Attachment 5 General Condition Breakdown.docx

DOCX document 13 KB Posted

Attached to
Y1DA--596-22-101- Replace Overhead Paging System
Solicitation number
36C24925R0039
Issued by

About this file

The attachment is a General Condition Breakdown document detailing project management and site condition requirements for a construction project. The document outlines comprehensive project staffing needs, including roles such as Superintendent, Safety Manager, CPM Scheduler, Project Manager, and Field Office Support Staff. Additionally, the breakdown includes detailed provisions for site conditions and temporary infrastructure, covering aspects like temporary power, water, electrical hookups, communication systems, site protection, security, and documentation measures.

The related federal contract opportunity is a Department of Veterans Affairs solicitation (36C24925R0039) for the Veterans Health Administration Veterans Integrated Service Network 9, specifically focused on replacing an obsolete overhead paging system. The solicitation number Y1DA--596-22-101 indicates a targeted infrastructure upgrade project for the VA healthcare network, with the primary objective of modernizing communication systems within a medical facility or network.

View the file

Other files

File Type Posted
Attachment 1 - 36C24925R0039 Replace Obsolete Overhead Paging RFIs.pdf PDF
Attachment 2 - 21-306 Lexington Paging Pre-Bid Wall Types.pdf PDF
36C24925R0039 0006.docx DOCX document
36C24925R0039 0005.docx DOCX document
Sign-in Sheet - 596-22-101- Replace Obsolete Overhead Paging System - 6-25-25.pdf PDF
36C24925R0039 0004.docx DOCX document
Sign-in Sheet - 596-22-101- Replace Obsolete Overhead Paging System-02.pdf PDF
Sign-in Sheet - 596-22-101- Replace Obsolete Overhead Paging System.pdf PDF
Header - List of Attachments.docx DOCX document
36C24925R0039 Replace Obsolete Overhead Paging _ RFI_s.pdf PDF
36C24925R0039 0003.docx DOCX document
36C24925R0039 0002.docx DOCX document
36C24925R0039 0001.docx DOCX document
Attachment 6 Past Performance Questionnaire.docx DOCX document
Attachment 2 Drawings.pdf PDF
Attachment 1 Specifications.pdf PDF
Attachment 8 Request For Information Form.docx DOCX document
Attachment 4 Calc. of Self Performed Work General Contractor.xlsx XLSX spreadsheet
Attachment 3 Pricing Schedule.xlsx XLSX spreadsheet
Attachment 9 Wage Determination - KY20250090 - Modification 5 - 6-6-25.pdf PDF
Attachment 7 Contractor EMR Certification.docx DOCX document
36C24925R0039_1.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Management:

Superintendent(s)

Safety Manager

CPM Scheduler

Quality Assurance/Quality Control

Project Manager (s)

Project Executive

Field Office Engineer

Field Office Support Staff

Project Expeditor

Assistant Superintendent (s)

Project Manager Subtotal

Bonds and Insurance (excluding any for Subcontractors):

Builder’s Risk Insurance

General Liability Insurance

Security, Payment & Performance Bonds

Bonds and Insurance Subtotal:

Site Conditions:

Temporary Power Consumption (Offices)

Temporary Power Consumption (General Site Use)

Temporary Water and Sewer Consumption

Temporary Water Hookup, Distribution & Meters

Temporary Electrical Hookup, Distribution & Meters

Temporary Telephone & Network System Installation

Temporary Telephone & Internet Consumption Fees

Temporary Fire Protection

Temporary Heating & Cooling

Temporary Fencing

Temporary Covered Walkways

SWPPP Measures

Temporary Entries and Truck Washes

Street Cleaning (by G.C.)

Traffic Control Measures

Temporary Barricades & Signage

Temporary Roads & Walkways (install & maintenance)

Temporary Lighting

Temporary Partitions & Covered Floor Openings

Temporary Toilets/Sanitary Measures

Temporary Laydown (prep and restoration)

Security System/Watchman

Pre-construction Photo Documentation

Progress Photos

Temporary Protection (in place work/adjacent structures)

File details come from the government source that posted it. Updated .