Attachment 3 - Drawings Part1 - Louis A. Johnson.pdf
PDF 47 MB Posted
- Attached to
- Y1DZ--Nutrition & Food Servicesand Eye/ PT Clinic Addition - - Construction - Louis A. Johnson VAMC
- Solicitation number
- 36C77623B0031
About this file
This document contains details of an attachment to a federal contract solicitation. The solicitation number is 36C77623B0031 for construction services for a Nutrition & Food Services and Eye/PT Clinic Addition at the Louis A. Johnson VA Medical Center. The opportunity was issued by the Department of Veterans Affairs Technology Acquisition Center located in Austin, Texas. The 47MB attachment includes drawings for the project. Responses to the solicitation are due based on the standard timeline and terms for a construction contract issued by the VA. The award is expected to be made to a contractor who can complete the clinic addition project at the specified medical center location.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HySecurity M
50 BARRIER O
PEN - 12' CLEAR O
PENING
SHEET 7
ARCHITECTS + ENGINEERS:
1 MEDICAL CENTER DRIVE
CLARKSBURG, WV 26301-4199
PROJECT LOCATION:
LOUIS A. JOHNSON
VA MEDICAL CENTER
PROJECT TITLE:
NUTRITION & FOOD SERVICE
AND EYE / PT CLINIC ADDITION
BUILDING NUMBER:
700 NICHOLAS BLVD. SUITE 300
ELK GROVE VILLAGE, ILLINOIS 60007
847.952.9362 www.bancroft-ae.com
BANCROFT ARCHITECTS + ENGINEERS
VA CONTRACT NO. 36C24521C0034
VA PROJECT NO. 540-370
BANCROFT-AE PROJECT NO. 20-109
PROJECT NUMBERS:
U.S. Department of Veterans Affairs
OCTOBER 21, 2022
CONSTRUCTION DOCUMENTS- ISSUED FOR BID
ENVIRONMENTAL CONSULTANT:
3280 WILLIAM PITT WAY
PITTSBURGH, PA 15238
412.828.1412 www.skellyloy.com
SKELLY AND LOY CONSULTANTS, INC.
COMMERCIAL KITCHEN CONSULTANT:
615 SOUTH COLLEGE ST. 9TH FLOOR
CHARLOTTE, NC 28202
704.545.6151 www.foodesignassociates.com
FOOD DESIGN ASSOCIATES
STRUCTURAL CONSULTANT:
3750 N. KEDZIE AVENUE
CHICAGO, ILLINOIS 60618
312.544.1908 www.orionengineersllc.com
ORION ENGINEERS, PLLC
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
CIVIL ENGINEERING CONSULTANT:
148 S. QUEEN STREET, SUITE 201
MARTINSBURG, WV 25401
304.725.8456 www.gordon-us.com
GORDON
KKolian Snapshot
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
(E)ACSS-46(E)ACSS-47
36x24 SA36x30 RA x24
SA
(E) x20
SA
24x20 SA
36x30 RA (E)20x14 RA36x26 RA
(E)30x24 RA
(E)14x10 RA
22x18 RA
(E)8"Ø SA
(E)8"Ø SA 8"Ø
SA
6"Ø SA
8"Ø SA
(E)12"Ø SA
20x16 SA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
ALTERNATE NO. 2:
AHU-1 TO BE REMOVED FROM SCOPE OF WORK. PHYSICAL THERAPY CLINIC TO BE SERVED FROM EXISTING AHU
LOCATED ON THE SECOND FLOOR MECHANICAL RM. 2128, ACSS-46.
HATCH INDICATES WALLS/ AHU/ ROOF ENCLOSURE STRUCTURE TO BE REMOVED
FROM SCOPE OF WORK.
1. AHU-1 (SERVES PHYSICAL THERAPY CLINIC) TO BE REMOVED FROM SCOPE OF WORK. SEE PLAN DETAIL
1/GI004 FOR MECHANICAL DUCTWORK MODIFICATIONS REQUIRED.
2. ALL THE ELECTRICAL DEVICES AND THEIR CIRCUITING ALONG WITH LIGHTNING PROTECTION SHALL BE
ADJUSTED ACCORDINGLY.
3. MECHANICAL ENCLOSURE TO BE REDUCED IN SCOPE AS SHOWN ON DRAWINGS. EAST WALL OF THE ROOF MECHANICAL ENCLOSURE SHALL BE ON STRUCTURAL COLUMN GRID BB.5. SEE PLAN DETAIL 2/GI004.
4. TAPERED ROOFIING INSULATION SHALL BE MODIFIED AS REQUIRED.
1. REFER TO 2/GI004A FOR CONTINUATION.
2. REWORK DUCTWORK AS REQUIRED TO ACCOMMODATE VAV BOXES,
DIFFUSERS, REGISTERS, AND GRILLES AS SHOWN ON SHEET MH101.1.
3. REMOVE EXISTING DUCT CONNECTION TO ACSS-46 IN SECOND FLOOR
MECHANICAL ROOM AND PROVIDE NEW DUCT CONNECTION OF INDICATED
SIZE.
4. REFER TO 1/GI004A FOR CONTINUATION.
5. LOCATION OF EXTERIOR WALL.
X
A. MECHANICAL DEMOLITION WORK IS NOT SHOWN BUT SHALL BE PERFORMED
AS FOLLOWS:
A.A. REMOVE EXISTING MEDIUM PRESSURE SUPPLY DUCT CONNECTION TO
ACSS-46 IN SECOND FLOOR MECHANICAL ROOM AND PORTION OF DUCT
ABOVE CORRIDOR 116B. REMOVE DUCTWORK FROM CORRIDOR 116B
NORTH TO ACCOMMODATE FOR LARGER DUCTWORK.
A.B. REMOVE EXISTING RETURN DUCT CONNECTION TO ACSS-46 IN SECOND
FLOOR MECHANICAL ROOM AND PORTION OF DUCT ABOVE WAITING
1124. REMOVE DUCTWORK FROM WAITING 1124 NORTH TO
ACCOMMODATE FOR LARGER DUCTWORK.
NOTE: REFER TO SPECIFICATION SECTION 01 00 00 FOR ADDITIONAL INFORMATION OF EACH OF EACH ALTERNATE.
ALTERNATE NO. 1:
REPLACE CAST STONE BANDING WITH FACE BRICK AT EXTERIOR MASONRY WALLS. WINDOWS SILLS WILL
BE CAST STONE.
ALTERNATE NO. 2:
REMOVE AIR HANDLING UNIT AHU-37. REDUCE MECHANICAL ENCLOSURE ON ROOF. SEE PLAN DETAILS 1 &
2/GI004A FOR ALTERNATE NO. 2 DESCRIPTION.
ALTERNATE N0. 3:
REMOVE ALL WORK ASSOCIATED WITH CONFERENCE ROOM B132.
ALTERNATE NO. 4:
REMOVE PORTIONS OF WORK ASSOCIATED WITH GENERAL OFFICES ROOM B120 SERIES. SEE PLAN DETAIL
1/GI004A FOR ALTERNATE NO. 4 DESCRIPTION.
ALTERNATE NO. 5:
REMOVE PORTIONS OF WORK IN PHYSICAL THERAPY CLINIC (1122 STORAGE ALCOVE, 1122J TOILET AND 1122K
TOILET. SEE PLAN DETAIL 2/GI004A FOR ALTERNATE NO. 5 DESCRIPTION.
ALTERNATE NO. 6:
REPLACE FIBERGLASS REINFORCED PANELS (FRP) GRAPHIC PANELS (FRP-1, FRP-2, FRP-3) IN THE FOLLOWING
ROOMS:
B122 TRAY ASSEMBLY B122A CORRIDOR
B122 COOK/PREP
ALTERNATE NO. 7:
REPLACE SOLID SURFACE WALL PANELS WITH EPOXY PAINT (P-1) AND FIBERGLASS REINFORCED PANELS
(FRP-4) IN THE FOLLOWING ROOMS. BOTTOM 48 INCHES OF WALL TO RECEIVE FRP:
B122 TRAY ASSEMBLY B122A CORRIDOR
B122K CORRIDOR B122L CORRIDOR
B122O EQUIPMENT ALCOVE B122P BOX BREAKDOWN
B122U COOK/PREP B122W SMALL WARES STOR.
B122AA DISHWASHING B122BB CORRIDOR
B122EE CORRIDOR
ALTERNATE NO. 8:
REPLACE LUXURY VINYL TILE (LVT) WITH VINYL COMPOSITE TILE (VCT) IN THE FOLLOWING ROOMS:
B122E STAFF LOUNGE B122F SECRETARY
B122G CHIEF B122H ASST. CHIEF 2
B122J ASST. CHIEF 1
ALTERNATE NO. 9:
REPLACE SHEET VINYL/RUBBER BACKED FLOORING (SV-1) AND LUXURY VINYL TILE (LVT) WITH VINYL
COMPOSITE TILE (VCT) IN THE FOLLOWING ROOMS:
1122A CHECKOUT 1122B WAITING 2
1122C CONSULT 1122D CVORRIDOR
1122E OFFICE 1122F GYM
1122H STORAGE ALCOVE 1122L ADL
1122M TREATMENT 4 1122N TREATMENT 3
1122O TREATMENT 2 1122P TREATMENT 1
1122Q CHARTING
ALTERNATE NO. 10:
REMOVE CEILING SOFFITS IN FIRST FLOOR PHYSICAL THERAPY, AND REPLACE WITH ACOUSTICAL CEILING TILE (ACT-1) IN THE FOLLOWING ROOMS. RECESSED DOWNLIGHTS SHALL BE REPLACED WITH 2' X 2' LIGHTS:
1122F GYM 1122D CORRIDOR
16x10 x12 x14 x10 x12
VAV-1122L
810 CFM
14x14
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
ALTERNATE NO. 4:
GENERAL OFFICE SPACE (B120 ROOM SERIES) TO BE REDUCED IN SCOPE OF WORK. SPACE TO BE SHELL OUT.
HATCH INDICATES WALLS TO BE REMOVED FROM SCOPE OF WORK.
1. DOORS B120 AND B120H (INCLUDING FRAME AND HARDWARE) SHALL REMAIN IN SCOPE OF WORK. SEE PLAN
DRAWINGS.
2. WALL TYPE 'C' (FURRING) AND WALL TYPE 'B1' FIRE RATED WALL (BETWEEN KITCHEN AND GENERAL OFFICE
SPACE) SHALL REMAIN AND BE PRIMED AND PAINTED.
3. FINISH CEILING AND FINISH FLOORING REMOVED FROM SCOPE OF WORK.
4. ELECTRICAL POWER/ DATA TO REMAIN ON FURRED OUT WALLS AND FIRE RATED WALL. REFER TO ELECTRICAL
DRAWINGS.
5. ELECTRICAL OUTLETS AND THEIR ASSOCIATED CIRCUITS ON HATCHED WALLS SHALL BE REMOVED FROM
SCOPE OF WORK.
6. COMMUNICATION OUTLETS ON HATCHED WALLS SHALL BE REMOVED FROM THE SCOPE OF WORK.
7. ALL EGRESS LIGHTS SHALL REMAIN. REMOVE ALL LIGHTS, ASSOCIATED SWITCHES AND CIRCUITS SHALL BE
REMOVED FROM THE SCOPE OF WORK. PROVIDE TWO (2) F3 LIGHTS AND INSTALL INTO SPACE THAT WILL
PROVIDE UNIFORM LIGHT DISTRIBUTION WITH SWITCH AT ENTRY.
8. ALL FIRE ALARM DEVICES SHALL REMAIN AS SHOWN ON EF100.
9. MECHANICAL SUPPLY AND RETURN SHALL TERMINATE AS INDICATED ON PLAN DRAWING 1/GI004A.
10. AUTOMATIC SPRINKLERS AND BRANCH PIPING SHALL BE INSTALLED IN THE UPRIGHT POSITION TO PROVIDE
ADEQUATE CODE REQUIRED COVERAGE.
ALTERNATE NO. 5:
PHYSICAL THERAPY CLINIC TO BE REDUCED IN SCOPE OF WORK. AREA CONTAINING STORAGE ALCOVE 1122H, TOILET 1
1122J, TOILET 2 1122K AND ADL 1122L WILL BECOME A SHELLED OUT SPACE.
HATCH INDICATES WORK REMOVED FROM SCOPE OF WORK.
1. EXTERIOR WALLS (INCLUDING FURRING) IN SHELLED OUT SPACE SHALL BE CONSTRUCTED AS DESIGNED, PRIMED AND PAINTED. PLUMBING CHASE WALL FRAMING FOR TOILET ROOM FIXTURES TO BE INSTALLED. DO
NOT INSTALL GYPSUM BOARD ON FINISH SIDE.
2. FINISH CEILING AND FLOORING SHALL BE REMOVED FROM SCOPE OF WORK.
3. MECHANICAL DUCTWORK TO BE MODIFIED AS INDICATED ON THE PLAN DRAWING GI004A.
4. ELECTRICAL POWER/DATA SHALL REMAIN ON BUILDING ADDITION EXTERIOR FURRED WALLS. SEE ELECTRICAL
DRAWINGS.
5. ELECTRICAL OUTLETS AND THEIR ASSOCIATED CIRCUITS ON HATCHED WALLS SHALL BE REMOVED FROM
SCOPE OF WORK.
6. ALL NURSE CALL DEVICES AND ASSOCIATED DOME LIGHTS FOR ROOMS 1122J AND 1122K SHALL BE REMOVED
FROM SCOPE OF WORK.
7. ALL EGRESS LIGHTS SHALL REMAIN. REMOVE ALL LIGHTS, ASSOCIATED SWITCHES AND CIRCUITS SHALL BE
REMOVED FROM THE SCOPE OF WORK. PROVIDE TWO (2) F3 LIGHTS AND INSTALL INTO SPACE THAT WILL
PROVIDE UNIFORM LIGHT DISTRIBUTION WITH SWITCH AT ENTRY.
8. REMOVE FIRE ALARM STROBE FROM ROOM 1122J AND 1122K. ALL OTHER FIRE ALARM DEVICES SHOWN SHALL
REMAIN.
9. TEMPORARY WALL (TYPE 'A') SHALL BE INSTALLED SEPARATING AREA FROM REMAINDER OF GYM. WALL SHALL
BE PRIMED AND PAINTED ON GYM SIDE. WALL SHALL BE PRIMED ON UNFINISHED AREA.
10. NEW 3'-0" X 7'-0" WOOD DOOR (INCLUDING H.M. FRAME AND HARDWARE) SHALL BE INSTALLED IN WALL.
HARDWARE SHALL MATCH HARDWARE SET NO. 10 IN SPECIFICATION SECTION 08 71 00.
11. SANITARY, VENT, AND DOMESTIC WATER PIPING SHALL BE INSTALLED AND SET FOR ROUGH-IN OF THE SCHEDULED FIXTURES AND TRIM, BASED ON THE FIXTURE / TRIM MANUFACTURER'S INSTALLATION SHEETS.
ROUGH-IN PIPING SHALL TERMINATE ON THE INSIDE OF THE CHASE DRYWALL LOCATION.
12. AUTOMATIC SPRINKLERS SHALL BE INSTALLED IN THE UPRIGHT POSITION TO PROVIDE ADEQUATE CODE
REQUIRED COVERAGE.
1. NEW TITUS DESV 10"Ø VAV BOX WITH HOT WATER REHEAT COIL (OR VA
APPROVED EQUAL) AT 950 CFM, 1.1 GPM. INSTALL NEW 3/4" HOT WATER
SUPPLY AND RETURN BRANCH PIPING AND CONNECT TO MAINS AS REQUIRED
TO SERVE VAV BOX. REFER TO SHEET MP100.2 FOR PIPING ROUTING.
2. NEW 18x10 TITUS 300RL GRILLE (OR VA APPROVED EQUAL) AT 475 CFM.
PROVIDE WITH BALANCING DAMPER.
3. NEW 18x10 TITUS 350RL GRILLE (OR VA APPROVED EQUAL) AT 475 CFM.
PROVIDE WITH BALANCING DAMPER.
4. THERMOSTAT FOR NEW 10"Ø VAV BOX.
X 1. NEW 12x8 TITUS 300RL GRILLE (OR VA APPROVED EQUAL) AT 270 CFM.
PROVIDE WITH BALANCING DAMPER.
2. NEW 24x12 TITUS 350RL GRILLE (OR VA APPROVED EQUAL) AT 810 CFM.
PROVIDE WITH BALANCING DAMPER.
3. CONNECT TO MAIN MEDIUM PRESSURE SUPPLY DUCTWORK.
4. CONNECT TO MAIN RETURN DUCTWORK.
5. TEMPORARY WALL. ALIGN WITH FURRED WALL IN TOILET ROOM 1122J.
X
A. MODIFICATIONS ARE ONLY TO SUPPLY AND RETURN DUCTWORK AND
EQUIPMENT. KITCHEN MAKE UP AIR DUCTWORK AND GENERAL EXHAUST
DUCTWORK SHALL REMAIN AS SHOWN ON SHEET MH100.2.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
ALTERNATE NO. 11:
ELIMINATE RENOVATION IN THE FOLLOWING ROOMS IN THE EXISTING PHYSICAL THERAPY CLINIC:
WORK AREA 1119 BREAK ROOM 1120 PATIENT TOILET 1121
GYM 1122 TREATMENT 1122C TREATMENT 1122D
ADL 1122E CORRIDOR 1124Z
CORRIDOR LEADING TO PATIENT TOILET, BREAK ROOM AND WORK AREA.
HATCH INDICATES WORK REMOVED FROM SCOPE OF WORK.
1. AREAS WITHIN THE HATCHED LINES WILL REMAIN IN THEIR EXISTING CONDITION.
2. TEMPORARY WALL (TYPE 'A') SHALL BE INSTALLED SEPARATING AREA FROM REMAINDER OF EXISTING GYM.
WALL SHALL BE PRIMED (1 COAT) AND FINISH PAINTED (2 COATS) ON EACH SIDE OF WALL.
3. NEW 3'-0" X 7'-0" WOOD DOOR (INCLUDING H.M. FRAME AND HARDWARE) SHALL BE INSTALLED IN WALL.
HARDWARE SHALL MATCH HARDWARE SET NO. 10 IN SPECIFICATION SECTION 08 71 00. PAINT FRAMES.
4. IT ROOM 1124NN SHALL REMAIN IN SCOPE OF WORK. SEE ELECTRICAL AND MECHANICAL DRAWINGS FOR
ADDITIONAL INFORMATION.
5. CORRIDORS 1122 AND 1122D SHALL RECEIVE THE FOLLOWING:
5.1. SPRINKLER HEADS TO BE MODIFIED TO COVER AREAS REMAINING IN SCOPE OF WORK.
5.2. ACOUSTICAL CEILING TILE (ACT-2) THROUGHOUT. GYPSUM BOARD SOFFIT REMOVED FROM SCOPE OF
WORK.
5.3. RUBBER WALL BASE.
5.4. EGRESS LIGHTS SHALL REMAIN IN SCOPE OF WORK.
5.5. LUXURY VINYL TILE (LVT-2).
5.6. PROVIDE 2 X 2 LED LIGHTING, TYPE F3 (TOTAL OF 5).
5.7. EMERGENCY LIGHTS SHALL REMAIN IN SCOPE OF WORK..
5.8. RECESSED WALL WASH LIGHT FIXTURES SHALL BE REMOVED FROM SCOPE OF WORK.
1. TEMPORARY WALL. SEE GENERAL NOTES ABOVE FOR ADDITIONAL
INFORMATION.
2. REMOVE FLOOR AND CEILING FINISH AS REQUIRED FOR INSTALLATION OF
NEW IT CLOSET 1122NN. NEW IT CLOSET TO REMAIN IN SCOPE OF WORK.
3. TEMPORARY DOOR. SEE GENERAL NOTES ABOVE FOR ADDITIONAL
INFORMATION.
X
A. RECONNECT ALL EXISTING SUPPLY AND RETURN DUCTWORK WITHIN
HATCHED AREA TO NEW MAIN SUPPLY AND RETURN DUCTWORK SHOWN IN
BID ALTERNATE NO. 2 ON SHEET GI004 AS REQUIRED.
B. INSTALL NEW HEATING HOT WATER PIPING TO AVOID PIPING ABOVE 1124NN IT
ROOM AND TO SERVE EXPANSION AREA AS SHOWN ON BASE BID PLANS.
C. ROUTE COOLING COIL CONDENSATE DRAIN PIPING FROM DFSS-1124NN IN
1124NN IT ROOM TO NEAREST OPEN SIGHT DRAIN.
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
1 HR FIRE BARRIER
SMOKE PARTITION
SMOKE BARRIER (FIRE RATED 1 HR.)
2 HR FIRE BARRIER
FEC
UP
UP
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
1 HR FIRE BARRIER
SMOKE PARTITION
SMOKE BARRIER (FIRE RATED 1 HR.)
2 HR FIRE BARRIER
UP
DN
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
SUSPENDED PLASTIC
ZIPPER WALL CURTAIN
BARRIER
INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE
(VERIFY DAILY) - IF NOT, VERIFY ALL OPENINGS
(SUCH AS DOORS) ARE CLOSED AND/OR CHANGE
OUT NEGATIVE AIR PRE-FILTER.
ICRA, ILSM
FIRE WATCH
MISC. FORMS
PAPER
CADDY
INDICATOR (REFER TO
PLAN & ELEVATION)
FRAMED PICTURE
OF C.O.R.
WITH CONTACT
INFORMATION
CONST. SUPERVISOR
NAME AND
CELL PHONE
XXXX XXXX
XXXX XXXX
XXXX XXXX
CHILLER PLANT AFTER HOURS
CALL (VA PROVIDE PHONE #)
HOUSE PHONE (VA PROVIDED)
FIRE EMERGENCY DIAL 911
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
MONTHLY CHANGED
HEPA FILTER
HEPA NEGATIVE AIR UNIT
WEEKLY CHANGED (OR MORE AS
NEEDED) PRE-FILTER
SUPPLY DUCTS -
EITHER KEEP RUNNING OR COVER
WHEN RUNNING TO KEEP DUST
OUT
PROVIDE STICKY MATS (CHANGED
END OF SHIFT OR MORE IF
NECESSARY TO MAINTAIN
CLEANLINESS)
INDICATOR MUST BE AT -0.01 OR GREATER (VERIFY DAILY) - IF
NOT, VERIFY ALL OPENINGS (SUCH AS DOORS) ARE CLOSED
AND/OR CHANGE OUT NEGATIVE AIR PRE-FILTER
PROVIDE STICKY MATS (CHANGED END OF SHIFT OR MORE IF
NECESSARY TO MAINTAIN CLEANLINESS)
FIRE EXTINGUISHER ON
PORTABLE FLOOR BRACKET (ILSM
MAY REQUIRE MORE THAN ONE)
TAPE ALL SERVICES TO PROTECT
AGAINST CONTAMINATION
A
O
V
OPTIONAL EXHAUST DUCTS
(COVER THE GRATES AND
DIFFUSERS)
E
COVER ALL RETURNS AT THE
GRATE/ DIFFUSERS
OUTSIDE OF BUILDING
FIRE RATED PLYWOOD (REFER TO
ELEVATION)
FL
EX
DU
CT
A A
SUSPENDED ACOUSTICAL
CEILING AS SCHEDULED
ON FLOOR PLAN
QUICK SET FIRE STOP
BOTTOM OF METAL DECK
EXISTING FLOOR/ ROOF DECK
5/8" TYPE 'X' GYPSUM
BOARD EACH SIDE OVER
3-5/8" METAL STUDS (16
GA.) AT 16" O.C., WITH
3-1/2" BATT INSULATION-
EXTEND TO BOTTOM OF
STRUCTURE ABOVE
4" RUBBER COVE BASE TO
MATCH EXISTING AREA
BASE ON EACH SIDE OF
WALL
NOTE: ALL TEMPORARY CONSTRUCTION BARRIERS TO BE 1- HOUR RATED, U.N.O.
WALL CONST. TYPES (DETAILS)
TYPE A UL DESIGN NO. 419 TYPE B TYPE C UL DESIGN NO. V497
TYPICAL IDEAL CONSTRUCTION LAYOUT
CLASS III
SCALE: 1/2"= 1'-0"
ENTRANCE ELEVATION
MOBILE CONTAINMENT CART
(CONSTRUCTION BARRIER TYPES)
SCALE: 1/2"= 1'-0"
SWIVEL CASTERS
HARD SIDED MOBILE
CONTAINMENT CART
ZIPPER SIDE ENTRY
PLASTIC WINDOW
(ON ALL SIDES)
AD
JU
ST
AB
LE
HE
IGH
T
AD
JU
ST
AB
LE
HE
IGH
T
FLEX DUCT
FLEX DUCT
HEPA NEGATIVE AIR UNIT
SUSPENDED ACOUSTICAL
CEILING AS SCHEDULED
ON FLOOR PLAN
5/8" TYPE 'X' GYPSUM
BOARD EACH SIDE OVER
3-5/8" METAL STUDS (16
GA.) AT 16" O.C.- EXTEND
TO BOTTOM OF
STRUCTURE ABOVE
4" RUBBER COVE BASE TO
MATCH EXISTING AREA
BASE ON EACH SIDE OF
WALL
QUICK SET FIRE STOP
EXISTING FINISH CEILING
TO REMAIN
EXISTING WALL TO
REMAIN
TWO (2) LAYERS 5/8" TYPE
'X' GYPSUM BOARD ONE
SIDE (CONSTRUCTION
SIDE) OVER 3-5/8" METAL
STUDS (16 GA.) AT 16"
O.C.-WALL TO EXTEND TO
BOTTOM OF STRUCTURE
ABOVE
BOTTOM OF METAL DECK
EXIST. FLOOR/ ROOF
DECK
NOTE:
USE OF MOBILE CONTAINMENT CART OUTSIDE OF THE SCOPE OF WORK
AREAS SHALL BE APPRVOED BY THE VA COR
THIS IS A
RESTRICTED AREA
AREA UNDER
CONSTRUCTION
COMING SOON!!!
(DESCRIPTION OF NEWLY PROPOSED OCCUPANCY)
PERSONNEL ENTERING MUST HAVE: HARD HAT, SAFETY
GLASSES AND PROPER I.D.
BLUE CORE LOCKSET
(LOCKED AT ALL TIMES)
1. REMOVE OR ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION
OF DUCT SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS IF
INDICATED.
4. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
5. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID.
6. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE
OWNER'S SAFETY DEPARTMENT AND INFECTION CONTROL DEPARTMENT AND THOROUGHLY CLEANED BY
THE OWNER'S ENVIRONMENTAL SERVICES DEPARTMENT.
CLASS III WORK ITEM NOTES
PRIOR TO ANY CONSTRUCTION
POST CONSTRUCTION
1. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUTION.
2. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.
3. WET MOP AREA WITH DISINFECTANT.
4. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
CL
AS
S
III
IC MATRIX - CLASS OF PRECAUTIONS:
CONSTRUCTION PROJECT BY PATIENT RISK BY
CONSTRUCTION PROJECT TYPE
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
RISK RELATED GROUP TYPE A
I
I
I
II
TYPE B
II
II
II
III/IV
TYPE D
III/IV
IV
IV
IV
TYPE C
II
III
III/IV
III/IV
NOTE:
INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK LEVEL
INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.
PATIENT RISK GROUPS
LOW RISK
OFFICE AREAS
MEDIUM RISK
CARDIOLOGY
ECHOCARDIOGRAPHY
ENDOSCOPY
NUCLEAR MEDICINE
PHYSICAL THERAPY
RADIOLOGY/ MRI
RESPIRATORY THERAPY
HIGH RISK
CCU
EMERGENCY ROOM
LABOR & DELIVERY
LABORATORY (SPECIMEN)
NEWBORN NURSERY
OUTPATIENT SURGERY
PEDIATRICS
POST ANESTHESIA
CARE UNIT
PHARMACY
SURGICAL UNITS
HIGHEST RISK
ANY AREA CARING FOR
IMMUNOCOMPROMISED PATIENTS
BURN UNIT
CARDIAC CATH LAB
CENTRAL STERILE SUPPLY
INTENSIVE CARE UNITS
MEDICAL UNIT
NEGATIVE PRESSURE ISOLATION ROOMS
OPERATING ROOMS INCLUDING C-SECTION
ROOMS
ONCOLOGY
CONSTRUCTION PROJECT TYPES
TYPE A
MINIMAL
FIRE RISK
TYPE B
LIMITED
FIRE RISK
TYPE C
MODERATE
FIRE RISK
TYPE D
SIGNIFICANT
FIRE RISK
INSPECTION AND NON-INVASIVE ACTIVITES.
INCLUDES, BUT IS NOT LIMITED TO:
- REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE PER 50 SQUARE FEET.
- PAINTING (BUT NOT SANDING).
- WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH DO NOT GENERATE
DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.
- REMOVAL OF FLOOR TILE LESS THAN 25 SQUARE FEET, NON-ACM AND NO GRINDING OR DUST GENERATING
ACTIVITIES.
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST.
INCLUDES, BUT IS NOT LIMITED TO:
- INSTALLATION OF TELEPHONE AND COMPUTER CABLING.
- ACCESS TO CHASE SPACES.
- CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF ANY
FIXED BUILDING OR ASSEMBLIES.
INCLUDES, BUT IS NOT LIMITED TO:
- SANDING OF WALLS FOR PAINTING OR WALL COVERING.
- REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK.
- NEW CONSTRUCTION OR RENOVATIONS OVER 3 DAYS DURATION.
- MAJOR DUCT WORK, PLUMBING, PIPING, OR ELECTRICAL WORK.
- SOLDERING OR BRAZING OPERATIONS.
- ANY ACTIVITY THAT REQUIRES A BURN PERMIT.
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS.
INCLUDES, BUT IS NOT LIMITED TO:
- ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS.
- REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE BUILDING SYSTEM.
- NEW CONSTRUCTION OR RENOVATIONS OVER 3 DAYS DURATION.
SEE SHEET GI002 FOR INFECTION CONTROL GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
TYPE B
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
INDICATOR MUST BE AT -0.01 OR MORE NEGATIVE (VERIFY DAILY)
- IF NOT, VERIFY ALL OPENINGS (SUCH AS DOORS) ARE CLOSED
AND/OR CHANGE OUT NEGATIVE AIR PRE-FILTER.
ICRA, ILSM
FIRE WATCH
MISC. FORMS
PAPER
CADDY INDICATOR (REFER TO
PLAN & ELEVATION)
FRAMED PICTURE
OF C.O.R.
WITH CONTACT
INFORMATION
CONST. SUPERVISOR
NAME AND
CELL PHONE
XXXX XXXX
XXXX XXXX
XXXX XXXX
CHILLER PLANT AFTER HOURS
CALL (VA PROVIDE PHONE #)
HOUSE PHONE (VA PROVIDED)
FIRE EMERGENCY DIAL 911
SUSPENDED ACOUSTICAL
CEILING AS SCHEDULED
ON FLOOR PLAN
QUICK SET FIRE STOP
BOTTOM OF METAL DECK
EXISTING FLOOR/ ROOF DECK
5/8" TYPE 'X' GYPSUM
BOARD EACH SIDE OVER
3-5/8" METAL STUDS (16
GA.) AT 16" O.C., WITH
3-1/2" BATT INSULATION-
EXTEND TO BOTTOM OF
STRUCTURE ABOVE
4" RUBBER COVE BASE TO
MATCH EXISTING AREA
BASE ON EACH SIDE OF
WALL
NOTE: ALL TEMPORARY CONSTRUCTION BARRIERS TO BE 1- HOUR RATED, U.N.O.
TYPE A UL DESIGN NO. 419 TYPE B TYPE C UL DESIGN NO. V497
(CONSTRUCTION BARRIER TYPES)
SCALE: 1/2"= 1'-0"
SWIVEL CASTERS
HARD SIDED MOBILE
CONTAINMENT CART
ZIPPER SIDE ENTRY
PLASTIC WINDOW
(ON ALL SIDES)
AD
JU
ST
AB
LE
HE
IGH
T
AD
JU
ST
AB
LE
HE
IGH
T
FLEX DUCT
FLEX DUCT
HEPA NEGATIVE AIR UNIT
SUSPENDED ACOUSTICAL
CEILING AS SCHEDULED
ON FLOOR PLAN
5/8" TYPE 'X' GYPSUM
BOARD EACH SIDE OVER
3-5/8" METAL STUDS (16
GA.) AT 16" O.C.- EXTEND
TO BOTTOM OF
STRUCTURE ABOVE
4" RUBBER COVE BASE TO
MATCH EXISTING AREA
BASE ON EACH SIDE OF
WALL
QUICK SET FIRE STOP
EXISTING FINISH CEILING
TO REMAIN
EXISTING WALL TO
REMAIN
TWO (2) LAYERS 5/8" TYPE
'X' GYPSUM BOARD ONE
SIDE (CONSTRUCTION
SIDE) OVER 3-5/8" METAL
STUDS (16 GA.) AT 16"
O.C.-WALL TO EXTEND TO
BOTTOM OF STRUCTURE
ABOVE
BOTTOM OF METAL DECK
EXIST. FLOOR/ ROOF
DECK
NOTE:
USE OF MOBILE CONTAINMENT CART OUTSIDE OF
THE SCOPE OF WORK AREAS SHALL BE APPRVOED
BY THE VA COR
THIS IS A
RESTRICTED AREA
AREA UNDER
CONSTRUCTION
COMING SOON!!!
(DESCRIPTION OF NEWLY PROPOSED OCCUPANCY)
PERSONNEL ENTERING MUST HAVE: HARD HAT, SAFETY
GLASSES AND PROPER I.D.
OUTSIDE OF BUILDING
HARD BARRIER
BLUE CORE LOCKSET
(LOCKED AT ALL TIMES)
MONTHLY CHANGED
HEPA FILTER
COVER ALL RETURNS AT THE
GRATE/ DIFFUSERS WITH FIRE
RATED PLASTIC SHEETING AND
SECURE WITH DUCT TAPE
FIRE RATED PLYWOOD (REFER TO
ELEVATION)
FL
EX
DU
CT
WEEKLY CHANGED (OR MORE AS
NEEDED) PRE-FILTER
SUPPLY DUCTS -
EITHER KEEP RUNNING OR COVER
WITH FIRE RATED PLASTIC
SHEETING AND SECURE WITH
DUCT TAPE TO KEEP DUST OUT
HEPA NEGATIVE AIR UNIT
ABC TYPE FIRE EXTINGUISHER ON
PORTABLE FLOOR BRACKET (ILSM
MAY REQUIRE MORE THAN ONE
OR WALL MOUNTED).
NEED INSPECTION TAG AND
MONTHLY INSPECTION
(INITIALS/DATED)
TAPE ALL SERVICES TO PROTECT
AGAINST CONTAMINATION
OPTIONAL EXHAUST DUCTS
(COVER THE GRATES AND
DIFFUSERS)
E
A
O
V
INDICATOR MUST BE AT -0.01 OR GREATER (VERIFY DAILY) - IF
NOT, VERIFY ALL OPENINGS (SUCH AS DOORS) ARE CLOSED
AND/OR CHANGE OUT NEGATIVE AIR PRE-FILTER (TYPICAL
REGULATOR INSTALLATION)
POST ICRA, ILSM, FIRE INSPECTION SHEETS VISIBLE TO PUBLIC
PROVIDE STICKY MATS (CHANGED END
OF SHIFT OR MORE IF NECESSARY TO
MAINTAIN CLEANLINESS)
A A
WALL CONST. TYPES (DETAILS)
ANTEROOM ENTRANCE - SIDE ELEVATION
MOBILE CONTAINMENT CART
TYPICAL IDEAL CONSTRUCTION LAYOUT
CLASS IV
SCALE: 1/2"= 1'-0"
EXISTING WALL
FINISHED FLOORING TO BE KEPT CLEAN. FLOORS
NOT BEING REPLACED TO BE PROTECTED OR
COVERED WITH ROSEN PAPER/ FIRE RATED
PLYWOOD.
HEPA NEGATIVE AIR UNIT
EXISTING WINDOW FRAME
FIRE RATED PLYWOOD (TEMP.
REMOVE GLASS PANEL)
FIRE/ U.L. RATED PLASTIC TO
PREVENT DUCT INFILTRATION
(INSTALL PRIOR TO
CONSTRUCTION).
EXISTING FIRE SPRINKLER
SYSTEM
EXISTING WALL
EXISTING CONCRETE SLAB
FLOORING
SCALE: 1/2"= 1'-0"
CROSS-SECTION 'A-A'
CLASS IV
TEMPORARY ANTEROOM
1. ISOLATE H.V.A.C. SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT
SYSTEM.
2. COMPLETE ALL CRITICAL BARRIERS IE. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON-WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS.
3. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS IF
INDICATED.
4. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES APPROPRIATELY.
5. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE
VACUUMED USING HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR
PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
6. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS MUST BE CHANGED EACH TIME THE WORKER EXITS THE WORK AREA SITE OR THEY CAN WEAR CLOTH OR PAPER
COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE THE WORK SITE.
7. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE VA'S
SAFETY DEPARTMENT AND INFECTION CONTROL.
PRIOR TO ANY CONSTRUCTION
POST CONSTRUCTION
1. OBTAIN APPROVAL BY THE VA TO REMOVE BARRIERS.
2. REMOVE BARRIER MATERIALS CAREFULLY TO MINIMIZE SPREADING OF DIRT AND DEBRIS ASSOCIATED WITH
CONSTRUCTION.
3. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
4. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LIQUID.
5. VACUUM WORK AREA WITH HEPA FILTERED VACUUM.
6. WET MOP AREA WITH DISINFECTANT.
7. REMOVE ISOLATION OF H.V.A.C. SYSTEM IN AREAS WHERE WORK IS BEING PERFORMED.
8. ROOM AND/ OR AREA SHALL BE THOROUGHLY CLEANED BY THE VA'S ENVIRONMENTAL SERVICES
DEPARTMENT.
CL
AS
S
IV
IC MATRIX - CLASS OF PRECAUTIONS:
CONSTRUCTION PROJECT BY PATIENT RISK BY
CONSTRUCTION PROJECT TYPE
LOW RISK GROUP
MEDIUM RISK GROUP
HIGH RISK GROUP
HIGHEST RISK GROUP
RISK RELATED GROUP TYPE A
I
I
I
II
TYPE B
II
II
II
III/IV
TYPE D
III/IV
IV
IV
IV
TYPE C
II
III
III/IV
III/IV
NOTE:
INFECTION CONTROL APPROVAL WILL BE REQUIRED WHEN THE CONSTRUCTION ACTIVITY AND RISK LEVEL
INDICATE THAT CLASS III OR CLASS IV CONTROL PROCEDURES ARE NECESSARY.
PATIENT RISK GROUPS
LOW RISK
OFFICE AREAS
MEDIUM RISK
CARDIOLOGY
ECHOCARDIOGRAPHY
ENDOSCOPY
NUCLEAR MEDICINE
PHYSICAL THERAPY
RADIOLOGY/ MRI
RESPIRATORY THERAPY
HIGH RISK
CCU
EMERGENCY ROOM
LABOR & DELIVERY
LABORATORY (SPECIMEN)
NEWBORN NURSERY
OUTPATIENT SURGERY
PEDIATRICS
POST ANESTHESIA
CARE UNIT
PHARMACY
SURGICAL UNITS
HIGHEST RISK
ANY AREA CARING FOR
IMMUNOCOMPROMISED PATIENTS
BURN UNIT
CARDIAC CATH LAB
CENTRAL STERILE SUPPLY
INTENSIVE CARE UNITS
MEDICAL UNIT
NEGATIVE PRESSURE ISOLATION ROOMS
OPERATING ROOMS INCLUDING C-SECTION
ROOMS
ONCOLOGY
CONSTRUCTION PROJECT TYPES
TYPE A
MINIMAL
FIRE RISK
TYPE B
LIMITED
FIRE RISK
TYPE C
MODERATE
FIRE RISK
TYPE D
SIGNIFICANT
FIRE RISK
INSPECTION AND NON-INVASIVE ACTIVITES.
INCLUDES, BUT IS NOT LIMITED TO:
- REMOVAL OF CEILING TILES FOR VISUAL INSPECTION LIMITED TO 1 TILE PER 50 SQUARE FEET.
- PAINTING (BUT NOT SANDING).
- WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND ACTIVITIES WHICH DO NOT GENERATE
DUST OR REQUIRE CUTTING OF WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.
- REMOVAL OF FLOOR TILE LESS THAN 25 SQUARE FEET, NON-ACM AND NO GRINDING OR DUST GENERATING
ACTIVITIES.
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL DUST.
INCLUDES, BUT IS NOT LIMITED TO:
- INSTALLATION OF TELEPHONE AND COMPUTER CABLING.
- ACCESS TO CHASE SPACES.
- CUTTING OF WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.
WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR REQUIRES DEMOLITION OR REMOVAL OF ANY
FIXED BUILDING OR ASSEMBLIES.
INCLUDES, BUT IS NOT LIMITED TO:
- SANDING OF WALLS FOR PAINTING OR WALL COVERING.
- REMOVAL OF FLOOR COVERINGS, CEILING TILES AND CASEWORK.
- NEW CONSTRUCTION OR RENOVATIONS OVER 3 DAYS DURATION.
- MAJOR DUCT WORK, PLUMBING, PIPING, OR ELECTRICAL WORK.
- SOLDERING OR BRAZING OPERATIONS.
- ANY ACTIVITY THAT REQUIRES A BURN PERMIT.
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS.
INCLUDES, BUT IS NOT LIMITED TO:
- ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK SHIFTS.
- REQUIRES HEAVY DEMOLITION OR REMOVAL OF A COMPLETE BUILDING SYSTEM.
- NEW CONSTRUCTION OR RENOVATIONS OVER 3 DAYS DURATION.
CLASS IV WORK ITEM NOTES
SEE SHEET GI002 FOR INFECTION CONTROL GENERAL NOTES
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
EXIST. BUILDING
EXIST. BUILDING
(VETERANS NURSING FACILITY) EXIST.
GENERATOR
EXIST.
A.C
EXIST.
BUILDING
(#5)
NEW
BUILDING
EXISTING
BUILDING (#7)
EXIST. CANOPY
EXISTING
PARKING LOT
EXISTING
BUILDING (#6)
EXIST.
BUILDING
DRIVE TO NURSING HOME
EXISTING PARKING
EXISTING PARKING
EXISTING
PARKING LOT
EXIST.
LOADING DOCK
EXIST.
LOADING
DOCK
EXIST.
BUILDING
(#1)
EXIST.
BUILDING
EXIST.
UNDERGROUND
FUEL STORAGE
EXISTING
BUILDING
(#20)
NEW BUILDING
PROPERTY LINE
DUMPSTER LOCATION - COORDINATE WITH VA COR
CONTRACTOR ENTRANCE INTO BUILDING
CONTRACTOR PARKING - COORDINATE WITH VA COR
TEMPORARY FOOD SERVICE COOLERS
CONSTRUCTION ENTRANCE
CRANE LOCATION - INDICATING GENERAL DIRECTION AND REACH
CRANE LOCATION TO BE COORDINATED WITH VA COR.
A. GENERAL CONTRACTOR TO COORDINATE CONSTRUCTION STAGING AND
ROUTING WITH VA COR. TO INCLUDE, BUT NOT LIMITED TO, CONTRACTOR
PARKING, CONTRACTOR ENTRANCE TO HOSPITAL, DUMPSTER LOCATIONS,
ETC.
B. EXISTING ROOFS SHALL BE PROTECTED DURING CONSTRUCTION.
C. POWER FOR SECURITY GATE SHALL BE CONNECTED IN BUILDINIG 20,
ELECTRICAL ROOM. COMMUNICATIONS SHALL BE CONNECTED TO THE
SECURITY OFFICE IN BUILDING 1, FIRST FLOOR. GATE SHALL BE CONTROLLED
FROM SECURITY OFFICE DURING NORMAL BUSINESS HOURS. GATE SHALL BE
CONTROLLED FROM ROOM AOD OFFICE IN BUILDING 1 DURING AFTER HOURS.
REFER TO ELECTRICAL DRAWINGS FOR ADDITIONAL INFORMATION.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
AREA OF WORK -
PHYSICAL SECURITY GATE/ FENCE
SEE NOTE C.
AREA OF WORK-
BUILDING ADDITION AND
RENOVATION
AREA OF WORK -
ELECTRICAL ROOM (PHYSICAL SECURITY
GATE POWER CONNECTION)
SEE NOTE C.
SECURITY OFFICE
(FIRST FLOOR- RM. 1240)
SEE NOTE C.
ADMINISTRATIVE OFFICER ON
DUTY OFFICE
(FIRST FLOOR- RM. 1220B)
SEE NOTE C.
FEC
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
SCOPE OF WORK:
NEW DISHWASHING AREA, COOLERS/ FREEZERS, NFS OFFICES AND NEW
ADDITION. EXISTING KITCHEN PREP, COOKING, TRAY ASSEMBLY, DRY FOOD
STORAGE, DISHWASHING AND NFS OFFICES TO REMAIN FULLY OPERATIONAL
DURING PHASE 1 WORK.
PERFORM ASBESTOS ABATEMENT FOR WORK AREAS IN THIS PHASE. REFER
TO HAZARDOUS MATERIALS DRAWINGS AND REPORT (IN SPECIFICATIONS
MANUAL) FOR EXTENT OF ACM ABATEMENT.
SEQUENCE OF WORK TO ALLOW FOR EXPEDITED CONSTRUCTION AND
TRANSITION INTO PHASE 1B AREAS.
PHASE 1A:
1. EXISTING OFFICE SUITE B117 AND STORAGE SUITE B120 TO BE
DEMOLISHED.
2. STEAM PIPING FOR NEW DISHWASHER AND CART WASHER TO BE
INSTALLED IN EXISTING AND NEW PIPE TRENCHES.
3. ELECTRICAL ROOM SHALL BE CONSTRUCTED DURING PHASE 1A.
PHASE 1B:
1. REROUTE EXHAUST FOR EXISTING DISHWASHING EQUIPMENT PRIOR
TO START OF DEMOLITION ON PHASE 1B. REFER TO MECHANICAL
DRAWINGS FOR PROPOSED ROUTING FOR TEMPORARY EXHAUST
DUCTWORK. WORK TO BE COMPLETED AFTER HOURS.
2. EXISTING COOLERS/ FREEZERS AND STORAGE AREAS TO BE
DEMOLISHED.
3. INSTALL TEMPORARY CONDENSING UNITS FOR COOLERS/ FREEZERS.
LOCATE UNITS ON ROOF ABOVE EXISTING PHYSICAL THERAPY CLINIC
(UNLESS PERMANENT CU'S HAVE BEEN INSTALLED ON ROOF OF
ADDITION).
4. TEMPORARY COOLERS/ FREEZERS SHALL BE LOCATED IN EXISTING
CART STORAGE AREA B122 DURING THIS PHASE.
5. PHASE 1B NEW WORK TO BE COMPLETED PRIOR TO REMOVAL OF
TEMPORARY COOLERS/ FREEZERS.
6. NEW GREASE TRAP AND UNDERGROUND UTILITIES TO BE INSTALLED
PRIOR TO START OF PHASE 1C. GREASE TRAP TO BE FULLY
OPERATIONAL PRIOR TO START OF PHASE 2.
PHASE 1A PHASE 1C
(ADDITION)
PHASE 1B
PHASE 2A
PHASE
SCOPE OF WORK:
MOVE KITCHEN TRAY ASSEMBLY TO NEW SPACE, GENERAL OFFICE SPACE,
AND REMODEL CONFERENCE ROOM B132.
PERFORM ASBESTOS ABATEMENT FOR WORK AREAS IN THIS PHASE. REFER
TO HAZARDOUS MATERIALS DRAWINGS AND REPORT (IN SPECIFICATIONS
MANUAL) FOR EXTENT OF ACM ABATEMENT.
1. MOVE KITCHEN TRAY ASSEMBLY TO NEW KITCHEN.
2. DEMOLISH EXISTING OFFICES, BREAK RM., FOOD STORAGE AREAS.
3. BUILD NEW GENERAL OFFICE SPACE.
4. RENOVATE CONFERENCE ROOM B132.
1. TEMPORARY WALL. SEE ICRA TYPE SHEETS GI403 AND GI404 FOR NOTES AND
DETAILS. COORDINATE WITH VA COR FOR FINAL REQUIREMENTS.
1A. TEMPORARY WALL TO BE CONSTRUCTED TOWARD END OF CONSTRUCTION FOR
INSTALLATION OF NEW DOOR AND WALL. SEE ICRA TYPE SHEETS GI403 AND
GI404 FOR NOTES AND DETAILS. COORDINATE WITH VA COR FOR FINAL
REQUIREMENTS.
1B. INFECTION CONTROL WALL TO BE CONSTRUCTED AS PERMANENT BARRIER
WALL.
2. TEMPORARY 42 INCH CONSTRUCTION DOOR WITH SELF CLOSING DEVICES WITH
RATED STOREROOM FUNCTION DOOR HARDWARE. GENERAL CONTRACTOR TO
PROVIDE CONSTRUCTION DOORS FOR THE PROJECT. SEE SPECIFICATION
SECTION 01 35 26, CH. 1.12 FOR BARRIER AND INFECTION CONTROL
PROCEDURES.
3. EXISTING DOORS TO REMAIN DURING CONSTRUCTION. TOWARD END OF PHASE,
BUILD TEMPORARY WALLS FOR CONSTRUCTION OF NEW WALL AND DOORS.
4. SINGLE LEAF OF PAIR OF DOORS TO BE RENDERED INOPERABLE DURING PHASE
1A CONSTRUCTION. ALLOW FOR INSTALLATION OF TEMPORARY WALL.
5. PROVIDE TEMPORARY DOOR FRAME, DOOR AND HARDWARE FOR ACCESS TO
OFFICE DURING PHASE 2 CONSTRUCTION. UPON COMPLETION OF WORK, INFILL
WALL TO MATCH EXISTING CONSTRUCTION AND FINIISH.
6. PROVIDE STICKY WALK-OFF MATS ON EACH SIDE OF DOOR, SIZED TO DOOR
OPENING. CHANGE MATS AS REQUIRED.
7. FULLY SEAL WINDOWS/ DOORS WITH 6 MIL HEAVY DUTY, REINFORCED,
FIRE-RETARDANT, POLY SHEETING (VISQUEEN). PLASTIC SHEET SHALL BE
FULLY SEALED AT PERIMETER .
8. FLOOR SLAB SHALL BE CUT AS REQUIRED FOR INSTALLATION OF GAS, WATER
AND STEAM PIPING. WORK WILL BE REQUIRED TO OCCUR AFTER HOURS. FOR
MULTIPLE SHIFT WORK, INSTALL STEEL PLATE OVER OPENINGS SO THAT
KITCHEN STAFF CAN CONTINUE WORK FOLLOWING DAY. EQUIPMENT ON EAST
WALL SHALL BE MOVED DURING AFTER HOURS WORK AND RETURNED IN PLACE
PRIOR TO START OF KITCHEN STAFF WORK DAY. REFER TO PLUMBING AND
MECHANICAL DRAWINGS FOR ADDITIONAL INFORMATION.
9. EXISTING SANITARY PIPING TO SINKS SHALL BE REROUTED TO TEMPORARY
SANITARY THROUGH WALL. REFER TO PLUMBING DRAWINGS FOR ADDITIONAL
INFORMATION.
10. WATER PIPING TO BE INSTALLED AFTER HOURS. REFER TO PLUMBING
DRAWINGS. REPLACE DAMAGED CEILING TILE AS REQUIRED.
11. DUCTWORK IN ROOM B122 TO BE DISCONNECTED. PORTABLE COOLING UNIT TO
BE PROVIDED DURING CONSTRUCTION. REFER TO MECHANICAL DRAWINGS.
WORK TO BE COMPLETED AFTER HOURS.
12. EXISTING ELECTRICAL PANEL LOCATED ON EAST WALL OF ROOM B122 TO BE
REMOVED AFTER INSTALLATION OF TEMPORARY ELECTRICAL PANEL IS PLACED
ON WEST WALL. RETHERM UNITS TO BE CONNECTED TO TEMPORARY PANEL.
REFER TO ELECTRICAL DRAWIINGS. WORK TO BE COMPLETED AFTER HOURS.
13. REMOVE EXISTING GATE AS PART OF PHASE 2A.
14. EXISTING DUCTWORK TO BE REPLACED DURING PHASE 2A. WORK TO BE
COMPLETED AFTER HOURS.
15. EXHAUST DUCT TO BE REROUTED DURING PHASE 1 AFTER HOURS. REFER TO
MECHANICAL DRAWINGS FOR ADDITIONAL INIFORMATION.
16. TEMPORARY WALL PARTITION TO BE INSTALLED PRIOR TO AFTER HOURS WORK
AND TO BE REMOVED FOLLOWING AFTER HOURS WORK. IN ADDITION, PROVIDE
PLASTIC SHEETING ON KITCHEN SIDE, FULLY SEALED AT PERIMETERS.
SCOPE OF WORK:
MOVE DISHWASHING OPERATIONS, COLD FOOD STORAGE AND PARTIAL NFS
OFFICES INTO RENOVATED SPACES FROM EXPEDITED PHASE 1A.
RENOVATED PHASE 2 TO INCLUDE DIET COMMUNICATIONS OFFICES, TOILET
ROOMS, SECRETARY, STAFF LOUNGE, KITCHEN COOK/ PREP AND
TEMPORARY TRAY ASSEMBLY.
CONSTRUCTION OF PHASE 2 SHALL BEGIN UPON COMPLETION OF PHASE 1C
WORK.
PERFORM ASBESTOS ABATEMENT FOR WORK AREAS IN THIS PHASE. REFER
TO HAZARDOUS MATERIALS DRAWINGS AND REPORT (IN SPECIFICAITONS
MANUAL) FOR EXTENT OF ACM ABATEMENT.
PHASE 2A:
1. EXISTING STEAM LINES TO BE DEMOLISHED, AND NEW STEAM LINES
TO BE INSTALLED PRIOR TO START UP OF DISHWASHING/ CART
WASHING EQUIPMENT.
2. EXISTING DISHWASHER TO BE REMOVED UPON START UP OF NEW
DISHWASHING EQUIPMENT.
3. MOVE DISHWASHING OPERATIONS INTO NEW SPACE.
4. MOVE COLD FOOD STORAGE INTO NEW COOLERS/FREEZERS.
5. MOVE PARTIAL NFS OFFICES INTO NEW OFFICES IN PHASE 1A.
6. DEMOLISH EXISTING PREP/ COOK, DISHWASHING.
7. TEMPORARY TRAY ASSEMBLY SHALL BE LOCATED IN VACATED FOOD
STORAGE AND OFFICES.
8. KEEP PASSAGE AVAILABLE FROM DISHWASHING CORRIDOR TO
TEMPORARY TRAY ASSEMBLY.
PHASE 2B:
1. UPON COMPLETION OF PHASE 2A, TOILET ROOMS AND CORRIDOR TO
BE COMPLETED.
A. CONTRACTOR SHALL BE RESPONSIBLE FOR SEQUENCING AND COORDINATION
OF CONSTRUCTION PHASING WITH THE VA'S SCHEDULE, INFECTION CONTROL,
AND INTERIM LIFE SAFETY REQUIREMENTS.
B. CONTRACTOR SHALL PROVIDE ALL SUB-PHASING ACTIVITIES AS REQUIRED FOR
WORK OCCURING BETWEEN VARIOUS PHASES.
C. THE PHASING PLAN IS SUBJECT TO THE CONTRACTORS MEANS AND METHODS,
SCHEDULING AND TO EXISTING CONDITIONS AND TIME RESTRAINTS.
D. CONTRACTOR SHALL REFER TO ALL DEMOLITION AND CONSTRUCTION
DRAWINGS FOR A COMPLETE UNDERSTANDING OF THE SPECIFIED SCOPE OF
WORK.
E. CONTRACTOR SHALL MAINTAIN EGRESS PASSAGE WAYS MAIN CORRIDOR,
ELEVATOR LOBBY AND STAIR EXITS DURING COMPLETE PROJECT DURATION.
ALSO MAINTAIN ALL EGRESS/EXIT DOORS OF THE FACILITY.
F. CONTRACTOR SHALL REFER TO DRAWING GI403 AND GI404 FOR INFECTION
CONTROL NOTES AND SUGGESTED LOCATION OF CONSTRUCTION BARRIERS
AND ENTRANCES. ICRA BARRIERS TO BE LOCATED AS REQUIRED FOR EACH
PHASE OF CONSTRUCTION. COORDINATE WITH VA COR.
G. CONTRACTOR SHALL NOTE ALL EXISTING PLUMBING, MECHANICAL AND
ELECRICAL SERVICES AND SYSTEMS THAT ARE SCHEDULED TO REMAIN FULLY
OPERATIONAL AND FUNCTIONAL FOR DURACTION OF SPECIFIC PHASES.
H. CONTRACTOR SHALL NOTE THAT BUILDING NO. 1 SHALL BE OCCUPIED DURING
CONSTRUCTION.
I. HOURS OF OPERATION FOR NOISE AND VIBRATION OPERATIONS ARE DURING
OFF NORMAL HOSPITAL OPERATION HOURS (6:00 PM TO 6:00 AM). SERVICE
INTERRUPTIONS DURING OFF NORMAL WORK HOURS AND SCHEDULED MINIMUM
(2) WEEK ADVANCED NOTICE.
J. WHERE TWO OR MORE SEQUENCES MEET IT IS THE RESPONSIBILITY OF THE
CONTRACTOR TO COORDINATE THE TRANSITION WORK BETWEEN PHASES.
K. CONTRACTOR TO HAVE ALL MATERIALS AND EQUIPMENT ON SITE FOR THE
COMPLETION OF ANY WORK THAT IS DESIGNATED FOR OFF HOURS PRIOR TO
THE START OF OFF HOURS WORK.
L. PHASES TO BE PERFORMED IN SEQUENCE.
M. NUTRITION AND FOOD SERVICES AFTER HOURS:
EVERY DAY INCLUDING WEEKENDS: 8:00 P.M. TO 4:00 A.M.
EXISTING KITCHEN SHALL REMAIN OPERATIONAL AND UNINTERRUPTED
DURING CONSTRUCTION. WORK REQUIRED TO BE PERFORMED AFTER HOURS
SHALL BE CLEANED UP AND LEFT IN CONDITION WHERE NORMAL KITCHEN
OPERATIONS CAN BE CONTINUED AT THE START OF THE FOLLOWING DAY.
N. PHYSICAL THERAPY AND EYE CLINICS AFTER HOURS:
WEEKDAYS: 5:00 P.M. TO 6:30 A.M.
WEEKENDS: ALL DAY
EXISTING CLINICS SHALL REMAIN OPERATIONAL AND UNINTERRUPTED DURING
CONSTRUCTION. WORK REQUIRED TO BE PERFORMED AFTER HOURS SHALL BE
CLEANED UP AND LEFT IN CONDITION WHERE NORMAL CLINIC OPERATIONS CAN
BE CONTINUED AT THE START OF THE FOLLOWING DAY.
PHASED AREA OF WORK
(SHADES VARY FOR CLARITY)
CONSTRUCTION ROUTING
PHASE 1C: DEMOLISH EXISTING SITE AREA IN SCOPE OF WORK AND BEGIN
CONSTRUTION ON ADDITION. NEW ADDITION WILL BECOME KITCHEN PREP,
COOKING AND DRY FOOD STORAGE.
1. PROVIDE ADDITIONAL TEMPORARY COLD FOOD STORAGE TO BE
LOCATED AT THE SOUTH LOADING DOCK. COORDINATE EXACT
LOCATION WITH VA COR.
2. COOK/ PREP AREAS TO BE COMPLETED BEFORE DEMOLITION BEGINS
IN PHASE 2.
3. GREASE BASIN AND ASSOCIATED PIPING TO BE INSTALLED PRIOR TO
REMOVAL OF EXISTING GREASE BASIN.
PHASE 2B
NOTE:
PRIOR TO START OF PHASE 2, STEAM
LINES FOR DISHWASHING AND CART
WASHING EQUIPMENT TO BE INSTALLED
AND CONNECTED. EQUIPMENT MUST
FULLY OPERATIONAL BEFORE EXISTING
DISHWASHING EQUIPMENT IS REMOVED.
Drawing Number
Project Title
Location
Issue Date Checked Drawn
CONSTRUCTION DOCUMENTS-
ISSUE FOR BID
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
STAMP NUTRITION & FOOD SERVICE
AND
EYE/ PT CLINIC ADDITION
1 MEDICAL CENTER DRIVE, CLARKSBURG, WV 26301
540-370
10-21-202225% DD1 SUBMISSION 06-14-21
50% DD2 SUBMISSION 08-23-21
75% CD1 SUBMISSION 11-01-21
www. bancroft-ae.com
BAE PROJECT NO. 20-109
3300 Dundee Rd.
Northbrook, IL 60062
T: 847.952.9362
VA CONTRACT NO. 36C24521C0034
75% CD1 SUBMISSION (RESUBMITTAL) 01-11-22
100% CD 2 SUBMISSION 07-29-22
100% CD 2 SUBMISSION (RESUBMITTAL) 09-23-22
CONSTRUCTION DOCUMENTS- ISSUED FOR BID 10-21-22
SCOPE OF WORK:
CONSTRUCTION OF NEW ADDITION AND PROVIDE NEW SECONDARY EXIT
FROM NEW ADDITION.
PERFORM ASBESTOS ABATEMENT FOR WORK AREAS IN THIS PHASE. REFER
TO HAZARDOUS MATERIALS DRAWINGS AND REPORT (IN SPECIFICATIONS
MANUAL) FOR EXTENT OF ACM ABATEMENT.
1. REMOVE EXISTING WINDOWS IN NORTH WING ADJACENT TO NEW
BUIDLING ADDITION. INFILL WALL OPENINGS.
2. PROVIDE NEW OPENING IN EXISTING WALL FOR SECONDARY EXIT TO
EXISTING STAIR.
3. MECHANICAL CHILLED WATER PIPING TO BE CONNECTED TO NEW
ADDITION.
SCOPE OF WORK:
COMPLETE CONSTRUCTION IN CORRIDOR. WORK SHALL BE DONE AFTER
HOURS.
1. FINISH FLOORING TO BE INSTALLED IN CORRIDOR.
2. PATCH FLOORIING IN EYE CLINIC WAITING ROOM TO MATCH EXISTING.
1. TEMPORARY WALL. SEE ICRA TYPE SHEETS GI403 AND GI404 FOR
NOTES AND DETAILS. COORDINATE WITH VA COR FOR FINAL
REQUIREMENTS.
1A. TEMPORARY WALL . WALL CAN BE USED AS PERMANENT WALL.
PATCH, SAND, PAINT WALL TO MATCH FINAL FINISHES.
1B. PORTION OF TEMPORARY WALL CAN BE USED AS PERMANENT WALL.
PATCH, SAND, PAINT WALL TO MATCH FINAL FINISHES. REFER TO
NEW PLANS FOR PERMANENT WALLS.
2. TEMPORARY 42 INCH CONSTRUCTION DOOR WITH SELF CLOSING
DEVICES WITH RATED STOREROOM FUNCTION DOOR HARDWARE.
GENERAL CONTRACTOR TO PROVIDE CONSTRUCTION DOORS FOR
THE PROJECT. SEE SPECIFICATION SECTION 01 35 26, CH. 1.12 FOR
BARRIER AND INFECTION CONTROL PROCEDURES.
3. EXISTING EMERGENCY EXIT TO REMAIN ACCESSIBLE DURING
CONSTRUCTION.
4. EXISTING WINDOW TO BE REMOVED. EXISTING PORTION OF WALL TO
BE REMOVED FOR NEW…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .