Attachment 5 - Drawings Part3 - Louis A. Johnson.pdf
PDF 31 MB Posted
- Attached to
- Y1DZ--Nutrition & Food Servicesand Eye/ PT Clinic Addition - - Construction - Louis A. Johnson VAMC
- Solicitation number
- 36C77623B0031
About this file
This document outlines a federal contract opportunity for construction services. The Department of Veterans Affairs Technology Acquisition Center Austin is soliciting proposals for the Y1DZ--Nutrition & Food Servicesand Eye/ PT Clinic Addition project at the Louis A. Johnson VAMC. An attachment provides drawings for part 3 of the project. Proposals are due by the date listed in solicitation number 36C77623B0031. The opportunity is for construction services to support an addition for nutrition and food services as well as eye, physical therapy, and other clinics at the Louis A. Johnson VA Medical Center. The selected contractor will be responsible for completing the outlined construction work.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
KKolian Snapshot
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
GENERAL NOTES FOR CONTRACTORS: SEE ALL PROJECT GENERAL NOTES AND OTHER
REQUIREMENTS INCLUDING THE LIFE SAFETY AND INFECTION CONTROL WORK LOCATED WITHIN
THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A DIRECT
PART OF THIS SECTION AS IF THEY WERE DIRECTLY INCLUDED AND PROVIDED HEREIN.
EQUIVALENCY SUBSTITUTIONS: THE “BASIS OF DESIGN (BOD) COMPLIANCE PROTOCOLS” ARE TO
BE FOLLOWED FOR ALL MATERIALS, EQUIPMENT, ASSEMBLIES AND SYSTEMS SPECIFIED AND
DETAILED THROUGHOUT ALL DRAWINGS AND SPECIFICATION SECTIONS, WHETHER THE BOD
DESIGNATE IS SPECIFICALLY REFERENCED THEREIN OR NOT. SEE THE GENERAL DRAWINGS
SECTION FOR THE SPECIFIC BOD COMPLIANCE REQUIREMENTS AND PROTOCOLS TO BE
FOLLOWED.
1. THIS CONTRACTOR SHALL REVIEW ENTIRE SET OF CONTRACT DOCUMENTS: INCLUDING
BUT NOT NECESSARILY LIMITED TO ARCHITECTURAL, STRUCTURAL, MECHANICAL,
EQUIPMENT, PLUMBING, FIRE PROTECTION, ELECTRICAL DRAWIINGS AND ENTIRE
PROJECT MANUAL. THIS CONTRACTOR SHALL ACKNOWLEDGE AND INCLUDE IN THE
SCOPE OF WORK (CONTRACT) ALL CONDITIONS PERTINENT TO THE COMPLETION OF
THEIR WORK. THE CONTRACTOR SHALL FULLY COORDINATE THEIR WORK WITH THE
INSTALLATION OF THEIR WORK WITH THE INSTALLATION OF WORK BY OTHER TRADES
AND MAKE NECESSARY FIELD ADJUSTMENTS AS REQUIRED TO ACCOMMODATE THE
INSTALLATION. ALL OF THE ABOVE SHALL BE INCLUDED IN THE SCOPE OF WORK AT NO
ADDITIONAL CHARGE TO THE VA/GOVERNMENT.
2. THIS CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATIONS,
VISIT THE SITE OF THE WORK AND FULLY INFORM THEMSELVES AS TO ALL CONDITIONS
AND MATTERS THAT CAN, IN ANY WAY, AFFECT THE WORK OR THE COST THEREOF.
SHOULD THIS CONTRACTOR FIND DISCREPANCIES IN, OR OMISSIONS FROM THE
DRAWINGS, SPECIFICATIONS OR OTHER DOCUMENTS, OR BE IN DOUBT AS TO THEIR
MEANING, NOTIFY THE VA/CO AT ONCE, IN WRITING, OF ANY DISCREPANCIES BETWEEN
EXISTING CONDITIONS AND NEW WORK, OR BETWEEN THEIR WORK AND THE WORK OF
OTHER TRADES AND OBTAIN CLARIFICATION PRIOR TO SUBMITTING ANY BID. LACK OF
SUCH NOTIFICATION SHALL BE CONSTRUED AS TO INDICATE NO DISCREPANCIES OR
CONFLICTING CONDITIONS EXIST.
3. THE DRAWINGS INDICATE DIAGRAMMATICALLY THE INTENT, GENERAL CHARACTER,
REQUIREMENTS AND LOCATION OF THE WORK SHOWN AND INCLUDED. THE WORK
INDICATED BUT HAVING MINOR DETAILS OBVIOUSLY OMITTED SHALL BE PROVIDED AT NO
ADDITIONAL COST TO THE VA/GOVERNMENT.
4. THIS CONTRACTOR IS REQUIRED TO BID, AS SPECIFIED, ON THE DRAWINGS WITHOUT
DEVIATION FROM THE BOD.
5. IT IS THE INTENT OF THESE DOCUMENTS THAT THE FIRE PROTECTION CONTRACTOR
PROVIDE ALL LABOR, MATERIAL, EQUIPMENT AND TOOLS FOR THE COMPLETE
INSTALLATION OF ALL WORK SHOWN ON THE PLANS AND/OR DESCRIBED HEREIN,
INCLUDING ALL DEVICES, CONTROLS AND APPURTENANCES REQUIRED TO SET NEW
SYSTEMS INTO OPERATION.
6. SHOULD CONDITIONS NECESSITATE ANY REARRANGEMENTS, OR IF PIPING CAN BE RUN
TO BETTER ADVANTAGE, PREPARE AND SUBMIT SHOP DRAWINGS SHOWING THE
CHANGES BEFORE PROCEEDING WITH THE WORK. IF SUCH CHANGES ARE APPROVED BY
THE VA/COR AND SUCCESSFULLY REVIEWED BY THE ARCHITECT, THEY SHALL BECOME A
PART OF THE CONTRACT.
7. THIS CONTRACTOR SHALL VERIFY ALL MOUNTING, ALL ARRANGEMENTS, HEIGHTS AND
LOCATIONS PRIOR TO ROUGH-IN. ANY MENTION OF A SPECIFIC MOUNTING
ARRANGEMENT, WEIGHT OR LOCATION SHALL NOT RELIEVE THE CONTRACTOR OF THE
RESPONSIBILITY TO VERIFY THE SPECIFIC REQUIREMENT FURNISHED OR THE OTHER
TRADES WORKING IN THE SAME AREA. NO ADDITIONS TO THE CONTRACT SUM WILL BE
PERMITTED FOR ITEMS INSTALLED IN WRONG LOCATIONS, IN CONFLICT WITH OTHER
WORK, ETC.
8. ALL WORK SHALL BE DONE IN ACCORDANCE WITH ALL CURRENT FEDERAL BUILDING
CODES, REGULATIONS, AND REQUIREMENTS, LOCAL UTILITY COMPANY REQUIREMENTS,
NFPA, IPC, AND ASHRAE STANDARDS. ALL COMPONENTS SHALL BE UL LISTED AND FM
APPROVED.
9. THIS CONTRACTOR SHALL PAY ALL PERMIT FEES, PLAN REVIEW FEES, LICENSE FEES,
INSPECTIONS, AND TAXES APPLICABLE TO THEIR DIVISION AND SHALL BE INCLUDED IN
THE BASE BID AS PART OF THEIR CONTRACT.
10. THIS CONTRACTOR SHALL BE LICENSED, BONDED, INSURED AND CAPABLE OF
PERFORMING QUALITY WORKMANSHIP. THIS CONTRACTOR GUARANTEES ALL OF HIS
WORK AND MATERIALS FOR THE PERIOD OF ONE YEAR. FROM FINAL ACCEPTANCE BY THE
VA/GOVERNMENT.
11. THIS CONTRACTOR SHALL ESTABLISH SAFE WORKING PROCEDURES FOR THE
PROTECTION OF THE WORKMEN IN ALL PHASES OF WORK, COMPLYING WITH ALL
APPLICABLE PROVISIONS OF CITY, STATE, AND FEDERAL SAFETY LAWS (OSHA) AND AS
RECOMMENDED IN THE "MANUAL OF ACCIDENT PREVENTION IN CONSTRUCTION" AS
ISSUED BY THE ASSOCIATION OF GENERAL CONTRACTORS OF AMERICA, IN., 20TH AND E.
STREETS, N.W. WASHINGTON, D.C.
12. THIS CONTRACTOR IS RESPONSIBLE FOR SCHEDULING THE PURCHASE, DELIVERY,
RECEIVING, UNLOADING, UNCRATING, STORING, SETTING IN PLACE, AND PROTECTING ALL
NEW EQUIPMENT FURNISHED BY THIS CONTRACTOR AND EQUIPMENT FURNISHED BY
VA/GOVERNMENT FROM DAMAGE BY VANDALISM AND WEATHER DURING CONSTRUCTION.
13. THIS CONTRACTOR SHALL PROVIDE A COMPETENT OPERATING TECHNICIAN TO INSTRUCT
THE VA/GOVERNMENT IN THE OPERATION AND MAINTENANCE OF THE NEW EQUIPMENT.
14. UPON COMPLETION OF THE WORK, THIS CONTRACTOR SHALL REVIEW AND CHECK THE
ENTIRE PORTION OF WORK, CLEAN EQUIPMENT AND DEVICES. REMOVE SURPLUS
MATERIALS AND RUBBISH FROM THE PROPERTY AND LEAVE THE WORK IN NEAT AND
CLEAN ORDER AND IN COMPLETE WORKING CONDITION. EACH RESPECTIVE CONTRACTOR
SHALL BE RESPONSIBLE FOR THE REMOVAL OF ANY CARTONS, DEBRIS, EQUIPMENT, ETC.,
INSTALLED BY THIS CONTRACTOR INCLUDING EQUIPMENT FURNISHED BY OTHERS AND
UNPACKED OR REMOVED FROM CARTONS BY THIS CONTRACTOR.
15. THIS CONTRACTOR SHALL FURNISH AND INSTALL ALL STRUCTURAL STEEL MEMBERS,
SLEEVES, AND SHIMS REQUIRED TO LEVEL AND SUPPORT EQUIPMENT AND PIPES.
16. BEFORE PLACING WATER SYSTEM IN OPERATION, CHLORINATE ENTIRE SYSTEM IN
ACCORDANCE WITH THE REQUIREMENTS OF THE SPECIFICATIONS AND IN CONJUNCTION
WITH ALL LOCAL, STATE AND FEDERAL PLUMBING CODES, SUPPLY CERTIFICATE.
17. EXISTING SERVICE VALVES AT ALL BRANCH SUPPLY PIPING SHALL REMAIN AS IS. SUCH
SERVICE VALVES SHALL BE AS PER THE SPECIFICATIONS AND/OR IN KEEPING WITH THE
FACILITY STANDARDS.
18. SPRINKLER HEADS SHALL BE LOCATED IN CEILING GRID IN A SYMMETRICAL PATTERN,
COORDINATED WITH OTHER DEVICES MOUNTED IN OR ON THE CEILING. PROVIDE
ADDITIONAL SPRINKLER HEADS REQUIRED TO ACHIEVE SYMMETRY. LOCATE SPRINKLER
HEADS IN THE CENTER OF CEILING TILES.
19. SPRINKLER CONTRACTOR SHALL PROVIDE A COORDINATED REFLECTED CEILING PLAN AS
PART OF THE SUBMITTAL TO THE VA/COR SHOWING SPRINKLER HEAD LOCATIONS
COORDINATED WITH CEILING AND ALL OBJECTS MOUNTED IN OR ON THE CEILING.
20. THE SPRINKLER CONTRACTOR SHALL BE A LICENSED, AUTHORIZED INSTALLER OF
COMMERCIAL SPRINKLER SYSTEM AND SHALL HAVE HAD A MINIMUM OF THREE (3) YEARS
OF EXPERIENCE IN THE INSTALLATION OF SPRINKLER SYSTEMS.
21. THE CONTRACTOR IS RESPONSIBLE FOR THE COMPLETE DESIGN OF THE SPRINKLER
SYSTEM AND TO SUBMIT HYDRAULIC CALCULATIONS PER NFPA 13 IN SUBMITTAL OF SHOP
DRAWINGS AND FOR THE COMPLETE DESIGN OF THE SPRINKLER SYSTEM. THE
SPRINKLER SYSTEM SHALL BE:
A. A DESIGNED SYSTEM IN ACCORDANCE WITH NFPA 13, 2022 AND SPECIFICATION.
B. DESIGNED TO CONFORM WITH BUILDING STRUCTURAL, MECHANICAL, AND
ELECTRICAL SYSTEM, AS INDICATED AND DESCRIBED ON THE CONTRACT
DOCUMENTS.
C. ACCEPTABLE TO THE FIRE MARSHAL AND OR ALL LOCAL AUTHORITIES HAVING
JURISDICTION.
22. THE SPECIFICATIONS, THE CONTRACTOR SHALL SUBMIT FOR APPROVAL TO THE
AUTHORITIES HAVING JURISDICTION, FULLY COORDINATED SHOP DRAWINGS OF
SPRINKLER HEADS, HANGERS AND SUPPORTS. DESIGN PLAN SHALL BE PREPARED AND
SIGNED/SEALED BY A REGISTERED FIRE PROTECTION ENGINEER IN ACCORDANCE WITH
UCF REQUIREMENT OR BY A NICET LEVEL III/IV TECHNICIAN.
23. THE SPRINKLER SYSTEM SHALL BE INSPECTED AND TESTED IN ACCORDANCE WITH THE
REQUIREMENTS OF THE NATIONAL FIRE PROTECTION CODE, AND ALL LOCAL
AUTHORITIES HAVING JURISDICTION.
24. THE CONTRACTOR SHALL ARRANGE FOR INSPECTION AND TEST OF ANY OR ALL PARTS OF
THE WORK AS REQUIRED BY AUTHORITIES HAVING JURISDICTION AND PAY ALL CHARGES
FOR SAME.
25. ARCHITECT/ENGINEER SHALL BE RESPONSIBLE FOR OBTAINING ACCURATE FLOW TEST
DATA OR PERFORMING AN UPDATED FLOW TEST AS PER NFPA 13 AND NFPA 25.
26. AREA SHALL BE DESIGNED IN ACCORDANCE WITH THE REQUIREMENT FOR OCCUPANCY
PER NFPA 13.
27. THE AUTOMATIC WET FIRE SPRINKLER SYSTEM SHALL BE INSTALLED IN SUCH A MANNER
TO PREVENT THE SYSTEM PIPING OR SPRINKLER HEAD EXPOSURE TO TEMPERATURES
LESS THAN 40 DEGREES F.
28. PAINT NEW SPRINKLER PIPING RED AND LABEL PER NFPA 13.
29. CONTRACTOR SHALL PROVIDE COORDINATED PIPE SLEEVE DRAWINGS SHOWING ALL
PENETRATIONS THROUGH FLOORS.
30. PROVIDE OR EXTEND STANDPIPE SYSTEM IN ACCORDANCE WITH NFPA 14.
31. ALL FIRE PROTECTION VALVES SHALL BE SUPERVISED.
32. CONTRACTOR SHALL PROVIDED COORDINATED PIPE SLEEVE DRAWINGS SHOWING ALL
PENETRATIONS THROUGH FLOORS.
33. INSTALLER QUALIFICATIONS: CONTRACTOR'S RESPONSIBILITY SHALL INCLUDE
DESIGNING, FABRICATING AND INSTALLING FIRE-SUPPRESSION SYSTEMS AND PROVIDING
PROFESSIONAL ENGINEERING SERVICES OR THE SERVICES OF A NICET LEVEL III/IV
TECHNICIAN AS NEEDED TO ASSUME ENGINEERING RESPONSIBILITY. CALCULATIONS
BASED ON RESULTS OF THE FIRE-HYDRANT FLOW TEST(S) THEY PERFORM.
A. ENGINEERING RESPONSIBILITY: PREPARATION OF WORKING PLANS, CALCULATIONS,
AND FIELD TEST REPORTS BY A QUALIFIED PROFESSIONAL FIRE PROTECTION
ENGINEER.
34. WELDING: QUALIFY PROCESSES AND OPERATORS ACCORDING TO ASME BOILER AND
PRESSURE VESSEL CODE, SECTION IX.
35. NFPA STANDARDS: FIRE SUPPRESSION SYSTEM EQUIPMENT, SPECIALTIES, ACCESSORIES,
INSTALLATION AND TESTING SHALL COMPLY WITH THE FOLLOWING:
A. NFPA 13, 2022 INSTALLATION OF SPRINKLER SYSTEMS.
B. NFPA 101, 2021 LIFE SAFETY CODE.
36. FIRE-SUPPRESSION SPRINKLER SYSTEM DESIGN SHALL BE APPROVED BY AUTHORITIES
HAVING JURISDICTION.
A. MARGIN OF SAFETY FOR AVAILABLE WATER FLOW AND PRESSURE: 10 PERCENT,
INCLUDING LOSSES THROUGH WATER-SERVICE PIPING, VALVES, AND BACKFLOW
PREVENTERS.
37. CONTRACTOR SHALL SUBMIT FOR REVIEW TO THE VA/COR A COMPLETE LIST OF ITEMS TO
BE FURNISHED AND INSTALLED UNDER THIS CONTRACT. INCLUDING, BUT NOT BE LIMITED
TO THE FOLLOWING:
A. DIMENSIONED SHOP DRAWINGS OF MATERIALS AND FIXTURES. DIMENSIONED SHOP
DRAWINGS OF EQUIPMENT AND PIPING PLAN LAYOUT(S).
38. REQUIRED ITEMS TO BE SUBMITTED SHALL INCLUDE, BUT NOT BE LIMITED TO THE
FOLLOWING:
A. PRODUCT DATA.
B. APPROVED SPRINKLER PIPING DRAWINGS: WORKING PLANS, PREPARED ACCORDING
TO NFPA, AND HAVE BEEN APPROVED BY AUTHORITIES HAVING JURISDICTION,
INCLUDING HYDRAULIC CALCULATIONS.
C. FIELD QUALITY-CONTROL TEST REPORTS.
D. FIELD TEST CERTIFICATES.
E. OPERATION AND MAINTENANCE DATA.
39. SEISMIC PERFORMANCE: FIRE-SUPPRESSION PIPING SHALL BE CAPABLE OF
WITHSTANDING THE EFFECTS OF EARTHQUAKE MOTIONS DETERMINED ACCORDING TO
NFPA 13 AND APPLICABLE CODE REQUIREMENTS. ASCE 7, VA 11-18-8. REFER TO
ARCHITECTURAL DESIGN FOR SEISMIC HAZARD LEVEL CLASSIFICATIONS.
40. CONTRACTOR SHALL SUBMIT FOR REVIEW TO THE VA/COR A COMPLETE LIST OF ITEMS TO
BE FURNISHED AND INSTALLED UNDER THIS CONTRACT. INCLUDING, BUT NOT BE LIMITED
TO THE FOLLOWING:
A. DIMENSIONED SHOP DRAWINGS OF MATERIALS, FIXTURES AND EQUIPMENT.
B. DIMENSIONED SHOP DRAWINGS OF EQUIPMENT AND PIPING PLAN LAYOUT(S).
41. FLEXIBLE CONNECTORS:
A. FLEXIBLE CONNECTORS SHALL HAVE MATERIALS SUITABLE FOR SYSTEM FLUID.
INCLUDE 175 PSIG MINIMUM WORKING-PRESSURE RATING AND ENDS ACCORDING TO
THE FOLLOWING:
a. NPS 2 AND SMALLER: THREADED.
b. NPS 2-1/2 AND LARGER: GROOVED FOR USE WITH GROOVED-END PIPE
COUPLINGS.
B. STAINLESS-STEEL-HOSE/STEEL PIPE, FLEXIBLE CONNECTORS: CORRUGATED,
STAINLESS-STEEL, INNER TUBING COVERED WITH STAINLESS-STEEL WIRE BRAID.
INCLUDE STEEL NIPPLES OR FLANGES, WELDED TO HOSE.
C. STAINLESS-STEEL-HOSE/STAINLESS-STEEL PIPE, FLEXIBLE CONNECTORS:
CORRUGATED STAINLESS-STEEL, INNER TUBING COVERED WITH STAINLESS-STEEL
WIRE BRAID. INCLUDE STAINLESS-STEEL NIPPLES OR FLANGES, WELDED TO HOSE.
D. ALL CONNECTIONS AND FLEXIBLE HOSES SHALL BE FM APPROVED.
SYMBOL DESCRIPTION
CHECK VALVE
GATE VALVE WITH TAMPER SWITCH
CONTROL PANEL
SWING CHECK VALVE
FLOW SWITCH
PRESSURE GAUGE
INSPECTOR TEST
SIGHT GLASS
UNION
SCOPE OF WORK BOUNDARY
FIRE SPRINKLER PIPINGSP
STANDPIPE SYSTEM PIPINGSS
PRESSURE SWITCH
DESCRIPTION
ABOVE FINISH FLOOR
SYMBOL
AFF
AUTHORITY HAVING JURISDICTIONAHJ
DOWNDN
DATA SHEETDS
EXTENDED COVERAGEEC
EXISTINGEX
FIRE HOSE VALVEFHV
FACTORY MUTUALFM
FIRE PROTECTIONFP
FIRE PROTECTION CONTRACTORFPC
GENERAL CONTRACTORGC
INCHIN
SPRINKLER K-FACTORK-F
PLUMBING CONTRACTORPC
SPRINKLER RESPONSESPR
STANDARD RESPONSESR
STANDPIPE SYSTEMSS
STANDARD PENDENT SPRINKLERSSP
STANDARD UPRIGHT SPRINKLERSSU
STANDARDSTND
THE FIRE PROTECTION CONTRACTOR SHALL BE RESPONSIBLE FOR DESIGNING AND PROVIDING A COMPLETE, FUNCTIONAL, AND CODE COMPLIANT AUTOMATIC SPRINKLER SYSTEM. REFER TO GENERAL NOTES FOR ADDITIONAL DETAIL CONCERNING DESIGN, FLOW PRESSURE TEST, HYDRAULIC CALCULATIONS PER NFPA 13, 14 TO BE SUMBITTED, COORDINATION AND SHOP DRAWINGS REQUIREMENTS.
DOUBLE CHECK BACKFLOW PREVENTER
FS
PS
P
DRY PENDENTDP
ELBOW 90
GATE VALVE
TEE PLAN
RISER
CONTINUATION
SPRINKLER HEADS TO BE DEMO
SIDEWALL SPRINKLER HEAD
TEE-ELBOW UP
CAPS
NEW CONNECTION
DEMO AND CAP EXISTING
TAMPER SWITCHTS
FIRE PROTECTION GENERAL NOTES FIRE PROTECTION ABBREVIATION LIST
FIRE PROTECTION DELEGATED-DESIGN NOTE
SPRINKLER HEADS TO REMAIN
OS&Y ZONE CONTROL VALVE W/ TAMPER SWITCH
DRAIN PIPINGD
FIRE PROTECTION SYMBOL LIST
QUICK RESPONSEQR/QRS
NOT IN CONTRACTNIC
NOT IN CONTRACT (NIC)
HIGH TEMPERATUREHT
LIGHT HAZARD
ORDINARY HAZARD GROUP 2
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
DEDUCT ALTERNATES:
1. REFER TO SPECIFICATION 01 00 00 GENERAL REQUIREMENTS FOR DESCRIPTION
OF DEDUCT ALTERNATES.
2. REFER TO DRAWINGS GI004 AND GI004A FOR DESCRIPTION OF DEDUCT
ALTERNATES.
NOTE:
1. HYDRAULIC AREA OF OPERATION SHALL BE INCREASED (CUMULATIVELY) WITHOUT REVISING THE DENSITY FOR THE FOLLOWING APPLICATIONS:
A. INCREASED BY 30% FOR AREAS WITH SLOPED CEILINGS WITH A PITCH EXCEEDING 1 IN 6 (16.7%) SLOPE IN ACCORDANCE WITH NFPA 13 19.3.3.2.4.
B. INCREASED BY 30% FOR DRY-PIPE AND DOUBLE INTERLOCK PRE-ACTION SYSTEMS, IN ACCORDANCE WITH NFPA 13 19.3.3.2.5.
C. INCREASED TO 3,000 SQFT IF THE BUILDING HAS ADJACENT, NON-SPRINKLERED COMBUSTIBLE SPACES.
2. THE ABOVE CRITERIA NOTED DOES NOT PRECLUDE THE USE OF EXTENDED COVERAGE OR LISTED SPECIAL APPLICATION SPRINKLERS THAT ARE DESIGNED AND INSTALLED IN ACCORDANCE WITH THEIR LISTING AND MANUFACTURER REQUIREMENTS.
3. THE HOSE STREAM ALLOWANCE SHALL BE PROVIDED AT THE BASE OF RISER.
HAZARD
LIGHT HAZARD
GROUP 1
ORDINARY HAZARD
GROUP 1
ORDINARY HAZARD
GROUP 2
AREA
OFFICE AREAS / PUBLIC AREA / CORRIDORS / RESTROOMS /LOBBY /
CONFERENCE ROOMS / BREAK ROOM
ELECTRICAL / MECHANICAL / SERVER / IT SERVER
COMMERCIAL KITCHENS, DRY STORAGE, COLD STORAGE
(FREEZERS/COOLERS), CHEMICAL STORAGE
DESIGN CRITERIA
AREA
0.10 / 1500 SQFT
0.15 / 1500 SQFT
0.2/1500 SQFT
HOSE
(GPM)
MAX
SPACING
PROTECTION
AREA
225 SQFT
130 SQFT
130 SQFT
DESIGN BASIS
NFPA 13 SECTIONS 4.3..3.1; TABLE 19.2.3.1.1; TABLE 19.2.3.1.2;
FIGURE 19.2.3.1.1
REMARKS
NOTES 1, 2, 3, AND 4
NOTES 1, 2, 3, AND 4
NOTES 1, 2, 3, AND 4
SYMBOL TYPE
SEMI-RECESSED
DRY PENDENT
SEMI-RECESSED
PENDENT
UPRIGHT
SIDEWALL
DRY SIDEWALL
RE.
QR
K-F
5.6
FINISH
WHITE
COVER PLATE
WHITE
BRASS
WHITE
WHITE
REMARKS
NOTE 1
GENERAL NOTES:
1. SPRINKLER SHALL BE THE APPROPRIATE TEMPERATURE RATING FOR LOCATION AND OCCUPANCY IN
ACCORDANCE WITH NFPA 13.
2. SPRINKLER SHALL ALIGN WITH LIGHT FIXTURES AND OTHER CEILING MOUNTED DEVICES.
COORDINATE SPRINKLER LOCATIONS WITH ARCHITECT'S REFLECTED CEILING PLAN, AND PROVIDE ADDITIONAL SPRINKLERS WHERE REQUIRED TO MAINTAIN THE CEILING LAYOUT OF ALL DISCIPLINES, FIXTURES, EQUIPMENT AND WORK.
NOTES:
1. PROVIDE HIGH TEMPERATURE RATED SPRINKLERS IN VESTIBULES AND AS NOTED AROUND KITCHEN
HOOD
2. PROVIDED WITH LISTED SPRINKLER GUARD FOR INSTALLATION BELOW 7-FT AFF.
QR
QR
QR
QR
5.6
5.6
5.6
5.6
NOTE 2
NOTE 2
NOTE 2
NOTE 2
FIRE PROTECTION DESIGN CRITERIA (NFPA 13-2022 EDITION) FIRE PROTECTION SPRINKLER SCHEDULE
SEMI-RECESSED
PENDENT WHITEQR 5.6 NOTE 2
SIDEWALL WHITEQR 5.6 NOTE 2HT
HTNFPA 13 SECTIONS 4.3.3.1; TABLE 19.2.3.1.1; TABLE 19.2.3.1.2;
FIGURE 19.2.3.1.1
NFPA 13 SECTIONS 4.3..3.2; TABLE 19.2.3.1.1; TABLE 19.2.3.1.2;
FIGURE 19.2.3.1.1
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
FEC
EXIST. 4"
EXISTING 4"
EXISTING 4"
EXISTING 4"
EXIST. 4"
EXISTING 4"
FHC
D
D
D
D
D
D
D
TYP.
FHC
1 2
1 2
3" RISER
FHC
SP
SP
SP
SP
SPRINKLER
ZONE
PERIMETERSPRINKLER
ZONE
PERIMETER
SPRINKLER
ZONE
PERIMETER
A C
3A
4 4
4 4 4 4
4 4
4 4
4 4
4 4
4 4
4 4
4 4 4 4
4 4
1 HR FIRE BARRIER
SMOKE PARTITION
SMOKE BARRIER (FIRE RATED 1 HR.)
2 HR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
X
A. CONTRACTOR TO COORDINATE WITH VA COR FOR ALL FIRE PROTECTION SERVICE
OUTAGES.
B. THE FIRE PROTECTION DRAWINGS ARE CONCEPTUAL. FOR GENERAL INFORMATION
ONLY AND NOT AN EXACT INDICATOR OF PIPE OR SPRINKLER HEAD LOCATIONS.
C. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR
COMPONENTS NOT SCHEDULED FOR DEMOLITION. DAMAGED ITEMS SHALL BE
REPLACED OR REPAIRED TO MEET OR EXCEED FORMER CONDITIONS.
D. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF
CEILING, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY
ALL CONTRACTORS.
E. AREA OF WORK WHERE EXISTING CEILINGS ARE TO BE REMOVED AND NEW FINISH
CEILINGS TO BE INSTALLED; ALL EXISTING MOUNTED ITEMS SHALL BE REMOVED,
STORED AND REINSTALLED IN SAME LOCATION.
F. CONTRACTOR IS RESPONSIBLE FOR ALL COST ASSOCIATED WITH CEILING
DISASSEMBLY AND REASSEMBLY TO ACCOMMODATE THIS WORK. CONTRACTOR TO
SALVAGE, STORE, AND REINSTALL ALL CEILING MOUNTED DEVICES.
G. REMOVE ALL ASSOCIATED CLAMPS, HANGERS, SUPPORTS, ITC., ASSOCIATED WITH
PIPING REMOVAL.
H. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING
NECESSARY TO PERMIT THE INSTALLATION OF NEW WORK.
I. DURING DEMOLITION, CONTRACTOR TO REVERSE A/S HEAD CONNECTION TO
UPRIGHT, PROVIDE A NEW UPRIGHT SPRINKLER AND SPRIG IF NECESSARY, TO
KEEP SYSTEM ACTIVE DURING CONSTRUCTION. REPLACE A/S HEAD WITH
DESIGNATED NEW FINAL TYPE AT END OF CONSTRUCTION.
1. EXISTING STANDPIPE/AUTOMATIC SPRINKLER RISER
2. EXISTING AUTOMATIC SPRINKLER FLOOR CONTROL VALVE, TAMPER SWITCH, AND FLOW
SWITCH. (SEE DETAIL X/FP501)
3. EXISTING AUTOMATIC SPRINKLER TO REMAIN
4. EXISTING AUTOMAITC SPRINKLER TO BE REMOVED. REMOVE EXISTING PIPING BACK TO
BRANCH OR CROSS MAIN.
5. EXISTING AUTOMATIC SPRINKLER TO BE REMOVED DURING CONSTRUCTION AND NEW
SPRINKLER TO BE RE-INSTALLED IN SAME LOCATION.
6. EXISTING 4” CROSS MAIN, TO REMAIN.
7. EXISTING 4” FEED MAIN, TO REMAIN
8. EXISTING 4” FEED MAIN, BACK TO FIRE SYSTEM CONTROL VALVES, EXISTING ENTRY
POINT TO BUILDING FROM 8” SITE FIRE LOOP, AND EXISTING POST INDICATOR VALVE.
9. 2” DRAIN FROM BASE OF RISER DOWN TO SPLASH BLOCK OUTSIDE OF BUILDING.
10. AREA WITH IS NOT IN CONTRACT.
SEE SHEET FX100.1 FOR PHASING NOTES.
TYP.
TYP.
TYP.
TYP.
TYP.
SP
A
SP
SP
C
EXISTING
SP
3A
SPRINKLER
ZONE
PERIMETER
SPRINKLER
ZONE
PERIMETER
3 3 3 3 3
4 4 4
4 4 4
4 4 4
1 HR FIRE BARRIER
SMOKE PARTITION
SMOKE BARRIER (FIRE RATED 1 HR.)
2 HR FIRE BARRIER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
X
A. CONTRACTOR TO COORDINATE WITH VA COR FOR ALL FIRE PROTECTION SERVICE
OUTAGES.
B. THE FIRE PROTECTION DRAWINGS ARE CONCEPTUAL. FOR GENERAL INFORMATION
ONLY AND NOT AN EXACT INDICATOR OF PIPE OR SPRINKLER HEAD LOCATIONS.
C. CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE TO FINISHES OR
COMPONENTS NOT SCHEDULED FOR DEMOLITION. DAMAGED ITEMS SHALL BE
REPLACED OR REPAIRED TO MEET OR EXCEED FORMER CONDITIONS.
D. GENERAL CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF
CEILING, CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY
ALL CONTRACTORS.
E. AREA OF WORK WHERE EXISTING CEILINGS ARE TO BE REMOVED AND NEW FINISH
CEILINGS TO BE INSTALLED; ALL EXISTING MOUNTED ITEMS SHALL BE REMOVED,
STORED AND REINSTALLED IN SAME LOCATION.
F. CONTRACTOR IS RESPONSIBLE FOR ALL COST ASSOCIATED WITH CEILING
DISASSEMBLY AND REASSEMBLY TO ACCOMMODATE THIS WORK. CONTRACTOR TO
SALVAGE, STORE, AND REINSTALL ALL CEILING MOUNTED DEVICES.
G. REMOVE ALL ASSOCIATED CLAMPS, HANGERS, SUPPORTS, ITC., ASSOCIATED WITH
PIPING REMOVAL.
H. CONTRACTOR IS RESPONSIBLE FOR ALL MODIFICATIONS TO THE EXISTING PIPING
NECESSARY TO PERMIT THE INSTALLATION OF NEW WORK.
I. DURING DEMOLITION, CONTRACTOR TO REVERSE A/S HEAD CONNECTION TO
UPRIGHT, PROVIDE A NEW UPRIGHT SPRINKLER AND SPRIG IF NECESSARY, TO
KEEP SYSTEM ACTIVE DURING CONSTRUCTION. REPLACE A/S HEAD WITH
DESIGNATED NEW FINAL TYPE AT END OF CONSTRUCTION.
1. EXISTING STANDPIPE/AUTOMATIC SPRINKLER RISER
2. EXISTING AUTOMATIC SPRINKLER FLOOR CONTROL VALVE, TAMPER SWITCH, AND FLOW
SWITCH. (SEE DETAIL X/FP501)
3. EXISTING AUTOMATIC SPRINKLER TO REMAIN
4. EXISTING AUTOMAITC SPRINKLER TO BE REMOVED. REMOVE EXISTING PIPING BACK TO
BRANCH OR CROSS MAIN.
5. EXISTING AUTOMATIC SPRINKLER TO BE REMOVED DURING CONSTRUCTION AND NEW
SPRINKLER TO BE RE-INSTALLED IN SAME LOCATION.
6. EXISTING 4” CROSS MAIN, TO REMAIN.
7. EXISTING 4” FEED MAIN, TO REMAIN
8. EXISTING 4” FEED MAIN, BACK TO FIRE SYSTEM CONTROL VALVES, EXISTING ENTRY
POINT TO BUILDING FROM 8” SITE FIRE LOOP, AND EXISTING POST INDICATOR VALVE.
9. 2” DRAIN FROM BASE OF RISER DOWN TO SPLASH BLOCK OUTSIDE OF BUILDING.
SEE SHEET FX100.1 FOR PHASING NOTES.
1 HR FIRE BARRIER
SMOKE PARTITION
SMOKE BARRIER (FIRE RATED 1 HR.)
2 HR FIRE BARRIER
(TYP.)
HT
HT
HTHT
HT
HT
HT
2"
2"
2"
SP
EXISTING
SP
A
F
F
SPRINKLER
ZONE
PERIMETER
SPRINKLER
ZONE
PERIMETER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
1. REWORK FIRE PROTECTION BRANCH PIPING AS NECESSARY TO
ACCOMMODATE NEW ARCHITECTURAL LAYOUT. INSTALL NEW SPRINKLER
HEADS PER NFPA #13.
2. INSTALL NEW SEMI RECESSED SPRINKLER HEAD PER NFPA #13.
3. AREA WITH NO HATCH IS LIGHT HAZARD OCCUPANCY.
4. AREA WITH HATCH IS ORDINARY HAZARD GROUP 2.
5. DRY PIPE A/S HEAD IN CORRIDOR AND FREEZERS.
6. CONNECT 2" MAIN DRAIN TO EXISTING MAIN DRAIN. MAINTAIN PITCH.
7. NEW 2" MAIN DRAIN.
8. 2" MAIN DRAIN DOWN TO SPLASH BLOCK.
9. INSTALL NEW HIGH TEMPERATURE A/S HEAD IN AREA AROUND KITCHEN
HOOD.
10. EXISTING 4" CROSS MAIN CONNECTION TO EXISTING STAND PIPE.
11. EXISTING 4" SPRINKLER RISER SERVING KITCHEN AREA.
A. THE FIRE PROTECTION DRAWINGS ARE CONCEPTUAL, FOR GENERAL
INFORMATION ONLY AND SHALL NOT BE CONSTRUED AS FINAL DESIGN OR
INSTALLATION DOCUMENTS. THE SPRINKLER DESIGN AND INSTALLATION
SHALL BE THE RESPONSIBILITY OF THE DESIGN BUILD FIRE PROTECTION
CONTRACTOR. THIS INCLUDES THE RELOCATION OF SPRINKLER MAINS,
BRANCH PIPING AND HEADS AS NECESSARY FOR THE NEW DESIGN.
REFER TO SPECIFICATION FOR DESIGN CRITERIA.
B. DESIGN TO BE IN ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN
MANUAL, DATED JUNE 1 2021
C. CONTRACTOR TO PROTECT EXISTING HEADS FROM DAMAGE DURING
CONSTRUCTION ACTIVITIES.
D. CONTRACTOR TO UTILIZE EXISTING BRANCH LINES, CROSS MAINS, AND
FEED MAINS, SERVING NEW SPRINKLER LOCATIONS WITH MODIFIED ARM
OVER CONNECTIONS FED FROM EXISTING OUTLET. SHOW ALL PIPING ON
SHOP DRAWING SUBMITTAL.
E. DURING DEMOLITION, CONTRACTOR TO REVERSE A/S HEAD CONNECTION
TO UPRIGHT, PROVIDE A NEW UPRIGHT SPRINKLER AND SPRIG IF
NECESSARY, TO KEEP SYSTEM ACTIVE DURING CONSTRUCTION. REPLACE
A/S HEAD WITH DESIGNATED NEW FINAL TYPE AT END OF CONSTRUCTION.
F. BOTTOM OF FINISH CEILING TYP. 8'-0" A.F.F. , UNLESS NOTED OTHERWISE.
1. PHASE 1- WORK UNDER THIS PHASE INCLUDES:
SYSTEMATIC REMOVAL OF EXISTING AUTOMATIC SPRINKLER
BRANCHES AND LINE WITHIN THE EXISTING BUILDING PERIMETER OF
PHASE 1 (DISHWASHING , COOLER AND FREEZER AREAS). AFTER
HOURS WORK WILL REQUIRE FIRE WATCH IN PHASE 1 AND PHASE 2
AREAS.
2. PHASE 2- WORK UNDER THIS PHASE INCLUDES:
SYSTEMATIC INSTALLATION OF NEW AUTOMATIC SPRINKLER
BRANCHES AND LINES WITHIN THE EXISTING BUILDING PERIMETER OF
PHASE 2.(TRAY ASSEMBLY, TOILET ROOMS). AFTER HOURS WORK
WILL REQUIRE FIRE WATCH IN PHASE 1 AND PHASE 2 AREAS.
3. PHASE 3- WORK UNDER THIS PHASE INCLUDES:
SYSTEMATIC INSTALLATION OF NEW AUTOMATIC SPRINKLER
BRANCHES AND LINES WITHIN THE EXISTING BUILDING PERIMETER OF
PHASE 3 (GENERAL OFFICE AREA).
4. REFER TO SHEETS GC200 AND GC201 FOR OVERAL PROJECT PHASING.
SMOKE BARRIER (FIRE RATED 1 HR.)
2 HR FIRE BARRIER
HT
HT
2"
SP
A
2"
EXISTING
SP
F
SPRINKLER
ZONE
PERIMETER
SPRINKLER
ZONE
PERIMETER
SPRINKLER
ZONE
PERIMETER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
1. REWORK FIRE PROTECTION BRANCH PIPING AS NECESSARY TO
ACCOMMODATE NEW ARCHITECTURAL LAYOUT. INSTALL NEW SPRINKLER
HEADS PER NFPA #13.
2. INSTALL NEW SPRINKLER HEAD PER NFPA #13. CONNECT BRANCH TO
EXISTING STEEL FIRE PROTECTION PIPING.
3. AREA WITH NO HATCH IS LIGHT HAZARD OCCUPANCY.
4. AREA WITH HATCH IS ORDINARY HAZARD GROUP 2.
5. DRY PIPE A/S HEAD IN FREEZERS AND COOLERS.
6. EXISTING 2" MAIN DRAIN.
7. EXISTING FEED MAIN FROM FIRE SERVICE, VERIFY LOCATION IN ROOM #30.
8. EXISTING 4" FEED MAIN.
A. THE FIRE PROTECTION DRAWINGS ARE CONCEPTUAL, FOR GENERAL
INFORMATION ONLY AND SHALL NOT BE CONSTRUED AS FINAL DESIGN OR
INSTALLATION DOCUMENTS. THE SPRINKLER DESIGN AND INSTALLATION
SHALL BE THE RESPONSIBILITY OF THE DESIGN BUILD FIRE PROTECTION
CONTRACTOR. THIS INCLUDES THE RELOCATION OF SPRINKLER MAINS,
BRANCH PIPING AND HEADS AS NECESSARY FOR THE NEW DESIGN.
REFER TO SPECIFICATION FOR DESIGN CRITERIA.
B. DESIGN TO BE IN ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN
MANUAL, DATED JUNE 1 2021
C. CONTRACTOR TO PROTECT EXISTING HEADS FROM DAMAGE DURING
CONSTRUCTION ACTIVITIES.
D. CONTRACTOR TO UTILIZE EXISTING BRANCH LINES, CROSS MAINS, AND
FEED MAINS, SERVING NEW SPRINKLER LOCATIONS WITH MODIFIED ARM
OVER CONNECTIONS FED FROM EXISTING OUTLET. SHOW ALL PIPING ON
SHOP DRAWING SUBMITTAL.
E. DURING DEMOLITION, CONTRACTOR TO REVERSE A/S HEAD CONNECTION
TO UPRIGHT, PROVIDE A NEW UPRIGHT SPRINKLER AND SPRIG IF
NECESSARY, TO KEEP SYSTEM ACTIVE DURING CONSTRUCTION. REPLACE
A/S HEAD WITH DESIGNATED NEW FINAL TYPE AT END OF CONSTRUCTION.
F. BOTTOM OF FIINISH CEILING TYP. 8'-0" A.F.F., UNLESS NOTED OTHERWISE.
SEE SHEET FX100.1 FOR PHASING NOTES.
SMOKE BARRIER (FIRE RATED 1 HR.)
2 HR FIRE BARRIER
SPRINKLER
ZONE
PERIMETER
SPRINKLER
ZONE
PERIMETER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
1. REWORK FIRE PROTECTION BRANCH PIPING AS NECESSARY TO
ACCOMMODATE NEW ARCHITECTURAL LAYOUT. INSTALL NEW SPRINKLER
HEADS PER NFPA #13.
2. INSTALL NEW SPRINKLER HEAD PER NFPA #13. CONNECT BRANCH TO
EXISTING STEEL FIRE PROTECTION PIPING.
3. AREA WITH NO HATCH IS LIGHT HAZARD OCCUPANCY.
4. AREA WITH HATCH IS ORDINARY HAZARD GROUP 2.
5. AREA WITH IS NOT IN CONTRACT.
A. THE FIRE PROTECTION DRAWINGS ARE CONCEPTUAL, FOR GENERAL
INFORMATION ONLY AND SHALL NOT BE CONSTRUED AS FINAL DESIGN OR
INSTALLATION DOCUMENTS. THE SPRINKLER DESIGN AND INSTALLATION
SHALL BE THE RESPONSIBILITY OF THE DESIGN BUILD FIRE PROTECTION
CONTRACTOR. THIS INCLUDES THE RELOCATION OF SPRINKLER MAINS,
BRANCH PIPING AND HEADS AS NECESSARY FOR THE NEW DESIGN.
REFER TO SPECIFICATION FOR DESIGN CRITERIA.
B. DESIGN TO BE IN ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN
MANUAL, DATED JUNE 1 2021
C. CONTRACTOR TO PROTECT EXISTING HEADS FROM DAMAGE DURING
CONSTRUCTION ACTIVITIES.
D. CONTRACTOR TO UTILIZE EXISTING BRANCH LINES, CROSS MAINS, AND
FEED MAINS, SERVING NEW SPRINKLER LOCATIONS WITH MODIFIED ARM
OVER CONNECTIONS FED FROM EXISTING OUTLET. SHOW ALL PIPING ON
SHOP DRAWING SUBMITTAL.
E. DURING DEMOLITION, CONTRACTOR TO REVERSE A/S HEAD CONNECTION
TO UPRIGHT, PROVIDE A NEW UPRIGHT SPRINKLER AND SPRIG IF
NECESSARY, TO KEEP SYSTEM ACTIVE DURING CONSTRUCTION. REPLACE
A/S HEAD WITH DESIGNATED NEW FINAL TYPE AT END OF CONSTRUCTION.
SEE SHEET FX100.1 FOR PHASING NOTES.
SMOKE BARRIER (FIRE RATED 1 HR.)
2 HR FIRE BARRIER
EXISTING
SP
SPRINKLER
ZONE
PERIMETER
SPRINKLER
ZONE
PERIMETER
SPRINKLER
ZONE
PERIMETER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
A. THE FIRE PROTECTION DRAWINGS ARE CONCEPTUAL, FOR GENERAL
INFORMATION ONLY AND SHALL NOT BE CONSTRUED AS FINAL DESIGN OR
INSTALLATION DOCUMENTS. THE SPRINKLER DESIGN AND INSTALLATION
SHALL BE THE RESPONSIBILITY OF THE DESIGN BUILD FIRE PROTECTION
CONTRACTOR. THIS INCLUDES THE RELOCATION OF SPRINKLER MAINS,
BRANCH PIPING AND HEADS AS NECESSARY FOR THE NEW DESIGN.
REFER TO SPECIFICATION FOR DESIGN CRITERIA.
B. DESIGN TO BE IN ACCORDANCE WITH THE VA FIRE PROTECTION DESIGN
MANUAL, DATED JUNE 1 2021
C. CONTRACTOR TO PROTECT EXISTING HEADS FROM DAMAGE DURING
CONSTRUCTION ACTIVITIES.
D. CONTRACTOR TO UTILIZE EXISTING BRANCH LINES, CROSS MAINS, AND
FEED MAINS, SERVING NEW SPRINKLER LOCATIONS WITH MODIFIED ARM
OVER CONNECTIONS FED FROM EXISTING OUTLET. SHOW ALL PIPING ON
SHOP DRAWING SUBMITTAL.
E. DURING DEMOLITION, CONTRACTOR TO REVERSE A/S HEAD CONNECTION
TO UPRIGHT, PROVIDE A NEW UPRIGHT SPRINKLER AND SPRIG IF
NECESSARY, TO KEEP SYSTEM ACTIVE DURING CONSTRUCTION. REPLACE
A/S HEAD WITH DESIGNATED NEW FINAL TYPE AT END OF CONSTRUCTION.
1. REWORK FIRE PROTECTION BRANCH PIPING AS NECESSARY TO
ACCOMMODATE NEW ARCHITECTURAL LAYOUT. INSTALL NEW SPRINKLER
HEADS PER NFPA #13.
2. INSTALL NEW SPRINKLER HEAD PER NFPA #13. CONNECT BRANCH TO
EXISTING STEEL FIRE PROTECTION PIPING.
3. AREA WITH NO HATCH IS LIGHT HAZARD OCCUPANCY.
4. AREA WITH HATCH IS ORDINARY HAZARD GROUP 2.
5. AREA WITH IS NOT IN CONTRACT.
SEE SHEET FX100.1 FOR PHASING NOTES.
ALL SPACES BETWEEN PIPES AND SLEEVES SHALL BE
PACKED FULL DEPTH WITH FIRE RESISTIVE MATERIAL
(FIBER GLASS SHALL NOT BE USED) SLEEVE CLEARANCES
SHALL NOT EXCEED 1/2 INCH BETWEEN PIPES AND
SLEEVES.
ESCUTCHEON
BOTH SIDES
PIPE SLEEVE (CEMENT ANY
GAPS BETWEEN SLEEVES AND
WALL)
WALL OR PARTITION
PIPE
NOTE:
1. REFER TO SPECIFICATIONS ARTICLE ENTITLED "BASIC PIPING MATERIALS
AND METHODS".
NEW BRANCH
RETURN BEND
OUTLET FROM TOP OF
BRANCH PIPE
BRANCH PIPE
FINISHED CEILINGQUICK RESPONSE SEMI-RECESSED
SPRINKLER HEAD (FM APPROVED)
REDUCER
1" MINIMUM
SPRINKLER PIPE
VA
RIE
S
DRY TYPE SPRINKLER
CLEARANCE HOLE
BOOT
STRAP TIES
COUPLING
ADHESIVE
FREEZER CEILING
MOUNT PIPING ABOVE
BOTTOM CHORD OF JOIST
INSULATED FREEZER
STRUCTURE
EQUAL
EQUAL
EQUAL
EQUAL
ARM-OVER PIPING
NOTE:
FIREFLEX MAY BE USED IN
CONCEALED AREAS.
1" x 1/2" REDUCER MANUF. AS
SPECIFIED
PIPE
ADJUSTING NUTDOUBLE NUT
HANGER "A" EXPANSION ANCHOR
HANGER ROD
PIPE
ADJUSTING NUTDOUBLE NUT
HANGER "B" POWER DRIVEN STUD
ROD COUPLING
HANGER ROD
SWIVEL RING SWIVEL RING
1" 1-1/2" 1-1/4" 2" 2-1/2"
MAXIMUM DISTANCE BETWEEN HANGERS
3" 6"4"
15' 0"15' 0"12' 0" 15' 0" 15' 0" 14' 0" 15' 0"12' 0"
12' 0" - -12' 0"
STEEL PIPE (EXCEPT TREADED
LIGHT WALL)
STEEL PIPE TREADED
LIGHT WALL
NOMINAL PIPE SIZE
12' 0" 12' 0" 12' 0" 12' 0"
NOTES:
4"-12" UNDER UNOBSTRUCTED
CONSTRUCTION (TYPICAL)
1"-22" UNDER OBSTRUCTED
CONSTRUCTION (TYPICAL)
1"UNDER OBSTRUCTED
CONSTRUCTION (TYPICAL)
1. 100 PSI STATIC PRESSURE ON SYSTEM REQUIRES UP-LIFT RESTRAINT WITHIN 12 INCHES HORIZONTALLY OF
HEAD FOR ARM-OVERS AND END OF BRANCH LINE.
2. THE UNSUPPORTED LENGTH BETWEEN THE END SPRINKLER AND THE LAST HANGER ON THE LINE SHALL NOT EXCEED 36" FOR 1" PIPE, 48" FOR 1 1/4" PIPE AND 60" FOR 1 1/2" PIPE OR LARGER.
3. THE CUMULATIVE HORIZONTAL LENGTH OF AN UNSUPPORTED ARMOVER TO A SPRINKLER, SPRINKLER DROP, OR SPRIG-UP SHALL NOT EXCEED 24" *MANY CODES AND SPECIFICATIONS REQUIRE PIPE HANGERS
TO BE SPACED EVERY 10 FT (3.05M) REGARDLESS OF SIZE. CHECK LOCAL CODES.
PENDENT SPRINKLER
2'x2' CEILING TILE
OR HALF OF A
2'x4' CEILING TILE
SPRINKLER GUARD AS
SPECIFIED
1" x 0'-0" NIPPLE
BRANCHLINE
NOTE:
IDENTIFICATION MARKERS OR STRIPS TO BE PLACED ON ALL EXPOSED COVERED AND UNCOVERED PIPES AT 50'-0" INTERVALS AND AT ALL VALVES AND BRANCHES AND ON BOTH SIDES OF WALLS WHERE PIPES PASS THROUGH SAME. ARROWS OF SAME COLOR AS IDENTIFICATION MARKERS SHALL ALSO BE PLACED ON PIPES POINTING AWAY FROM MAKER INDICATING DIRECTION OF FLOW.
OUTSIDE DIAMETER
OF PIPE OR COVERING LENGTH OF COLOR FIELD A SIZE OF
LETTERS B
3/4" TO 1-1/4"
1-1/2" TO 2"
2-1/2" TO 6"
8" TO 10"
OVER 10"
8"
8"
12"
24"
32"
1/2"
3/4"
1-1/4"
2-1/2"
3-1/2"
SIZE OF LEGEND LETTERS
LABEL BACKGROUND OR
COLOR BAND IDENTIFICATION MARKER
FIRE PROTECTION (ZONE #)
(ALL ZONES TO BE NUMBERED) RED WHITE ON RED
SECURE TO VALVE WITH BRASS CHAIN AND HOOD. DRILL
VALVE HANDLE AS REQUIRED TO ACCEPT TAG CHAIN.
TYPICAL LAMINATE THREE LAYER
PLASTIC OR BRASS VALVE TAG PER
SPECIFICATIONS
TAG LEGEND (FIRE PROTECTION)
FP = FIRE PROTECTION
EMBOSSED / PRINTED
LETTERING
1/4" MIN.
1/2" MIN.
1-1/2" O.D.
(MINIMUM)
PLASTIC TAGS TO HAVE COLORED BACKGROUND
WHICH COINCIDES WITH SERVICE COLOR.
1. ABBREVIATIONS TO BE AS INDICATED FOR EACH DESIGN SYSTEM AS
INDICATED ON DESIGN DRAWINGS.
2. VALVE TAGS SHOULD BE INDICATED IN "VALVE CHARTS" AND ON "PROJECT
RECORD" DRAWINGS TO CORRELATE WITH TAG I.D.'S.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
PLUMBING FIXTURE SCHEDULE
PLUMBING GENERAL NOTES PLUMBING MATERIALS AND PROCEDURES NOTES PLUMBING SYMBOL LIST
SYMBOL
AP ACCESS PANEL
PROCEDURES: DESCRIPTION
1. THE PLUMBING FIXTURE AND EQUIPMENT SCHEDULE, IN GENERAL, SPECIFIES THE PLUMBING FIXTURES, EQUIPMENT AND DEVICES: HOWEVER, UNLESS NOTED OTHERWISE, ALL FIXTURES SHALL BE PROVIDED WITH APPLICABLE ACCESSORIES (SUCH AS SUPPLY STOPS, WASTE TRAPS, FIXTURE
MOUNTING SUPPORTS, BOLT CAPS, WATER CLOSET SEATS, ETC., AS REQ'D TO COMPLETE THE
INSTALLATION.)
2. ALL ITEMS SPECIFIED HEREAFTER SHALL BE NEW, CLEANED AND ADJUSTED FOR THE SPECIFIED
DESIGN PURPOSE (UNLESS OTHERWISE SPECIFIED).
3. ALL EQUIPMENT AND DEVICES SHALL BEAR A.G.A., N.S.F., ASME, C.S.A. OR U.L. APPROVED LABELS AND
CERTIFICATIONS FOR THE SPECIFIED DESIGN PURPOSE.
4. PLUMBING CONTRACTOR SHALL VERIFY IN FIELD WITH VA/COR ALL FINAL FIXTURE AND EQUIPMENT
LOCATIONS AND MOUNTING HEIGHTS REQUIRED FOR THE DESIGN PURPOSE.
5. SUBMIT, AS PER THE SPECIFICATIONS, THE NUMBER OF COPIES OF EACH CATALOG CUT, FOR EACH ITEM, TO BE APPROVED BY THE VA/COR (PRIOR TO THE BEGINNING OF CONSTRUCTION) FOR ALL NEW
ITEMS SPECIFIED HEREAFTER.
6. THE CONTRACTOR SHALL SUBMIT EQUIPMENT PRODUCT DATA FOR EACH PIECE OF EQUIPMENT PRIOR TO ORDERING. SUBMIT, AS PER THE SPECIFICATIONS, THE NUMBER OF COPIES FOR APPROVAL BY THE VA/COR THIS CONTRACTOR SHALL ALSO ASSEMBLE PRINTED INSTRUCTIONS FOR THE OPERATION
AND MAINTENANCE OF EACH ITEM INSTALLED AND BIND TOGETHER WITH EQUIPMENT CUTS AND
CONTROL WIRING DIAGRAMS. DO NOT SUBMIT EQUIPMENT DATA FOR B.O.D. EQUIVALENCY
SUBSTITUTION ITEMS UNTIL SUCH TIME AS THE B.O.D. PROTOCOLS PROCESS HAS BEEN COMPLETED
AND THE SUBSTITUTION HAS BEEN APPROVED BY BOTH THE CO AND COR.
7. SOME FIXTURES FURNISHED BY VA SHALL BE INSTALLED BY PLUMBING CONTRACTOR, ALL OTHER
FIXTURES SHALL BE FURNISHED & INSTALLED BY PLUMBING CONTRACTOR.
1. ALL MATERIALS SHALL BE NEW OF FIRST QUALITY AND UL LISTED FOR THE SPECIFIC DESIGN PURPOSE.
2. SANITARY, VENT, AND STORM LINES SHALL BE SCHEDULE 40 CAST IRON OR COPPER PIPE.
3. DOMESTIC WATER SUPPLY PIPING LOCATED BELOW THE SLAB-ON-GRADE LESS THAN 2" SHALL BE TYPE "K" COPPER LINES
6" AND LARGER SHALL BE STAINLESS STEEL (ASTM 312)
4. THREADED FITTINGS ON GALVANIZED STEEL PIPING SHALL BE 150# CLASS GALVANIZED MALLEABLE IRON FITTING
CONFORMING TO ASTM A-197 SPECIFICATION.
5. FURNISH AND INSTALL UNIONS WHERE INDICATED OR AS DEEMED NECESSARY FOR REPAIR OR SERVICE. UNIONS 2" AND SMALLER SHALL BE STANDARD GROUND JOINT BRASS TO IRON SEAT, MALLEABLE IRON, SCREWED. UNIONS 2-1/2" AND
LARGER SHALL BE STANDARD CAST IRON FLANGED UNIONS 125# CLASS.
6. DOMESTIC HOT WATER SUPPLY AND RETURN PIPING SHALL BE INSULATED WITH ONE OF THE FOLLOWING:
A. 1" THICK PREFORMED FIBERGLASS WITH "K" FACTOR OF 0.23 MAXIMUM AT 75°F. MEAN TEMPERATURE. JACKET TO
BE FACTORY APPLIED KRAFT PAPER WITH VAPOR BARRIER.
B. 1" THICK MOLDED RIGID PHENOLIC FOAM WITH "K" FACTOR OF 0.23 MAXIMUM AT 78°F MEAN TEMPERATURE WITH
FACTORY APPLIED LAMINATED ALUMINUM FOILAND WHITE KRAFT PAPER VAPOR BARRIER JACKET.
9. DOMESTIC COLD WATER PIPING SHALL BE INSULATED WITH:
A. 1/2" THICK INSULATION FOR PIPING UP TO 1-1/4" DIAMETER.
B. 1" THICK INSULATION FOR PIPING LARGER THAN 1-1/2" DIAMETER.
10. HANGERS SHALL BE OF STANDARD WEIGHT STEEL OR IRON ROD AND RING OR CLEVIS TYPE. SEE DETAIL.
1. DISINFECTION OF POTABLE WATER SYSTEM SHALL BE AT THE VERY MINIMUM AS DESCRIBED BELOW IN ITEMS A THRU
D, OR THE MOST AGRESSIVE SYSTEM REQUIRED BY THE FOLLOWING FOR CITED AUTHORITIES:
NEW POTABLE WATER SYSTEMS SHALL BE PURGED OF DELETERIOUS MATTER AND DISINFECTED PRIOR TO UTILIZATION. THE METHOD TO BE FOLLOWED SHALL BE THAT PRESCRIBED BY THE HEALTH AUTHORITY HAVING JURISDICTION OR, IN THE ABSENCE OF A PRESCRIBED METHOD, THE PROCEDURE DESCRIBED IN EITHER AWWA C651 OR AWWA C652 LISTED IN CHAPTER 19, AND AS DESCRIBED IN THE VA SPECIFICATION SECTION. THIS REQUIREMENT SHALL APPLY TO "ONSITE" OR "IN-PLANT" FABRICATION OF A SYSTEM OR TO A MODULAR PORTION OF A SYSTEM.
A. THE PIPE SYSTEM SHALL BE FLUSHED WITH CLEAN, POTABLE WATER UNTIL DIRTY WATER DOES NOT APPEAR
AT THE POINTS OF OUTLET.
B. THE SYSTEM OR PART THEREOF SHALL BE FILLED WITH A WATER/CHLORINE SOLUTION AT LEAST 50 PARTS PER MILLION (50 mg/l) OF CHLORINE, AND THE SYSTEM OR PART THEREOF SHALL BE VALVED OFF AND
ALLOWED TO STAND FOR 24 HOURS; OR THE
SYSTEM OR PART THEREOF SHALL BE FILLED WITH A WATER CHLORINE SOLUTION AT LEAST 200 PARTS PER MILLION (200mg/l) OF CHLORINE AND ALLOWED TO STAND FOR 3 HOURS. FOLLOWING THE REQUIRED
STANDING TIME, THE SYSTEM SHALL BE FLUSHED.
C. THE SYSTEM SHALL BE FLUSHED WITH CLEAN POTABLE WATER UNTIL THE CHLORINE IS PURGED FROM THE
SYSTEM.
D. THE PROCEDURE SHALL BE REPEATED WHERE SHOWN BY A BACTERIOLOGICAL EXAMINATION THAT
CONTAMINATION REMAINS PRESENT IN THE SYSTEM.
2. PIPING SERVICE MARKING:
VINYL CLOTH PRESSURE SENSITIVE MARKERS BLACK LETTER ON WHITE BACKGROUND
A. PIPES 3" AND LARGER SPACING 30'-0" O.C. PIPES 2 1/2" AND SMALLER SPACING 20'-0" O.C.
B. INSTALL DIRECTIONAL ARROWS ON ALL PIPING AT SAME SPACING.
3. CONTRACTOR TO VERIFY IN FIELD AND PROVIDE EXTENSIONS REQUIRED TO ADJUST ALL FIXTURES TO GRADE LEVEL TO MAINTAIN INVERTS AS DETERMINED BY ALL FIXTURES RELATED (GREASE TRAPS, MAN HOLES, ETC.).
4. PROVIDE EXTERIOR ACCESS TO ISOLATION VALVES FOR HOT AND COLD WATER SUPPLY CUTOFF.
AFF ABOVE FINISH FLOOR
1. ALL SUSPENDED HORIZONTAL PIPING SHALL BE SUPPORTED BY HANGERS SPACED NO FURTHER THAN 8'-0" APART. NO PIPING SHALL BE SELF-SUPPORTING NOR BE SUPPORTED FROM EQUIPMENT
CONNECTIONS.
2. ALL PARALLEL PIPES (TWO(2) OR MORE) SHALL BE SUPPORTED ON A CHANNEL TYPE TRAPEZE
HANGER.
3. SUPPORTS AND HANGERS SHALL BE INSTALLED TO PERMIT FREE EXPANSION AND CONTRACTION IN
PIPING SYSTEMS UNLESS PIPE REQUIRES FIRM ANCHOR CONTROL.
4. HORIZONTAL SOIL OR WASTE LINES SHALL BE AT A SLOPE OF NOT LESS THAN 1/8" PER FOOT AND
SHALL BE HELD CLOSE TO THE CONSTRUCTION TO MAINTAIN A MAXIMUM OF HEAD ROOM. ALL
CHANGES OF DIRECTION AND JUNCTIONS SHALL BE MADE WITH "Y" FITTINGS AND 1/8" BENDS. NO LINES OF ANY KIND SHALL BE LOCATED BELOW FREEZERS. ALL DRAIN LINES SHALL BE PROTECTED
FROM FREEZING.
5. HOT AND COLD WATER PIPING SHALL BE PROPERLY PITCHED TO LOW POINTS IN THE SYSTEM
WHERE DRAINS SHALL BE INSTALLED.
6. CLEANOUTS SHALL BE PLACED AT ALL DEAD ENDS, AT CHANGES OF DIRECTION, AT 50'-0" INTERVALS ON HORIZONTAL RUNS, OUT OF HIGH TRAFFIC AREAS, (NOT UNDER CASES) ETC. WHERE CLEANOUTS OCCUR IN CONCEALED SPACES, THEY SHALL BE PROVIDED WITH EXTENSIONS TO FLOOR ABOVE OR
TO WALLS. A HAND-HOLE TEST TEE SHALL BE PLACED AT THE BASE OF EACH STACK.
7. VENT STACKS EXTENDING UP THROUGH THE ROOF SHALL BE FLASHED WITH SIX POUND SHEET LEAD. FLASHING SHALL EXTEND 12" IN ALL DIRECTIONS FROM THE VENT, CARRIED OVER AND
TURNED DOWN THE INSIDE OF THE VENT. ALL SEAMS AND JOINTS OF FLASHING SHALL BE
SOLDERED AND PROVEN WEATHERTIGHT. EXTEND VENTS A MIN. OF 12" ABOVE ROOF, AND 30" AWAY
FROM PARAPET.
8. ALL SUPPLY PIPING TO BE RUN OVERHEAD, UNLESS NOTED OTHERWISE.
9. ALL SUPPLY PIPING TO BE A MINIMUM OF 3/4" DIA.
10. EACH FIXTURE WILL HAVE A 1/2" X 12" AIR CHAMBER.
11. PROVIDE SERVICE VALVE AT BRANCHES AND AT ALL APPLIANCES.
12. ALL FIXTURES WILL BE FURNISHED WITH INTEGRAL STOPS.
13. ALL FLOOR DRAINS AND FIXTURES TO BE VENTED IN ACCORDANCE WITH ALL LOCAL, STATE AND
FEDERAL CODES AND REGULATIONS.
14. ALL HORIZONTAL VENT PIPING SHALL BE RUN ABOVE FINISHED CEILINGS AND SLOPED UP TOWARD
MAIN STACK.
15. THE PLUMBING CONTRACTOR WILL NOT INSTALL COMBUSTIBLE PIPING MATERIAL IN OR THROUGH
FIRE RATED ASSEMBLIES.
16. HORIZONTAL DRAINAGE PIPING SHALL BE PITCHED NOT LESS THAN 1/4" PER FOOT FOR PIPING 3" DIA.
AND UNDER.
17. HORIZONTAL DRAINAGE PIPING SHALL BE PITCHED NOT LESS THEN 1/8" PER FOOT FOR PIPING 4" DIA.
AND OVER.
18. ALL EQUIPMENT DEVICES SHALL BE INSTALLED WITH UNIONS IN SUCH A MANNER TO FACILITATE
EASY REMOVAL AND MAINTENANCE OF EQUIPMENT WITHOUT DISRUPTING SERVICE AND CAUSING
MAJOR PIPING REVISIONS.
DISCIPLINE SPECIFIC
MATERIALS
SEE ALL PROJECT GENERAL NOTES AND OTHER REQUIREMENTS INCLUDING THE LIFE SAFETY AND INFECTION CONTROL REQUIREMENTS LOCATED WITHIN THE GENERAL DRAWINGS SECTION. COMPLY WITH ALL REQUIREMENTS AS THEY ARE A DIRECT PART OF THIS SECTION AND AS IF THEY WERE DIRECTLY INCLUDED AND PROVIDED BELOW.
EQUIVALENCY SUBSTITUTIONS: THE “BASIS OF DESIGN (BOD) PROTOCOLS” ARE TO BE FOLLOWED FOR ALL EQUIPMENT, MATERIALS AND ASSEMBLIES SPECIFIED AND DETAILED THROUGHOUT ALL DRAWINGS AND SPECIFICATION SECTIONS, WHETHER THE BOD DESIGNATE IS SPECIFICALLY REFERENCED THEREIN OR NOT. SEE THE GENERAL DRAWINGS SECTION FOR THE FULL BOD EQUIVALENCY SUBSTITUTION REQUIREMENTS AND PROTOCOLS TO BE FOLLOWED.
1. THIS CONTRACTOR SHALL REVIEW ENTIRE SET OF CONTRACT DOCUMENTS: INCLUDING BUT NOT NECESSARILY LIMITED TO ALL ARCHITECTURAL, STRUCTURAL, MECHANICAL, PLUMBING, EQUIPMENT, FIRE PROTECTION, AND ELECTRICAL DRAWINGS AND ENTIRE PROJECT SPECIFICATIONS. THIS CONTRACTOR SHALL ACKNOWLEDGE AND INCLUDE IN THE SCOPE OF WORK (CONTRACT) ALL CONDITIONS PERTINENT TO THE COMPLETION OF HIS WORK.
THIS CONTRACTOR SHALL FULLY COORDINATE HIS/HER WORK WITH THE INSTALLATION OF WORK BY OTHER TRADES AND MAKE NECESSARY FIELD ADJUSTMENTS AS REQUIRED TO ACCOMMODATE THE INSTALLATION. ALL OF
THE ABOVE SHALL BE INCLUDED IN THE SCOPE OF WORK.
2. THIS CONTRACTOR SHALL CAREFULLY EXAMINE THE DRAWINGS AND SPECIFICATIONS, VISIT THE SITE OF THE WORK AND FULLY INFORM THEMSELVES AS TO ALL CONDITIONS AND MATTERS THAT CAN, IN ANY WAY, AFFECT THE WORK OR THE COST THEREOF. SHOULD THIS CONTRACTOR FIND DISCREPANCIES IN, OR OMISSIONS FROM THE DRAWINGS, SPECIFICATIONS OR OTHER DOCUMENTS, OR BE IN DOUBT AS TO THEIR MEANING, NOTIFY THE VA/CO AT ONCE, IN WRITING, OF ANY DISCREPANCIES BETWEEN EXISTING CONDITIONS AND NEW WORK, OR BETWEEN THEIR…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .