for each chamber is closed.
3.3 Installation. After completion and acceptance by the Coast Guard Inspector, the Contractor shall install all new strainers to the original locations, as shown on Coast Guard Drawings 282-WMEC 245-
002. Renew all gaskets with material conforming to ASTM D1330 of the same size and configuration as those gaskets removed. Renew all hardware with nickel-copper alloy (Monel) fasteners.
3.3.1 The contractor shall correct ASW inlet piping for the reverse osmosis unit to accept the GFE 1.5in strainer with flanged connections. Perform all work in accordance with SFLC Std Spec 0740. See Figure
1.
3.4 Notification. The Contractor shall notify the Coast Guard Inspector at least 24 hours prior to installing sea strainers.
3.5 Leak test. After completing all authorized mechanical (i.e. threaded, bolted, etc.) joint repairs, the
Contractor shall test the seawater system's operation using the system fluid at normal operating pressure.
Ensure zero visible leakage from or deformation of mechanical parts by repairing all leaks and discrepancies. Submit a CFR.
3.6 Surface preservation. The Contractor shall perform 100% preservation in accordance with SFLC Std
Spec 6310, Appendix B (Cutter and Boat Interior Painting Systems) on the following interior surfaces:
Sea strainer surfaces
3.6.1 Preparation method. The Contractor shall prepare interior surfaces using system specified for
“Bilges, Cofferdams and Forepeaks, Steel, Option II”
3.6.2 Coating method. The Contractor shall apply finish/top coat color to interior surfaces as follows:
match existing adjacent surfaces. Do not paint packing glands, valve stems, threads, and similar…