Attachment 2 Drawings.pdf
PDF 14 MB Posted
- Attached to
- Y1DA--596-22-101- Replace Overhead Paging System
- Solicitation number
- 36C24925R0039
About this file
These are architectural and engineering drawings for replacing the obsolete overhead paging system at the VA Medical Center in Lexington, Kentucky. The comprehensive set of 54 detailed floor plans and technical diagrams covers multiple buildings (Buildings 1-29) across the Sousley Campus, including ground, basement, and upper floors. The drawings specify the installation of a new Public Address and Mass Notification (PAMN) system, including:
Key technical specifications include installing new fiber optic cabling, PoE-enabled switches, amplifier chassis, end-of-line devices, and paging stations across various campus buildings. The system will utilize single-mode fiber optic backbone cabling, with new equipment cabinets to be installed in IT closets. The project involves replacing existing paging infrastructure while maintaining connectivity across multiple buildings, with specific attention to infection control measures, fire barrier continuity, and precise speaker placement in diverse medical and administrative spaces.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
Revisions: Date
CONSULTANTS:
DECEMBER 1, 2023 HTJDM
REPLACE OBSOLETE
OVERHEAD
PAGING SYSTEM
596-22-101
VA MEDICAL CENTER LEXINGTON
1101 VETERANS DRIVE
LEXINGTON, KENTUCKY 40502
21-306
100% BID DOCUMENTS
FULLY SPRINKLERED
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects U.S. Department of Veterans Affairs 53
G-001
PROJECT COVER SHEET
REPLACE PAGING SYSTEM
VA MEDICAL CENTER LEXINGTON
1101 VETERANS DRIVE
LEXINGTON, KENTUCKY 40502
VA PROJECT #: 596-22-101 APOGEE PROJECT #: 21-306
PROJECT SITE MAP BOWLING PROJECT SITE MAP SOUSLEY
PROJECT IMAGE
PROJECT LOCATION
BOWLING CAMPUS
PROJECT IMAGE
SOUSLEY CAMPUS
PROJECT LOCATION
FEBRUARY 29, 2024
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
AD
JU
ST
AB
LE
H
EI
G
H T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
FOR REPLACE PAGING
SYSTEM TROY BOWLING CAMPUS
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
1/ 2"
1" 1"
1/
2" 1"
1" 1"
1/
2" 1"
1/
2"
1'
0" 1/
2" 1/
2"
EQ.EQ.
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS
FOR CONSTRUCTION AND RENOVATION
III/IVLOW Risk Group 1
Class III Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
II
I
III
MEDIUM Risk Group 2 HIGH Risk Group 3 HIGHEST Risk Group 4 IV
IV
IV
III/IV
III/IV
III
III/IV
I
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete ceiling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding), wall covering
- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
- Physical and Occupational Therapy
- Outpatient Clincs
- Waiting Rooms
- Sleeb Lab
- Mental Health (outpatient only)
- Prosthetics / Orthotics
- Domicillary
- Other
- Office Areas;
- Out Doors;
- Electrical or Mechanical Rooms
- Social Work;
- Retail Store;
- Stage, Recreation, Theater
- Stairwells
- Conference Rooms;
- Other
I
Patient Risk Group
TYPE D
TYPE C
TYPE A
Group 4 Highest Risk
Group 3 High Risk
- Emergency Room
- Kitchen or Food Preparation/Dining/Canteen
- Echocardiography
- Radiology/MRI
- Respiratory Therapy
- Nuclear Medicine
- Senior Mental Health (In Patient or Senior)
- Community Living Center (CLC)
- Clean Supply
- Other
- Cardiac Cath
- EP Lab or Cardiology
- Sterile Processing Service (SPS)
- All inpatient medical or surgical units
- Care Units: PACU, MICU, SICU, TCU
- Spinal Cord injury (SCI)
- Negative pressure isolation rooms
- Outpatient chemotherapy or Oncology areas
- Operating Rooms
- Endoscopy
- Dialysis
- Bronchoscopy
- Pharmacy
- Clinical Laboratories
- Other
III
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
CL
AS
S
IV
CL
AS
S
II
During Construction Project
CL
- I
CL
AS
S
III
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant after barriers are removed.
6. Remove or isolate HVAC system in areas where work was being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work with HEPA-filtered vacuums.
5. Wet mop with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
1. Wipe surfaces to remove dust.
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
4. Complete all critical barriers before construction begins or implement control cube method.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
6. Contain construction waste before transport in tightly covered containers.
7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.
9. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed.
14. Remove isolation of HVAC system in areas where work is being performed.
TYPE B
1. CONTRACTOR SHALL VISIT ALL AREAS OF WORK, INCLUDING WALKING THE SITE, MEASURING EXISTING DIMENSIONS AND OBSERVING EXISTING CONDITIONS BEFORE BEGINNING WORK, ORDERING MATERIALS, OR STARTING ANY CONSTRUCTION.
CONTRACTOR TO FIELD VERIFY ALL DIMENSIONS OF EXISTING SITE CONDITION PRIOR TO START OF WORK AND ORDERING OF
MATERIALS.
2. CONTRACTOR IS RESPONSIBLE FOR DETERMINING INFECTION CONTROL PRECAUTION MEASURES BASED ON THE TYPE AND LOCATION OF WORK BEING PERFORMED. CONFIRM PRECAUTION MEASURES WITH COR PRIOR TO BEGINNING WORK IN SAID
AREA.
3. PENETRATIONS THRU RATED CONSTRUCTION (FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE BARRIERS, SMOKE PARTITIONS, HORIZONTAL ASSEMBLIES, AND VERTICAL OPENINGS) SHALL MAINTAIN CONTINUITY OF RATED CONSTRUCTION.
CONTRACTOR RESPONSIBLE FOR IDENTIFYING RATED AREAS AND FIRESTOPPING ALL PENETRATIONS. CONTACT COR AND A/E FOR CLARIFICATION AS NEEDED. VA GUIDELINES STATE ALL RATED CONSTRUCTION TO BE CLEARLY LABELED.
4. CONTRACTOR SHALL RECYCLE REMOVED MATERIALS WHENEVER POSSIBLE. SEE DIVISION 1 SPECIFICATIONS
5. CONTRACTOR TO PROTECT AREA ADJACENT TO THE DEMOLITION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES. (IF DAMAGED, REPAIR, PATCH, REPLACE, OR SAND SMOOTH AND TO MATCH EXISTING ADJACENT MATERIALS.)
6. CONTRACTOR SHALL REPORT TO COR IMMEDIATELY WHEN DISCREPANCIES TO THE DRAWINGS ARE FOUND IN THE FIELD.
7. CONTRACTOR TO INSTALL TEMPORARY BALL-IN-TUBE SYSTEM TO MONITOR AND ENSURE PRESSURE LEVEL TO MEET VA GUIDELINE WITHIN CONSTRUCTION AREA. (CONTRACTOR TO VERIFY LOCATIONS) WITH VA COR PRIOR TO INSTALLATION.
INFECTION CONTROL RISK ASSESSMENT NOTES:
* OBTAIN INFECTION CONTROL PERMIT BEFORE CONSTRUCTION BEGINS.
COMPLETE ALL CRITICAL BARRIERS OR CONTAINMENT MEASURES BEFORE CONSTRUCTION BEGINS.
SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE OWNER'S SAFETY DEPARTMENT AND THOROUGHLY CLEANED BY THE OWNER'S ENVIRONMENTAL SERVICES DEPARTMENT.
COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
VACUUM WORK AREA WITH HEPA FILTERED VACUUMS. WET MOP AREA WITH DISINFECTANT. REMOVE ISOLATION OF HVAC SYSTEM IN
AREAS WHERE WORK IS BEING PERFORMED.
COVER ALL RETURNS AND SUPPLY DUCTS AT THE GRATE/DIFFUSES WITH FILTER MEDIA OR BLANKED OFF ENTIRELY PER ICRA
REQUIREMENTS.
KEEP CONSTRUCTION SITE CLEAN & NEAT AT ALL TIMES.
CONTRACTOR TO CLEAN THE CONSTRUCTION AREA, AND PREPARE FOR SAFETY AND INFECTION CONTROL'S INSPECTION AND
FINAL CLEANING BY VA ECM STAFF.
VA ECM STAFF WILL PERFORM FINAL VERIFICATION OF CLEANING AND SANITATION.
INTERIM LIFE SAFETY MEASURES NOTES (ILSM):
IF APPLICABLE:
HOT WORK PERMITS.
PERMITS MUST BE OBTAINED 24 HOURS PRIOR TO COMMENCEMENT OF WORK, WHENEVER POSSIBLE. ORIGINAL PERMIT TO BE POSTED WHERE WORK IS BEING PERFORMED; CONTRACTOR MUST RETURN PERMIT TO SAFETY OFFICE WHEN WORK IS
COMPLETED.
FIRE WATCH. CONTRACTOR MUST INITIAL, DATE AND TIME EVERY 30 MINUTES AFTER HOT WORK HAS STARTED.
CONTRACTOR TO PROVIDE WARNING SIGNAGE AND DIRECTIONAL SIGNAGE THAT SHALL BE POSTED IN CONSTRUCTION AREA
WHILE WORK IS PERFORMED.
CONFINED SPACE. CONTRACTOR TO OBTAIN CONFINED SPACE PERMIT PRIOR TO ENTRY INTO MECHANICAL CHASE. ENSURE
IT IS APPROVED BY VA SAFETY DEPARTMENT AND COTR.
ABBREVIATIONS
(E) (N) N.I.C.
E.T.S.
N.T.S.
SIM.
BLDG.A.
PH.
INC.
S.
DL
GPM
O.C.
COR
PAMNS
IT
EXISTING
NEW
NOT IN CONTRACT
EXPOSED TO STRUCTURE
NOT TO SCALE
SIMILAR
BUILDING
PHONE
INCORPORATED
SOUTH
DEAD LEG
GALLONS PER MINUTE
ON CENTER
CONTRACTING OFFICER REPRESENTATIVE
PUBLIC ADDRESS MASS NOTIFICATION SYSTEM
INFORMATION TECHNOLOGY
FO
SM
MM
DR.
ST.
CMU
EQ.
STL.
NR.
A.F.F.
EJ
CJ
Q.R.S.
°F
FIBER OPTIC
SINGLE MODE
MULTIMODE
DRIVE
STREET
CONCRETE MASONRY UNIT
EQUAL
STAINLESS
NOT RATED
ABOVE FINISHED FLOOR
EXPANSION JOINT
CONTROL JOINT
QUICK RELEASE SPRINKLER
FAHRENHEIT
LIMIT OF DEMOLITION
1. NO MORE THAN 4 INPATIENT BEDS WILL BE DOWN AT ONE TIME, UNLESS COORDINATED BY THE COR BASED ON PATIENT CENSUS.
2. NO MORE THAN 1 OPERATING ROOM SHALL BE DOWN AT ANY TIME. WORK SHALL BE COMPLETED WITHIN ONE WORK RESTRICTED NIGHT SHIFT, LEAVING THE SPACE BROOM SWEPT AND READY FOR A VA
TERMINAL CLEAN BY 5:00 AM.
3. COORDINATE WITH DIRECTOR OF PHARMACY PRIOR TO ANY ACTIVITY. PHARMACIST MUST BE ON SITE FOR ANY ACTIVITY.
1.
2.
3.
4.
5.
NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, OR REPLACE MATERIALS AND FINISHES TO MATCH EXISTING.
BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED TEMPORARY CEILING TILE REMOVAL AND REPLACEMENT BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW OR OUTSIDE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR.
ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERENTLY FROM THAT INDICATED OR THAT ARE NOT IDENTIFIED, SHALL BE REPORTED TO THE
CONTRACTING OFFICER.
OBTAIN ALL REQUIRED COR AUTHORIZATION BEFORE BEGINNING WORK, AND NEW SITE CONSTRUCTION.
CONTRACTOR RESPONSIBLE FOR REPLACING ANY DAMAGED CEILING TILE WITH NEW TILE - TYPE, STYLE, AND COLOR TO MATCH
EXISTING ADJACENT TILES.
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
NOT FOR
CONSTRUCTION
NOT FOR
CONSTRUCTION
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs#
Engineers Architects
4/
/2
5:
:3
PM
C :\U se rs
\e gr an ov sk y\
D oc um en ts \2
1-
Ar ch _e gr an ov sk y.
rv t
G-002
ICRA INFORMATION AND DETAILS
2 2EG
REPLACE OBSOLETE
OVERHEAD
PAGING SYSTEM
VA MEDICAL CENTER LEXINGTON
1101 VETERANS DRIVE
LEXINGTON, KENTUCKY 40502 DECEMBER 1, 2023
100% BID DOCUMENTS
596-22-10121-306
WVS
Scale: 1/2" = 1'-0"2 ICRA MOBILE CONTAINMENT CART
Scale: 3" = 1'-0"1 ILSM CONSTRUCTION EGRESS SIGNAGE
GENERAL NOTES
OUTPATIENT CLINICS HIGH X X X X X X X
SLEEP LAB HIGH X X X X X X X X
RETAIL SPACE MEDIUM X X X X
RADIOLOGY / IMAGING HIGH X X X X
MORGUE HIGH X X X X
PHYSICAL THERAPY HIGH X X X X X X
PHARMACY HIGHEST X X X X X NOTE 3 X X X X NOTE 3 X X X X NOTE 3 X X X X NOTE 3
INPATIENT MENTAL HEALTH HIGH X X X X
INPATIENT NURSING UNIT HIGH X X X X NOTE 1 X X X X NOTE 1 X X NOTE 1 X X X X X NOTE 1
ENDOSCOPY HIGHEST X X X X
MEDICAL RECORDS LOW X X X X
LOGISTICS MEDIUM X X X X
LAB / MICROBIOLOGY HIGH X X X X X X X
INFORMATION TECHNOLOGY LOW X X X X
ICU / CRITICAL CARE HIGHEST X X X X NOTE 1 X X X X X NOTE 1 X X X X X NOTE 1 X X X X X NOTE 1
ONCOLOGY / HEMATOLOGY HIGHEST X X X X
SURGERY HIGHEST X X X X X NOTE 2 X X X X X X NOTE 2 X X X X X X X NOTE 2 X X X X X X NOTE 2
DIALYSIS HIGHEST X X X X X
SPECIALTY CLINICS HIGH X X X X X X X
FACILITIES LOW X X X X
ENGINEERING LOW X X X X
EMS MEDIUM X X X X
EMERGENCY DEPARTMENT HIGH X X X X X NOTE 1 X X X X X NOTE 1 X X X X X X X NOTE 1 X X X X X X NOTE 1
EDUCATION LOW X X X X
CANTEEN MEDIUM X X X X X X
DIETARY / FOOD SERVICE MEDIUM X X X X
COMMON AREA LOW X X X X
STERILE PROCESSING HIGHEST X X X X X X X X X X X X X
INTERVENTIONAL CARDIOLOGY HIGHEST X X X X X X X
BIO - MED MEDIUM X X X X X X
ANESTHESIOLOGY HIGH X X X X X
ADMINISTRATION LOW X X X X X
DEPARTMENTS
R
IS
K G
R O
U P
BU
SI
N
ES
S H
O U
R S
(7 :3
AM
5:
P
M
N
IG
H T
H O
U R
S (5
:3
PM
7:
A M
R
ES
TR
IC
TE
D
N
IG
H T
H O
U R
S (7
P M
AM
W
EE
KE
EN
D O
N
LY
(F R
ID
AY
:3
PM
M
O N
D
AY
:0
AM
W
EE
KE
N
D O
N
LY
N
IG
H T
H O
U R
S (F
R I, SA
T, S U
N
:3
PM
7:
A M
AD
VA
N C
ED
N
O
TI
C E
D O
W N
TI
M
E
SC
H
ED
U
LE
SI
N
G
LE
M
U
LT
IP
LE
R O
O M
S
N O
IS
E
R
ES
TR
IC
TI
O
N
VA
A
PP
R
O
VA
L
R
EM
AR
KS
BU
SI
N
ES
S H
O U
R S
(7 :3 am
5:
p m
N
IG
H T
H O
U R
S (5
:3
PM
7:
A M
R
ES
TR
IC
TE
D
N
IG
H T
H O
U R
S (7
P M
AM
W
EE
KE
EN
D O
N
LY
(F R
ID
AY
:3
PM
M
O N
D
AY
:0
AM
W
KE
N D
O N
LY
N
IG
H
T H
O U
R S(
FR
I, SA
T, S U
N 5:
P
M
7:
A M
AD
VA
N C
ED
N
O
TI
C E
D O
W N
TI
M
E
S C
H
ED
U
LE
SI
N
G
LE
M
U
LT
IP
LE
R O
O M
S
N O
IS
E
R
ES
TR
IC
TI
O
N
VA
A
PP
R
O
VA
L
R
EM
AR
KS
BU
SI
N
ES
S H
O U
R S
(7 :3 am
5:
p m
N
IG
H T
H O
U R
S (5
:3
PM
7:
A M
R
ES
TR
IC
TE
D
N
IG
H T
H O
U R
S (7
P M
AM
W
EE
KE
EN
D O
N
LY
(F R
ID
AY
:3
PM
M
O N
D
AY
:0
AM
W
EE
KE
N
D O
N
LY
N
IG
H T
H O
U R
S(
FR
I, SA
T, S
U N
5:
P M
7:
A
M
AD
VA
N C
ED
N
O
TI
C E
D O
W N
TI
M
E
SC
H
ED
U
LE
SI
N
G
LE
M
U
LT
IP
LE
R O
O M
S
N O
IS
E
R
ES
TR
IC
TI
O
N
VA
A
PP
R
O
VA
L
R
EM
AR
KS
BU
SI
N
ES
S H
O U
R S
(7 :3 am
5:
p m
N
IG
H T
H O
U R
S (5
:3
PM
7:
A M
R
ES
TR
IC
TE
D
N
IG
H T
H O
U R
S (7
P M
AM
W
EE
KE
EN
D O
N
LY
(F R
ID
AY
:3
PM
M
O N
D
AY
:0
AM
W
EE
KE
N
D O
N
LY
N
IG
H T
H O
U R
S (F
R I, SA
T, S U
N 5:
P
M
7:
A M
AD
VA
N C
E N
O
TI
C E
D O
W N
TI
M
E
SC
H
ED
U
LE
SI
N
G
LE
M
U
LT
IP
LE
R O
O M
S
N O
IS
E
R
ES
TR
IC
TI
O
N
VA
A
PP
R
O
VA
L
R
EM
AR
KS
WORKING HOURS SHUTDOWN CRITERIA WORKING HOURS SHUTDOWN CRITERIA WORKING HOURS SHUTDOWN CRITERIA WORKING HOURS SHUTDOWN CRITERIA
TYPE A TYPE C TYPE C TYPE D
NOTES
DEMOLITION NOTES
CABLES AND CONNECTORS COLOR LEGEND
TELEPHONE
DESCRIPTION
ITEM JACK CABLE PATCH CABLES I.D. NOTES
DATA/COMPUTER
FIBER - MULTI-MODE
SOUND SYSTEM
WHITE
BLUE
BLACK
N/A
WHITE
BLUE
AQUA
GREEN
WHITE
BLUE
AQUA
N/A
T
C
FO
SS
4 PAIR CABLE
4 PAIR CABLE
6/12/24/36
MULTI COLOR
CONDUCTORS
DUPLEX RECEPTACLE
SIMPLEX RECEPTACLE
EMERGENCY POWER RECEPTACLE
CLEAN RECEPTACLE
SPLIT WIRED RECEPTACLE
HIGH VOLTAGE RECEPTACLE
QUADRUPLEX RECEPTACLE
GFI RECEPTACLE
GFI
DED
DED DUPLEX RECEPTACLE
DED SIMPLEX RECEPTACLE
DED
PP POWER POLE
RECEPTACLES
SURFACE DOOR
SURFACE DOOR
RECESSED
SURFACE
PANELS
SPEAKER 8" ROUND CEILING MOUNTED
SPEAKER 10" x 10" SQUARE CEILING MOUNTED
CEILING TYPE#
#'-#" CEILING HEIGHT
SPEAKER SYMBOL LEGEND
VOLUME CONTROL MOUNTED AT 48"AFF
SPEAKER 10" x 10" WALL MOUNTS
VC
S
S
WALL HORN
LINE TYPE
LEGEND:
CEILING
BOUNDARY
2 x 2 DROP CEILING
HARD CEILING
2 x 4 DROP CEILING
GYP CEILING
UNFINISHED CEILING
1' x 2' METAL PAN CEILING
1' x 1' ACOUSTIC CEILING
PAMN PAMN EQUIPMENT CABINET
PS PAGING STATION
PAGING SYSTEM PHASING
1. INSTALL NEW PAGING HEAD END EQUIPMENT IN ROOMS AS INDICATED ON PLANS.
2. INSTALL NEW PAGING EQUIPMENT IN EACH RACK FOR FLOORS AS SHOWN.
3. INSTALL NEW PAGING BACKBONE CABLING TO THE NEW PAGING EQUIPMENT FROM THE HEAD END
EQUIPMENT.
4. CONNECT AND TERMINATE THE BACK BONE CABLING.
5. INSTALL NEW ZONE AMPLIFIERS IN EACH EQUIPMENT RACK.
6. COORDINATE INTERCONNECTION BETWEEN HEAD END AND ZONE AMPS.
7. INSTALL NEW CABLING AND NEW SPEAKERS.
8. REPLACE/INSTALL CHANGE OVER ALL SPEAKERS TO NEW CABLING.
9. CHANGE OVER ALL SPEAKER CIRCUITS TO NEW SYSTEM.
10. REMOVE ALL OLD PAGING EQUIPMENT.
A1 b
E1 c d
T1
'LPN'
THE LIGHTING FIXTURE TYPE IS INDICATED BY AN UPPER CASE LETTER OR AN UPPER
CASE LETTER AND NUMBER.
THE SWITCH DESIGNATION (IF NEEDED) IS INDICATED BY A LOWER CASE LETTER.
EXAMPLE: LIGHTING FIXTURE TYPE 'A1' IS CONTROLLED BY SWITCH 'b'.
EXIT SIGNS: STEM INDICATES WALL MOUNTING. NO STEM INDICATES CEILING
MOUNTING. SHADED AREA INDICATES ILLUMINATED FACE(S). ARROW INDICATES
DIRECTIONAL ARROW ON ILLUMINATED FACE(S).
DEVICES: THE SWITCH DESIGNATION IS INDICATED BY A LOWER CASE LETTER.
THE CONTROL DEVICE DESIGNATION IS INDICATED BY A LOWER CASE LETTER.
TRANSFORMERS: THE TRANSFORMER TYPE IS INDICATED BY A NUMBER
FOLLOWING THE UPPER CASE LETTER 'T'. SEE THE TRANSFORMER SCHEDULE OR
THE SINGLE LINE DIAGRAM FOR THE TRANSFORMER DESCRIPTION AND
REQUIREMENTS.
PANELBOARDS: PANELBOARD DOORS MAY BE SHOWN TO INDICATE OPENING
SIDE OF RECESSED PANELBOARDS. SEE PANELBOARD IDENTIFICATION FOR
DESIGNATION CODES.
SHEET KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE NOTE
NUMBER INDICATED IN THE HEXAGON.
HOME RUN TO BRANCH CIRCUIT PANEL: THE PANEL DESIGNATION AND CIRCUIT
DESIGNATION ARE SHOWN ADJACENT TO THE HOME RUN ARROW.
CIRCUIT BREAKER SIZES (AMPS/NUMBER OF POLES) ARE SHOWN IN THE PANEL
SCHEDULE WITH THE CORRESPONDING PANEL AND CIRCUIT DESIGNATION.
SYMBOL NOTATIONS: UPPER CASE LETTERS ADJACENT TO SYMBOLS INDICATE
A UNIT TYPE. SEE APPROPRIATE SCHEDULE OR SPECIFICATIONS.
'LPN'-1,3,5
EXAMPLE 1: WALL MOUNTED EXIT SIGN TYPE 'E1' WITH SINGLE FACE
AND DIRECTIONAL ARROW.
EXAMPLE 2: CEILING MOUNTED EXIT SIGN TYPE 'E2' WITH DOUBLE
FACE AND DIRECTIONAL ARROWS.E2
EXAMPLE: SPLIT DUPLEX RECEPTACLE; ONE RECEPTACLE OUTLET IS
CONTROLLED BY SWITCH 'c'.
EXAMPLE: SINGLE POLE SWITCH 'd' TO CONTROL LIGHTING FIXTURES INDICATED BY 'd'.
EXAMPLE: TRANSFORMER TYPE 'T1'.
EXAMPLE: HOME RUN TO PANELBOARD 'LPN'; CIRCUITS 1, 3, 5.
# DEMOLITION KEY NOTE: SEE THE SHEET KEY NOTES ON THAT SHEET FOR THE
NOTE NUMBER INDICATED IN THE SQUARE.
TECHNOLOGY GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
PROVIDE COMMUNICATIONS DEVICES AND EQUIPMENT IN ACCORDANCE WITH THE CONTRACT DOCUMENTS, MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT, LATEST EDITION OF THE NATIONAL ELECTRICAL CODE, BICSI STANDARDS, AND VA
STANDARDS.
PROVIDE ADDITIONAL SUPPORT FOR DEVICES AND EQUIPMENT WHERE BUILDING CONSTRUCTION IS NOT
SUITABLE FOR DIRECT MOUNTING.
FIRESTOP, DRAFTSTOP, SMOKESTOP OR PROTECT ANNULAR SPACE AROUND PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILINGS, AND ROOF IN ACCORDANCE WITH REQUIREMENTS OF NFPA 70, UL
LISTING REQUIREMENT AND APPLICABLE BUILDING CODES.
PROVIDE CABLING THAT COMPLIES WITH THE LATEST EDITION OF TELECOMMUNICATIONS DISTRIBUTION
METHOD MANUAL AND ANSI/TIA/EIA PUBLICATIONS.
COMPLY WITH THE LATEST ANSI/TIA/EIA 758 AND 607B OR 607A - GROUNDING AND BONDING REQUIREMENTS
FOR TELECOMMUNICATIONS IN COMMERCIAL BUILDING.
COMPLY WITH THE LATEST ANSI/TIA/EIA 568B - COMMERCIAL BUILDING TELECOMMUNICATIONS WIRING
STANDARD.
COMPLY WITH THE LATEST ANSI/TIA/EIA 569B - COMMERCIAL BUILDING STANDARD FOR TELECOMMUNICATIONS
PATHWAYS AND SPACES.
COMPLY WITH THE LATEST NFPA 70 NATIONAL ELECTRICAL CODE.
COMPLY WITH THE LATEST NFPA 99 HEALTHCARE FACILITIES CODE.
COMPLY WITH THE LATEST NFPA 101 LIFE SAFETY CODE.
COORDINATE WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION.
MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES TO INDICATE A QUALITY STANDARD AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER.
PRODUCTS DEEMED EQUAL AND APPROVED BY THE COR WILL BE ACCEPTABLE. COMPLY WITH "BUY AMERICAN
ACT".
MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, BOXES, OUTLET, OR EQUIPMENT UNLESS NOTED
OTHERWISE.
PROVIDE RGS OR EMT CONDUIT UNLESS OTHERWISE NOTED.
PROVIDE MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT LABEL LISTED BY APPROVED THIRD PARTY
TESTING AGENCY.
NOTIFY COR REGARDING DISCREPANCY BETWEEN PLANS AND SPECIFICATIONS FOR CLARIFICATION. THE
MORE STRINGENT OF THE THEM SHALL TAKE PRECEDENCE.
PROVIDE TIA/EIA CAT 6 COPPER OUTLETS AND CONNECTORS.
ALL WORK AREA OUTLETS SHALL BE 8 PIN, CAT 6 KEYSTONE JACK WIRED PER T568A OR T568B AS DIRECTED
BY THE VA COR.
LABEL DEVICES IN ACCORDANCE WITH LATEST ANSI/TIA 606A OR 606B EDITION AS WELL AS THE STANDARDS
SET FORTH BY THE VA HOSPITAL OIT.
PROVIDE A MINIMUM OF 12" CLEARANCE ABOVE THE CABLE TRAY PER TIA/EIA 569.B PARAGRAPH 4.5.6.2.
ALL CABLING INSTALLED ABOVE CEILING SHALL BE PLENUM RATED.
MINIMUM CONDUIT SIZE TO BE USED IS 1-1/4".
DEVICES PLACED IN INTERCOMMUNICATION ROOM TO BE MOUNTED ON FIRE RETARDANT PLYWOOD.
24. CONTRACTOR SHALL USE PRE-ASSEMBLED FIRE SLEEVES OR SHALL USE 3RD-PARTY FIRE PENETRATION INSTALLER
AND INSPECTOR.
25. BASIS OF DESIGN UTILIZED IN THIS DESIGN IS THE BIAMP VOCIA PAGING SYSTEM. ALTERNATES TO THE BASIS OF DESIGN ARE ACCEPTABLE UPON MEETING OR EXCEEDING THE FUNCTIONALITY OF THE SYSTEM AS DESIGNED.
26. CONTRACTOR SHALL TRACK AND NOTE ORDER OF SPEAKERS AND DEVICES IN SPEAKER CIRCUITS, AND PROVIDE
RECORD DRAWINGS INDICATING THE ORDERING OF DEVICES.
27. LIST OF AREAS THAT ARE AFTER HOUR TO BE PROVIDED BY THE VA. CONTRACTOR TO COORDINATE ALL WORK
WITH VA COR AT LEAST THREE WEEKS PRIOR TO WORK.
ADO AUTOMATIC DOOR OPERATOR
AFF ABOVE FINISH FLOOR
BOD BASIS OF DESIGN
CCTV CLOSED CIRCUIT TELEVISION
COAX COAXIAL CABLE
COMM COMMUNICATION
COR CONTRACTING OFFICER REPRESENTATIVE
DC DOOR CONTACT SWITCH
DN DOWN
DO DOOR OPERATOR
DVC DIGITAL VOICE COMMAND
DVR DIGITAL VIDEO RECORDER
E EXISTING DEVICES
EEB EMERGENCY EXIT BUTTON
EL ELECTRICAL STRIKE
ETR EXISTING TO REMAIN
FA FIRE ALARM
FACP FIRE ALARM CONTROL PANEL
FAAP FIRE ALARM ANNUNCIATOR PANEL
FO FIBER OPTIC
FAGAP FIRE ALARM GRAPHIC ANNUNCIATOR PANEL
IT INTERCOMMUNICATION ROOM
MATV MASTER ANTENNA TELEVISION
MM MULTI MODE FIBER
NAC NETWORK APPLIANCE CIRCUIT PANEL
N NEW DEVICES
NCA NETWORK CONTROL ANNUNCIATOR
NS NO SCALE
NTS NOT TO SCALE
NVR NETWORK VIDEO RECORDER
TECHNOLOGY ABBREVIATIONS LIST
OC ON CENTER
OIT OFFICE OF INFORMATION TECHNOLOGY
PACS PHYSICAL ACCESS CONTROL SYSTEM
PAMN PUBLIC ADDRESS AND MASS NOTIFICATION SYSTEM
PB PUSH BUTTON
PBB PRIMARY BONDING BUSBAR
PDU RACK POWER DISTRIBUTION UNITS
POE POWER OVER ETHERNET
PR PAIR
RBB RACK BONDING BUSBAR
RX REQUEST TO EXIT
SBB SECONDARY BONDING BUSBAR
SEP SERVICE ENTRANCE PROTECTION
SLC SIGNALING LINE CIRCUIT
SM SINGLE MODE FIBER
TBB TELECOM BONDING CONDUCTOR
TEL TELEPHONE
TGB TELECOM GROUND BUS BAR
TM TELEMONITORING
TMGB TELECOM MAIN GROUND BUS BAR
TP TWISTED PAIR
TR TELECOM ROOM
TTB TELEPHONE TERMINAL BOARD
TV TELEVISION
WM WIRE MANAGEMENT
WAP WIRELESS ACCESS POINT
UL UNDERWRITERS LABORATORY
UPS UNINTERRUPTIBLE POWER SUPPLY
UTP UNSHIELDED TWISTED PAIR
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
ALL ELECTRICAL DEVICES, FIXTURES, EQUIPMENT AND FEEDERS SHALL BE INSTALLED IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS, THE MANUFACTURER'S RECOMMENDED PROCEDURES, ALL APPLICABLE LOCAL AND STATE CODES, AMERICANS WITH DISABILITIES ACT AND WITH THE LATEST EDITION OF THE NATIONAL ELECTRICAL CODE AND VA
STANDARDS.
PROVIDE ADDITIONAL SUPPORT FOR DEVICES, FIXTURES, EQUIPMENT AND FEEDERS WHERE THE BUILDING
CONSTRUCTION IS NOT SUITABLE FOR DIRECT MOUNTING.
FIRESTOP, DRAFTSTOP, SMOKESTOP AND/OR PROTECT THE ANNULAR SPACE AROUND ALL PENETRATIONS THROUGH WALLS, PARTITIONS, FLOORS, CEILING, AND ROOFS IN ACCORDANCE WITH THE REQUIREMENTS OF THE NATIONAL
ELECTRICAL CODE, UL LISTING REQUIREMENT AND THE APPLICABLE BUILDING CODES.
VERIFY CEILING SYSTEMS AND PROVIDE MOUNTING ACCESSORIES, TRIMS AND ALL REQUIRED MOUNTING HARDWARE TO
SUIT THE PARTICULAR INSTALLATION.
PROTECT EXISTING UNDERGROUND AND BUILDING INTERIOR UTILITIES DURING CONSTRUCTION.
BRANCH CIRCUIT CONDUCTORS SHALL BE 12 AWG COPPER MINIMUM.
COORDINATE ANY AND ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION SO AS TO AVOID CONFLICT DURING
CONSTRUCTION.
ALL PANELS SHALL HAVE TYPED, COMPLETED DIRECTORIES INDICATING EQUIPMENT SERVED AND ROOM NUMBER (AS INDICATED ON FINAL BUILDING ROOM SIGNAGE) OF EQUIPMENT LOCATION, OR SPARE, OR SPACE.
MANUFACTURER'S NAME AND MODEL NUMBER ARE GIVEN FOR DESCRIPTIVE PURPOSES, TO INDICATE A QUALITY STANDARD, AND ARE NOT INTENDED TO LIMIT PRODUCTS TO A PARTICULAR MANUFACTURER. PRODUCTS DEEMED EQUAL AND APPROVED BY THE DESIGNER WILL BE ACCEPTED. ALL PRODUCTS MUST COMPLY WITH "BUY AMERICAN ACT".
ALL FEEDERS AND CIRCUITRY SHALL BE TORQUED PER THE PANEL, BREAKER, AND/OR PARTICULAR EQUIPMENT
MANUFACTURER'S SPECIFICATIONS.
CIRCUITRY TO SWITCHES, RECEPTACLES, AND ALL OTHER DEVICES SHALL BE TERMINATED ON THE DEVICE'S SCREW
TERMINALS.
MOUNTING HEIGHTS INDICATED ARE TO CENTER OF DEVICE, OUTLET, FIXTURE, OR EQUIPMENT UNLESS NOTED
OTHERWISE.
ALL WIRE TERMINATIONS SHALL BE RATED FOR 75 DEGREES C.
ALL CONDUCTORS SHALL HAVE THHN/THWN INSULATION, UNLESS OTHERWISE NOTED.
ALL CONDUIT SHALL BE RGS OR EMT UNLESS OTHERWISE NOTED. FMC CONDUIT SHALL BE USED ON VIBRATING EQUIPMENT (MAXIMUM LENGTH OF 6 FEET). PVC SHALL BE USED FOR UNDERGROUND CONDUIT OR WHERE CONCRETE- ENCASED. WHERE VIBRATING EQUIPMENT IS LOCATED OUTSIDE, LFMC CONDUIT SHALL BE USED (MAXIMUM SIX FEET) FOR
FINAL CONNECTIONS.
ALL ELECTRICAL MATERIALS, DEVICES, APPLIANCES AND EQUIPMENT SHALL BE LABEL LISTED BY AN APPROVED THIRD
PARTY TESTING AGENCY.
FOR ALL LED FIXTURES, THE FIXTURE MUST BE CAPABLE OF SELF-RESETTING TO THE SWITCHED/CONTROLLED STATE DURING ANY FLUCTUATION IN POWER SUPPLY WHERE AUTOMATIC PROTECTIVE MEASURES DISABLE THE LED LAMPS.
PROVIDE A LETTER OR STATEMENT FROM THE MANUFACTURER, OR OTHER ACCEPTABLE PROOF, THAT ALL LED FIXTURES, WITH OR WITHOUT BROWNOUT PROTECTION, WILL RETURN TO THE SWITCHED/CONTROLLED STATE AUTOMATICALLY.
PROVIDE STATEMENT WITH THE FIXTURE SUBMITTALS.
IN CASE OF CONFLICTS OR DISCREPANCIES WITHIN OR AMONG THE CONTRACT DRAWINGS, THE BETTER QUALITY, MORE STRINGENT REQUIREMENTS OR GREATER QUANTITY OF WORK , AS DETERMINED BY THE GOVERNMENT, SHALL BE
PROVIDED.
COMPRESSION COUPLINGS SHALL BE USED. NO SET SCREW FITTINGS ARE ALLOWED.
MINIMUM CONDUIT SIZE TO BE USED IS 3/4".
FEEDER TAGS APPENDED WITH 'VD' ARE UPSIZED IN AMPACITY DUE TO VOLTAGE DROP.
LEGEND
E
D
R
N
EXISTING TO REMAIN
EXISTING TO BE DEMOLISHED
EXISTING TO BE REPLACED
NEW DEVICES
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
321 4 5 6 7
A B
C E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
Revisions: Date
CONSULTANTS:
DECEMBER 1, 2023 HTJDM
REPLACE OBSOLETE
OVERHEAD
PAGING SYSTEM
596-22-101
VA MEDICAL CENTER LEXINGTON
1101 VETERANS DRIVE
LEXINGTON, KENTUCKY 40502
21-306
100% BID DOCUMENTS
FULLY SPRINKLERED
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.
Engineers Architects U.S. Department of Veterans Affairs 53
T-001
TECHNOLOGY GENERAL NOTES,
SYMBOL LEGEND & ABBREVIATIONS
ELECTRICAL SYMBOL NOTES ELECTRICAL GENERAL NOTES
njusi Text Box
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
Revisions: Date
CONSULTANTS:
FEBRUARY 29, 2024 HTJDM
REPLACE OBSOLETE
OVERHEAD
PAGING SYSTEM
596-22-101
VA MEDICAL CENTER LEXINGTON
1101 VETERANS DRIVE
LEXINGTON, KENTUCKY 40502
21-306
100% BID DOCUMENTS
FULLY SPRINKLERED
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.
X
53Engineers Architects U.S. Department of Veterans Affairs
TS-101
BOWLING SITE PLAN
1 BOWLING SITE PLAN
SCALE: 1" = 50
NORTH
PLAN
0 25' 50' 100'
A. PROVIDE NEW 4 STRAND OS2 OUTDOOR FIBER
TO PAMNS EQUIPMENT LOCATED AT EACH
BUILDING IN 2" CONDUIT WITH INNERDUCT, FROM
BUILDING 1 MAIN HEAD END EQUIPMENT RACK.
B. CONTRACTOR SHALL UTILIZE EXISTING BUILDING
PATHWAYS AND BUILDING CONNECTORS FOR
CABLING ORIGINATING AT BUILDING 1.
1. UTILIZE EXISTING INNERDUCT ROUTING
THROUGH TUNNEL TO PROVIDE COVERAGE TO
CHILLER PLANT. REFERENCE T-101A.
2. CHILLER PLANT BUILDING.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
WP
AutoCAD SHX Text T
AutoCAD SHX Text B.P.
AutoCAD SHX Text
GENERAL
AutoCAD SHX Text
WASTE DUMP
AutoCAD SHX Text
AREA
AutoCAD SHX Text
MARK II
AutoCAD SHX Text
OFF-SET
AutoCAD SHX Text
SANIPAK
AutoCAD SHX Text
STERILIZER
AutoCAD SHX Text
COMPACTOR
AutoCAD SHX Text
WP
AutoCAD SHX Text
WP
AutoCAD SHX Text
ROLL-OFF
AutoCAD SHX Text
CONTAINER
AutoCAD SHX Text
40 CU. YD.
AutoCAD SHX Text
PROPERTY LINE
U G
T
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGTU
G T
UGT
UGT
UGT
UGT
UGT
UG
T
UG
T
UGT
UGT
UGT
UGT
U G
T U
G T
U G
T U
G T
U G
T U
G T
U G
T U
G T
UGT
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
UG
T
U G
T
UGT UGT UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
U G
T U
G T
U G
T U
G T
U G
T U
G T
U G
T U
G T
U G
T U
G T
UG
T
U G
T
U G
T
U G
T
U G
T
UGT UGT
UGT UGT UGT UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGT
UGTUGTUGT
UGTUGT
U G
T U
G T
U G
T U
G T
U G
T U
G T
U G
T U
G T
U G
T U
G T
U G
T U
G T
B25
B17
B1
B3
B2
B16
B29B28
B27
B4
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
Revisions: Date
CONSULTANTS:
DECEMBER 1, 2023 HTJDM
REPLACE OBSOLETE
OVERHEAD
PAGING SYSTEM
596-22-101
VA MEDICAL CENTER LEXINGTON
1101 VETERANS DRIVE
LEXINGTON, KENTUCKY 40502
21-306
100% BID DOCUMENTS
FULLY SPRINKLERED
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.
X
53Engineers Architects U.S. Department of Veterans Affairs
TS-102
SOUSLEY SITE PLAN
1 SOUSLEY SITE PLAN
SCALE: 1" = 50
NORTH
PLAN
0 25' 50' 100'
A. PROVIDE NEW 4 STRAND OS2 OUTDOOR FIBER
TO PAMNS EQUIPMENT LOCATED AT EACH
BUILDING IN 2" CONDUIT WITH INNERDUCT, FROM
BUILDING 1 MAIN HEAD END EQUIPMENT RACK.
B. CONTRACTOR SHALL UTILIZE EXISTING BUILDING
PATHWAYS AND BUILDING CONNECTORS FOR
CABLING ORIGINATING AT BUILDING 1.
1. FOR BUILDING 12, CONTRACTOR SHALL UTILIZE
EXISTING UNDERGROUND PATHWAY TO PROVIDE
NEW FIBER CONNECTION IN INNERDUCT, FROM
BUILDING 1.
UP
UP DN
GARAGE GATE
UP
MOTOR
CYCLE PARKING
WHEEL
CHAIR PARKING
DN
ATM
DN
RAISED FLOOR
GAS CYL
STORAGE
B005D
HAC
A006F
ELEC.
B009
ELECTRICAL
AU003
ELECTRICAL
AU002ELECTRICAL
AU001
SIGNAL CLOSET
D008
TOILET
FEMALE
B019
PREPARATION STERILIZATION
WORK RM
A005C
STORAGE
A008
FOOD
SERVICING
A006D
CLERK
TYPIST
A011
ASST
CHIEF
A012
CHIEF
A010
PARKING LEVEL A
PA01
MECH RM
D-B038
CORRIDOR
BH005
STORAGE
PA08
OTHER SPACE
PAM03
STORAGE
PA07
ELEVATOR
LOBBY
PA02
ELEVATOR
PAE05
ELEVATOR
PAE04
STAIRWELL
PAS05
EMERGENCY
GENERATOR
D003
TRANSFORMERS &
SWITCHGEAR
D003A
STORAGE
D006STORAGE
D005A
EMS
D005
MECH RM
D004
CORRIDOR
DH001
CORRIDOR
DH002
CORRIDOR
DH004
CORRIDOR
DH003
CORRIDOR
DH003
COMM EQUIP
RM
D007D
TD
D002
ELECTRICAL
D001
STAIR
PAS06 STAIR
PAS07
ELEVATOR
S7
ELEVATOR
S6
STORAGE AREA
PA06
PAINT SHOP
D007C
CARPENTER SHOP
D007
LOCKSMITH
D007B
CHIEF
D007A
CORRIDOR
DH005
STAIR
PAS08
CORRIDOR
BH002
M&O
FORMAN
B013
CHIEF
ELECTRICIAN
B014B
ELECTRIC SHOP
B014C
ELECTRONIC
B014
CORRIDOR
BH003
CORRIDOR
BH003
STORAGE
FLAMMABLE
B016
OFFICE
B017
STAFF
TOILET
B015A
WARE HOUSE
B015
STORAGE
GENERAL
B020
MAIL RM
B015B
EMS EQUIP
B021
TOILET
MALE
B018
SOILED
UTILITY
B022A
CORRIDOR
BH004
OFFICE
B022D
OFFICE
B022E
LOGISTICS SVC
INVENTORY MGMT
B022
OFFICE
B022C
OFFICE
B022B
OFFICE
B022A
EMERGENCY GENERATOR
RM
B037
TRANSFORMER RM
B037A
A/C REFRIGERATION
EQUIP RM
B038
CORRIDOR
BH004
ELECTRICAL DISTRIBUTION
RM
B037B
SVC RM
B039
CORRIDOR
BH006
CORRIDOR
BH006
HAS
B044
HAS
B044C
HAS
B044B
EMS OFFICE
B042A
EMS CHECK IN
B042B
SECY/
RECEPTIONIST
B-042
OFFICE
ASST CHIEF
WORK RM
B-042C
TOILET
B044A
IT
B046
EMS
B043
ELECTRIC
CLOSET
B043A
CHARTING
A032E
HALL
A032
CONFERENCE RM
A032D
RESIDENTS
OFFICE
A032C
SECY
OFFICE
A032B
PM&RS CHIEF'S
OFFICE
A032A
MAIN KITCHEN
B036
DISH
WASHING
A020
CONFERENCE M
A029
BREAK RM
B045A
SUPV OFFICE
B045
SURGICAL PACK
B045C
ENVIRONMENTAL
MGMT SUPPLY
B045D
STORAGE
B045B
MAIN KITCHEN
B036
LINEN
B036D
EMS
B036C
MENS
TOILET
B041
FEMALE
TOILET
B040
CANTEEN STORAGE
B036B
OFFICE
B035
STORAGE
B035A
DAIRY & EGG
REFRIG
B036G
OFFICE SUPVS
B036F
CORRIDOR
AH005
CORRIDOR
AH004
CORRIDOR
AH006
CORRIDOR
AH004
SECY
A028
DIETICIANS
OFFICE
A025A
ASST CHIEF
A027
DIETICIANS
OFFICE
A025EMS
A023
ELECTRIC
CLOSET
AU004
ELEVATOR
LOBBY
A000
ELEVATOR LOBBY
A001
BREAK RM
A021
ELEV
AE004
ELEV
AE005
EQUIP
STORAGE AREA
B001
STORAGE
& ISSUE
B034
OFFICE
A019
ELECTRIC
CLOSET
BU003
EMS
A001B
DUMB
ELEVATOR
SOILED RECEIVING
DECONTAMINATION AREA
B005
MANUAL
CART WASH
B005B
STAIRWELL
BS003HALL
B004
EMS
B005A
WOMENS TOILET
B002
MENS TOILET
B003
STORAGE
B009A
HALL
B006A
CORRIDOR
OX101
BULK
STORAGE
B010
LOGISTICS
STORAGE
B011
ELECTRIC
CLOSET
BU002
UNION OFFICE
B011A
FF: VCT
AC PLUMBING
MACH
B012
OFFICE
B012A
CORRIDOR
BH001
CORRIDOR
AH003
CLEAN RECEIVING
B007
CORRIDOR
AH002
STERILE AND NON-STERILE
STORAGE
A001A
RETAIL STORE
A009
STAIRWELL
PAS04
CORRIDOR
AH001
ELECTRIC
CLOSET
AU005
OFFICE
ASST CHIEF
A003
KITCHEN
A006
OFFICE
CANTEEN
A007
REFR WALK IN
A006B
PREFAB
REFRIG
A006C
FOOD
STORAGE
A006A
SERVING LINE
A005
AU008 AU007 AU006
STAIR
AS002
CAFETERIA
A004A
VCS OFFICE
A004E
VCS OFFICE CHIEF
A004A
STORAGE
A004
STORAGE
A004A
EMS
A004B LOUNGE
A002
LOCKERS
FEMALE
A002A
TOILET &
SHOWERS
A002B
IT CLOSET
A002C
ELEV
P3
ELEV
P2
ELEV
P1
TOILET
A024TELEPHONE EQUIP RM
A022
LOCKERS
A026B
EMS
A026
PHYSICAL
THERAPY
A035
STORAGE
A033
HYDROTHERAPY
A034
RECEPTION
A030
CORRIDOR
AH007
PHYSICAL THERAPY
OUTPATIENT
A036
CORRIDOR
A030A
WAITING AREA
A042
EXAM/EMG
A037
PROVIDER
A038
EXAM
A041
EXAM
A040 PROVIDER
A039
STAIRWELL
AS001
TOILET & SHOWERS
A046
A026A TOILET
FEMALE
A045
OT CLINIC
A044
OT OFFICE
A043
OT OFFICE
A043A
RECEPTION AREA
A050
CORRIDOR
AH009
OFFICE
A070RECEIVING
A071
SVC MGR
A072
CORRIDOR
AH008PGM MGR
A068
OFFICE
A069
COMPUTER RM
A073
CORRIDOR
AH010
SOFTWARE APPL
SUPPORT
A067
APPLICATION
SUPPORT
A066
SYSTEMS
MGR
A065
NETWORKING
MGR
A064
PROG MGR SYST &
NETWORKING
A063
ADP
WORKSHOP
A062
STAIRWELL
AS004
TELECOMM
SVCS
A061
TELECOMM
SVCS
A060
SUPPORT
A059
APPLICATION
SUPPORT
A058
APPLICATION
SUPPORT
A057
OFFICE
A051
PGM
SPECIALISTS
A052
PGMMING &
INFO
A053
PGMMING &
INFO
A054
CONFERENCE
RM
A055
ELECTRICAL
A056
MECHANICAL
B015F
FF: CONC.
PROSTHETICS STORAGE
B015C
FF: VCT
MORGUE
B015A
FF: VCT
LOGISTICS BREAKDOWN
B006B
FF: VCT
PAMNS ZONE 'C'
PAMNS ZONE 'E'
PAMNS ZONE 'E'
PAMNS ZONE 'C'
PAMNS ZONE 'E'
PAMNS ZONE 'L'
PAMNS ZONE 'L'
PAMNS ZONE 'C'
PAMNS ZONE 'H'
PAMNS ZONE 'C'
PAMNS ZONE 'L'
PAMNS ZONE 'C
PAMNS ZONE 'E'
PAMNS ZONE 'L'
PAMNS ZONE 'C'
PAMNS ZONE 'H'
PAMNS ZONE 'P'
PAMNS ZONE 'P'
PAMNS ZONE 'P'
PAMNS ZONE 'C'
PAMNS ZONE 'I' PAMNS ZONE 'C'
PAMNS ZONE 'I'
PAMNS ZONE 'C'
PAMNS ZONE 'P'
PAMNS ZONE 'PDeck'
PAMNS ZONE 'F'
PAMNS ZONE 'C'
PAMNS ZONE 'F'
PAMNS ZONE 'C'
PAMNS ZONE 'K'
PAMNS ZONE 'S'
PAMNS ZONE 'L'
PAMNS ZONE 'C'
PAMNS ZONE 'L'
PAMNS ZONE 'C'
PAMNS ZONE 'K'
PAMNS ZONE 'C'
PAMNS ZONE 'K'
PAMNS ZONE 'PDeck'
SRSR
SR
SR
SR
SR
SR
SR
SR
SR
SRSR
SR
SR
SRSR
SR
SR
SR SR
SR
SRSRSR
SR SR
SR
SR SR SR
SR
SR
SRSR
SR
SR
SR
SR
SR
SR
SR
SR SR SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SRSR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SR
SRSR
SR
SR
SRSR
SN
SN
SN
SN
SN
SN
SN
SN
SN
SN
SNSN
SN
SN SN
SNSN
SN
SN
SN
SN
SN SN
SN
SN
SN
SNSN
SNSN
SNSN
SN
SN
SNSN
SN
SN
SN
SN
SN
SN
SN
SN
SN
SN
SN
N
N
N
N
N
N N
N
N N
N N
N
N
N
N
N N
SN
SN
SN SN
SNSN
SN
SN
N N
N
N
N
N
N
PS PS PS PS
PS PS PS PS
PS PS
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0" 18'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
8'-0"
S N
S N
S N
S N
S N SN
S N
S N
PAMNS ZONE 'Z'
PAMNS ZONE 'Z'
PAMNS ZONE 'Z'
PAMNS ZONE 'L'
7'7'
7'
7' 7'
7'
7'
7'
7'7'
7'
7'
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
Revisions: Date
CONSULTANTS:
DECEMBER 1, 2023 HTJDM
REPLACE OBSOLETE
OVERHEAD
PAGING SYSTEM
596-22-101
VA MEDICAL CENTER LEXINGTON
1101 VETERANS DRIVE
LEXINGTON, KENTUCKY 40502
21-306
100% BID DOCUMENTS
FULLY SPRINKLERED
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.
WALL RATINGS
BUILDING SEPARATION ( >2 HOURS)
3 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
1/2 HOUR FIRE BARRIER
SMOKE BARRIER ( >1/2 HOUR)
SMOKE RESISTIVE CONSTRUCTION
X
Engineers Architects U.S. Department of Veterans Affairs
SPEAKER 8" ROUND CEILING MOUNT
SPEAKER 10" X 10" SQUARE CEILING MOUNT
SPEAKER 10" x 10" WALL MOUNT
WALL HORN
CEILING TYPE
CEILING HEIGHT
CEILING TYPE LEGEND
1 2X2 DROP CEILING
2 HARD CEILING
3 2X4 DROP CEILING
4 GYP CEILING
5 UNFINISHED CEILING
6 1' x 2' METAL PAN CEILING 7 1' x 1' ACOUSTIC CEILING
S
S
S
LINE TYPE LEGEND:
CEILING BOUNDARY:
VOLUME CONTROL MOUNTED AT 48"AFFVC
SYMBOL LEGEND
PAGING SYSTEMPS
8 2' x 4' DRY WALL CEILING
T-101A
BOWLING GROUND LEVEL OVERALL
PLAN
1 BOWLING GROUND LEVEL OVERALL PLAN
SCALE: 1/16" = 1' 0"
NORTH
TRUE
8 16 320
1. SPEAKERS IN THIS ZONE WILL HAVE
ANTI-MICROBIAL FACE/BAFFLE.
2. PROVIDE PAGING STATION IN THE PAGING
CENTER AND CONNECT TO THE PAMN SYSTEM
COORDINATE EXACT LOCATION WITH COR
3. UTILIZE EXISTING INNERDUCT FROM ROOM
D007D TO FEED DEVICES LOCATED IN CHILLER
PLANT. INNERDUCT TRAVELS APPROXIMATELY 2
STORIES DOWN PRIOR TO TRAVELLING TO
GROUND FLOOR OFFICE OF CHILLER PLANT.
COORDINATE WORK WITH COR.
T-401
A. ALL EXISTING CONDITIONS ARE BASED ON BEST
AVAILABLE INFORMATION AT THE TIME OF
SURVEY AND VISUAL INSPECTION.
B. REPAIR/REPLACE ANY DAMAGED CEILING.
C. PROVIDE NEW SPEAKER ASSEMBLY AS SHOWN
AND CONNECT TO EXISTING SPEAKER/PAGING
ZONE.
D. ALL SPEAKERS SHALL BE TAPPED AT 1/2 WATT
UNLESS OTHERWISE NOTED.
E. MINIMUM SPEAKER WIRE SHALL BE 16 AWG.
F. PAGING CABLES SHALL BE INSTALLED IN
CONDUITS IN ALL EXPOSED AREAS (ROOMS WITH
NO CEILINGS) IN ELECTRICAL ROOMS,
MECHANICAL ROOMS, BOILER ROOMS, STORAGE
ROOMS, GARAGES, OUTSIDE AREAS AND STAIRS.
G. ALL PAGING CABLING/CONDUIT SHALL BE
SUPPORTED BY J-HOOKS, IN CABLE TRAY OR AN
APPROVED SUPPORTING SYSTEM.
njusi Text Box
WHEEL CHAIR PARK
HANDICAPPED
PARKING
HANDICAPPED
HANDICAPPED
PARKING PARKING
HANDICAPPED
PARKING
HANDICAPPED HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING
HANDICAPPED
PARKING PARKING
LEVEL B
VOLUNTEER
PARKING
VOLUNTEER
PARKING
VOLUNTEER
PARKING
VOLUNTEER
PARKING
VOLUNTEER
PARKING
VOLUNTEER
PARKING
VOLUNTEER
PARKING
DOWN
UP
PARKING
DOWN
UP
EMERGENCY
GENERATOR RM
PB01
B038
A/C
REFRIGERATION
EQUIP RM
OTHER SPACE
PB11
TRANSFORMER
RM
B037A
B039
B037
SVC RM
B037B
ELECTRICAL
DISTRIBUTION RM
STAIRWELL
STAIRWELL
AS02
BS03
AS01
STAIRWELL
DENTAL
ORAL
EVAC
UNIT
STAIRWELL
PB09A
PBS05
CHASE
PB03
STORAGE
PB10
ELEV
VESTIBULE
PB02
ELEVATOR
P5
ELEVATOR
P4
PUMP
RM
0-C-1
TC
PB06
EC
PB05
STAIRWELL
PBS06
STAIRWELL
PBS04
UTILITY TUNNEL OTHER SPACE
PB09 PB09
OTHER
SPACE
PB07
FAN RM
PB04
PAMNS ZONE 'PDeck'
PAMNS ZONE 'PDeck'
SN
S
S
N N N
N
NNN
N
N N N
N
N
N
N N N
N
PAMNS ZONE 'B'
PAMNS ZONE 'B'
N
N
N
NN
S
N
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
Revisions: Date
CONSULTANTS:
DECEMBER 1, 2023 HTJDM
REPLACE OBSOLETE
OVERHEAD
PAGING SYSTEM
596-22-101
VA MEDICAL CENTER LEXINGTON
1101 VETERANS DRIVE
LEXINGTON, KENTUCKY 40502
21-306
100% BID DOCUMENTS
FULLY SPRINKLERED
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.
WALL RATINGS
BUILDING SEPARATION ( >2 HOURS)
3 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
1/2 HOUR FIRE BARRIER
SMOKE BARRIER ( >1/2 HOUR)
SMOKE RESISTIVE CONSTRUCTION
X
Engineers Architects U.S. Department of Veterans Affairs
SPEAKER 8" ROUND CEILING MOUNT
SPEAKER 10" X 10" SQUARE CEILING MOUNT
SPEAKER 10" x 10" WALL MOUNT
WALL HORN
CEILING TYPE
CEILING HEIGHT
CEILING TYPE LEGEND
1 2X2 DROP CEILING
2 HARD CEILING
3 2X4 DROP CEILING
4 GYP CEILING
5 UNFINISHED CEILING
6 1' x 2' METAL PAN CEILING 7 1' x 1' ACOUSTIC CEILING
S
S
S
LINE TYPE LEGEND:
CEILING BOUNDARY:
VOLUME CONTROL MOUNTED AT 48"AFFVC
SYMBOL LEGEND
PAGING SYSTEMPS
8 2' x 4' DRY WALL CEILING
T-101B
BOWLING BASEMENT LEVEL
OVERALL PLAN
1 BOWLING BASEMENT LEVEL OVERALL PLAN
SCALE: 1/16" = 1' 0"
NORTH
TRUE
8 16 320
A. ALL EXISTING CONDITIONS ARE BASED ON BEST
AVAILABLE INFORMATION AT THE TIME OF
SURVEY AND VISUAL INSPECTION.
B. REPAIR/REPLACE ANY DAMAGED CEILING.
C. PROVIDE NEW SPEAKER ASSEMBLY AS SHOWN
AND CONNECT TO EXISTING SPEAKER/PAGING
ZONE.
D. ALL SPEAKERS SHALL BE TAPPED AT 1/2 WATT
UNLESS OTHERWISE NOTED.
E. MINIMUM SPEAKER WIRE SHALL BE 16 AWG.
F. PAGING CABLES SHALL BE INSTALLED IN
CONDUITS IN ALL EXPOSED AREAS (ROOMS WITH
NO CEILINGS) IN ELECTRICAL ROOMS,
MECHANICAL ROOMS, BOILER ROOMS, STORAGE
ROOMS, GARAGES, OUTSIDE AREAS AND STAIRS.
G. ALL PAGING CABLING/CONDUIT SHALL BE
SUPPORTED BY J-HOOKS, IN CABLE TRAY OR AN
APPROVED SUPPORTING SYSTEM.
DOWN
MOTORCYCLE
MOTORCYCLE
STAIRWELL
PCS04
PARKING
PC01
SUMP
00-C-3
OTHER SPACE
PCM17
FAN RM
00-C-2
STORAGE
PC14
STORAGE
00C6
MECH
RM
PC15
STORAGE
PC16
ELEVATOR
LOBBY
PC02
ELEVATOR
PCE05
ELEVATOR
PCE04
ELEV
EQUIP
00-C-1
STAIR
PCS05
STORAGE
PC05
STORAGE
PC09
MECH RM
PC10
TC
00-D-3
EC
00-D-2STAIR
PCS06
FAN RM
00-D-1
OTHER
SPACE
PCM11
FF:CONCRETE
FF:CONCRETE
FF:VCT
FF:CONCRETE FF:CONCRETE
FF:CONCRETE
FF:VCT
FF:VCT
FF:VCT
FF:CONCRETE
FF:VCT
FF:VCT
FF:CONCRETE
FF:VCT
FF:VCT
FF:CONCRETE
FF:CONCRETE
FF:CONCRETE
FF:CONCRETE
FF:VCT
PAMNS ZONE 'PDeck'
S
S
S
SN
N
N N N
N N N
N
N N N
N
N N N
VA PROJECT NUMBER
Building Number
Drawing Number
Project Title
Date Checked Drawn
Drawing Title
Approved:
VA FORM 08-6231
A
B C
D E
21 4 5 6 7
SHEET NOTES:
SHEET KEY NOTES:
321 4 5 6 7
A B
C E
Dwg. of
LocationLocation
Office of Construction and Facilities Management
PROJECT MANAGER: ACG Project Number
Revisions: Date
CONSULTANTS:
DECEMBER 1, 2023 HTJDM
REPLACE OBSOLETE
OVERHEAD
PAGING SYSTEM
596-22-101
VA MEDICAL CENTER LEXINGTON
1101 VETERANS DRIVE
LEXINGTON, KENTUCKY 40502
21-306
100% BID DOCUMENTS
FULLY SPRINKLERED
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 © COPYRIGHT Apogee Consulting Group, P.A.
WALL RATINGS
BUILDING SEPARATION ( >2 HOURS)
3 HOUR FIRE BARRIER
2 HOUR FIRE BARRIER
1 HOUR FIRE BARRIER
1/2 HOUR FIRE BARRIER
SMOKE BARRIER ( >1/2 HOUR)
SMOKE RESISTIVE CONSTRUCTION
X
Engineers Architects U.S. Department of Veterans Affairs
SPEAKER 8" ROUND CEILING MOUNT
SPEAKER 10" X 10" SQUARE CEILING MOUNT
SPEAKER 10" x 10" WALL MOUNT
WALL HORN
CEILING TYPE
CEILING HEIGHT
CEILING TYPE LEGEND
1 2X2 DROP CEILING
2 HARD CEILING
3 2X4 DROP CEILING
4 GYP CEILING
5 UNFINISHED CEILING
6 1' x 2' METAL PAN CEILING 7 1' x 1' ACOUSTIC CEILING
S
S
S
LINE TYPE LEGEND:
CEILING BOUNDARY:
VOLUME CONTROL MOUNTED AT 48"AFFVC
SYMBOL LEGEND
PAGING SYSTEMPS
8 2' x 4' DRY WALL CEILING
T-101C
BOWLING SUB-BASEMENT LEVEL
OVERALL PLAN
1 LOWER LEVEL OVERALL PLAN
SCALE: 1/16" = 1' 0"
NORTH
TRUE
8 16 320
A. ALL EXISTING CONDITIONS ARE BASED ON BEST
AVAILABLE INFORMATION AT THE TIME OF
SURVEY AND VISUAL INSPECTION.
B. REPAIR/REPLACE ANY DAMAGED CEILING.
C. PROVIDE NEW SPEAKER ASSEMBLY AS SHOWN
AND CONNECT TO EXISTING SPEAKER/PAGING
ZONE.
D. ALL SPEAKERS SHALL BE TAPPED AT 1/2 WATT
UNLESS OTHERWISE NOTED.
E. MINIMUM SPEAKER WIRE SHALL BE 16 AWG.
F. PAGING CABLES SHALL BE INSTALLED IN
CONDUITS IN ALL EXPOSED AREAS (ROOMS WITH
NO CEILINGS) IN ELECTRICAL ROOMS,
MECHANICAL ROOMS, BOILER ROOMS, STORAGE
ROOMS, GARAGES, OUTSIDE AREAS AND STAIRS.
G. ALL PAGING CABLING/CONDUIT SHALL BE
SUPPORTED BY J-HOOKS, IN CABLE TRAY OR AN
EXISTING
STAIR
DS108
TOILET
ELEC
B146A
STORAGE
FEMALE
TOILET
CORRIDOR
AS106
OFFICE
NURSE MGR
INPT PHARMACY
IV STORAGETECHNICIAN OFFICE
A-166
VAULT
A-180
B102
SVC ELEV
LOBBY
CORRIDOR
AH101
SUPPLY
B101L
NUCLEAR MED AND
RADIATION SAFETY
ADMIN OFFICE
CORRIDOR
A-151A A-151
A-160
READING RM
A-159
B133D175
A-184
A-184B
C125G
OFFICE
C125
PASSAGE
C125I C129
BH108
CORRIDOR
B101K
B107
B106
SUPV
LAB
BH105
CT SCAN 1
B114
CONFERENCE
CLASS & STUDY
CLINICAL
MICROBIOLOGIST
CORRIDOR
BH103
CORRIDOR
B147A
B148
B141
B140
DRESSING
B137A
VESTIBULE
CH130A
STAFF TLT
CH132AC134
TLT
EXAM / ISO
C130J
EXAM
C125A
TLT
C121C
TRIAGE 01
C121B
STAFF / WORK RM
VASCULAR LAB
D181
RAD STORAGE
EMSCORRIDOR
B138
PATIENT PREP
STORAGE RM
WORK
RM
D191
VASCULAR LAB
D190
SURG CLINIC
CHECK IN
D157
D158 OFFICE
BREAK/
READING
E126
E123
TOILET
CRYOGEN
STORAGE
MRI
E120
COMPUTER RM
E104
SECTION
OFFICE
EM113
D158
D160A
EXAM
D146
EXAM
EXAM
EXAM
CONS
D144
IT EQUIP RM
D112
STAFF TOILET
D111
STAFF TOILET
D108
D107
BREAK RM
D113 D140B
DS107
STAIR
PHYSICIAN
CONSULTANT RM
DU141
EC
DU142
TC
D102C
TOILET
D102D
PATIENT RM
D109
D110
EXAM
D116
CONS
D106
CLEAN SUPPLY D118
EXAM
D104
DIRTY SUPPLY
D120
EXAM
TOILET
D103
EXAM
D101
EXAM
D124
EXAM
D100
MED RECORD
WORK RM
D100A
RECEPTION
INFUSION / CHEMO TREATMENT
DH108
CORRIDOR
D139
CLEAN STOR
SUPPLY RM
D115
PROCEDURE RM
D117
OFFICE D135
EXAM
D133
EXAMD119
EXAM
D121
EXAM
D131
EXAM
D123
EXAM
D129
EXAM
D125
EXAM
D127
EXAM
D143
STORAGE
D136
CAST RM
D145
EXAM
D147
EXAM
D134
EXAM
D132
EXAM
D149
EXAM
D130
EXAM
D151
EXAM
D128
EXAM
D153
EXAM
DH107
CORRIDOR
DH111
CORRIDOR
DH109
CORRIDOR
CH105C
WAITING
CH113
CORRIDOR
CH105
CORRIDOR
C108
TRAVEL
C111
P5
ELEVATOR
P4
ELEVATOR
D102B
TOILET
D102A
PATIENT RM
C109
MENS TOILET
WOMENS
TOILET
C106 C107
EC
C112B
C112A C112 C113A
C113
DIRECTOR OFFICE
C104V1
CUBICLE
C104V2
CUBICLE
C104V3
CUBICLE
C104V4
CUBICLE HEALTH
BENEFITS
CENTER
C104V6
COPY
C104V11 C104V12 C104V13
C104V14
C104V15
C104V19
C104V18
C104U
DECEDENT
AFFAIRS
C104T
OFFICE
C104S
SUPVY MED
SUPPORT
ASST
C104R
PATIENT SUPPORT
PGM SPECIALIST
C104Q
CHIEF AMBULATORY
CARE AND
PROCESSING
C104P
CHIEF HEALTH
INFO MGMT
C104O
HEALTH ADMIN
CHIEF OFFICE C104N
ADMIN
ASST
C104M
ASST CHIEF
HEALTH ADMIN
C104K
CHIEF
OFFICE C104J
UM / UR MGR
OFFICE
CUBICLE
C104H
WORK RM C104
POLICE
C105
HOLDING
C104D
PAT
TOILET C104A
RECEPTION
C104E
STAFF
TOILET
C107
PIV
C104G
BREAK RM
C103
ARMORY
C102
POLICE
C104I
CONFERENCE RM 101
WHEEL CHAIR
STORAGE
C1-1A
VESTIBULE
C110
POLICE
CH101
LOBBY
C113B
E.R. STAFF
C109
EVIDENCE
UP
C139A
D192
TOILET
CORRIDOR
A-191
AS108
PHARMACY OFFICE
A-189
A102
SUPPORT UNIT
ADMINA-190C
PRE-PACK
A164
CORRIDOR
JANITOR
ASSOCIATE CHIEF
OF PHARMACY
OFFICE
BREAK RM
CONFERENCE RM
A190A
STORAGES V
BH102
A-153
WAITING
C126C
EXAM
MENTAL HEALTH
RM
EXAM
E CYL
MED RM
B105
B104
CORRIDOR
BIO MED
ENGG
GLASS WASH
MICROBIOLOGY
LAB
B117
BH104
B144
OUTPATIENT
READING RM
B147
B143
VACANT
B140A
BU106
RESUSCITATION 1 /
ISOEMS
CLEAN UTIL
C136
C125K
STORAGE
C125D
EXAM
PASSAGE
C122
CH121B
EKG/LAB
PASSAGE
EXAM
D183B
D189
D196
WAITING
VESTIBULE
CONFERENCE RM
C107C104E
RECEPTION
C104A
HOLDING
POLICE
WORK RM
UM / UR MGR
OFFICE
C104M
ADMIN
ASST
COPY
C104V6
C104V4
C112A
C107
C109
ELEVATOR
D194
CORRIDOR
ULTRA SOUND
ANGIOGRAPHY
LINEN RM
MRI READING RM
E130
STAIRWELL
PUBLIC TOILET
CAST RM
E128ORTHO STORAGE
PREPARATION
E121
E127
HVAC
MECH/ELEC
CORRIDOR
E119
PROCESSING
ADMIN
OFFICER
E108E110
C111
CORRIDOR
CORRIDOR
DH107
OFFICE
EXAM
EXAM
CONS
D130
D147EXAM
D117
D120
D106
TC
S7
ELEVATOR
S6
D113
ELEC
DN
C109
E128A
A-188
PASSAGE
CH126
CH101C
AH102
CORRIDOR
AH101
CORRIDOR
PATIENT
ADVOCATE
A-190b
MEN
A-179
CLINICAL
PHARMACIST
A-168 A-170
PHARMACY STORAGE
B101B
SURGICAL
PATHOLOGY
B101H
BU101
CORRIDOR
EXAMBREAK RM
A-158
BONE DENSITY
B132
MECH
A-184A
C127
C126D
EXAM
ELEC
BU103
BH107
MECH
HALL WAYSCANNER
RM
CORRIDOR
X-RAY DIAGNOSTIC RM
FILM PROCESSING
AREA
B142
STAFF WORK
C130
C130E
ER OFFICE 2
C141C143
C132D
C128
C125B
SPECIMEN
SOILED UTIL
TRIAGE 02
CH130B
C132A
C121
SOILED UTIL
CS109
ELEVATOR
D195
C114B
RESP
CARE
POLICE
C1-1A
WHEEL CHAIR
STORAGEC104I
C102
ARMORY
C103
BREAK RM C105
SUPVY MED
SUPPORT
ASST
OFFICE
C104T
C104V13C104V12
CUBICLECUBICLE
C104V2
CUBICLE
C104V1
C112B
ELEC
TOILET
E101
MRI RECEPTION
D193
D169
D169a
PROCEDURE RM
E124
E116 E122
RADIOLOGIST
E107
CH105
CH105E
DH110
D161
EXAM
D153
EXAM
D151
D145
D136
D143
D125
D135
D101
ELEVATOR
DU141
DS107
D140B
BREAK RM
D107
D108
STORAGE
EVIDENCE
MALE
TOILET
ADMIN
ASSIST
EXIST WELCOME
DESK
CORRIDOR
CORRIDOR
CORRIDOR A-190
A-175
A-178
MED MGMT
SPECIALIST
A-163
A-167
PHARMACY
ADAPC
RESIDENTS
A-166
PATHOLOGY LAB
CORRIDOR SOILED
A146
CONFERENCE RM
BREAK RM
B108
BREAK RM
B101G
STORAGE
B101ISUPV
ELEC
AU-105
A-150
FILE RM
A-152B
MENS
RESTROOM
A-156
VIEWING RM
A-185
STORAGE
DECONTAM
TOILET
ON CALL
C125F
C130A
CH125H
NOUR
PREP
C125J
STAIR
CS104
OFFICE
B103
ELEC
BS103
B128
B150A
B152A
LAB INFO
MGR
B113B
MEDIA
PREPARATION
B114D
CHIEF
PATHOLOGY SVC
B118B121
B153
CORRIDOR
BH106
STORAGE
PASSAGE
CH121
ISO
RESUSCITATION 2 /
CH140
EXAM / ISO
C130H
C140 C144
C131
EXAM
C130K
C125E
C125C
EXAM
C124
C123SUB-WAITING
C121DC121A
C132C
EC
CU100
P7
EXAM
C114C
CH104
C104G
PIV
STAFF
TOILET
C104
C104J C104K
CHIEF HEALTH
I…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .