Attachment 2 - 21-306 Lexington Paging Pre-Bid Wall Types.pdf

PDF 23 MB Posted

Attached to
Y1DA--596-22-101- Replace Overhead Paging System
Solicitation number
36C24925R0039
Issued by

About this file

The document is a comprehensive set of architectural and engineering drawings for a Public Address and Mass Notification (PAMNS) system replacement project at the VA Medical Center in Lexington, Kentucky. The project, identified as VA Project Number 596-22-101, involves replacing the existing obsolete overhead paging system across multiple buildings in the Sousley Campus, including Buildings 1, 2, 3, 4, 12, 16, 17, 25, 27, 28, and 29.

The drawings provide detailed floor plans for each building, specifying speaker locations, zones, and technical infrastructure requirements. Key technical specifications include using a Biamp Vocia paging system, installing new speaker assemblies, implementing fiber optic and copper cabling, setting up new equipment cabinets, and ensuring compliance with VA standards, NFPA codes, and Americans with Disabilities Act requirements. The project involves comprehensive wiring, conduit installation, and integration of paging stations across various building floors, with a focus on creating a robust, campus-wide communication system. The design documents are dated February 29, 2024, and prepared by Apogee Consulting Group for the VA Medical Center.

View the file

Other files

File Type Posted
Attachment 1 - 36C24925R0039 Replace Obsolete Overhead Paging RFIs.pdf PDF
36C24925R0039 0006.docx DOCX document
36C24925R0039 0005.docx DOCX document
Sign-in Sheet - 596-22-101- Replace Obsolete Overhead Paging System - 6-25-25.pdf PDF
36C24925R0039 0004.docx DOCX document
Sign-in Sheet - 596-22-101- Replace Obsolete Overhead Paging System.pdf PDF
36C24925R0039 Replace Obsolete Overhead Paging _ RFI_s.pdf PDF
36C24925R0039 0003.docx DOCX document
Sign-in Sheet - 596-22-101- Replace Obsolete Overhead Paging System-02.pdf PDF
Header - List of Attachments.docx DOCX document
36C24925R0039 0002.docx DOCX document
36C24925R0039 0001.docx DOCX document
Attachment 1 Specifications.pdf PDF
Attachment 4 Calc. of Self Performed Work General Contractor.xlsx XLSX spreadsheet
Attachment 3 Pricing Schedule.xlsx XLSX spreadsheet
Attachment 6 Past Performance Questionnaire.docx DOCX document
36C24925R0039_1.docx DOCX document
Attachment 7 Contractor EMR Certification.docx DOCX document
Attachment 5 General Condition Breakdown.docx DOCX document
Attachment 2 Drawings.pdf PDF
Attachment 8 Request For Information Form.docx DOCX document
Attachment 9 Wage Determination - KY20250090 - Modification 5 - 6-6-25.pdf PDF
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project Number

Revisions: Date

CONSULTANTS:

DECEMBER 1, 2023 HTJDM

REPLACE OBSOLETE

OVERHEAD

PAGING SYSTEM

596-22-101

VA MEDICAL CENTER LEXINGTON

1101 VETERANS DRIVE

LEXINGTON, KENTUCKY 40502

21-306

100% BID DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects U.S. Department of Veterans Affairs 53

G-001

PROJECT COVER SHEET

REPLACE PAGING SYSTEM

VA MEDICAL CENTER LEXINGTON

1101 VETERANS DRIVE

LEXINGTON, KENTUCKY 40502

VA PROJECT #: 596-22-101 APOGEE PROJECT #: 21-306

PROJECT SITE MAP BOWLING PROJECT SITE MAP SOUSLEY

PROJECT IMAGE

PROJECT LOCATION

BOWLING CAMPUS

PROJECT IMAGE

SOUSLEY CAMPUS

PROJECT LOCATION

FEBRUARY 29, 2024

CABLES AND CONNECTORS COLOR LEGEND

TELEPHONE

DESCRIPTION

ITEM JACK CABLE PATCH CABLES I.D. NOTES

DATA/COMPUTER

FIBER - MULTI-MODE

SOUND SYSTEM

WHITE

BLUE

BLACK

N/A

WHITE

BLUE

AQUA

GREEN

WHITE

BLUE

AQUA

N/A

T

C

FO

SS

4 PAIR CABLE

4 PAIR CABLE

6/12/24/36

MULTI COLOR

CONDUCTORS

DUPLEX RECEPTACLE

SIMPLEX RECEPTACLE

EMERGENCY POWER RECEPTACLE

CLEAN RECEPTACLE

SPLIT WIRED RECEPTACLE

HIGH VOLTAGE RECEPTACLE

QUADRUPLEX RECEPTACLE

GFI RECEPTACLE

GFI

DED

DED DUPLEX RECEPTACLE

DED SIMPLEX RECEPTACLE

DED

PP POWER POLE

RECEPTACLES

SURFACE DOOR

SURFACE DOOR

RECESSED

SURFACE

PANELS

SPEAKER 8" ROUND CEILING MOUNTED

SPEAKER 10" x 10" SQUARE CEILING MOUNTED

CEILING TYPE#

#'-#" CEILING HEIGHT

SPEAKER SYMBOL LEGEND

VOLUME CONTROL MOUNTED AT 48"AFF

SPEAKER 10" x 10" WALL MOUNTS

VC

S

S

WALL HORN

LINE TYPE

LEGEND:

CEILING

BOUNDARY

2 x 2 DROP CEILING

HARD CEILING

2 x 4 DROP CEILING

GYP CEILING

UNFINISHED CEILING

1' x 2' METAL PAN CEILING

1' x 1' ACOUSTIC CEILING

PAMN PAMN EQUIPMENT CABINET

PS PAGING STATION

PAGING SYSTEM PHASING

1. INSTALL NEW PAGING HEAD END EQUIPMENT IN ROOMS AS INDICATED ON PLANS.

2. INSTALL NEW PAGING EQUIPMENT IN EACH RACK FOR FLOORS AS SHOWN.

3. INSTALL NEW PAGING BACKBONE CABLING TO THE NEW PAGING EQUIPMENT FROM THE HEAD END

EQUIPMENT.

4. CONNECT AND TERMINATE THE BACK BONE CABLING.

5. INSTALL NEW ZONE AMPLIFIERS IN EACH EQUIPMENT RACK.

6. COORDINATE INTERCONNECTION BETWEEN HEAD END AND ZONE AMPS.

7. INSTALL NEW CABLING AND NEW SPEAKERS.

8. REPLACE/INSTALL CHANGE OVER ALL SPEAKERS TO NEW CABLING.

9. CHANGE OVER ALL SPEAKER CIRCUITS TO NEW SYSTEM.

10. REMOVE ALL OLD PAGING EQUIPMENT.

A1 b

E1 c d

T1

'LPN'

THE LIGHTING FIXTURE TYPE IS INDICATED BY AN UPPER CASE LETTER OR AN UPPER

CASE LETTER AND NUMBER.

THE SWITCH DESIGNATION (IF NEEDED) IS INDICATED BY A LOWER CASE LETTER.

EXAMPLE: LIGHTING FIXTURE TYPE 'A1' IS CONTROLLED BY SWITCH 'b'.

EXIT SIGNS: STEM INDICATES WALL MOUNTING. NO STEM INDICATES CEILING

MOUNTING. SHADED AREA INDICATES ILLUMINATED FACE(S). ARROW INDICATES

DIRECTIONAL ARROW ON ILLUMINATED FACE(S).

DEVICES: THE SWITCH DESIGNATION IS INDICATED BY A LOWER CASE LETTER.

THE CONTROL DEVICE DESIGNATION IS INDICATED BY A LOWER CASE LETTER.

TRANSFORMERS: THE TRANSFORMER TYPE IS INDICATED BY A NUMBER

FOLLOWING THE UPPER CASE LETTER 'T'. SEE THE TRANSFORMER SCHEDULE OR

THE SINGLE LINE DIAGRAM FOR THE TRANSFORMER DESCRIPTION AND

REQUIREMENTS.

PANELBOARDS: PANELBOARD DOORS MAY BE SHOWN TO INDICATE OPENING

SIDE OF RECESSED PANELBOARDS. SEE PANELBOARD IDENTIFICATION FOR

DESIGNATION CODES.

SHEET KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE NOTE

NUMBER INDICATED IN THE HEXAGON.

HOME RUN TO BRANCH CIRCUIT PANEL: THE PANEL DESIGNATION AND CIRCUIT

DESIGNATION ARE SHOWN ADJACENT TO THE HOME RUN ARROW.

CIRCUIT BREAKER SIZES (AMPS/NUMBER OF POLES) ARE SHOWN IN THE PANEL

SCHEDULE WITH THE CORRESPONDING PANEL AND CIRCUIT DESIGNATION.

SYMBOL NOTATIONS: UPPER CASE LETTERS ADJACENT TO SYMBOLS INDICATE

A UNIT TYPE. SEE APPROPRIATE SCHEDULE OR SPECIFICATIONS.

'LPN'-1,3,5

EXAMPLE 1: WALL MOUNTED EXIT SIGN TYPE 'E1' WITH SINGLE FACE

AND DIRECTIONAL ARROW.

EXAMPLE 2: CEILING MOUNTED EXIT SIGN TYPE 'E2' WITH DOUBLE

FACE AND DIRECTIONAL ARROWS.E2

EXAMPLE: SPLIT DUPLEX RECEPTACLE; ONE RECEPTACLE OUTLET IS

CONTROLLED BY SWITCH 'c'.

EXAMPLE: SINGLE POLE SWITCH 'd' TO CONTROL LIGHTING FIXTURES INDICATED BY 'd'.

EXAMPLE: TRANSFORMER TYPE 'T1'.

EXAMPLE: HOME RUN TO PANELBOARD 'LPN'; CIRCUITS 1, 3, 5.

# DEMOLITION KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE

NOTE NUMBER INDICATED IN THE SQUARE.

TECHNOLOGY GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

PROVIDE COMMUNICATIONS DEVICES AND EQUIPMENT IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT, LATEST EDITION OF THE NATIONAL ELECTRICAL CODE, BICSI STANDARDS, AND VA

STANDARDS.

PROVIDE ADDITIONAL SUPPORT FOR DEVICES AND EQUIPMENT WHERE BUILDING CONSTRUCTION IS NOT

SUITABLE FOR DIRECT MOUNTING.

FIRESTOP, DRAFTSTOP, SMOKESTOP OR PROTECT ANNULAR SPACE AROUND PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILINGS, AND ROOF IN ACCORDANCE WITH REQUIREMENTS OF NFPA 70, UL

LISTING REQUIREMENT AND APPLICABLE BUILDING CODES.

PROVIDE CABLING THAT COMPLIES WITH THE LATEST EDITION OF TELECOMMUNICATIONS DISTRIBUTION

METHOD MANUAL AND ANSI/TIA/EIA PUBLICATIONS.

COMPLY WITH THE LATEST ANSI/TIA/EIA 758 AND 607B OR 607A - GROUNDING AND BONDING REQUIREMENTS

FOR TELECOMMUNICATIONS IN COMMERCIAL BUILDING.

COMPLY WITH THE LATEST ANSI/TIA/EIA 568B - COMMERCIAL BUILDING TELECOMMUNICATIONS WIRING

STANDARD.

COMPLY WITH THE LATEST ANSI/TIA/EIA 569B - COMMERCIAL BUILDING STANDARD FOR TELECOMMUNICATIONS

PATHWAYS AND SPACES.

COMPLY WITH THE LATEST NFPA 70 NATIONAL ELECTRICAL CODE.

COMPLY WITH THE LATEST NFPA 99 HEALTHCARE FACILITIES CODE.

COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE.

COORDINATE WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION.

MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES TO INDICATE A QUALITY STANDARD AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER.

PRODUCTS DEEMED EQUAL AND APPROVED BY THE COR WILL BE ACCEPTABLE. COMPLY WITH "BUY AMERICAN

ACT".

MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, BOXES, OUTLET, OR EQUIPMENT UNLESS NOTED

OTHERWISE.

PROVIDE RGS OR EMT CONDUIT UNLESS OTHERWISE NOTED.

PROVIDE MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT LABEL LISTED BY APPROVED THIRD PARTY

TESTING AGENCY.

NOTIFY COR REGARDING DISCREPANCY BETWEEN PLANS AND SPECIFICATIONS FOR CLARIFICATION. THE

MORE STRINGENT OF THE THEM SHALL TAKE PRECEDENCE.

PROVIDE TIA/EIA CAT 6 COPPER OUTLETS AND CONNECTORS.

ALL WORK AREA OUTLETS SHALL BE 8 PIN, CAT 6 KEYSTONE JACK WIRED PER T568A OR T568B AS DIRECTED

BY THE VA COR.

LABEL DEVICES IN ACCORDANCE WITH LATEST ANSI/TIA 606A OR 606B EDITION AS WELL AS THE STANDARDS

SET FORTH BY THE VA HOSPITAL OIT.

PROVIDE A MINIMUM OF 12" CLEARANCE ABOVE THE CABLE TRAY PER TIA/EIA 569.B PARAGRAPH 4.5.6.2.

ALL CABLING INSTALLED ABOVE CEILING SHALL BE PLENUM RATED.

MINIMUM CONDUIT SIZE TO BE USED IS 1-1/4".

DEVICES PLACED IN INTERCOMMUNICATION ROOM TO BE MOUNTED ON FIRE RETARDANT PLYWOOD.

24. CONTRACTOR SHALL USE PRE-ASSEMBLED FIRE SLEEVES OR SHALL USE 3RD-PARTY FIRE PENETRATION INSTALLER

AND INSPECTOR.

25. BASIS OF DESIGN UTILIZED IN THIS DESIGN IS THE BIAMP VOCIA PAGING SYSTEM. ALTERNATES TO THE BASIS OF DESIGN ARE ACCEPTABLE UPON MEETING OR EXCEEDING THE FUNCTIONALITY OF THE SYSTEM AS DESIGNED.

26. CONTRACTOR SHALL TRACK AND NOTE ORDER OF SPEAKERS AND DEVICES IN SPEAKER CIRCUITS, AND PROVIDE

RECORD DRAWINGS INDICATING THE ORDERING OF DEVICES.

27. LIST OF AREAS THAT ARE AFTER HOUR TO BE PROVIDED BY THE VA. CONTRACTOR TO COORDINATE ALL WORK

WITH VA COR AT LEAST THREE WEEKS PRIOR TO WORK.

ADO AUTOMATIC DOOR OPERATOR

AFF ABOVE FINISH FLOOR

BOD BASIS OF DESIGN

CCTV CLOSED CIRCUIT TELEVISION

COAX COAXIAL CABLE

COMM COMMUNICATION

COR CONTRACTING OFFICER REPRESENTATIVE

DC DOOR CONTACT SWITCH

DN DOWN

DO DOOR OPERATOR

DVC DIGITAL VOICE COMMAND

DVR DIGITAL VIDEO RECORDER

E EXISTING DEVICES

EEB EMERGENCY EXIT BUTTON

EL ELECTRICAL STRIKE

ETR EXISTING TO REMAIN

FA FIRE ALARM

FACP FIRE ALARM CONTROL PANEL

FAAP FIRE ALARM ANNUNCIATOR PANEL

FO FIBER OPTIC

FAGAP FIRE ALARM GRAPHIC ANNUNCIATOR PANEL

IT INTERCOMMUNICATION ROOM

MATV MASTER ANTENNA TELEVISION

MM MULTI MODE FIBER

NAC NETWORK APPLIANCE CIRCUIT PANEL

N NEW DEVICES

NCA NETWORK CONTROL ANNUNCIATOR

NS NO SCALE

NTS NOT TO SCALE

NVR NETWORK VIDEO RECORDER

TECHNOLOGY ABBREVIATIONS LIST

OC ON CENTER

OIT OFFICE OF INFORMATION TECHNOLOGY

PACS PHYSICAL ACCESS CONTROL SYSTEM

PAMN PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEM

PB PUSH BUTTON

PBB PRIMARY BONDING BUSBAR

PDU RACK POWER DISTRIBUTION UNITS

POE POWER OVER ETHERNET

PR PAIR

RBB RACK BONDING BUSBAR

RX REQUEST TO EXIT

SBB SECONDARY BONDING BUSBAR

SEP SERVICE ENTRANCE PROTECTION

SLC SIGNALING LINE CIRCUIT

SM SINGLE MODE FIBER

TBB TELECOM BONDING CONDUCTOR

TEL TELEPHONE

TGB TELECOM GROUND BUS BAR

TM TELEMONITORING

TMGB TELECOM MAIN GROUND BUS BAR

TP TWISTED PAIR

TR TELECOM ROOM

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

WM WIRE MANAGEMENT

WAP WIRELESS ACCESS POINT

UL UNDERWRITERS LABORATORY

UPS UNINTERRUPTIBLE POWER SUPPLY

UTP UNSHIELDED TWISTED PAIR

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT AND WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE AND VA

STANDARDS.

PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS WHERE THE BUILDING

CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.

FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL

ELECTRICAL CODE, UL LISTING REQUIREMENT AND THE APPLICABLE BUILDING CODES.

VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL REQUIRED MOUNTING HARDWARE TO

SUIT THE PARTICULAR INSTALLATION.

PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING CONSTRUCTION.

BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG COPPER MINIMUM.

COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS TO AVOID CONFLICT DURING

CONSTRUCTION.

ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR SPARE, OR SPACE.

MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES, TO INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER. PRODUCTS DEEMED EQUAL AND APPROVED BY THE DESIGNER WILL BE ACCEPTED. ALL PRODUCTS MUST COMPLY WITH "BUY AMERICAN ACT".

ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR PARTICULAR EQUIPMENT

MANUFACTURER'S SPECIFICATIONS.

CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED ON THE DEVICE'S SCREW

TERMINALS.

MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR EQUIPMENT UNLESS NOTED

OTHERWISE.

ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.

ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.

ALL CONDUIT SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED. FMC CONDUIT SHALL BE USED ON VIBRATING EQUIPMENT (MAXIMUM LENGTH OF 6 FEET). PVC SHALL BE USED FOR UNDERGROUND CONDUIT OR WHERE CONCRETE- ENCASED. WHERE VIBRATING EQUIPMENT IS LOCATED OUTSIDE, LFMC CONDUIT SHALL BE USED (MAXIMUM SIX FEET) FOR

FINAL CONNECTIONS.

ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN APPROVED THIRD

PARTY TESTING AGENCY.

FOR ALL LED FIXTURES, THE FIXTURE MUST BE CAPABLE OF SELF-RESETTING TO THE SWITCHED/CONTROLLED STATE DURING ANY FLUCTUATION IN POWER SUPPLY WHERE AUTOMATIC PROTECTIVE MEASURES DISABLE THE LED LAMPS.

PROVIDE A LETTER OR STATEMENT FROM THE MANUFACTURER, OR OTHER ACCEPTABLE PROOF, THAT ALL LED FIXTURES, WITH OR WITHOUT BROWNOUT PROTECTION, WILL RETURN TO THE SWITCHED/CONTROLLED STATE AUTOMATICALLY.

PROVIDE STATEMENT WITH THE FIXTURE SUBMITTALS.

IN CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK , AS DETERMINED BY THE GOVERNMENT, SHALL BE

PROVIDED.

COMPRESSION COUPLINGS SHALL BE USED. NO SET SCREW FITTINGS ARE ALLOWED.

MINIMUM CONDUIT SIZE TO BE USED IS 3/4".

FEEDER TAGS APPENDED WITH 'VD' ARE UPSIZED IN AMPACITY DUE TO VOLTAGE DROP.

LEGEND

E

D

R

N

EXISTING TO REMAIN

EXISTING TO BE DEMOLISHED

EXISTING TO BE REPLACED

NEW DEVICES

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project Number

Revisions: Date

CONSULTANTS:

DECEMBER 1, 2023 HTJDM

REPLACE OBSOLETE

OVERHEAD

PAGING SYSTEM

596-22-101

VA MEDICAL CENTER LEXINGTON

1101 VETERANS DRIVE

LEXINGTON, KENTUCKY 40502

21-306

100% BID DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects U.S. Department of Veterans Affairs 53

T-001

TECHNOLOGY GENERAL NOTES,

SYMBOL LEGEND & ABBREVIATIONS

ELECTRICAL SYMBOL NOTES ELECTRICAL GENERAL NOTES

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project Number

Revisions: Date

CONSULTANTS:

FEBRUARY 29, 2024 HTJDM

REPLACE OBSOLETE

OVERHEAD

PAGING SYSTEM

596-22-101

VA MEDICAL CENTER LEXINGTON

1101 VETERANS DRIVE

LEXINGTON, KENTUCKY 40502

21-306

100% BID DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

X

53Engineers Architects U.S. Department of Veterans Affairs

TS-101

BOWLING SITE PLAN

1 BOWLING SITE PLAN

SCALE: 1" = 50

NORTH

PLAN

0 25' 50' 100'

A. PROVIDE NEW 4 STRAND OS2 OUTDOOR FIBER

TO PAMNS EQUIPMENT LOCATED AT EACH

BUILDING IN 2" CONDUIT WITH INNERDUCT, FROM

BUILDING 1 MAIN HEAD END EQUIPMENT RACK.

B. CONTRACTOR SHALL UTILIZE EXISTING BUILDING

PATHWAYS AND BUILDING CONNECTORS FOR

CABLING ORIGINATING AT BUILDING 1.

1. UTILIZE EXISTING INNERDUCT ROUTING

THROUGH TUNNEL TO PROVIDE COVERAGE TO

CHILLER PLANT. REFERENCE T-101A.

2. CHILLER PLANT BUILDING.

U G

T

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGTU

G T

UGT

UGT

UGT

UGT

UGT

UG

T

UG

T

UGT

UGT

UGT

UGT

U G

T U

G T

U G

T U

G T

U G

T U

G T

U G

T U

G T

UGT

UG

T

UG

T

UG

T

UG

T

UG

T

UG

T

UG

T

U G

T

UGT UGT UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

U G

T U

G T

U G

T U

G T

U G

T U

G T

U G

T U

G T

U G

T U

G T

UG

T

U G

T

U G

T

U G

T

U G

T

UGT UGT

UGT UGT UGT UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGTUGTUGT

UGTUGT

U G

T U

G T

U G

T U

G T

U G

T U

G T

U G

T U

G T

U G

T U

G T

U G

T U

G T

B25

B17

B1

B3

B2

B16

B29B28

B27

B4

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project Number

Revisions: Date

CONSULTANTS:

DECEMBER 1, 2023 HTJDM

REPLACE OBSOLETE

OVERHEAD

PAGING SYSTEM

596-22-101

VA MEDICAL CENTER LEXINGTON

1101 VETERANS DRIVE

LEXINGTON, KENTUCKY 40502

21-306

100% BID DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

X

53Engineers Architects U.S. Department of Veterans Affairs

TS-102

SOUSLEY SITE PLAN

1 SOUSLEY SITE PLAN

SCALE: 1" = 50

NORTH

PLAN

0 25' 50' 100'

A. PROVIDE NEW 4 STRAND OS2 OUTDOOR FIBER

TO PAMNS EQUIPMENT LOCATED AT EACH

BUILDING IN 2" CONDUIT WITH INNERDUCT, FROM

BUILDING 1 MAIN HEAD END EQUIPMENT RACK.

B. CONTRACTOR SHALL UTILIZE EXISTING BUILDING

PATHWAYS AND BUILDING CONNECTORS FOR

CABLING ORIGINATING AT BUILDING 1.

1. FOR BUILDING 12, CONTRACTOR SHALL UTILIZE

EXISTING UNDERGROUND PATHWAY TO PROVIDE

NEW FIBER CONNECTION IN INNERDUCT, FROM

BUILDING 1.

UP

UP DN

GARAGE GATE

UP

MOTOR

CYCLE PARKING

WHEEL

CHAIR PARKING

DN

ATM

DN

RAISED FLOOR

GAS CYL

STORAGE

B005D

HAC

A006F

ELEC.

B009

ELECTRICAL

AU003

ELECTRICAL

AU002ELECTRICAL

AU001

SIGNAL CLOSET

D008

TOILET

FEMALE

B019

PREPARATION STERILIZATION

WORK RM

A005C

STORAGE

A008

FOOD

SERVICING

A006D

CLERK

TYPIST

A011

ASST

CHIEF

A012

CHIEF

A010

PARKING LEVEL A

PA01

MECH RM

D-B038

CORRIDOR

BH005

STORAGE

PA08

OTHER SPACE

PAM03

STORAGE

PA07

ELEVATOR

LOBBY

PA02

ELEVATOR

PAE05

ELEVATOR

PAE04

STAIRWELL

PAS05

EMERGENCY

GENERATOR

D003

TRANSFORMERS &

SWITCHGEAR

D003A

STORAGE

D006STORAGE

D005A

EMS

D005

MECH RM

D004

CORRIDOR

DH001

CORRIDOR

DH002

CORRIDOR

DH004

CORRIDOR

DH003

CORRIDOR

DH003

COMM EQUIP

RM

D007D

TD

D002

ELECTRICAL

D001

STAIR

PAS06 STAIR

PAS07

ELEVATOR

S7

ELEVATOR

S6

STORAGE AREA

PA06

PAINT SHOP

D007C

CARPENTER SHOP

D007

LOCKSMITH

D007B

CHIEF

D007A

CORRIDOR

DH005

STAIR

PAS08

CORRIDOR

BH002

M&O

FORMAN

B013

CHIEF

ELECTRICIAN

B014B

ELECTRIC SHOP

B014C

ELECTRONIC

B014

CORRIDOR

BH003

CORRIDOR

BH003

STORAGE

FLAMMABLE

B016

OFFICE

B017

STAFF

TOILET

B015A

WARE HOUSE

B015

STORAGE

GENERAL

B020

MAIL RM

B015B

EMS EQUIP

B021

TOILET

MALE

B018

SOILED

UTILITY

B022A

CORRIDOR

BH004

OFFICE

B022D

OFFICE

B022E

LOGISTICS SVC

INVENTORY MGMT

B022

OFFICE

B022C

OFFICE

B022B

OFFICE

B022A

EMERGENCY GENERATOR

RM

B037

TRANSFORMER RM

B037A

A/C REFRIGERATION

EQUIP RM

B038

CORRIDOR

BH004

ELECTRICAL DISTRIBUTION

RM

B037B

SVC RM

B039

CORRIDOR

BH006

CORRIDOR

BH006

HAS

B044

HAS

B044C

HAS

B044B

EMS OFFICE

B042A

EMS CHECK IN

B042B

SECY/

RECEPTIONIST

B-042

OFFICE

ASST CHIEF

WORK RM

B-042C

TOILET

B044A

IT

B046

EMS

B043

ELECTRIC

CLOSET

B043A

CHARTING

A032E

HALL

A032

CONFERENCE RM

A032D

RESIDENTS

OFFICE

A032C

SECY

OFFICE

A032B

PM&RS CHIEF'S

OFFICE

A032A

MAIN KITCHEN

B036

DISH

WASHING

A020

CONFERENCE M

A029

BREAK RM

B045A

SUPV OFFICE

B045

SURGICAL PACK

B045C

ENVIRONMENTAL

MGMT SUPPLY

B045D

STORAGE

B045B

MAIN KITCHEN

B036

LINEN

B036D

EMS

B036C

MENS

TOILET

B041

FEMALE

TOILET

B040

CANTEEN STORAGE

B036B

OFFICE

B035

STORAGE

B035A

DAIRY & EGG

REFRIG

B036G

OFFICE SUPVS

B036F

CORRIDOR

AH005

CORRIDOR

AH004

CORRIDOR

AH006

CORRIDOR

AH004

SECY

A028

DIETICIANS

OFFICE

A025A

ASST CHIEF

A027

DIETICIANS

OFFICE

A025EMS

A023

ELECTRIC

CLOSET

AU004

ELEVATOR

LOBBY

A000

ELEVATOR LOBBY

A001

BREAK RM

A021

ELEV

AE004

ELEV

AE005

EQUIP

STORAGE AREA

B001

STORAGE

& ISSUE

B034

OFFICE

A019

ELECTRIC

CLOSET

BU003

EMS

A001B

DUMB

ELEVATOR

SOILED RECEIVING

DECONTAMINATION AREA

B005

MANUAL

CART WASH

B005B

STAIRWELL

BS003HALL

B004

EMS

B005A

WOMENS TOILET

B002

MENS TOILET

B003

STORAGE

B009A

HALL

B006A

CORRIDOR

OX101

BULK

STORAGE

B010

LOGISTICS

STORAGE

B011

ELECTRIC

CLOSET

BU002

UNION OFFICE

B011A

FF: VCT

AC PLUMBING

MACH

B012

OFFICE

B012A

CORRIDOR

BH001

CORRIDOR

AH003

CLEAN RECEIVING

B007

CORRIDOR

AH002

STERILE AND NON-STERILE

STORAGE

A001A

RETAIL STORE

A009

STAIRWELL

PAS04

CORRIDOR

AH001

ELECTRIC

CLOSET

AU005

OFFICE

ASST CHIEF

A003

KITCHEN

A006

OFFICE

CANTEEN

A007

REFR WALK IN

A006B

PREFAB

REFRIG

A006C

FOOD

STORAGE

A006A

SERVING LINE

A005

AU008 AU007 AU006

STAIR

AS002

CAFETERIA

A004A

VCS OFFICE

A004E

VCS OFFICE CHIEF

A004A

STORAGE

A004

STORAGE

A004A

EMS

A004B LOUNGE

A002

LOCKERS

FEMALE

A002A

TOILET &

SHOWERS

A002B

IT CLOSET

A002C

ELEV

P3

ELEV

P2

ELEV

P1

TOILET

A024TELEPHONE EQUIP RM

A022

LOCKERS

A026B

EMS

A026

PHYSICAL

THERAPY

A035

STORAGE

A033

HYDROTHERAPY

A034

RECEPTION

A030

CORRIDOR

AH007

PHYSICAL THERAPY

OUTPATIENT

A036

CORRIDOR

A030A

WAITING AREA

A042

EXAM/EMG

A037

PROVIDER

A038

EXAM

A041

EXAM

A040 PROVIDER

A039

STAIRWELL

AS001

TOILET & SHOWERS

A046

A026A TOILET

FEMALE

A045

OT CLINIC

A044

OT OFFICE

A043

OT OFFICE

A043A

RECEPTION AREA

A050

CORRIDOR

AH009

OFFICE

A070RECEIVING

A071

SVC MGR

A072

CORRIDOR

AH008PGM MGR

A068

OFFICE

A069

COMPUTER RM

A073

CORRIDOR

AH010

SOFTWARE APPL

SUPPORT

A067

APPLICATION

SUPPORT

A066

SYSTEMS

MGR

A065

NETWORKING

MGR

A064

PROG MGR SYST &

NETWORKING

A063

ADP

WORKSHOP

A062

STAIRWELL

AS004

TELECOMM

SVCS

A061

TELECOMM

SVCS

A060

SUPPORT

A059

APPLICATION

SUPPORT

A058

APPLICATION

SUPPORT

A057

OFFICE

A051

PGM

SPECIALISTS

A052

PGMMING &

INFO

A053

PGMMING &

INFO

A054

CONFERENCE

RM

A055

ELECTRICAL

A056

MECHANICAL

B015F

FF: CONC.

PROSTHETICS STORAGE

B015C

FF: VCT

MORGUE

B015A

FF: VCT

LOGISTICS BREAKDOWN

B006B

FF: VCT

PAMNS ZONE 'C'

PAMNS ZONE 'E'

PAMNS ZONE 'E'

PAMNS ZONE 'C'

PAMNS ZONE 'E'

PAMNS ZONE 'L'

PAMNS ZONE 'L'

PAMNS ZONE 'C'

PAMNS ZONE 'H'

PAMNS ZONE 'C'

PAMNS ZONE 'L'

PAMNS ZONE 'C

PAMNS ZONE 'E'

PAMNS ZONE 'L'

PAMNS ZONE 'C'

PAMNS ZONE 'H'

PAMNS ZONE 'P'

PAMNS ZONE 'P'

PAMNS ZONE 'P'

PAMNS ZONE 'C'

PAMNS ZONE 'I' PAMNS ZONE 'C'

PAMNS ZONE 'I'

PAMNS ZONE 'C'

PAMNS ZONE 'P'

PAMNS ZONE 'PDeck'

PAMNS ZONE 'F'

PAMNS ZONE 'C'

PAMNS ZONE 'F'

PAMNS ZONE 'C'

PAMNS ZONE 'K'

PAMNS ZONE 'S'

PAMNS ZONE 'L'

PAMNS ZONE 'C'

PAMNS ZONE 'L'

PAMNS ZONE 'C'

PAMNS ZONE 'K'

PAMNS ZONE 'C'

PAMNS ZONE 'K'

PAMNS ZONE 'PDeck'

SRSR

SR

SR

SR

SR

SR

SR

SR

SR

SRSR

SR

SR

SRSR

SR

SR

SR SR

SR

SRSRSR

SR SR

SR

SR SR SR

SR

SR

SRSR

SR

SR

SR

SR

SR

SR

SR

SR SR SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SRSR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SRSR

SR

SR

SRSR

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SNSN

SN

SN SN

SNSN

SN

SN

SN

SN

SN SN

SN

SN

SN

SNSN

SNSN

SNSN

SN

SN

SNSN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

N

N

N

N

N

N N

N

N N

N N

N

N

N

N

N N

SN

SN

SN SN

SNSN

SN

SN

N N

N

N

N

N

N

PS PS PS PS

PS PS PS PS

PS PS

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0" 18'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

S N

S N

S N

S N

S N SN

S N

S N

PAMNS ZONE 'Z'

PAMNS ZONE 'Z'

PAMNS ZONE 'Z'

PAMNS ZONE 'L'

7'7'

7'

7' 7'

7'

7'

7'

7'7'

7'

7'

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project Number

Revisions: Date

CONSULTANTS:

DECEMBER 1, 2023 HTJDM

REPLACE OBSOLETE

OVERHEAD

PAGING SYSTEM

596-22-101

VA MEDICAL CENTER LEXINGTON

1101 VETERANS DRIVE

LEXINGTON, KENTUCKY 40502

21-306

100% BID DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

WALL RATINGS

BUILDING SEPARATION ( >2 HOURS)

3 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

1/2 HOUR FIRE BARRIER

SMOKE BARRIER ( >1/2 HOUR)

SMOKE RESISTIVE CONSTRUCTION

X

Engineers Architects U.S. Department of Veterans Affairs

SPEAKER 8" ROUND CEILING MOUNT

SPEAKER 10" X 10" SQUARE CEILING MOUNT

SPEAKER 10" x 10" WALL MOUNT

WALL HORN

CEILING TYPE

CEILING HEIGHT

CEILING TYPE LEGEND

1 2X2 DROP CEILING

2 HARD CEILING

3 2X4 DROP CEILING

4 GYP CEILING

5 UNFINISHED CEILING

6 1' x 2' METAL PAN CEILING 7 1' x 1' ACOUSTIC CEILING

S

S

S

LINE TYPE LEGEND:

CEILING BOUNDARY:

VOLUME CONTROL MOUNTED AT 48"AFFVC

SYMBOL LEGEND

PAGING SYSTEMPS

8 2' x 4' DRY WALL CEILING

T-101A

BOWLING GROUND LEVEL OVERALL

PLAN

1 BOWLING GROUND LEVEL OVERALL PLAN

SCALE: 1/16" = 1' 0"

NORTH

TRUE

8 16 320

1. SPEAKERS IN THIS ZONE WILL HAVE

ANTI-MICROBIAL FACE/BAFFLE.

2. PROVIDE PAGING STATION IN THE PAGING

CENTER AND CONNECT TO THE PAMN SYSTEM

COORDINATE EXACT LOCATION WITH COR

3. UTILIZE EXISTING INNERDUCT FROM ROOM

D007D TO FEED DEVICES LOCATED IN CHILLER

PLANT. INNERDUCT TRAVELS APPROXIMATELY 2

STORIES DOWN PRIOR TO TRAVELLING TO

GROUND FLOOR OFFICE OF CHILLER PLANT.

COORDINATE WORK WITH COR.

T-401

A. ALL EXISTING CONDITIONS ARE BASED ON BEST

AVAILABLE INFORMATION AT THE TIME OF

SURVEY AND VISUAL INSPECTION.

B. REPAIR/REPLACE ANY DAMAGED CEILING.

C. PROVIDE NEW SPEAKER ASSEMBLY AS SHOWN

AND CONNECT TO EXISTING SPEAKER/PAGING

ZONE.

D. ALL SPEAKERS SHALL BE TAPPED AT 1/2 WATT

UNLESS OTHERWISE NOTED.

E. MINIMUM SPEAKER WIRE SHALL BE 16 AWG.

F. PAGING CABLES SHALL BE INSTALLED IN

CONDUITS IN ALL EXPOSED AREAS (ROOMS WITH

NO CEILINGS) IN ELECTRICAL ROOMS,

MECHANICAL ROOMS, BOILER ROOMS, STORAGE

ROOMS, GARAGES, OUTSIDE AREAS AND STAIRS.

G. ALL PAGING CABLING/CONDUIT SHALL BE

SUPPORTED BY J-HOOKS, IN CABLE TRAY OR AN

APPROVED SUPPORTING SYSTEM.

FEBRUARY 29, 2024

WALL DEVICES

MOUNTED ON

CONCRETE/MASONRY

IN PARKING GARAGE

CONCRETE/

MASONRY

CONCRETE/

MASONRY

GYPSUM

GYPSUM

GYPSUM

CONCRETE

GYPSUM

GYPSUM

GYPSUM

GYPSUM

GYPSUM

GYPSUM

WHEEL CHAIR PARK

HANDICAPPED

PARKING

HANDICAPPED

HANDICAPPED

PARKING PARKING

HANDICAPPED

PARKING

HANDICAPPED HANDICAPPED

PARKING

HANDICAPPED

PARKING

HANDICAPPED

PARKING

HANDICAPPED

PARKING

HANDICAPPED

PARKING PARKING

LEVEL B

VOLUNTEER

PARKING

VOLUNTEER

PARKING

VOLUNTEER

PARKING

VOLUNTEER

PARKING

VOLUNTEER

PARKING

VOLUNTEER

PARKING

VOLUNTEER

PARKING

DOWN

UP

PARKING

DOWN

UP

EMERGENCY

GENERATOR RM

PB01

B038

A/C

REFRIGERATION

EQUIP RM

OTHER SPACE

PB11

TRANSFORMER

RM

B037A

B039

B037

SVC RM

B037B

ELECTRICAL

DISTRIBUTION RM

STAIRWELL

STAIRWELL

AS02

BS03

AS01

STAIRWELL

DENTAL

ORAL

EVAC

UNIT

STAIRWELL

PB09A

PBS05

CHASE

PB03

STORAGE

PB10

ELEV

VESTIBULE

PB02

ELEVATOR

P5

ELEVATOR

P4

PUMP

RM

0-C-1

TC

PB06

EC

PB05

STAIRWELL

PBS06

STAIRWELL

PBS04

UTILITY TUNNEL OTHER SPACE

PB09 PB09

OTHER

SPACE

PB07

FAN RM

PB04

PAMNS ZONE 'PDeck'

PAMNS ZONE 'PDeck'

SN

S

S

N N N

N

NNN

N

N N N

N

N

N

N N N

N

PAMNS ZONE 'B'

PAMNS ZONE 'B'

N

N

N

NN

S

N

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project Number

Revisions: Date

CONSULTANTS:

DECEMBER 1, 2023 HTJDM

REPLACE OBSOLETE

OVERHEAD

PAGING SYSTEM

596-22-101

VA MEDICAL CENTER LEXINGTON

1101 VETERANS DRIVE

LEXINGTON, KENTUCKY 40502

21-306

100% BID DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

WALL RATINGS

BUILDING SEPARATION ( >2 HOURS)

3 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

1/2 HOUR FIRE BARRIER

SMOKE BARRIER ( >1/2 HOUR)

SMOKE RESISTIVE CONSTRUCTION

X

Engineers Architects U.S. Department of Veterans Affairs

SPEAKER 8" ROUND CEILING MOUNT

SPEAKER 10" X 10" SQUARE CEILING MOUNT

SPEAKER 10" x 10" WALL MOUNT

WALL HORN

CEILING TYPE

CEILING HEIGHT

CEILING TYPE LEGEND

1 2X2 DROP CEILING

2 HARD CEILING

3 2X4 DROP CEILING

4 GYP CEILING

5 UNFINISHED CEILING

6 1' x 2' METAL PAN CEILING 7 1' x 1' ACOUSTIC CEILING

S

S

S

LINE TYPE LEGEND:

CEILING BOUNDARY:

VOLUME CONTROL MOUNTED AT 48"AFFVC

SYMBOL LEGEND

PAGING SYSTEMPS

8 2' x 4' DRY WALL CEILING

T-101B

BOWLING BASEMENT LEVEL

OVERALL PLAN

1 BOWLING BASEMENT LEVEL OVERALL PLAN

SCALE: 1/16" = 1' 0"

NORTH

TRUE

8 16 320

A. ALL EXISTING CONDITIONS ARE BASED ON BEST

AVAILABLE INFORMATION AT THE TIME OF

SURVEY AND VISUAL INSPECTION.

B. REPAIR/REPLACE ANY DAMAGED CEILING.

C. PROVIDE NEW SPEAKER ASSEMBLY AS SHOWN

AND CONNECT TO EXISTING SPEAKER/PAGING

ZONE.

D. ALL SPEAKERS SHALL BE TAPPED AT 1/2 WATT

UNLESS OTHERWISE NOTED.

E. MINIMUM SPEAKER WIRE SHALL BE 16 AWG.

F. PAGING CABLES SHALL BE INSTALLED IN

CONDUITS IN ALL EXPOSED AREAS (ROOMS WITH

NO CEILINGS) IN ELECTRICAL ROOMS,

MECHANICAL ROOMS, BOILER ROOMS, STORAGE

ROOMS, GARAGES, OUTSIDE AREAS AND STAIRS.

G. ALL PAGING CABLING/CONDUIT SHALL BE

SUPPORTED BY J-HOOKS, IN CABLE TRAY OR AN

APPROVED SUPPORTING SYSTEM.

FEBRUARY 29, 2024

WALL DEVICES

MOUNTED ON

CONCRETE/MASONRY

IN PARKING GARAGE

CONCRETE/

MASONRY

CONCRETE/

MASONRY

CONCRETE

/MASONRY

DOWN

MOTORCYCLE

MOTORCYCLE

STAIRWELL

PCS04

PARKING

PC01

SUMP

00-C-3

OTHER SPACE

PCM17

FAN RM

00-C-2

STORAGE

PC14

STORAGE

00C6

MECH

RM

PC15

STORAGE

PC16

ELEVATOR

LOBBY

PC02

ELEVATOR

PCE05

ELEVATOR

PCE04

ELEV

EQUIP

00-C-1

STAIR

PCS05

STORAGE

PC05

STORAGE

PC09

MECH RM

PC10

TC

00-D-3

EC

00-D-2STAIR

PCS06

FAN RM

00-D-1

OTHER

SPACE

PCM11

FF:CONCRETE

FF:CONCRETE

FF:VCT

FF:CONCRETE FF:CONCRETE

FF:CONCRETE

FF:VCT

FF:VCT

FF:VCT

FF:CONCRETE

FF:VCT

FF:VCT

FF:CONCRETE

FF:VCT

FF:VCT

FF:CONCRETE

FF:CONCRETE

FF:CONCRETE

FF:CONCRETE

FF:VCT

PAMNS ZONE 'PDeck'

S

S

S

SN

N

N N N

N N N

N

N N N

N

N N N

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project Number

Revisions: Date

CONSULTANTS:

DECEMBER 1, 2023 HTJDM

REPLACE OBSOLETE

OVERHEAD

PAGING SYSTEM

596-22-101

VA MEDICAL CENTER LEXINGTON

1101 VETERANS DRIVE

LEXINGTON, KENTUCKY 40502

21-306

100% BID DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

WALL RATINGS

BUILDING SEPARATION ( >2 HOURS)

3 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

1/2 HOUR FIRE BARRIER

SMOKE BARRIER ( >1/2 HOUR)

SMOKE RESISTIVE CONSTRUCTION

X

Engineers Architects U.S. Department of Veterans Affairs

SPEAKER 8" ROUND CEILING MOUNT

SPEAKER 10" X 10" SQUARE CEILING MOUNT

SPEAKER 10" x 10" WALL MOUNT

WALL HORN

CEILING TYPE

CEILING HEIGHT

CEILING TYPE LEGEND

1 2X2 DROP CEILING

2 HARD CEILING

3 2X4 DROP CEILING

4 GYP CEILING

5 UNFINISHED CEILING

6 1' x 2' METAL PAN CEILING 7 1' x 1' ACOUSTIC CEILING

S

S

S

LINE TYPE LEGEND:

CEILING BOUNDARY:

VOLUME CONTROL MOUNTED AT 48"AFFVC

SYMBOL LEGEND

PAGING SYSTEMPS

8 2' x 4' DRY WALL CEILING

T-101C

BOWLING SUB-BASEMENT LEVEL

OVERALL PLAN

1 LOWER LEVEL OVERALL PLAN

SCALE: 1/16" = 1' 0"

NORTH

TRUE

8 16 320

A. ALL EXISTING CONDITIONS ARE BASED ON BEST

AVAILABLE INFORMATION AT THE TIME OF

SURVEY AND VISUAL INSPECTION.

B. REPAIR/REPLACE ANY DAMAGED CEILING.

C. PROVIDE NEW SPEAKER ASSEMBLY AS SHOWN

AND CONNECT TO EXISTING SPEAKER/PAGING

ZONE.

D. ALL SPEAKERS SHALL BE TAPPED AT 1/2 WATT

UNLESS OTHERWISE NOTED.

E. MINIMUM SPEAKER WIRE SHALL BE 16 AWG.

F. PAGING CABLES SHALL BE INSTALLED IN

CONDUITS IN ALL EXPOSED AREAS (ROOMS WITH

NO CEILINGS) IN ELECTRICAL ROOMS,

MECHANICAL ROOMS, BOILER ROOMS, STORAGE

ROOMS, GARAGES, OUTSIDE AREAS AND STAIRS.

G. ALL PAGING CABLING/CONDUIT SHALL BE

SUPPORTED BY J-HOOKS, IN CABLE TRAY OR AN

APPROVED SUPPORTING SYSTEM.

FEBRUARY 29, 2024

WALL DEVICES

MOUNTED ON

CONCRETE/MASONRY

EXISTING

STAIR

DS108

TOILET

ELEC

B146A

STORAGE

FEMALE

TOILET

CORRIDOR

AS106

OFFICE

NURSE MGR

INPT PHARMACY

IV STORAGETECHNICIAN OFFICE

A-166

VAULT

A-180

B102

SVC ELEV

LOBBY

CORRIDOR

AH101

SUPPLY

B101L

NUCLEAR MED AND

RADIATION SAFETY

ADMIN OFFICE

CORRIDOR

A-151A A-151

A-160

READING RM

A-159

B133D175

A-184

A-184B

C125G

OFFICE

C125

PASSAGE

C125I C129

BH108

CORRIDOR

B101K

B107

B106

SUPV

LAB

BH105

CT SCAN 1

B114

CONFERENCE

CLASS & STUDY

CLINICAL

MICROBIOLOGIST

CORRIDOR

BH103

CORRIDOR

B147A

B148

B141

B140

DRESSING

B137A

VESTIBULE

CH130A

STAFF TLT

CH132AC134

TLT

EXAM / ISO

C130J

EXAM

C125A

TLT

C121C

TRIAGE 01

C121B

STAFF / WORK RM

VASCULAR LAB

D181

RAD STORAGE

EMSCORRIDOR

B138

PATIENT PREP

STORAGE RM

WORK

RM

D191

VASCULAR LAB

D190

SURG CLINIC

CHECK IN

D157

D158 OFFICE

BREAK/

READING

E126

E123

TOILET

CRYOGEN

STORAGE

MRI

E120

COMPUTER RM

E104

SECTION

OFFICE

EM113

D158

D160A

EXAM

D146

EXAM

EXAM

EXAM

CONS

D144

IT EQUIP RM

D112

STAFF TOILET

D111

STAFF TOILET

D108

D107

BREAK RM

D113 D140B

DS107

STAIR

PHYSICIAN

CONSULTANT RM

DU141

EC

DU142

TC

D102C

TOILET

D102D

PATIENT RM

D109

D110

EXAM

D116

CONS

D106

CLEAN SUPPLY D118

EXAM

D104

DIRTY SUPPLY

D120

EXAM

TOILET

D103

EXAM

D101

EXAM

D124

EXAM

D100

MED RECORD

WORK RM

D100A

RECEPTION

INFUSION / CHEMO TREATMENT

DH108

CORRIDOR

D139

CLEAN STOR

SUPPLY RM

D115

PROCEDURE RM

D117

OFFICE D135

EXAM

D133

EXAMD119

EXAM

D121

EXAM

D131

EXAM

D123

EXAM

D129

EXAM

D125

EXAM

D127

EXAM

D143

STORAGE

D136

CAST RM

D145

EXAM

D147

EXAM

D134

EXAM

D132

EXAM

D149

EXAM

D130

EXAM

D151

EXAM

D128

EXAM

D153

EXAM

DH107

CORRIDOR

DH111

CORRIDOR

DH109

CORRIDOR

CH105C

WAITING

CH113

CORRIDOR

CH105

CORRIDOR

C108

TRAVEL

C111

P5

ELEVATOR

P4

ELEVATOR

D102B

TOILET

D102A

PATIENT RM

C109

MENS TOILET

WOMENS

TOILET

C106 C107

EC

C112B

C112A C112 C113A

C113

DIRECTOR OFFICE

C104V1

CUBICLE

C104V2

CUBICLE

C104V3

CUBICLE

C104V4

CUBICLE HEALTH

BENEFITS

CENTER

C104V6

COPY

C104V11 C104V12 C104V13

C104V14

C104V15

C104V19

C104V18

C104U

DECEDENT

AFFAIRS

C104T

OFFICE

C104S

SUPVY MED

SUPPORT

ASST

C104R

PATIENT SUPPORT

PGM SPECIALIST

C104Q

CHIEF AMBULATORY

CARE AND

PROCESSING

C104P

CHIEF HEALTH

INFO MGMT

C104O

HEALTH ADMIN

CHIEF OFFICE C104N

ADMIN

ASST

C104M

ASST CHIEF

HEALTH ADMIN

C104K

CHIEF

OFFICE C104J

UM / UR MGR

OFFICE

CUBICLE

C104H

WORK RM C104

POLICE

C105

HOLDING

C104D

PAT

TOILET C104A

RECEPTION

C104E

STAFF

TOILET

C107

PIV

C104G

BREAK RM

C103

ARMORY

C102

POLICE

C104I

CONFERENCE RM 101

WHEEL CHAIR

STORAGE

C1-1A

VESTIBULE

C110

POLICE

CH101

LOBBY

C113B

E.R. STAFF

C109

EVIDENCE

UP

C139A

D192

TOILET

CORRIDOR

A-191

AS108

PHARMACY OFFICE

A-189

A102

SUPPORT UNIT

ADMINA-190C

PRE-PACK

A164

CORRIDOR

JANITOR

ASSOCIATE CHIEF

OF PHARMACY

OFFICE

BREAK RM

CONFERENCE RM

A190A

STORAGES V

BH102

A-153

WAITING

C126C

EXAM

MENTAL HEALTH

RM

EXAM

E CYL

MED RM

B105

B104

CORRIDOR

BIO MED

ENGG

GLASS WASH

MICROBIOLOGY

LAB

B117

BH104

B144

OUTPATIENT

READING RM

B147

B143

VACANT

B140A

BU106

RESUSCITATION 1 /

ISOEMS

CLEAN UTIL

C136

C125K

STORAGE

C125D

EXAM

PASSAGE

C122

CH121B

EKG/LAB

PASSAGE

EXAM

D183B

D189

D196

WAITING

VESTIBULE

CONFERENCE RM

C107C104E

RECEPTION

C104A

HOLDING

POLICE

WORK RM

UM / UR MGR

OFFICE

C104M

ADMIN

ASST

COPY

C104V6

C104V4

C112A

C107

C109

ELEVATOR

D194

CORRIDOR

ULTRA SOUND

ANGIOGRAPHY

LINEN RM

MRI READING RM

E130

STAIRWELL

PUBLIC TOILET

CAST RM

E128ORTHO STORAGE

PREPARATION

E121

E127

HVAC

MECH/ELEC

CORRIDOR

E119

PROCESSING

ADMIN

OFFICER

E108E110

C111

CORRIDOR

CORRIDOR

DH107

OFFICE

EXAM

EXAM

CONS

D130

D147EXAM

D117

D120

D106

TC

S7

ELEVATOR

S6

D113

ELEC

DN

C109

E128A

A-188

PASSAGE

CH126

CH101C

AH102

CORRIDOR

AH101

CORRIDOR

PATIENT

ADVOCATE

A-190b

MEN

A-179

CLINICAL

PHARMACIST

A-168 A-170

PHARMACY STORAGE

B101B

SURGICAL

PATHOLOGY

B101H

BU101

CORRIDOR

EXAMBREAK RM

A-158

BONE DENSITY

B132

MECH

A-184A

C127

C126D

EXAM

ELEC

BU103

BH107

MECH

HALL WAYSCANNER

RM

CORRIDOR

X-RAY DIAGNOSTIC RM

FILM PROCESSING

AREA

B142

STAFF WORK

C130

C130E

ER OFFICE 2

C141C143

C132D

C128

C125B

SPECIMEN

SOILED UTIL

TRIAGE 02

CH130B

C132A

C121

SOILED UTIL

CS109

ELEVATOR

D195

C114B

RESP

CARE

POLICE

C1-1A

WHEEL CHAIR

STORAGEC104I

C102

ARMORY

C103

BREAK RM C105

SUPVY MED

SUPPORT

ASST

OFFICE

C104T

C104V13C104V12

CUBICLECUBICLE

C104V2

CUBICLE

C104V1

C112B

ELEC

TOILET

E101

MRI RECEPTION

D193

D169

D169a

PROCEDURE RM

E124

E116 E122

RADIOLOGIST

E107

CH105

CH105E

DH110

D161

EXAM

D153

EXAM

D151

D145

D136

D143

D125

D135

D101

ELEVATOR

DU141

DS107

D140B

BREAK RM

D107

D108

STORAGE

EVIDENCE

MALE

TOILET

ADMIN

ASSIST

EXIST WELCOME

DESK

CORRIDOR

CORRIDOR

CORRIDOR A-190

A-175

A-178

MED MGMT

SPECIALIST

A-163

A-167

PHARMACY

ADAPC

RESIDENTS

A-166

PATHOLOGY LAB

CORRIDOR SOILED

A146

CONFERENCE RM

BREAK RM

B108

BREAK RM

B101G

STORAGE

B101ISUPV

ELEC

AU-105

A-150

FILE RM

A-152B

MENS

RESTROOM

A-156

VIEWING RM

A-185

STORAGE

DECONTAM

TOILET

ON CALL

C125F

C130A

CH125H

NOUR

PREP

C125J

STAIR

CS104

OFFICE

B103

ELEC

BS103

B128

B150A

B152A

LAB INFO

MGR

B113B

MEDIA

PREPARATION

B114D

CHIEF

PATHOLOGY SVC

B118B121

B153

CORRIDOR

BH106

STORAGE

PASSAGE

CH121

ISO

RESUSCITATION 2 /

CH140

EXAM / ISO

C130H

C140 C144

C131

EXAM

C130K

C125E

C125C

EXAM

C124

C123SUB-WAITING

C121DC121A

C132C

EC

CU100

P7

EXAM

C114C

CH104

C104G

PIV

STAFF

TOILET

C104

C104J C104K

CHIEF HEALTH

INFO MGMT

C104P

C104Q

DECEDENT

AFFAIRS

C104V15

C104V3

CORRIDOR

D186

CONTROL

D188A

D180

E129

D156A

STAFF RM

PHYSICISTS

OFFICE & LAB

E125MRI READING

STAFF RADIOLOGIST

OFFICE

D166

SUPV MRI

TECH

E103

CHIEF OF

RADIOLOGY

E109E112

CORRIDOR

DH112

C108

CORRIDOR

MECH

D154A

OFFICE

EXAM

D154

EXAM

D150

EXAM

D127

D119

D139

DH108

D100

D124

EXAM

D103

D118

CONS

D116

D110

D109

D102C

PHYSICIAN

CONSULTANT RM

D111

STAFF TOILET

UP

DN

B140A

TOILET

E106

E105

CORRIDOR

CH102A

EXAM / ISO

C130I

C113B

CHIEF

TECHNOLOGIST

EH102

BMS CLOSET

A178

ANTEROOM

ACOS AMB

CARE

INVESTIGATION DRUGS SVC

PGME MGR

A-162

A-165

A-167A

CHIEF

A-169

CRITICAL CARE

PHARMACY

SPECIALIST OFFICE

A-171

IN-VITRO COUNTING

HIGH/LOW

STAIR

A147

B101A

B107A

OFFICE

STORAGE

EMS CLOSET

B101D

A-150A

HOT LAB

A-155

A-157

KITCHEN

B133A

B133B

PHARMACY WAITING

A-186

A-184C

EXAM

C130B

PASSAGE

CH125B

CLEAN UTILITY

C130D

CH132

CORRIDOR

BH109

STORAGE

BLOOD BANK MED

DIRECTOR

LAB MGR /

CHIEF

MED TECH

CLINICAL

CHEMIST

BU102

STAIR

CONTROL RM

PCR RM

ANCILLARY

TESTING COORD

B116B119B-120

RADIOLOGY SVC

SUPPLY RM RADIOGRAPHIC

RADIOGRAPHIC AND

FLUOROSCOPIC

RADIO/FLOUR

B137

WAITING

CH120

ENTRANCE

CH139

C130F

PASSAGE

C142

EMPLOYEE TRAINING

RM

EXAM

CART STORAGE

TLT

EXAM

CH125A

EXAM

C133

ELEVATOR

P6

EC

D183A

EXAMC114

CH104A

CH101

C110

CHIEF

OFFICE

PATIENT SUPPORT

PGM SPECIALIST

C104V11

CUBICLE

C113A

ELEVATOR

P5

CH118

D172

E100

D194

PRE-OP

ASSESSMENT

CH114

CAST RM

CAST RM

DRESS

EM115

X-RAY

E118E117

LIBRARY

STAFF

RADIOLOGIST

E111

DH111

EXAM

EXAM

D152

D162

D163

D132

D129D123

D131D121

D133

OFFICE

D115

D100A

D102D

D112

BU102

B139B

DRESSING

B139A

TOILET

B137B

A-152B

STAFF

TOILET

VASCULAR LAB

E102

CORRIDOR

CH102

C114A

EH103

A-177

AH103

AS107

A177

A103

A-190a

A-177a

WOMEN

A-176

MGR

CMOP

FORMULARY MGRPHARMACY

OPERATION

MGR

A-172

A-173

A174

AS102

1B-1

BH101

B101J

ELECTRIC

CLOSET

B104

PROVIDER

WORK RM

AH102

CORRIDOR

A-152A

WAITING

A-152

WOMENS

RESTROOM

A-154

SUPPLY

VACANT

B131

LOUNGE

STAFF

TOILET

B133A

C126A

PHYS

WORK

C130C

STAFF WORK

CH125

PASSAGE

LINE ITEM

MGR OFFICE

FEMALE

TOILET

B127

CORRIDOR

MALE TOILET

B126

B125

B152

B113

B114C

PATHOLOGY

B115

PATHOLOGISTCHIEF

PATHOLOGIST

UPS

RM

VACANT

CONTROL RM

B147B

X-RAY

RADIOGRAPHIC AND

FLUOROSCOPIC

B139

C138OFFICE 3

ER NURSE MGR

C137

IT

PASSAGETLT/SHWR

EMS

CH121A

PASSAGEC132B

EXAM

IT

C135

STAIRWELL

SPEC COLLECT

BREAK RM

LOBBY

POLICE

PAT

TOILET

C104H

CUBICLE

ASST CHIEF

HEALTH ADMIN

C104N

HEALTH ADMIN

CHIEF OFFICE

C104O

CHIEF AMBULATORY

CARE AND

PROCESSING

C104R

C104S

C104U

C104V17

C104V18

C104V19

C104V16

C104V14

C104C

C113

CANTEEN

HASC112

EMS

C106

C110A

D102AD102B

P4

B134C

D173

OFFICE- CHIEF VASCULAR

LAB TECH

D171

DS108

PRE-OP

ASSESSMENT

EC

D155

D156

D193

SVC

OFFICE

D185

DRESSING/

RESTROOM

D168A

TOILET

DRESS

TOILET

D165

EMS CLOSET

E114

EH104

STAFF

RADIOLOGIST

STAFF

RADIOLOGIST

FISCAL

CH113

WAITINGCH105C

CORRIDOR

DH109

D160

D148

D128

D149

D134

EXAM

CH100

D124A

D104

SOILED UTILITY

D164

DU142

EC

D140

STAIR

BREAK ROOM

D140A

UROLOGY

EMS

C104V7 C104V5

C104V20 C104V19 C104V18

C110

D126B

SURGERY

D137

D168

CONFERENCE

BH103

CORRIDOR

DH116

CORRIDOR

DH116A

CORRIDOR

B136

MECH. SHAFT B135

STORAGE

D137

EQUIPMENT

B134A

CHEST X-RAY

B134

CHEST X-RAY

B134B

OFFICE

D175A

RADIOLOGY

LOBBY

D180A

CONTROL RM

CH118

CORRIDOR

TOILET

B134D

RADIOLOGY

WAITING

BH103

B142

INPATIENT

HOLDING

BAY 3

B146E

INPATIENT

HOLDING

BAY 3

B146D

INPATIENT

HOLDING

BAY 3

B146C

OFFICE

B101F

STORAGE

B101C

OFFICE

B101E

RADIOLOGY

STORAGE

B146F

DRESSING

RM

B146H

DRESSING

RM

DRESSING RM

ALCOVE

B146G

DRESSING

RM

B14JG

INPATIENT

OBSEVATION

B146B

RECEPTION

B146B

HOT LAB

OFFICE

B132A

DOSE

B122A

DOSE

B122B

HOT LAB

B122C

TOILET

B122D

B122A

WAITING

C1-5D

WORK RM

D155

SURGERY

CLINIC

SURGERY

CLINIC

SURGERY

CLINIC

B144

X-RAY

DIAGNOSTIC

RM

BH105

CORRIDOR

PAMNS ZONE '1S'

PAMNS ZONE '1A'

PAMNS ZONE '1B'

PAMNS ZONE '1A'

PAMNS ZONE '1A'

PAMNS ZONE '1B'

PAMNS ZONE '1R'

PAMNS ZONE '1R'

PAMNS ZONE '1R'

PAMNS ZONE '1N'

PAMNS ZONE '1L'

PAMNS ZONE '1A'

PAMNS ZONE '1L'

PAMNS ZONE '1N'

PAMNS ZONE '1A'

PAMNS ZONE '1R'

PAMNS ZONE '1A'

PAMNS ZONE '1E'

PAMNS ZONE '1A'

PAMNS ZONE '1E'

PAMNS ZONE '1E'

PAMNS ZONE '1X'

PAMNS ZONE '1X'

PAMNS ZONE '1A'

PAMNS ZONE '1X'

SS

SS

S

S

S

S

SR

SR

SRSR

SR

SRSR

SR

SR

SR SR

SR

SR SR

SR

SR SR

SRSR

SR SR

SR

SR

SR

SR SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR SR

SR

SR

SR

SR

SR SR SR SR

SRSR

SRSR

SR

SRSR

SR

SRSR

SR

SR SR

SR

SR

SRSR

SR

SR

SR

SR SR SR

SR SR SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SRSR SRSR

SR

SR

SR

SRSRSR

SR

SR

SR

PAMNS ZONE '1A'SR

SR

SR

SR

SR

SR

PAMNS ZONE '1A'

SR

SR

SR SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR SRSR

SR

SR

SR

SR

SR

SR

SR

SR

SR SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SN

SN

S S

S S

SN

SN

SN

SN

SN

SN

SN

SN

N

N

N

N

SD

SD SD SN SN SD SD

SD

SD

SN

SN

SD

SD

SN

SN

SR

SN

SR

SN

SN

SN

SD

SN

SR

SD

SN

SDSN

SN

SR SD SN

SN

SD

SR

SN

SN

SRSN

SN

SRSN

SR

SN

SN

SNSN

SN

SN

SR SR SR

SN

SD

SR SR

SNSNSN

SN

SN

SD

SD

SNSNSNSD

SN

SN

SN

SN SN

SN SN SN SN

SN

SN

SN

SNSNSN SN

SN

PAMNS ZONE '1P'

PAMNS ZONE '1N'

PAMNS ZONE '1M'

PAMNS ZONE '1M'

SN

SN

SN

9'-0"

9'-0"

9'-6"

9'-6"

9'-6"

9'-6"

9'-6"

8'-0"

8'-0"

8'-0"

8'-6"

8'-0"

8'-0"

8'-0"

8'-0"

9'-0"

8'-0"

8'-0"

8'-0"

9'-0"

8'-0"

8'-6"

8'-6"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-6"

8'-6"

8'-6" 18'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

S N

SN

SN

SN

SN

SN

PRIVATE

A132

PRIVATE

A131

PRIVATE

A130 PRIVATE

A127

PRIVATE

A126

PRIVATE

A122

OFFICE

A121

OFFICE

A120

SE

MI

-P

RI

VA

TE

A1

29 SEMI-PRIVATE

A128

TOILET

A130A

TOILET

A131A

TOILET

A132A

TOILET

A127A

TOILET

A126A

TOILET

A124A

TOILET

A122A

TOILET

A121A

TOILET

A120A

GROUP

ROOM

A143

TOILET

A128A

TOILET

A129A

SECLUSION

ANTEROOM

A136A

TOILET

A136B

SECLUSION

ROOM

A136

CONSULT

A137

STAFF

STATION

A141

EXAM

ROOM

A108

CLEAN

UTILITY

A109

SOILED

UTILITY

A110

GROUP

ROOM

A111

LAB

SOILED

A107

LAB

CLEAN

ROOM

A105

PATIENT

TOILET

A112

CLOSET

A113

STORAGE

A103

TOILET

A102

ELECTRICAL

AU104

OFFICE:

PROGRAM

MGR.

A133

OFFICE:

HEAD

NURSE

A134

OFFICE

A124

LAUNDRY

A123

MULTI-PURPOSE

ROOM

A115

BREAK

ROOM

A119JAN.

A117

CO

RR

ID

OR

A1

DAY/DINING

ROOM

A125

SALLY

PORT

ENTRY

A101

STAIR

AS101

MED

ROOM

A142

TOILET

A106

ELEC.

A114

ANTEROOM

A106A

STAFF

TOILET

A118

CORRIDOR

ELEC

AU101

ELEC

AU102

ELEC

AU103

WAITING

A100

SRL

OFFICE

A138

PCR 1

A139A PCR 2

A139B

PCR 3

A139C

IFA SCOPE

A139D

SEROLOGY

LAB

A139

SRL

TESTING

B111

SUPV

SEROLOGY

LAB

B111A

BCE

CO-ORDER

B112

STERILIZER

B113A

GLASS

WASH

B113

MICROBIOLOGY

LAB

B114

LAB

B114B

PRIVATE

B114A

LAB MED

MGR.

B113B

SIM.

SIM.

PRIVATE

A125A

LOCKERS

A100-B

LOCKERS

A100-C

ANTEROOM

A100-A

OFFICE

B129H

OFFICE

B129G

OFFICE

B129F

OFFICE

B129E

CLOSET

B129D

OFFICE

B129C

OFFICE

B129B

ST

UD

EN

TS

B1

L

SHARED

OFFICE

B129J

PANTRY

B129K

CORRIDOR

B129

CLOSET

B129A

PAMNS ZONE '1A'

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project Number

Revisions: Date

CONSULTANTS:

DECEMBER 1, 2023 HTJDM

REPLACE OBSOLETE

OVERHEAD

PAGING SYSTEM

596-22-101

VA MEDICAL CENTER LEXINGTON

1101 VETERANS DRIVE

LEXINGTON, KENTUCKY 40502

21-306

100% BID DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

WALL RATINGS

BUILDING SEPARATION ( >2 HOURS)

3 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

1/2 HOUR FIRE BARRIER

SMOKE BARRIER ( >1/2 HOUR)

SMOKE RESISTIVE CONSTRUCTION

Engineers Architects U.S. Department of Veterans Affairs

SPEAKER 8" ROUND CEILING MOUNT

SPEAKER 10" X 10" SQUARE CEILING MOUNT

SPEAKER 10" x 10" WALL MOUNT

WALL HORN

CEILING TYPE

CEILING HEIGHT

CEILING TYPE LEGEND

1 2X2 DROP CEILING

2 HARD CEILING

3 2X4 DROP CEILING

4 GYP CEILING

5 UNFINISHED CEILING

6 1' x 2' METAL PAN CEILING 7 1' x 1' ACOUSTIC CEILING

S

S

S

LINE TYPE LEGEND:

CEILING BOUNDARY:

VOLUME CONTROL MOUNTED AT 48"AFFVC

SYMBOL LEGEND

PAGING SYSTEMPS

8 2' x 4' DRY WALL CEILING

T-111

BOWLING FIRST FLOOR OVERALL

PLAN MENTAL HEALTH

1 BOWLING FIRST FLOOR OVERALL PLAN MENTAL HEALTH

SCALE: 1/8" = 1' 0"

NORTH

TRUE

8 16 320

A. ALL EXISTING CONDITIONS ARE BASED ON BEST

AVAILABLE INFORMATION AT THE TIME OF

SURVEY AND VISUAL INSPECTION.

B. REPAIR/REPLACE ANY DAMAGED CEILING.

C. PROVIDE NEW SPEAKER ASSEMBLY AS SHOWN

AND CONNECT TO EXISTING SPEAKER/PAGING

ZONE.

D. ALL SPEAKERS SHALL BE TAPPED AT 1/2 WATT

UNLESS OTHERWISE NOTED.

E. MINIMUM SPEAKER WIRE SHALL BE 16 AWG.

F. PAGING CABLES SHALL BE INSTALLED IN

CONDUITS IN ALL EXPOSED AREAS (ROOMS WITH

NO CEILINGS) IN ELECTRICAL ROOMS,

MECHANICAL ROOMS, BOILER ROOMS, STORAGE

ROOMS, GARAGES, OUTSIDE AREAS AND STAIRS.

G. ALL PAGING CABLING/CONDUIT SHALL BE

SUPPORTED BY J-HOOKS, IN CABLE TRAY OR AN

APPROVED SUPPORTING SYSTEM.

T-401

FEBRUARY 29, 2024

Gypsum

Gypsum

Gypsum

Gypsum

Gypsum

Gypsum

Gypsum

DN

UP

UPDN

DN

UP

DN

ROOF OF FIRST

FLOOR BELOW

ROOF OF GROUND

FLOOR BELOW

CARD CATALOGRE

FE

RE

NC

E

UP

UP

BABY CHANGING

STATION

S

S D

W

D

W

ELEC

AU203

ELEC

AU202

ELEC

AU201

ELEC

AU206

ELEC

AU207

ELEC

AU208

ELECTRIC

CLOSET

A205A

STAFF TOILET

D227

STORAGE

C223B

CORRIDOR

BH205

ELEC

BU203

TOILET

A271B

STORAGE

CH2-12A

CORRIDOR

BH212

CORRIDOR

AH202

CORRIDOR

AH205

CORRIDOR

AH206A

CORRIDOR

AH203

CORRIDOR

AH206

CORRIDOR

AH207

LOBBY

AH200

CORRIDOR

AH209

CORRIDOR

AH208

CORRIDOR

AH201

CORRIDOR

AH211

CORRIDOR

AH210

SEMI-PRIVATE

RM

A257

CCU1

A258

CCU2

A259

CCU3

A260

CARDIAC

PROCEDURE RM

A261

SEMI-PRIVATE

RM

A256

SHOWER

A269

TOILET

A257A

TOILET

A256A

NURSE

STATION

A267

NURSES

WORK RM

A268

NOURISHMENT

CENTER

A267C

EMS

A270

STAIRWELL

AS202

CCU4

A262

CCU5

A263

CCU6

A264

IT CLOSET

A265 STRESS LAB

A266

SOILED UTILITY

A267B

CLEAN

UTILITY

A267A

BREAK

A267D

NURSE

COORD OFC

A274

TOILET

A251

EMS

A252

HEART STATION

SUPV OFFICE

A272

LOCKER

A271A

NURSE

LOUNGE

A271

CONFERENCE RM

A255

VISITOR WAITING

A254

STOR

A255

TOILET

A255A

ECHO LAB

A250

ECHO LAB

A249

CORRIDOR

AH211A

CONTROL RM

A248A

PHONO

CARDIOLOGY

A248

EC

AU205

CARDIO CASE

MGR OFFICE

A276A

CARDIO

OFFICE

A276

HEART STATION

A245

HEART STATION

WORK RM

A244

PACEMAKER

A247

EKG COMPUTER

A247A

EEO ADMIN

OFFICE

A277

CARDIOLOGY

DOCTOR OFFICE

A246

IT CLOSET

A243

CATH LAB

OFFICE

A242 CATH LAB 1

A235

EQUIP

RM

A235BELEVATOR

P1

ELEVATOR

P2

ELEVATOR

P3

CATH

STORAGE

A235A

STAFF

OFFICE

A231A

BREAK

RM

A231

STAFF

CORRIDOR

A232

CONTROL

A234

CATH LAB 2

A233

CATH STORAGE

A233A

CLEAN

HOLDING

A230

SOILED

LINEN

A229

EQUIP

RM

A233B

CONSULT

A225

CLEAN

UTILITY

A226

STAIRWELL

AS201

RECEPTION/

BUSINESS

A214

FILE

A214A

STRETCHER

STORAGESTAFF TOILET

A228

PATIENT CARE

STAFF WORKROOM

A227

PHYSICIAN

WORK RM

A222

CONSULT

A241

JANITOR

A240 TOILET

A239 CLEAN STOR

A238

PREPARATION/HOLDING

A237

READING/

VIEWING

A236

BREAK RM

A224

PROCEDURE

A223

PATIENT

TOILET

A223A

SOILED

HOLDING

A223B

EXAMINATION/

TREATMENT

A221

EXAMINATION

A220

EXAMINATION

A219

EXAMINATION

A218

EXAMINATION

A217

EXAMINATION

A216

EXAMINATION

A215

CLINIC C

WAITING

A211

GROUP CLINIC RM

A210

EMS

A212

PATIENT

TOILET

A213

CORRIDOR

AH204

WC STORAGE

A211A

TOILET

A207A

EC

AU204

LAB

A207

SVC

LOBBY

A201

ELEVATOR

S5

ELEVATOR

S4

WAITING

A205

PHARMACY

A204

EQUIP STOR

A202

MECH

RM

B234

CLEAN

UTILITY

A202 STAFF

TOILET

A206A

STORAGE

A248B

MECH

RM

A273 SOCIAL

WORKER

B247

VENDING RM

B250 ENTRY

B200

CORRIDOR

C212

CORRIDOR

BH202

TOILET

B248

TOILET

B249

CORRIDOR

BH201

CLINIC A

WAITING AREA

B201

EXAM

B207

EXAM

B208

EXAM

B209

EXAM

B210

EXAM

B211

EXAM

B212

RECEPTION/

BUSINESS

B202

CHECK

OUT

B202A

STOR

B203

CORRIDOR

C2B4

STAFF

TOILET

B205HAC

B204

PATIENT

TOILET

B206

STAFF

CORRIDOR

BH203

PATIENT

CARE

B217

PHYSICIAN

WORK RM

B218

PHYSICIAN

WORK RM

B219

NURSE

WORK RM

B220

SOILED

HOLDINGS

B245

PROCEDURE

B244

PATIENT

TOILET

B244A

PATIENT

TOILET

B243

EXAM

B242

STAIRWELL

BS203

WORK

RM

B239

CORRIDOR

BH206

RECEPTION/

BUSINESS

B237

CLINIC B

WAITING

B238

ELECTRIC

CLOSET

BU201

STOR

A203

CHECK

OUT

B237A

COPY RM

B236

CORRIDOR

BH207

CONSULT

B235

STAFF

LOCKER

A206

WARFARIN

CLINIC

B234

NURSE MGR

OFFICE

B233

EXAM

B232

EXAM

B231

EXAM

B230

EXAM

B229

EXAM

B228

EXAM

B227

EXAM

B226

EXAM

B225

EXAM

B224

EXAM

B223

TREATMENT

B222

SUPPLY

B221

EXAM

B216

EXAM

B215

EXAM

B214

EXAM

B213

CORRIDOR

CH218

COMPUTER

TRAINING

D205

CLASSROOM

D206

LEARNING

OFFICER OFFICE

D207

ACOS OFF

D208

LEARNING

RESOURCE

CENTER OFFICE

D203A

CORRIDOR

C221

TRAINING

INSTRUCTOR

LPIS FACILITY

CO-ORDINATOR

OFFICE

D204

STORAGE

D201B

CORRIDOR

DH223

LRC OFFICE

D203

FEM TOILET

D202

STORAGE

D205A

VESTIBULE

DH220

STORAGE

PROJ

D201AAUDITORIUM

D201

CONTROL RM

C205

CORRIDOR

CH206

CORRIDOR

CH207

EC

CU208

PREPARATION/

WORK AREA

C206

LIBRARY

C209 M TOILET

D200

STORAGE

C210

LIBRARY

RECEPTION

C211D

CONFERENCE

C211A

STORAGE

CH205 OFFICE

C211B

VISUAL INFO OFFICE

C207

TELEMEDICINE

DISTANCE

LEARNING A

C204

CORRIDOR

CH204

CORRIDOR

CH203

INFO

C201

LOBBY

CH201

CORRIDOR

DH229

EMS

D228

STAFF TOILET

D226

CORRIDOR

DH228

CORRIDOR

DH230

EC

DU230

EC

DU229

STAIRWELL

DS207

ELEVATOR

S6

ELEVATOR

S7 IT

D231

CORRIDOR

DH231

CORRIDOR

DH226

CORRIDOR

DH224

CORRIDOR

DH225

CORRIDOR

DH227

TOILET

D211

STORAGE

D212

TRAINEES

D214

AUDIOLOGY

EXTERN

D216

AUDIO

D217

AUDIO

D219

AUDIOLOGY

D210

VOICE

LABORATORY

D213

SP PATH

D215

TREATMENT RM

D218

PM&R

CO-ORDR

D220

OFFICE

D221A

EXAM

D221

ROTARY CHAIR

D221B

CORRIDOR

CH211

CORRIDOR

DH232

AMPUTEE

PGM

OFFICE

D222

SOUND SUITE (VV)

D223

CONTROL

D223A

CONTROL

D224A

SOUND SUITE (VV)

D224

AUDIOLOGY

CO-ORDR

D225

CLERICAL REC

D209

WAITING

DH224A

CORRIDOR

CH212

STAFF DEV

SPECIALIST OFFICE

C203A

PATIENT SAFETY

FELLOWS

OFFICE

C203B

SIM CTR

TRAINING RM

C203C

LIBRARY

C203

MULTI PURPOSE

C203D

STAFF

DEVELOPMENT

SPECIALIST OFFICE

C203E

STORAGE

D236

CORRIDOR

DH233

STAIRWELL

DS208

CORRIDOR

C234

REPAIR AND DEVELOPMENT

D232

SEC/WAIT

D230

SUPV BIO MED

OFFICE

D234

INDUSTRIAL HYGIENIST

OFFICE

D235

STORAGE

D232A

OFFICE RM

D238

WORK RM

D237

MECH SHAFT

DU202

STORAGE

D232D

MECH SHAFT

DU201

CORRIDOR

CH215

CORRIDOR

CH214

CORRIDOR

CH217

CORRIDOR

CH216

ORAL SURGY

C235

ORAL SURGY

C238

RECOVERY

C239

TOILET

LOCKER RM

C241

OPERATORY

C261

DENTAL LAB

C260

STORAGE

C236

STORAGE

C237

OFFICE RM

C234

CONFERENCE RM

C232

INSTRUMENT

STORAGE

C240

CHIEF

OFFICE

C233

STOR

C228 TOILET

C227

OFFICE

C242

X-RAY

C244

X-RAY

C246

SUPPLY

C248

GENERAL

C245

TREATMENT

OPERATORY

C243

EC

C257

GENERAL

C255

GENERAL

C253

PROSTHETICS

LAB

C259

SOLID

C258

OPERATORY

C256

OPERATORY

C254

DENTISTS

OFFICE

C252

EMS

C231

DATA

ENTRY

C251

HYGIENE

OPERATOR

C250

HYGIENE

OPERATOR

C249

EXAM

OPERATOR

C247

WAITING

C229B

SECY/CLERICAL

C229

OFFICE

C230

CORRIDOR

CH213

RECORDS

C225

STAIRWELL

CS204

SUPER OFFICE

C226A

WAITING

EMS

C224

WORK AREA/STORAGE

C223E

MAIL

C223F

RECEPTION

C223

TOILET

C223C

IT

CU222

WAITING

C223A

OFFICE CHIEF

C223D

ELEVATOR

P6

ELEVATOR

P7

ELEVATOR

(FUTURE)

CE208

EC

CU200

STAIRWELL

CS209

SCREENING

C271

WAITING RM

C270

SCREENING

C272

OPTICAL

SCREENING

C273

MENS

TOILET

C212

WOMENS

TOILET

C213

RECEPTION WORKSPACE

C270B

CORRIDOR

TECH WORK

AREA

C297

EXAM RM

C294

EXAM RM

C293

EXAM RM

C290

EXAM RM

C289

RECEPTION

C270A

EXAM RM

C292

EXAM RM

C295

EXAM RM

C296

CLINIC

DIRECTOR

C274

VISUAL

FIELD

C276

SPECIAL TESTING

C277

YAG LASER

C280

ARGON LASER

C281

EXAM RM

C291

SOILED SPD

C285A

CLEAN SPD

C285

OFFICE

C288

VIST

COORD

C287

VISIT DOC OFFICE

C286

CASE MGR

C284

OPTICAL

SHOP

C275

PHOTO

RM

C278

PROCEDURE RM

C279

CLIN DIR OFFICE

C282

WORK AREA / KITCHENETTE

C283

STOR

C229A

PAMNS ZONE '2L'

PAMNS ZONE '2Y'

PAMNS ZONE '2L'

PAMNS ZONE '2Y'

PAMNS ZONE '2A'

PAMNS ZONE '2A'

PAMNS ZONE '2S'

PAMNS ZONE '2S'

PAMNS ZONE '2L'

PAMNS ZONE '2L'

PAMNS ZONE '2A'

PAMNS ZONE '2R'

PAMNS ZONE '2P'

PAMNS ZONE '2A'

PAMNS ZONE '2P'

PAMNS ZONE '2R'

PAMNS ZONE '2A'

PAMNS ZONE '2D'

PAMNS ZONE '2A'

PAMNS ZONE '2E'

PAMNS ZONE '2A'

PAMNS ZONE '2A'

PAMNS ZONE '2U'

PAMNS ZONE '2A'

PAMNS ZONE '2U'

PAMNS ZONE '2H'

PAMNS ZONE '2B'

PAMNS ZONE '2B'

PAMNS ZONE '2B'

PAMNS ZONE '2H'

PAMNS ZONE '2A'

PAMNS ZONE '2H'SRSR

SR

SR

SR

SR SR SR

SR

SR SR SR

SR

SR SR

SR

SR

SRSR

SR

SR

SR

SR

SRSR

SR

SR

SRSR

SR

SR

SR

SR

SR

SR

SR

SR

SRSRSR

SR

SRSR

SR

SR SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SN

VC

N

S

N

S

N S

N S

N

S

N

S

SN

SN

VC

VC

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

VC

VC

SN

SN SN SN

SN

SN

SN SN

SN

SNSNSN

SN

SN

SN

SN

SN

SN

SN

SD

SD

SD

SN

SR

SNSN

SN

SD

SN

SD SN

SD

SN

SN

SD N

SD

SD

SD

SN

SD

SD

SD

SN

PAMNS ZONE '2H'

SN

8'-0"

8'-0"

8'-0"

9'-5"

8'-0"

9'-5"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-5"

8'-5"

9'-6"

9'-6"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

9'-0"

8'-0"

8'-0" 18'-0"

9'-0"

9'-0"

9'-0"

9'-0"

SN

9'-0"

8'-0"

9'-6"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

9'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

S N

S N

S N

SN

S N S N

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project Number

Revisions: Date

CONSULTANTS:

DECEMBER 1, 2023 HTJDM

REPLACE OBSOLETE

OVERHEAD

PAGING SYSTEM

596-22-101

VA MEDICAL CENTER LEXINGTON

1101 VETERANS DRIVE

LEXINGTON, KENTUCKY 40502

21-306

100% BID DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

WALL RATINGS

BUILDING SEPARATION ( >2 HOURS)

3 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

1/2 HOUR FIRE BARRIER

SMOKE BARRIER ( >1/2 HOUR)

SMOKE RESISTIVE CONSTRUCTION

Engineers Architects U.S. Department of Veterans Affairs

SPEAKER 8" ROUND CEILING MOUNT

SPEAKER 10" X 10" SQUARE CEILING MOUNT

SPEAKER 10" x 10" WALL MOUNT

WALL HORN

CEILING TYPE

CEILING HEIGHT

CEILING TYPE LEGEND

1 2X2 DROP CEILING

2 HARD CEILING

3 2X4 DROP CEILING

4 GYP CEILING

5 UNFINISHED CEILING

6 1' x 2' METAL PAN CEILING 7 1' x 1' ACOUSTIC CEILING

S

S

S

LINE TYPE LEGEND:

CEILING BOUNDARY:

VOLUME CONTROL MOUNTED AT 48"AFFVC

SYMBOL LEGEND

PAGING SYSTEMPS

8 2' x 4' DRY WALL CEILING

T-121

BOWLING SECOND FLOOR OVERALL

PLAN

1 BOWLING SECOND FLOOR OVERALL PLAN

SCALE: 1/16" = 1' 0"

NORTH

TRUE

8 16 320

A. ALL EXISTING CONDITIONS ARE BASED ON BEST

AVAILABLE INFORMATION AT THE TIME OF

SURVEY AND VISUAL INSPECTION.

B. REPAIR/REPLACE ANY DAMAGED CEILING.

C. PROVIDE NEW SPEAKER ASSEMBLY AS SHOWN

AND CONNECT TO EXISTING SPEAKER/PAGING

ZONE.

D. ALL SPEAKERS SHALL BE TAPPED AT 1/2 WATT

UNLESS OTHERWISE NOTED.

E. MINIMUM SPEAKER WIRE SHALL BE 16 AWG.

F. PAGING CABLES SHALL BE INSTALLED IN

CONDUITS IN ALL EXPOSED AREAS (ROOMS WITH

NO CEILINGS) IN ELECTRICAL ROOMS,

MECHANICAL ROOMS, BOILER ROOMS, STORAGE

ROOMS, GARAGES, OUTSIDE AREAS AND STAIRS.

G. ALL PAGING CABLING/CONDUIT SHALL BE

SUPPORTED BY J-HOOKS, IN CABLE…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .