Attachment 2 Drawings.pdf

PDF 14 MB Posted

Attached to
Y1DA--596-22-101- Replace Overhead Paging System
Solicitation number
36C24925R0039
Issued by

About this file

These are architectural and engineering drawings for replacing the obsolete overhead paging system at the VA Medical Center in Lexington, Kentucky. The comprehensive set of 54 detailed floor plans and technical diagrams covers multiple buildings (Buildings 1-29) across the Sousley Campus, including ground, basement, and upper floors. The drawings specify the installation of a new Public Address and Mass Notification (PAMN) system, including:

Key technical specifications include installing new fiber optic cabling, PoE-enabled switches, amplifier chassis, end-of-line devices, and paging stations across various campus buildings. The system will utilize single-mode fiber optic backbone cabling, with new equipment cabinets to be installed in IT closets. The project involves replacing existing paging infrastructure while maintaining connectivity across multiple buildings, with specific attention to infection control measures, fire barrier continuity, and precise speaker placement in diverse medical and administrative spaces.

View the file

Other files

File Type Posted
Attachment 1 - 36C24925R0039 Replace Obsolete Overhead Paging RFIs.pdf PDF
Attachment 2 - 21-306 Lexington Paging Pre-Bid Wall Types.pdf PDF
36C24925R0039 0006.docx DOCX document
36C24925R0039 0005.docx DOCX document
Sign-in Sheet - 596-22-101- Replace Obsolete Overhead Paging System - 6-25-25.pdf PDF
36C24925R0039 0004.docx DOCX document
Sign-in Sheet - 596-22-101- Replace Obsolete Overhead Paging System.pdf PDF
Header - List of Attachments.docx DOCX document
Sign-in Sheet - 596-22-101- Replace Obsolete Overhead Paging System-02.pdf PDF
36C24925R0039 Replace Obsolete Overhead Paging _ RFI_s.pdf PDF
36C24925R0039 0003.docx DOCX document
36C24925R0039 0002.docx DOCX document
36C24925R0039 0001.docx DOCX document
Attachment 8 Request For Information Form.docx DOCX document
Attachment 4 Calc. of Self Performed Work General Contractor.xlsx XLSX spreadsheet
Attachment 3 Pricing Schedule.xlsx XLSX spreadsheet
Attachment 6 Past Performance Questionnaire.docx DOCX document
Attachment 5 General Condition Breakdown.docx DOCX document
Attachment 1 Specifications.pdf PDF
Attachment 9 Wage Determination - KY20250090 - Modification 5 - 6-6-25.pdf PDF
Attachment 7 Contractor EMR Certification.docx DOCX document
36C24925R0039_1.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project Number

Revisions: Date

CONSULTANTS:

DECEMBER 1, 2023 HTJDM

REPLACE OBSOLETE

OVERHEAD

PAGING SYSTEM

596-22-101

VA MEDICAL CENTER LEXINGTON

1101 VETERANS DRIVE

LEXINGTON, KENTUCKY 40502

21-306

100% BID DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects U.S. Department of Veterans Affairs 53

G-001

PROJECT COVER SHEET

REPLACE PAGING SYSTEM

VA MEDICAL CENTER LEXINGTON

1101 VETERANS DRIVE

LEXINGTON, KENTUCKY 40502

VA PROJECT #: 596-22-101 APOGEE PROJECT #: 21-306

PROJECT SITE MAP BOWLING PROJECT SITE MAP SOUSLEY

PROJECT IMAGE

PROJECT LOCATION

BOWLING CAMPUS

PROJECT IMAGE

SOUSLEY CAMPUS

PROJECT LOCATION

FEBRUARY 29, 2024

PLASTIC WINDOW

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

AD

JU

ST

AB

LE

H

EI

G

H T

HEPA NEGATIVE

AIR UNIT

EXISTING WALL

EXISTING CEILING

FLEX DUCT

ISLM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT

FOR REPLACE PAGING

SYSTEM TROY BOWLING CAMPUS

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA.

PLEASE USE ALL ALTERNATE EXITS AS MARKED.

1' - 5"

1/2"1/2"

1/ 2"

1" 1"

1/

2" 1"

1" 1"

1/

2" 1"

1/

2"

1'

0" 1/

2" 1/

2"

EQ.EQ.

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS

FOR CONSTRUCTION AND RENOVATION

III/IVLOW Risk Group 1

Class III Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

II

I

III

MEDIUM Risk Group 2 HIGH Risk Group 3 HIGHEST Risk Group 4 IV

IV

IV

III/IV

III/IV

III

III/IV

I

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects

Includes, but is not limited to:

- activities which require consecutive work shifts

- requires heavy demolition or removal of a complete ceiling system

- new construction

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies

Includes, but is not limited to:

- sanding of walls for painting or wall covering

- removal of floor coverings, ceiling tiles and casework

- new wall construction

- minor duct work or electrical work above ceilings

- major cabling activities

- any activity which cannot be completed within a single work shift

Small scale, short duration activities which create minimal dust

Includes, but is not limited to:

- installation of telephone and computer cabling

- access to chase spaces

- cutting of walls or ceiling where dust migration can be controlled

Inspection and Non-Invasive Activities

Includes, but is not limited to:

- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet

- painting (but not sanding), wall covering

- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

- Physical and Occupational Therapy

- Outpatient Clincs

- Waiting Rooms

- Sleeb Lab

- Mental Health (outpatient only)

- Prosthetics / Orthotics

- Domicillary

- Other

- Office Areas;

- Out Doors;

- Electrical or Mechanical Rooms

- Social Work;

- Retail Store;

- Stage, Recreation, Theater

- Stairwells

- Conference Rooms;

- Other

I

Patient Risk Group

TYPE D

TYPE C

TYPE A

Group 4 Highest Risk

Group 3 High Risk

- Emergency Room

- Kitchen or Food Preparation/Dining/Canteen

- Echocardiography

- Radiology/MRI

- Respiratory Therapy

- Nuclear Medicine

- Senior Mental Health (In Patient or Senior)

- Community Living Center (CLC)

- Clean Supply

- Other

- Cardiac Cath

- EP Lab or Cardiology

- Sterile Processing Service (SPS)

- All inpatient medical or surgical units

- Care Units: PACU, MICU, SICU, TCU

- Spinal Cord injury (SCI)

- Negative pressure isolation rooms

- Outpatient chemotherapy or Oncology areas

- Operating Rooms

- Endoscopy

- Dialysis

- Bronchoscopy

- Pharmacy

- Clinical Laboratories

- Other

III

TYPE DTYPE CTYPE B

Class IVor control procedures are necessary.

CL

AS

S

IV

CL

AS

S

II

During Construction Project

CL

- I

CL

AS

S

III

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant after barriers are removed.

6. Remove or isolate HVAC system in areas where work was being performed.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering.

4. Vacuum work with HEPA-filtered vacuums.

5. Wet mop with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

1. Wipe surfaces to remove dust.

Upon Completion of Project

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.

4. Remove isolation of HVAC system in areas where work is being performed.

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

4. Complete all critical barriers before construction begins or implement control cube method.

5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.

6. Contain construction waste before transport in tightly covered containers.

7. Cover transport receptacles or carts. Tape covers.

8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.

9. Remove isolation of HVAC system in areas where work is being performed.

1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.

1. Includes all activities required by Class I

2. Provide active means to prevent airborne dust from dispersing into atmosphere.

3. Water mist work surfaces to control dust while cutting.

4. Seal unused doors with duct tape.

5. Block off and seal air vents.

6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.

4. Complete all critical barriers or implement control cube method before construction begins.

5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

6. Seal holes, pipes, conduits, and punctures appropriately.

7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.

8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

9. Place adhesive walk-off mats at entrance to work area within anteroom.

10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.

11. Cover transport receptacles or carts. Tape covering

12. Vacuum work area with HEPA filtered vacuums.

13. Wet mop with disinfectant after barriers are removed.

14. Remove isolation of HVAC system in areas where work is being performed.

TYPE B

1. CONTRACTOR SHALL VISIT ALL AREAS OF WORK, INCLUDING WALKING THE SITE, MEASURING EXISTING DIMENSIONS AND OBSERVING EXISTING CONDITIONS BEFORE BEGINNING WORK, ORDERING MATERIALS, OR STARTING ANY CONSTRUCTION.

CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS OF EXISTING SITE CONDITION PRIOR TO START OF WORK AND ORDERING OF

MATERIALS.

2. CONTRACTOR IS RESPONSIBLE FOR DETERMINING INFECTION CONTROL PRECAUTION MEASURES BASED ON THE TYPE AND LOCATION OF WORK BEING PERFORMED. CONFIRM PRECAUTION MEASURES WITH COR PRIOR TO BEGINNING WORK IN SAID

AREA.

3. PENETRATIONS THRU RATED CONSTRUCTION (FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE BARRIERS, SMOKE PARTITIONS, HORIZONTAL ASSEMBLIES, AND VERTICAL OPENINGS) SHALL MAINTAIN CONTINUITY OF RATED CONSTRUCTION.

CONTRACTOR RESPONSIBLE FOR IDENTIFYING RATED AREAS AND FIRESTOPPING ALL PENETRATIONS. CONTACT COR AND A/E FOR CLARIFICATION AS NEEDED. VA GUIDELINES STATE ALL RATED CONSTRUCTION TO BE CLEARLY LABELED.

4. CONTRACTOR SHALL RECYCLE REMOVED MATERIALS WHENEVER POSSIBLE. SEE DIVISION 1 SPECIFICATIONS

5. CONTRACTOR TO PROTECT AREA ADJACENT TO THE DEMOLITION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES. (IF DAMAGED, REPAIR, PATCH, REPLACE, OR SAND SMOOTH AND TO MATCH EXISTING ADJACENT MATERIALS.)

6. CONTRACTOR SHALL REPORT TO COR IMMEDIATELY WHEN DISCREPANCIES TO THE DRAWINGS ARE FOUND IN THE FIELD.

7. CONTRACTOR TO INSTALL TEMPORARY BALL-IN-TUBE SYSTEM TO MONITOR AND ENSURE PRESSURE LEVEL TO MEET VA GUIDELINE WITHIN CONSTRUCTION AREA. (CONTRACTOR TO VERIFY LOCATIONS) WITH VA COR PRIOR TO INSTALLATION.

INFECTION CONTROL RISK ASSESSMENT NOTES:

* OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.

COMPLETE ALL CRITICAL BARRIERS OR CONTAINMENT MEASURES BEFORE CONSTRUCTION BEGINS.

SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.

DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES DEPARTMENT.

COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.

VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. WET MOP AREA WITH DISINFECTANT. REMOVE ISOLATION OF HVAC SYSTEM IN

AREAS WHERE WORK IS BEING PERFORMED.

COVER ALL RETURNS AND SUPPLY DUCTS AT THE GRATE/DIFFUSES WITH FILTER MEDIA OR BLANKED OFF ENTIRELY PER ICRA

REQUIREMENTS.

KEEP CONSTRUCTION SITE CLEAN & NEAT AT ALL TIMES.

CONTRACTOR TO CLEAN THE CONSTRUCTION AREA, AND PREPARE FOR SAFETY AND INFECTION CONTROL'S INSPECTION AND

FINAL CLEANING BY VA ECM STAFF.

VA ECM STAFF WILL PERFORM FINAL VERIFICATION OF CLEANING AND SANITATION.

INTERIM LIFE SAFETY MEASURES NOTES (ILSM):

IF APPLICABLE:

HOT WORK PERMITS.

PERMITS MUST BE OBTAINED 24 HOURS PRIOR TO COMMENCEMENT OF WORK, WHENEVER POSSIBLE. ORIGINAL PERMIT TO BE POSTED WHERE WORK IS BEING PERFORMED; CONTRACTOR MUST RETURN PERMIT TO SAFETY OFFICE WHEN WORK IS

COMPLETED.

FIRE WATCH. CONTRACTOR MUST INITIAL, DATE AND TIME EVERY 30 MINUTES AFTER HOT WORK HAS STARTED.

CONTRACTOR TO PROVIDE WARNING SIGNAGE AND DIRECTIONAL SIGNAGE THAT SHALL BE POSTED IN CONSTRUCTION AREA

WHILE WORK IS PERFORMED.

CONFINED SPACE. CONTRACTOR TO OBTAIN CONFINED SPACE PERMIT PRIOR TO ENTRY INTO MECHANICAL CHASE. ENSURE

IT IS APPROVED BY VA SAFETY DEPARTMENT AND COTR.

ABBREVIATIONS

(E) (N) N.I.C.

E.T.S.

N.T.S.

SIM.

BLDG.A.

PH.

INC.

S.

DL

GPM

O.C.

COR

PAMNS

IT

EXISTING

NEW

NOT IN CONTRACT

EXPOSED TO STRUCTURE

NOT TO SCALE

SIMILAR

BUILDING

PHONE

INCORPORATED

SOUTH

DEAD LEG

GALLONS PER MINUTE

ON CENTER

CONTRACTING OFFICER REPRESENTATIVE

PUBLIC ADDRESS MASS NOTIFICATION SYSTEM

INFORMATION TECHNOLOGY

FO

SM

MM

DR.

ST.

CMU

EQ.

STL.

NR.

A.F.F.

EJ

CJ

Q.R.S.

°F

FIBER OPTIC

SINGLE MODE

MULTIMODE

DRIVE

STREET

CONCRETE MASONRY UNIT

EQUAL

STAINLESS

NOT RATED

ABOVE FINISHED FLOOR

EXPANSION JOINT

CONTROL JOINT

QUICK RELEASE SPRINKLER

FAHRENHEIT

LIMIT OF DEMOLITION

1. NO MORE THAN 4 INPATIENT BEDS WILL BE DOWN AT ONE TIME, UNLESS COORDINATED BY THE COR BASED ON PATIENT CENSUS.

2. NO MORE THAN 1 OPERATING ROOM SHALL BE DOWN AT ANY TIME. WORK SHALL BE COMPLETED WITHIN ONE WORK RESTRICTED NIGHT SHIFT, LEAVING THE SPACE BROOM SWEPT AND READY FOR A VA

TERMINAL CLEAN BY 5:00 AM.

3. COORDINATE WITH DIRECTOR OF PHARMACY PRIOR TO ANY ACTIVITY. PHARMACIST MUST BE ON SITE FOR ANY ACTIVITY.

1.

2.

3.

4.

5.

NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, OR REPLACE MATERIALS AND FINISHES TO MATCH EXISTING.

BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED TEMPORARY CEILING TILE REMOVAL AND REPLACEMENT BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW OR OUTSIDE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR.

ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERENTLY FROM THAT INDICATED OR THAT ARE NOT IDENTIFIED, SHALL BE REPORTED TO THE

CONTRACTING OFFICER.

OBTAIN ALL REQUIRED COR AUTHORIZATION BEFORE BEGINNING WORK, AND NEW SITE CONSTRUCTION.

CONTRACTOR RESPONSIBLE FOR REPLACING ANY DAMAGED CEILING TILE WITH NEW TILE - TYPE, STYLE, AND COLOR TO MATCH

EXISTING ADJACENT TILES.

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

NOT FOR

CONSTRUCTION

NOT FOR

CONSTRUCTION

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#

Engineers Architects

4/

/2

5:

:3

PM

C :\U se rs

\e gr an ov sk y\

D oc um en ts \2

1-

Ar ch _e gr an ov sk y.

rv t

G-002

ICRA INFORMATION AND DETAILS

2 2EG

REPLACE OBSOLETE

OVERHEAD

PAGING SYSTEM

VA MEDICAL CENTER LEXINGTON

1101 VETERANS DRIVE

LEXINGTON, KENTUCKY 40502 DECEMBER 1, 2023

100% BID DOCUMENTS

596-22-10121-306

WVS

Scale: 1/2" = 1'-0"2 ICRA MOBILE CONTAINMENT CART

Scale: 3" = 1'-0"1 ILSM CONSTRUCTION EGRESS SIGNAGE

GENERAL NOTES

OUTPATIENT CLINICS HIGH X X X X X X X

SLEEP LAB HIGH X X X X X X X X

RETAIL SPACE MEDIUM X X X X

RADIOLOGY / IMAGING HIGH X X X X

MORGUE HIGH X X X X

PHYSICAL THERAPY HIGH X X X X X X

PHARMACY HIGHEST X X X X X NOTE 3 X X X X NOTE 3 X X X X NOTE 3 X X X X NOTE 3

INPATIENT MENTAL HEALTH HIGH X X X X

INPATIENT NURSING UNIT HIGH X X X X NOTE 1 X X X X NOTE 1 X X NOTE 1 X X X X X NOTE 1

ENDOSCOPY HIGHEST X X X X

MEDICAL RECORDS LOW X X X X

LOGISTICS MEDIUM X X X X

LAB / MICROBIOLOGY HIGH X X X X X X X

INFORMATION TECHNOLOGY LOW X X X X

ICU / CRITICAL CARE HIGHEST X X X X NOTE 1 X X X X X NOTE 1 X X X X X NOTE 1 X X X X X NOTE 1

ONCOLOGY / HEMATOLOGY HIGHEST X X X X

SURGERY HIGHEST X X X X X NOTE 2 X X X X X X NOTE 2 X X X X X X X NOTE 2 X X X X X X NOTE 2

DIALYSIS HIGHEST X X X X X

SPECIALTY CLINICS HIGH X X X X X X X

FACILITIES LOW X X X X

ENGINEERING LOW X X X X

EMS MEDIUM X X X X

EMERGENCY DEPARTMENT HIGH X X X X X NOTE 1 X X X X X NOTE 1 X X X X X X X NOTE 1 X X X X X X NOTE 1

EDUCATION LOW X X X X

CANTEEN MEDIUM X X X X X X

DIETARY / FOOD SERVICE MEDIUM X X X X

COMMON AREA LOW X X X X

STERILE PROCESSING HIGHEST X X X X X X X X X X X X X

INTERVENTIONAL CARDIOLOGY HIGHEST X X X X X X X

BIO - MED MEDIUM X X X X X X

ANESTHESIOLOGY HIGH X X X X X

ADMINISTRATION LOW X X X X X

DEPARTMENTS

R

IS

K G

R O

U P

BU

SI

N

ES

S H

O U

R S

(7 :3

AM

5:

P

M

N

IG

H T

H O

U R

S (5

:3

PM

7:

A M

R

ES

TR

IC

TE

D

N

IG

H T

H O

U R

S (7

P M

AM

W

EE

KE

EN

D O

N

LY

(F R

ID

AY

:3

PM

M

O N

D

AY

:0

AM

W

EE

KE

N

D O

N

LY

N

IG

H T

H O

U R

S (F

R I, SA

T, S U

N

:3

PM

7:

A M

AD

VA

N C

ED

N

O

TI

C E

D O

W N

TI

M

E

SC

H

ED

U

LE

SI

N

G

LE

M

U

LT

IP

LE

R O

O M

S

N O

IS

E

R

ES

TR

IC

TI

O

N

VA

A

PP

R

O

VA

L

R

EM

AR

KS

BU

SI

N

ES

S H

O U

R S

(7 :3 am

5:

p m

N

IG

H T

H O

U R

S (5

:3

PM

7:

A M

R

ES

TR

IC

TE

D

N

IG

H T

H O

U R

S (7

P M

AM

W

EE

KE

EN

D O

N

LY

(F R

ID

AY

:3

PM

M

O N

D

AY

:0

AM

W

KE

N D

O N

LY

N

IG

H

T H

O U

R S(

FR

I, SA

T, S U

N 5:

P

M

7:

A M

AD

VA

N C

ED

N

O

TI

C E

D O

W N

TI

M

E

S C

H

ED

U

LE

SI

N

G

LE

M

U

LT

IP

LE

R O

O M

S

N O

IS

E

R

ES

TR

IC

TI

O

N

VA

A

PP

R

O

VA

L

R

EM

AR

KS

BU

SI

N

ES

S H

O U

R S

(7 :3 am

5:

p m

N

IG

H T

H O

U R

S (5

:3

PM

7:

A M

R

ES

TR

IC

TE

D

N

IG

H T

H O

U R

S (7

P M

AM

W

EE

KE

EN

D O

N

LY

(F R

ID

AY

:3

PM

M

O N

D

AY

:0

AM

W

EE

KE

N

D O

N

LY

N

IG

H T

H O

U R

S(

FR

I, SA

T, S

U N

5:

P M

7:

A

M

AD

VA

N C

ED

N

O

TI

C E

D O

W N

TI

M

E

SC

H

ED

U

LE

SI

N

G

LE

M

U

LT

IP

LE

R O

O M

S

N O

IS

E

R

ES

TR

IC

TI

O

N

VA

A

PP

R

O

VA

L

R

EM

AR

KS

BU

SI

N

ES

S H

O U

R S

(7 :3 am

5:

p m

N

IG

H T

H O

U R

S (5

:3

PM

7:

A M

R

ES

TR

IC

TE

D

N

IG

H T

H O

U R

S (7

P M

AM

W

EE

KE

EN

D O

N

LY

(F R

ID

AY

:3

PM

M

O N

D

AY

:0

AM

W

EE

KE

N

D O

N

LY

N

IG

H T

H O

U R

S (F

R I, SA

T, S U

N 5:

P

M

7:

A M

AD

VA

N C

E N

O

TI

C E

D O

W N

TI

M

E

SC

H

ED

U

LE

SI

N

G

LE

M

U

LT

IP

LE

R O

O M

S

N O

IS

E

R

ES

TR

IC

TI

O

N

VA

A

PP

R

O

VA

L

R

EM

AR

KS

WORKING HOURS SHUTDOWN CRITERIA WORKING HOURS SHUTDOWN CRITERIA WORKING HOURS SHUTDOWN CRITERIA WORKING HOURS SHUTDOWN CRITERIA

TYPE A TYPE C TYPE C TYPE D

NOTES

DEMOLITION NOTES

CABLES AND CONNECTORS COLOR LEGEND

TELEPHONE

DESCRIPTION

ITEM JACK CABLE PATCH CABLES I.D. NOTES

DATA/COMPUTER

FIBER - MULTI-MODE

SOUND SYSTEM

WHITE

BLUE

BLACK

N/A

WHITE

BLUE

AQUA

GREEN

WHITE

BLUE

AQUA

N/A

T

C

FO

SS

4 PAIR CABLE

4 PAIR CABLE

6/12/24/36

MULTI COLOR

CONDUCTORS

DUPLEX RECEPTACLE

SIMPLEX RECEPTACLE

EMERGENCY POWER RECEPTACLE

CLEAN RECEPTACLE

SPLIT WIRED RECEPTACLE

HIGH VOLTAGE RECEPTACLE

QUADRUPLEX RECEPTACLE

GFI RECEPTACLE

GFI

DED

DED DUPLEX RECEPTACLE

DED SIMPLEX RECEPTACLE

DED

PP POWER POLE

RECEPTACLES

SURFACE DOOR

SURFACE DOOR

RECESSED

SURFACE

PANELS

SPEAKER 8" ROUND CEILING MOUNTED

SPEAKER 10" x 10" SQUARE CEILING MOUNTED

CEILING TYPE#

#'-#" CEILING HEIGHT

SPEAKER SYMBOL LEGEND

VOLUME CONTROL MOUNTED AT 48"AFF

SPEAKER 10" x 10" WALL MOUNTS

VC

S

S

WALL HORN

LINE TYPE

LEGEND:

CEILING

BOUNDARY

2 x 2 DROP CEILING

HARD CEILING

2 x 4 DROP CEILING

GYP CEILING

UNFINISHED CEILING

1' x 2' METAL PAN CEILING

1' x 1' ACOUSTIC CEILING

PAMN PAMN EQUIPMENT CABINET

PS PAGING STATION

PAGING SYSTEM PHASING

1. INSTALL NEW PAGING HEAD END EQUIPMENT IN ROOMS AS INDICATED ON PLANS.

2. INSTALL NEW PAGING EQUIPMENT IN EACH RACK FOR FLOORS AS SHOWN.

3. INSTALL NEW PAGING BACKBONE CABLING TO THE NEW PAGING EQUIPMENT FROM THE HEAD END

EQUIPMENT.

4. CONNECT AND TERMINATE THE BACK BONE CABLING.

5. INSTALL NEW ZONE AMPLIFIERS IN EACH EQUIPMENT RACK.

6. COORDINATE INTERCONNECTION BETWEEN HEAD END AND ZONE AMPS.

7. INSTALL NEW CABLING AND NEW SPEAKERS.

8. REPLACE/INSTALL CHANGE OVER ALL SPEAKERS TO NEW CABLING.

9. CHANGE OVER ALL SPEAKER CIRCUITS TO NEW SYSTEM.

10. REMOVE ALL OLD PAGING EQUIPMENT.

A1 b

E1 c d

T1

'LPN'

THE LIGHTING FIXTURE TYPE IS INDICATED BY AN UPPER CASE LETTER OR AN UPPER

CASE LETTER AND NUMBER.

THE SWITCH DESIGNATION (IF NEEDED) IS INDICATED BY A LOWER CASE LETTER.

EXAMPLE: LIGHTING FIXTURE TYPE 'A1' IS CONTROLLED BY SWITCH 'b'.

EXIT SIGNS: STEM INDICATES WALL MOUNTING. NO STEM INDICATES CEILING

MOUNTING. SHADED AREA INDICATES ILLUMINATED FACE(S). ARROW INDICATES

DIRECTIONAL ARROW ON ILLUMINATED FACE(S).

DEVICES: THE SWITCH DESIGNATION IS INDICATED BY A LOWER CASE LETTER.

THE CONTROL DEVICE DESIGNATION IS INDICATED BY A LOWER CASE LETTER.

TRANSFORMERS: THE TRANSFORMER TYPE IS INDICATED BY A NUMBER

FOLLOWING THE UPPER CASE LETTER 'T'. SEE THE TRANSFORMER SCHEDULE OR

THE SINGLE LINE DIAGRAM FOR THE TRANSFORMER DESCRIPTION AND

REQUIREMENTS.

PANELBOARDS: PANELBOARD DOORS MAY BE SHOWN TO INDICATE OPENING

SIDE OF RECESSED PANELBOARDS. SEE PANELBOARD IDENTIFICATION FOR

DESIGNATION CODES.

SHEET KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE NOTE

NUMBER INDICATED IN THE HEXAGON.

HOME RUN TO BRANCH CIRCUIT PANEL: THE PANEL DESIGNATION AND CIRCUIT

DESIGNATION ARE SHOWN ADJACENT TO THE HOME RUN ARROW.

CIRCUIT BREAKER SIZES (AMPS/NUMBER OF POLES) ARE SHOWN IN THE PANEL

SCHEDULE WITH THE CORRESPONDING PANEL AND CIRCUIT DESIGNATION.

SYMBOL NOTATIONS: UPPER CASE LETTERS ADJACENT TO SYMBOLS INDICATE

A UNIT TYPE. SEE APPROPRIATE SCHEDULE OR SPECIFICATIONS.

'LPN'-1,3,5

EXAMPLE 1: WALL MOUNTED EXIT SIGN TYPE 'E1' WITH SINGLE FACE

AND DIRECTIONAL ARROW.

EXAMPLE 2: CEILING MOUNTED EXIT SIGN TYPE 'E2' WITH DOUBLE

FACE AND DIRECTIONAL ARROWS.E2

EXAMPLE: SPLIT DUPLEX RECEPTACLE; ONE RECEPTACLE OUTLET IS

CONTROLLED BY SWITCH 'c'.

EXAMPLE: SINGLE POLE SWITCH 'd' TO CONTROL LIGHTING FIXTURES INDICATED BY 'd'.

EXAMPLE: TRANSFORMER TYPE 'T1'.

EXAMPLE: HOME RUN TO PANELBOARD 'LPN'; CIRCUITS 1, 3, 5.

# DEMOLITION KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE

NOTE NUMBER INDICATED IN THE SQUARE.

TECHNOLOGY GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

PROVIDE COMMUNICATIONS DEVICES AND EQUIPMENT IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT, LATEST EDITION OF THE NATIONAL ELECTRICAL CODE, BICSI STANDARDS, AND VA

STANDARDS.

PROVIDE ADDITIONAL SUPPORT FOR DEVICES AND EQUIPMENT WHERE BUILDING CONSTRUCTION IS NOT

SUITABLE FOR DIRECT MOUNTING.

FIRESTOP, DRAFTSTOP, SMOKESTOP OR PROTECT ANNULAR SPACE AROUND PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILINGS, AND ROOF IN ACCORDANCE WITH REQUIREMENTS OF NFPA 70, UL

LISTING REQUIREMENT AND APPLICABLE BUILDING CODES.

PROVIDE CABLING THAT COMPLIES WITH THE LATEST EDITION OF TELECOMMUNICATIONS DISTRIBUTION

METHOD MANUAL AND ANSI/TIA/EIA PUBLICATIONS.

COMPLY WITH THE LATEST ANSI/TIA/EIA 758 AND 607B OR 607A - GROUNDING AND BONDING REQUIREMENTS

FOR TELECOMMUNICATIONS IN COMMERCIAL BUILDING.

COMPLY WITH THE LATEST ANSI/TIA/EIA 568B - COMMERCIAL BUILDING TELECOMMUNICATIONS WIRING

STANDARD.

COMPLY WITH THE LATEST ANSI/TIA/EIA 569B - COMMERCIAL BUILDING STANDARD FOR TELECOMMUNICATIONS

PATHWAYS AND SPACES.

COMPLY WITH THE LATEST NFPA 70 NATIONAL ELECTRICAL CODE.

COMPLY WITH THE LATEST NFPA 99 HEALTHCARE FACILITIES CODE.

COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE.

COORDINATE WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION.

MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES TO INDICATE A QUALITY STANDARD AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER.

PRODUCTS DEEMED EQUAL AND APPROVED BY THE COR WILL BE ACCEPTABLE. COMPLY WITH "BUY AMERICAN

ACT".

MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, BOXES, OUTLET, OR EQUIPMENT UNLESS NOTED

OTHERWISE.

PROVIDE RGS OR EMT CONDUIT UNLESS OTHERWISE NOTED.

PROVIDE MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT LABEL LISTED BY APPROVED THIRD PARTY

TESTING AGENCY.

NOTIFY COR REGARDING DISCREPANCY BETWEEN PLANS AND SPECIFICATIONS FOR CLARIFICATION. THE

MORE STRINGENT OF THE THEM SHALL TAKE PRECEDENCE.

PROVIDE TIA/EIA CAT 6 COPPER OUTLETS AND CONNECTORS.

ALL WORK AREA OUTLETS SHALL BE 8 PIN, CAT 6 KEYSTONE JACK WIRED PER T568A OR T568B AS DIRECTED

BY THE VA COR.

LABEL DEVICES IN ACCORDANCE WITH LATEST ANSI/TIA 606A OR 606B EDITION AS WELL AS THE STANDARDS

SET FORTH BY THE VA HOSPITAL OIT.

PROVIDE A MINIMUM OF 12" CLEARANCE ABOVE THE CABLE TRAY PER TIA/EIA 569.B PARAGRAPH 4.5.6.2.

ALL CABLING INSTALLED ABOVE CEILING SHALL BE PLENUM RATED.

MINIMUM CONDUIT SIZE TO BE USED IS 1-1/4".

DEVICES PLACED IN INTERCOMMUNICATION ROOM TO BE MOUNTED ON FIRE RETARDANT PLYWOOD.

24. CONTRACTOR SHALL USE PRE-ASSEMBLED FIRE SLEEVES OR SHALL USE 3RD-PARTY FIRE PENETRATION INSTALLER

AND INSPECTOR.

25. BASIS OF DESIGN UTILIZED IN THIS DESIGN IS THE BIAMP VOCIA PAGING SYSTEM. ALTERNATES TO THE BASIS OF DESIGN ARE ACCEPTABLE UPON MEETING OR EXCEEDING THE FUNCTIONALITY OF THE SYSTEM AS DESIGNED.

26. CONTRACTOR SHALL TRACK AND NOTE ORDER OF SPEAKERS AND DEVICES IN SPEAKER CIRCUITS, AND PROVIDE

RECORD DRAWINGS INDICATING THE ORDERING OF DEVICES.

27. LIST OF AREAS THAT ARE AFTER HOUR TO BE PROVIDED BY THE VA. CONTRACTOR TO COORDINATE ALL WORK

WITH VA COR AT LEAST THREE WEEKS PRIOR TO WORK.

ADO AUTOMATIC DOOR OPERATOR

AFF ABOVE FINISH FLOOR

BOD BASIS OF DESIGN

CCTV CLOSED CIRCUIT TELEVISION

COAX COAXIAL CABLE

COMM COMMUNICATION

COR CONTRACTING OFFICER REPRESENTATIVE

DC DOOR CONTACT SWITCH

DN DOWN

DO DOOR OPERATOR

DVC DIGITAL VOICE COMMAND

DVR DIGITAL VIDEO RECORDER

E EXISTING DEVICES

EEB EMERGENCY EXIT BUTTON

EL ELECTRICAL STRIKE

ETR EXISTING TO REMAIN

FA FIRE ALARM

FACP FIRE ALARM CONTROL PANEL

FAAP FIRE ALARM ANNUNCIATOR PANEL

FO FIBER OPTIC

FAGAP FIRE ALARM GRAPHIC ANNUNCIATOR PANEL

IT INTERCOMMUNICATION ROOM

MATV MASTER ANTENNA TELEVISION

MM MULTI MODE FIBER

NAC NETWORK APPLIANCE CIRCUIT PANEL

N NEW DEVICES

NCA NETWORK CONTROL ANNUNCIATOR

NS NO SCALE

NTS NOT TO SCALE

NVR NETWORK VIDEO RECORDER

TECHNOLOGY ABBREVIATIONS LIST

OC ON CENTER

OIT OFFICE OF INFORMATION TECHNOLOGY

PACS PHYSICAL ACCESS CONTROL SYSTEM

PAMN PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEM

PB PUSH BUTTON

PBB PRIMARY BONDING BUSBAR

PDU RACK POWER DISTRIBUTION UNITS

POE POWER OVER ETHERNET

PR PAIR

RBB RACK BONDING BUSBAR

RX REQUEST TO EXIT

SBB SECONDARY BONDING BUSBAR

SEP SERVICE ENTRANCE PROTECTION

SLC SIGNALING LINE CIRCUIT

SM SINGLE MODE FIBER

TBB TELECOM BONDING CONDUCTOR

TEL TELEPHONE

TGB TELECOM GROUND BUS BAR

TM TELEMONITORING

TMGB TELECOM MAIN GROUND BUS BAR

TP TWISTED PAIR

TR TELECOM ROOM

TTB TELEPHONE TERMINAL BOARD

TV TELEVISION

WM WIRE MANAGEMENT

WAP WIRELESS ACCESS POINT

UL UNDERWRITERS LABORATORY

UPS UNINTERRUPTIBLE POWER SUPPLY

UTP UNSHIELDED TWISTED PAIR

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT AND WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE AND VA

STANDARDS.

PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS WHERE THE BUILDING

CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.

FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL

ELECTRICAL CODE, UL LISTING REQUIREMENT AND THE APPLICABLE BUILDING CODES.

VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL REQUIRED MOUNTING HARDWARE TO

SUIT THE PARTICULAR INSTALLATION.

PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING CONSTRUCTION.

BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG COPPER MINIMUM.

COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS TO AVOID CONFLICT DURING

CONSTRUCTION.

ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR SPARE, OR SPACE.

MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES, TO INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER. PRODUCTS DEEMED EQUAL AND APPROVED BY THE DESIGNER WILL BE ACCEPTED. ALL PRODUCTS MUST COMPLY WITH "BUY AMERICAN ACT".

ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR PARTICULAR EQUIPMENT

MANUFACTURER'S SPECIFICATIONS.

CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED ON THE DEVICE'S SCREW

TERMINALS.

MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR EQUIPMENT UNLESS NOTED

OTHERWISE.

ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.

ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.

ALL CONDUIT SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED. FMC CONDUIT SHALL BE USED ON VIBRATING EQUIPMENT (MAXIMUM LENGTH OF 6 FEET). PVC SHALL BE USED FOR UNDERGROUND CONDUIT OR WHERE CONCRETE- ENCASED. WHERE VIBRATING EQUIPMENT IS LOCATED OUTSIDE, LFMC CONDUIT SHALL BE USED (MAXIMUM SIX FEET) FOR

FINAL CONNECTIONS.

ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN APPROVED THIRD

PARTY TESTING AGENCY.

FOR ALL LED FIXTURES, THE FIXTURE MUST BE CAPABLE OF SELF-RESETTING TO THE SWITCHED/CONTROLLED STATE DURING ANY FLUCTUATION IN POWER SUPPLY WHERE AUTOMATIC PROTECTIVE MEASURES DISABLE THE LED LAMPS.

PROVIDE A LETTER OR STATEMENT FROM THE MANUFACTURER, OR OTHER ACCEPTABLE PROOF, THAT ALL LED FIXTURES, WITH OR WITHOUT BROWNOUT PROTECTION, WILL RETURN TO THE SWITCHED/CONTROLLED STATE AUTOMATICALLY.

PROVIDE STATEMENT WITH THE FIXTURE SUBMITTALS.

IN CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK , AS DETERMINED BY THE GOVERNMENT, SHALL BE

PROVIDED.

COMPRESSION COUPLINGS SHALL BE USED. NO SET SCREW FITTINGS ARE ALLOWED.

MINIMUM CONDUIT SIZE TO BE USED IS 3/4".

FEEDER TAGS APPENDED WITH 'VD' ARE UPSIZED IN AMPACITY DUE TO VOLTAGE DROP.

LEGEND

E

D

R

N

EXISTING TO REMAIN

EXISTING TO BE DEMOLISHED

EXISTING TO BE REPLACED

NEW DEVICES

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project Number

Revisions: Date

CONSULTANTS:

DECEMBER 1, 2023 HTJDM

REPLACE OBSOLETE

OVERHEAD

PAGING SYSTEM

596-22-101

VA MEDICAL CENTER LEXINGTON

1101 VETERANS DRIVE

LEXINGTON, KENTUCKY 40502

21-306

100% BID DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

Engineers Architects U.S. Department of Veterans Affairs 53

T-001

TECHNOLOGY GENERAL NOTES,

SYMBOL LEGEND & ABBREVIATIONS

ELECTRICAL SYMBOL NOTES ELECTRICAL GENERAL NOTES

njusi Text Box

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project Number

Revisions: Date

CONSULTANTS:

FEBRUARY 29, 2024 HTJDM

REPLACE OBSOLETE

OVERHEAD

PAGING SYSTEM

596-22-101

VA MEDICAL CENTER LEXINGTON

1101 VETERANS DRIVE

LEXINGTON, KENTUCKY 40502

21-306

100% BID DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

X

53Engineers Architects U.S. Department of Veterans Affairs

TS-101

BOWLING SITE PLAN

1 BOWLING SITE PLAN

SCALE: 1" = 50

NORTH

PLAN

0 25' 50' 100'

A. PROVIDE NEW 4 STRAND OS2 OUTDOOR FIBER

TO PAMNS EQUIPMENT LOCATED AT EACH

BUILDING IN 2" CONDUIT WITH INNERDUCT, FROM

BUILDING 1 MAIN HEAD END EQUIPMENT RACK.

B. CONTRACTOR SHALL UTILIZE EXISTING BUILDING

PATHWAYS AND BUILDING CONNECTORS FOR

CABLING ORIGINATING AT BUILDING 1.

1. UTILIZE EXISTING INNERDUCT ROUTING

THROUGH TUNNEL TO PROVIDE COVERAGE TO

CHILLER PLANT. REFERENCE T-101A.

2. CHILLER PLANT BUILDING.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

WP

AutoCAD SHX Text T

AutoCAD SHX Text B.P.

AutoCAD SHX Text

GENERAL

AutoCAD SHX Text

WASTE DUMP

AutoCAD SHX Text

AREA

AutoCAD SHX Text

MARK II

AutoCAD SHX Text

OFF-SET

AutoCAD SHX Text

SANIPAK

AutoCAD SHX Text

STERILIZER

AutoCAD SHX Text

COMPACTOR

AutoCAD SHX Text

WP

AutoCAD SHX Text

WP

AutoCAD SHX Text

ROLL-OFF

AutoCAD SHX Text

CONTAINER

AutoCAD SHX Text

40 CU. YD.

AutoCAD SHX Text

PROPERTY LINE

U G

T

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGTU

G T

UGT

UGT

UGT

UGT

UGT

UG

T

UG

T

UGT

UGT

UGT

UGT

U G

T U

G T

U G

T U

G T

U G

T U

G T

U G

T U

G T

UGT

UG

T

UG

T

UG

T

UG

T

UG

T

UG

T

UG

T

U G

T

UGT UGT UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

U G

T U

G T

U G

T U

G T

U G

T U

G T

U G

T U

G T

U G

T U

G T

UG

T

U G

T

U G

T

U G

T

U G

T

UGT UGT

UGT UGT UGT UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGT

UGTUGTUGT

UGTUGT

U G

T U

G T

U G

T U

G T

U G

T U

G T

U G

T U

G T

U G

T U

G T

U G

T U

G T

B25

B17

B1

B3

B2

B16

B29B28

B27

B4

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project Number

Revisions: Date

CONSULTANTS:

DECEMBER 1, 2023 HTJDM

REPLACE OBSOLETE

OVERHEAD

PAGING SYSTEM

596-22-101

VA MEDICAL CENTER LEXINGTON

1101 VETERANS DRIVE

LEXINGTON, KENTUCKY 40502

21-306

100% BID DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

X

53Engineers Architects U.S. Department of Veterans Affairs

TS-102

SOUSLEY SITE PLAN

1 SOUSLEY SITE PLAN

SCALE: 1" = 50

NORTH

PLAN

0 25' 50' 100'

A. PROVIDE NEW 4 STRAND OS2 OUTDOOR FIBER

TO PAMNS EQUIPMENT LOCATED AT EACH

BUILDING IN 2" CONDUIT WITH INNERDUCT, FROM

BUILDING 1 MAIN HEAD END EQUIPMENT RACK.

B. CONTRACTOR SHALL UTILIZE EXISTING BUILDING

PATHWAYS AND BUILDING CONNECTORS FOR

CABLING ORIGINATING AT BUILDING 1.

1. FOR BUILDING 12, CONTRACTOR SHALL UTILIZE

EXISTING UNDERGROUND PATHWAY TO PROVIDE

NEW FIBER CONNECTION IN INNERDUCT, FROM

BUILDING 1.

UP

UP DN

GARAGE GATE

UP

MOTOR

CYCLE PARKING

WHEEL

CHAIR PARKING

DN

ATM

DN

RAISED FLOOR

GAS CYL

STORAGE

B005D

HAC

A006F

ELEC.

B009

ELECTRICAL

AU003

ELECTRICAL

AU002ELECTRICAL

AU001

SIGNAL CLOSET

D008

TOILET

FEMALE

B019

PREPARATION STERILIZATION

WORK RM

A005C

STORAGE

A008

FOOD

SERVICING

A006D

CLERK

TYPIST

A011

ASST

CHIEF

A012

CHIEF

A010

PARKING LEVEL A

PA01

MECH RM

D-B038

CORRIDOR

BH005

STORAGE

PA08

OTHER SPACE

PAM03

STORAGE

PA07

ELEVATOR

LOBBY

PA02

ELEVATOR

PAE05

ELEVATOR

PAE04

STAIRWELL

PAS05

EMERGENCY

GENERATOR

D003

TRANSFORMERS &

SWITCHGEAR

D003A

STORAGE

D006STORAGE

D005A

EMS

D005

MECH RM

D004

CORRIDOR

DH001

CORRIDOR

DH002

CORRIDOR

DH004

CORRIDOR

DH003

CORRIDOR

DH003

COMM EQUIP

RM

D007D

TD

D002

ELECTRICAL

D001

STAIR

PAS06 STAIR

PAS07

ELEVATOR

S7

ELEVATOR

S6

STORAGE AREA

PA06

PAINT SHOP

D007C

CARPENTER SHOP

D007

LOCKSMITH

D007B

CHIEF

D007A

CORRIDOR

DH005

STAIR

PAS08

CORRIDOR

BH002

M&O

FORMAN

B013

CHIEF

ELECTRICIAN

B014B

ELECTRIC SHOP

B014C

ELECTRONIC

B014

CORRIDOR

BH003

CORRIDOR

BH003

STORAGE

FLAMMABLE

B016

OFFICE

B017

STAFF

TOILET

B015A

WARE HOUSE

B015

STORAGE

GENERAL

B020

MAIL RM

B015B

EMS EQUIP

B021

TOILET

MALE

B018

SOILED

UTILITY

B022A

CORRIDOR

BH004

OFFICE

B022D

OFFICE

B022E

LOGISTICS SVC

INVENTORY MGMT

B022

OFFICE

B022C

OFFICE

B022B

OFFICE

B022A

EMERGENCY GENERATOR

RM

B037

TRANSFORMER RM

B037A

A/C REFRIGERATION

EQUIP RM

B038

CORRIDOR

BH004

ELECTRICAL DISTRIBUTION

RM

B037B

SVC RM

B039

CORRIDOR

BH006

CORRIDOR

BH006

HAS

B044

HAS

B044C

HAS

B044B

EMS OFFICE

B042A

EMS CHECK IN

B042B

SECY/

RECEPTIONIST

B-042

OFFICE

ASST CHIEF

WORK RM

B-042C

TOILET

B044A

IT

B046

EMS

B043

ELECTRIC

CLOSET

B043A

CHARTING

A032E

HALL

A032

CONFERENCE RM

A032D

RESIDENTS

OFFICE

A032C

SECY

OFFICE

A032B

PM&RS CHIEF'S

OFFICE

A032A

MAIN KITCHEN

B036

DISH

WASHING

A020

CONFERENCE M

A029

BREAK RM

B045A

SUPV OFFICE

B045

SURGICAL PACK

B045C

ENVIRONMENTAL

MGMT SUPPLY

B045D

STORAGE

B045B

MAIN KITCHEN

B036

LINEN

B036D

EMS

B036C

MENS

TOILET

B041

FEMALE

TOILET

B040

CANTEEN STORAGE

B036B

OFFICE

B035

STORAGE

B035A

DAIRY & EGG

REFRIG

B036G

OFFICE SUPVS

B036F

CORRIDOR

AH005

CORRIDOR

AH004

CORRIDOR

AH006

CORRIDOR

AH004

SECY

A028

DIETICIANS

OFFICE

A025A

ASST CHIEF

A027

DIETICIANS

OFFICE

A025EMS

A023

ELECTRIC

CLOSET

AU004

ELEVATOR

LOBBY

A000

ELEVATOR LOBBY

A001

BREAK RM

A021

ELEV

AE004

ELEV

AE005

EQUIP

STORAGE AREA

B001

STORAGE

& ISSUE

B034

OFFICE

A019

ELECTRIC

CLOSET

BU003

EMS

A001B

DUMB

ELEVATOR

SOILED RECEIVING

DECONTAMINATION AREA

B005

MANUAL

CART WASH

B005B

STAIRWELL

BS003HALL

B004

EMS

B005A

WOMENS TOILET

B002

MENS TOILET

B003

STORAGE

B009A

HALL

B006A

CORRIDOR

OX101

BULK

STORAGE

B010

LOGISTICS

STORAGE

B011

ELECTRIC

CLOSET

BU002

UNION OFFICE

B011A

FF: VCT

AC PLUMBING

MACH

B012

OFFICE

B012A

CORRIDOR

BH001

CORRIDOR

AH003

CLEAN RECEIVING

B007

CORRIDOR

AH002

STERILE AND NON-STERILE

STORAGE

A001A

RETAIL STORE

A009

STAIRWELL

PAS04

CORRIDOR

AH001

ELECTRIC

CLOSET

AU005

OFFICE

ASST CHIEF

A003

KITCHEN

A006

OFFICE

CANTEEN

A007

REFR WALK IN

A006B

PREFAB

REFRIG

A006C

FOOD

STORAGE

A006A

SERVING LINE

A005

AU008 AU007 AU006

STAIR

AS002

CAFETERIA

A004A

VCS OFFICE

A004E

VCS OFFICE CHIEF

A004A

STORAGE

A004

STORAGE

A004A

EMS

A004B LOUNGE

A002

LOCKERS

FEMALE

A002A

TOILET &

SHOWERS

A002B

IT CLOSET

A002C

ELEV

P3

ELEV

P2

ELEV

P1

TOILET

A024TELEPHONE EQUIP RM

A022

LOCKERS

A026B

EMS

A026

PHYSICAL

THERAPY

A035

STORAGE

A033

HYDROTHERAPY

A034

RECEPTION

A030

CORRIDOR

AH007

PHYSICAL THERAPY

OUTPATIENT

A036

CORRIDOR

A030A

WAITING AREA

A042

EXAM/EMG

A037

PROVIDER

A038

EXAM

A041

EXAM

A040 PROVIDER

A039

STAIRWELL

AS001

TOILET & SHOWERS

A046

A026A TOILET

FEMALE

A045

OT CLINIC

A044

OT OFFICE

A043

OT OFFICE

A043A

RECEPTION AREA

A050

CORRIDOR

AH009

OFFICE

A070RECEIVING

A071

SVC MGR

A072

CORRIDOR

AH008PGM MGR

A068

OFFICE

A069

COMPUTER RM

A073

CORRIDOR

AH010

SOFTWARE APPL

SUPPORT

A067

APPLICATION

SUPPORT

A066

SYSTEMS

MGR

A065

NETWORKING

MGR

A064

PROG MGR SYST &

NETWORKING

A063

ADP

WORKSHOP

A062

STAIRWELL

AS004

TELECOMM

SVCS

A061

TELECOMM

SVCS

A060

SUPPORT

A059

APPLICATION

SUPPORT

A058

APPLICATION

SUPPORT

A057

OFFICE

A051

PGM

SPECIALISTS

A052

PGMMING &

INFO

A053

PGMMING &

INFO

A054

CONFERENCE

RM

A055

ELECTRICAL

A056

MECHANICAL

B015F

FF: CONC.

PROSTHETICS STORAGE

B015C

FF: VCT

MORGUE

B015A

FF: VCT

LOGISTICS BREAKDOWN

B006B

FF: VCT

PAMNS ZONE 'C'

PAMNS ZONE 'E'

PAMNS ZONE 'E'

PAMNS ZONE 'C'

PAMNS ZONE 'E'

PAMNS ZONE 'L'

PAMNS ZONE 'L'

PAMNS ZONE 'C'

PAMNS ZONE 'H'

PAMNS ZONE 'C'

PAMNS ZONE 'L'

PAMNS ZONE 'C

PAMNS ZONE 'E'

PAMNS ZONE 'L'

PAMNS ZONE 'C'

PAMNS ZONE 'H'

PAMNS ZONE 'P'

PAMNS ZONE 'P'

PAMNS ZONE 'P'

PAMNS ZONE 'C'

PAMNS ZONE 'I' PAMNS ZONE 'C'

PAMNS ZONE 'I'

PAMNS ZONE 'C'

PAMNS ZONE 'P'

PAMNS ZONE 'PDeck'

PAMNS ZONE 'F'

PAMNS ZONE 'C'

PAMNS ZONE 'F'

PAMNS ZONE 'C'

PAMNS ZONE 'K'

PAMNS ZONE 'S'

PAMNS ZONE 'L'

PAMNS ZONE 'C'

PAMNS ZONE 'L'

PAMNS ZONE 'C'

PAMNS ZONE 'K'

PAMNS ZONE 'C'

PAMNS ZONE 'K'

PAMNS ZONE 'PDeck'

SRSR

SR

SR

SR

SR

SR

SR

SR

SR

SRSR

SR

SR

SRSR

SR

SR

SR SR

SR

SRSRSR

SR SR

SR

SR SR SR

SR

SR

SRSR

SR

SR

SR

SR

SR

SR

SR

SR SR SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SRSR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SR

SRSR

SR

SR

SRSR

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SNSN

SN

SN SN

SNSN

SN

SN

SN

SN

SN SN

SN

SN

SN

SNSN

SNSN

SNSN

SN

SN

SNSN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

SN

N

N

N

N

N

N N

N

N N

N N

N

N

N

N

N N

SN

SN

SN SN

SNSN

SN

SN

N N

N

N

N

N

N

PS PS PS PS

PS PS PS PS

PS PS

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0" 18'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

8'-0"

S N

S N

S N

S N

S N SN

S N

S N

PAMNS ZONE 'Z'

PAMNS ZONE 'Z'

PAMNS ZONE 'Z'

PAMNS ZONE 'L'

7'7'

7'

7' 7'

7'

7'

7'

7'7'

7'

7'

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project Number

Revisions: Date

CONSULTANTS:

DECEMBER 1, 2023 HTJDM

REPLACE OBSOLETE

OVERHEAD

PAGING SYSTEM

596-22-101

VA MEDICAL CENTER LEXINGTON

1101 VETERANS DRIVE

LEXINGTON, KENTUCKY 40502

21-306

100% BID DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

WALL RATINGS

BUILDING SEPARATION ( >2 HOURS)

3 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

1/2 HOUR FIRE BARRIER

SMOKE BARRIER ( >1/2 HOUR)

SMOKE RESISTIVE CONSTRUCTION

X

Engineers Architects U.S. Department of Veterans Affairs

SPEAKER 8" ROUND CEILING MOUNT

SPEAKER 10" X 10" SQUARE CEILING MOUNT

SPEAKER 10" x 10" WALL MOUNT

WALL HORN

CEILING TYPE

CEILING HEIGHT

CEILING TYPE LEGEND

1 2X2 DROP CEILING

2 HARD CEILING

3 2X4 DROP CEILING

4 GYP CEILING

5 UNFINISHED CEILING

6 1' x 2' METAL PAN CEILING 7 1' x 1' ACOUSTIC CEILING

S

S

S

LINE TYPE LEGEND:

CEILING BOUNDARY:

VOLUME CONTROL MOUNTED AT 48"AFFVC

SYMBOL LEGEND

PAGING SYSTEMPS

8 2' x 4' DRY WALL CEILING

T-101A

BOWLING GROUND LEVEL OVERALL

PLAN

1 BOWLING GROUND LEVEL OVERALL PLAN

SCALE: 1/16" = 1' 0"

NORTH

TRUE

8 16 320

1. SPEAKERS IN THIS ZONE WILL HAVE

ANTI-MICROBIAL FACE/BAFFLE.

2. PROVIDE PAGING STATION IN THE PAGING

CENTER AND CONNECT TO THE PAMN SYSTEM

COORDINATE EXACT LOCATION WITH COR

3. UTILIZE EXISTING INNERDUCT FROM ROOM

D007D TO FEED DEVICES LOCATED IN CHILLER

PLANT. INNERDUCT TRAVELS APPROXIMATELY 2

STORIES DOWN PRIOR TO TRAVELLING TO

GROUND FLOOR OFFICE OF CHILLER PLANT.

COORDINATE WORK WITH COR.

T-401

A. ALL EXISTING CONDITIONS ARE BASED ON BEST

AVAILABLE INFORMATION AT THE TIME OF

SURVEY AND VISUAL INSPECTION.

B. REPAIR/REPLACE ANY DAMAGED CEILING.

C. PROVIDE NEW SPEAKER ASSEMBLY AS SHOWN

AND CONNECT TO EXISTING SPEAKER/PAGING

ZONE.

D. ALL SPEAKERS SHALL BE TAPPED AT 1/2 WATT

UNLESS OTHERWISE NOTED.

E. MINIMUM SPEAKER WIRE SHALL BE 16 AWG.

F. PAGING CABLES SHALL BE INSTALLED IN

CONDUITS IN ALL EXPOSED AREAS (ROOMS WITH

NO CEILINGS) IN ELECTRICAL ROOMS,

MECHANICAL ROOMS, BOILER ROOMS, STORAGE

ROOMS, GARAGES, OUTSIDE AREAS AND STAIRS.

G. ALL PAGING CABLING/CONDUIT SHALL BE

SUPPORTED BY J-HOOKS, IN CABLE TRAY OR AN

APPROVED SUPPORTING SYSTEM.

njusi Text Box

WHEEL CHAIR PARK

HANDICAPPED

PARKING

HANDICAPPED

HANDICAPPED

PARKING PARKING

HANDICAPPED

PARKING

HANDICAPPED HANDICAPPED

PARKING

HANDICAPPED

PARKING

HANDICAPPED

PARKING

HANDICAPPED

PARKING

HANDICAPPED

PARKING PARKING

LEVEL B

VOLUNTEER

PARKING

VOLUNTEER

PARKING

VOLUNTEER

PARKING

VOLUNTEER

PARKING

VOLUNTEER

PARKING

VOLUNTEER

PARKING

VOLUNTEER

PARKING

DOWN

UP

PARKING

DOWN

UP

EMERGENCY

GENERATOR RM

PB01

B038

A/C

REFRIGERATION

EQUIP RM

OTHER SPACE

PB11

TRANSFORMER

RM

B037A

B039

B037

SVC RM

B037B

ELECTRICAL

DISTRIBUTION RM

STAIRWELL

STAIRWELL

AS02

BS03

AS01

STAIRWELL

DENTAL

ORAL

EVAC

UNIT

STAIRWELL

PB09A

PBS05

CHASE

PB03

STORAGE

PB10

ELEV

VESTIBULE

PB02

ELEVATOR

P5

ELEVATOR

P4

PUMP

RM

0-C-1

TC

PB06

EC

PB05

STAIRWELL

PBS06

STAIRWELL

PBS04

UTILITY TUNNEL OTHER SPACE

PB09 PB09

OTHER

SPACE

PB07

FAN RM

PB04

PAMNS ZONE 'PDeck'

PAMNS ZONE 'PDeck'

SN

S

S

N N N

N

NNN

N

N N N

N

N

N

N N N

N

PAMNS ZONE 'B'

PAMNS ZONE 'B'

N

N

N

NN

S

N

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project Number

Revisions: Date

CONSULTANTS:

DECEMBER 1, 2023 HTJDM

REPLACE OBSOLETE

OVERHEAD

PAGING SYSTEM

596-22-101

VA MEDICAL CENTER LEXINGTON

1101 VETERANS DRIVE

LEXINGTON, KENTUCKY 40502

21-306

100% BID DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

WALL RATINGS

BUILDING SEPARATION ( >2 HOURS)

3 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

1/2 HOUR FIRE BARRIER

SMOKE BARRIER ( >1/2 HOUR)

SMOKE RESISTIVE CONSTRUCTION

X

Engineers Architects U.S. Department of Veterans Affairs

SPEAKER 8" ROUND CEILING MOUNT

SPEAKER 10" X 10" SQUARE CEILING MOUNT

SPEAKER 10" x 10" WALL MOUNT

WALL HORN

CEILING TYPE

CEILING HEIGHT

CEILING TYPE LEGEND

1 2X2 DROP CEILING

2 HARD CEILING

3 2X4 DROP CEILING

4 GYP CEILING

5 UNFINISHED CEILING

6 1' x 2' METAL PAN CEILING 7 1' x 1' ACOUSTIC CEILING

S

S

S

LINE TYPE LEGEND:

CEILING BOUNDARY:

VOLUME CONTROL MOUNTED AT 48"AFFVC

SYMBOL LEGEND

PAGING SYSTEMPS

8 2' x 4' DRY WALL CEILING

T-101B

BOWLING BASEMENT LEVEL

OVERALL PLAN

1 BOWLING BASEMENT LEVEL OVERALL PLAN

SCALE: 1/16" = 1' 0"

NORTH

TRUE

8 16 320

A. ALL EXISTING CONDITIONS ARE BASED ON BEST

AVAILABLE INFORMATION AT THE TIME OF

SURVEY AND VISUAL INSPECTION.

B. REPAIR/REPLACE ANY DAMAGED CEILING.

C. PROVIDE NEW SPEAKER ASSEMBLY AS SHOWN

AND CONNECT TO EXISTING SPEAKER/PAGING

ZONE.

D. ALL SPEAKERS SHALL BE TAPPED AT 1/2 WATT

UNLESS OTHERWISE NOTED.

E. MINIMUM SPEAKER WIRE SHALL BE 16 AWG.

F. PAGING CABLES SHALL BE INSTALLED IN

CONDUITS IN ALL EXPOSED AREAS (ROOMS WITH

NO CEILINGS) IN ELECTRICAL ROOMS,

MECHANICAL ROOMS, BOILER ROOMS, STORAGE

ROOMS, GARAGES, OUTSIDE AREAS AND STAIRS.

G. ALL PAGING CABLING/CONDUIT SHALL BE

SUPPORTED BY J-HOOKS, IN CABLE TRAY OR AN

APPROVED SUPPORTING SYSTEM.

DOWN

MOTORCYCLE

MOTORCYCLE

STAIRWELL

PCS04

PARKING

PC01

SUMP

00-C-3

OTHER SPACE

PCM17

FAN RM

00-C-2

STORAGE

PC14

STORAGE

00C6

MECH

RM

PC15

STORAGE

PC16

ELEVATOR

LOBBY

PC02

ELEVATOR

PCE05

ELEVATOR

PCE04

ELEV

EQUIP

00-C-1

STAIR

PCS05

STORAGE

PC05

STORAGE

PC09

MECH RM

PC10

TC

00-D-3

EC

00-D-2STAIR

PCS06

FAN RM

00-D-1

OTHER

SPACE

PCM11

FF:CONCRETE

FF:CONCRETE

FF:VCT

FF:CONCRETE FF:CONCRETE

FF:CONCRETE

FF:VCT

FF:VCT

FF:VCT

FF:CONCRETE

FF:VCT

FF:VCT

FF:CONCRETE

FF:VCT

FF:VCT

FF:CONCRETE

FF:CONCRETE

FF:CONCRETE

FF:CONCRETE

FF:VCT

PAMNS ZONE 'PDeck'

S

S

S

SN

N

N N N

N N N

N

N N N

N

N N N

VA PROJECT NUMBER

Building Number

Drawing Number

Project Title

Date Checked Drawn

Drawing Title

Approved:

VA FORM 08-6231

A

B C

D E

21 4 5 6 7

SHEET NOTES:

SHEET KEY NOTES:

321 4 5 6 7

A B

C E

Dwg. of

LocationLocation

Office of Construction and Facilities Management

PROJECT MANAGER: ACG Project Number

Revisions: Date

CONSULTANTS:

DECEMBER 1, 2023 HTJDM

REPLACE OBSOLETE

OVERHEAD

PAGING SYSTEM

596-22-101

VA MEDICAL CENTER LEXINGTON

1101 VETERANS DRIVE

LEXINGTON, KENTUCKY 40502

21-306

100% BID DOCUMENTS

FULLY SPRINKLERED

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.

WALL RATINGS

BUILDING SEPARATION ( >2 HOURS)

3 HOUR FIRE BARRIER

2 HOUR FIRE BARRIER

1 HOUR FIRE BARRIER

1/2 HOUR FIRE BARRIER

SMOKE BARRIER ( >1/2 HOUR)

SMOKE RESISTIVE CONSTRUCTION

X

Engineers Architects U.S. Department of Veterans Affairs

SPEAKER 8" ROUND CEILING MOUNT

SPEAKER 10" X 10" SQUARE CEILING MOUNT

SPEAKER 10" x 10" WALL MOUNT

WALL HORN

CEILING TYPE

CEILING HEIGHT

CEILING TYPE LEGEND

1 2X2 DROP CEILING

2 HARD CEILING

3 2X4 DROP CEILING

4 GYP CEILING

5 UNFINISHED CEILING

6 1' x 2' METAL PAN CEILING 7 1' x 1' ACOUSTIC CEILING

S

S

S

LINE TYPE LEGEND:

CEILING BOUNDARY:

VOLUME CONTROL MOUNTED AT 48"AFFVC

SYMBOL LEGEND

PAGING SYSTEMPS

8 2' x 4' DRY WALL CEILING

T-101C

BOWLING SUB-BASEMENT LEVEL

OVERALL PLAN

1 LOWER LEVEL OVERALL PLAN

SCALE: 1/16" = 1' 0"

NORTH

TRUE

8 16 320

A. ALL EXISTING CONDITIONS ARE BASED ON BEST

AVAILABLE INFORMATION AT THE TIME OF

SURVEY AND VISUAL INSPECTION.

B. REPAIR/REPLACE ANY DAMAGED CEILING.

C. PROVIDE NEW SPEAKER ASSEMBLY AS SHOWN

AND CONNECT TO EXISTING SPEAKER/PAGING

ZONE.

D. ALL SPEAKERS SHALL BE TAPPED AT 1/2 WATT

UNLESS OTHERWISE NOTED.

E. MINIMUM SPEAKER WIRE SHALL BE 16 AWG.

F. PAGING CABLES SHALL BE INSTALLED IN

CONDUITS IN ALL EXPOSED AREAS (ROOMS WITH

NO CEILINGS) IN ELECTRICAL ROOMS,

MECHANICAL ROOMS, BOILER ROOMS, STORAGE

ROOMS, GARAGES, OUTSIDE AREAS AND STAIRS.

G. ALL PAGING CABLING/CONDUIT SHALL BE

SUPPORTED BY J-HOOKS, IN CABLE TRAY OR AN

EXISTING

STAIR

DS108

TOILET

ELEC

B146A

STORAGE

FEMALE

TOILET

CORRIDOR

AS106

OFFICE

NURSE MGR

INPT PHARMACY

IV STORAGETECHNICIAN OFFICE

A-166

VAULT

A-180

B102

SVC ELEV

LOBBY

CORRIDOR

AH101

SUPPLY

B101L

NUCLEAR MED AND

RADIATION SAFETY

ADMIN OFFICE

CORRIDOR

A-151A A-151

A-160

READING RM

A-159

B133D175

A-184

A-184B

C125G

OFFICE

C125

PASSAGE

C125I C129

BH108

CORRIDOR

B101K

B107

B106

SUPV

LAB

BH105

CT SCAN 1

B114

CONFERENCE

CLASS & STUDY

CLINICAL

MICROBIOLOGIST

CORRIDOR

BH103

CORRIDOR

B147A

B148

B141

B140

DRESSING

B137A

VESTIBULE

CH130A

STAFF TLT

CH132AC134

TLT

EXAM / ISO

C130J

EXAM

C125A

TLT

C121C

TRIAGE 01

C121B

STAFF / WORK RM

VASCULAR LAB

D181

RAD STORAGE

EMSCORRIDOR

B138

PATIENT PREP

STORAGE RM

WORK

RM

D191

VASCULAR LAB

D190

SURG CLINIC

CHECK IN

D157

D158 OFFICE

BREAK/

READING

E126

E123

TOILET

CRYOGEN

STORAGE

MRI

E120

COMPUTER RM

E104

SECTION

OFFICE

EM113

D158

D160A

EXAM

D146

EXAM

EXAM

EXAM

CONS

D144

IT EQUIP RM

D112

STAFF TOILET

D111

STAFF TOILET

D108

D107

BREAK RM

D113 D140B

DS107

STAIR

PHYSICIAN

CONSULTANT RM

DU141

EC

DU142

TC

D102C

TOILET

D102D

PATIENT RM

D109

D110

EXAM

D116

CONS

D106

CLEAN SUPPLY D118

EXAM

D104

DIRTY SUPPLY

D120

EXAM

TOILET

D103

EXAM

D101

EXAM

D124

EXAM

D100

MED RECORD

WORK RM

D100A

RECEPTION

INFUSION / CHEMO TREATMENT

DH108

CORRIDOR

D139

CLEAN STOR

SUPPLY RM

D115

PROCEDURE RM

D117

OFFICE D135

EXAM

D133

EXAMD119

EXAM

D121

EXAM

D131

EXAM

D123

EXAM

D129

EXAM

D125

EXAM

D127

EXAM

D143

STORAGE

D136

CAST RM

D145

EXAM

D147

EXAM

D134

EXAM

D132

EXAM

D149

EXAM

D130

EXAM

D151

EXAM

D128

EXAM

D153

EXAM

DH107

CORRIDOR

DH111

CORRIDOR

DH109

CORRIDOR

CH105C

WAITING

CH113

CORRIDOR

CH105

CORRIDOR

C108

TRAVEL

C111

P5

ELEVATOR

P4

ELEVATOR

D102B

TOILET

D102A

PATIENT RM

C109

MENS TOILET

WOMENS

TOILET

C106 C107

EC

C112B

C112A C112 C113A

C113

DIRECTOR OFFICE

C104V1

CUBICLE

C104V2

CUBICLE

C104V3

CUBICLE

C104V4

CUBICLE HEALTH

BENEFITS

CENTER

C104V6

COPY

C104V11 C104V12 C104V13

C104V14

C104V15

C104V19

C104V18

C104U

DECEDENT

AFFAIRS

C104T

OFFICE

C104S

SUPVY MED

SUPPORT

ASST

C104R

PATIENT SUPPORT

PGM SPECIALIST

C104Q

CHIEF AMBULATORY

CARE AND

PROCESSING

C104P

CHIEF HEALTH

INFO MGMT

C104O

HEALTH ADMIN

CHIEF OFFICE C104N

ADMIN

ASST

C104M

ASST CHIEF

HEALTH ADMIN

C104K

CHIEF

OFFICE C104J

UM / UR MGR

OFFICE

CUBICLE

C104H

WORK RM C104

POLICE

C105

HOLDING

C104D

PAT

TOILET C104A

RECEPTION

C104E

STAFF

TOILET

C107

PIV

C104G

BREAK RM

C103

ARMORY

C102

POLICE

C104I

CONFERENCE RM 101

WHEEL CHAIR

STORAGE

C1-1A

VESTIBULE

C110

POLICE

CH101

LOBBY

C113B

E.R. STAFF

C109

EVIDENCE

UP

C139A

D192

TOILET

CORRIDOR

A-191

AS108

PHARMACY OFFICE

A-189

A102

SUPPORT UNIT

ADMINA-190C

PRE-PACK

A164

CORRIDOR

JANITOR

ASSOCIATE CHIEF

OF PHARMACY

OFFICE

BREAK RM

CONFERENCE RM

A190A

STORAGES V

BH102

A-153

WAITING

C126C

EXAM

MENTAL HEALTH

RM

EXAM

E CYL

MED RM

B105

B104

CORRIDOR

BIO MED

ENGG

GLASS WASH

MICROBIOLOGY

LAB

B117

BH104

B144

OUTPATIENT

READING RM

B147

B143

VACANT

B140A

BU106

RESUSCITATION 1 /

ISOEMS

CLEAN UTIL

C136

C125K

STORAGE

C125D

EXAM

PASSAGE

C122

CH121B

EKG/LAB

PASSAGE

EXAM

D183B

D189

D196

WAITING

VESTIBULE

CONFERENCE RM

C107C104E

RECEPTION

C104A

HOLDING

POLICE

WORK RM

UM / UR MGR

OFFICE

C104M

ADMIN

ASST

COPY

C104V6

C104V4

C112A

C107

C109

ELEVATOR

D194

CORRIDOR

ULTRA SOUND

ANGIOGRAPHY

LINEN RM

MRI READING RM

E130

STAIRWELL

PUBLIC TOILET

CAST RM

E128ORTHO STORAGE

PREPARATION

E121

E127

HVAC

MECH/ELEC

CORRIDOR

E119

PROCESSING

ADMIN

OFFICER

E108E110

C111

CORRIDOR

CORRIDOR

DH107

OFFICE

EXAM

EXAM

CONS

D130

D147EXAM

D117

D120

D106

TC

S7

ELEVATOR

S6

D113

ELEC

DN

C109

E128A

A-188

PASSAGE

CH126

CH101C

AH102

CORRIDOR

AH101

CORRIDOR

PATIENT

ADVOCATE

A-190b

MEN

A-179

CLINICAL

PHARMACIST

A-168 A-170

PHARMACY STORAGE

B101B

SURGICAL

PATHOLOGY

B101H

BU101

CORRIDOR

EXAMBREAK RM

A-158

BONE DENSITY

B132

MECH

A-184A

C127

C126D

EXAM

ELEC

BU103

BH107

MECH

HALL WAYSCANNER

RM

CORRIDOR

X-RAY DIAGNOSTIC RM

FILM PROCESSING

AREA

B142

STAFF WORK

C130

C130E

ER OFFICE 2

C141C143

C132D

C128

C125B

SPECIMEN

SOILED UTIL

TRIAGE 02

CH130B

C132A

C121

SOILED UTIL

CS109

ELEVATOR

D195

C114B

RESP

CARE

POLICE

C1-1A

WHEEL CHAIR

STORAGEC104I

C102

ARMORY

C103

BREAK RM C105

SUPVY MED

SUPPORT

ASST

OFFICE

C104T

C104V13C104V12

CUBICLECUBICLE

C104V2

CUBICLE

C104V1

C112B

ELEC

TOILET

E101

MRI RECEPTION

D193

D169

D169a

PROCEDURE RM

E124

E116 E122

RADIOLOGIST

E107

CH105

CH105E

DH110

D161

EXAM

D153

EXAM

D151

D145

D136

D143

D125

D135

D101

ELEVATOR

DU141

DS107

D140B

BREAK RM

D107

D108

STORAGE

EVIDENCE

MALE

TOILET

ADMIN

ASSIST

EXIST WELCOME

DESK

CORRIDOR

CORRIDOR

CORRIDOR A-190

A-175

A-178

MED MGMT

SPECIALIST

A-163

A-167

PHARMACY

ADAPC

RESIDENTS

A-166

PATHOLOGY LAB

CORRIDOR SOILED

A146

CONFERENCE RM

BREAK RM

B108

BREAK RM

B101G

STORAGE

B101ISUPV

ELEC

AU-105

A-150

FILE RM

A-152B

MENS

RESTROOM

A-156

VIEWING RM

A-185

STORAGE

DECONTAM

TOILET

ON CALL

C125F

C130A

CH125H

NOUR

PREP

C125J

STAIR

CS104

OFFICE

B103

ELEC

BS103

B128

B150A

B152A

LAB INFO

MGR

B113B

MEDIA

PREPARATION

B114D

CHIEF

PATHOLOGY SVC

B118B121

B153

CORRIDOR

BH106

STORAGE

PASSAGE

CH121

ISO

RESUSCITATION 2 /

CH140

EXAM / ISO

C130H

C140 C144

C131

EXAM

C130K

C125E

C125C

EXAM

C124

C123SUB-WAITING

C121DC121A

C132C

EC

CU100

P7

EXAM

C114C

CH104

C104G

PIV

STAFF

TOILET

C104

C104J C104K

CHIEF HEALTH

I…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .