ATTACHMENT 5 - DRAWINGS.pdf

PDF 388 KB Posted

Attached to
Supply and installation of a heat exchanger for the separation and decoupling of hydraulic circuits
Solicitation number
Not on record
Issued by

About this file

This is a technical schematic diagram illustrating a heating system configuration dated 11/12/2025. The system depicts a dual-boiler arrangement on a rooftop feeding into a centralized boiler room setup with pressure and flow control components.

The rooftop section contains three boilers (labeled Boiler 1, 2, and 3) configured with parallel red supply lines and blue return lines that converge at a central mixing point before entering a storage tank. The boiler room section shows a pressure relief system with gauges indicating PC 3.5 bar and P2 10 bar operating ranges, connected to dual manifolds. The system includes a circulation pump (marked "NEW PUMP") and flow control elements (indicated by valve symbols). Return flow from the manifolds cycles back through a heat exchanger with coil configuration to the boiler supply. The schematic demonstrates a closed-loop heating distribution network designed to manage pressure differentials and regulate thermal flow between multiple heat sources and end-use points, with provision for system expansion or replacement of pump components.

View the file

Other files

File Type Posted
ATTACHMENT 7 - TECHNICAL SHEET.zip ZIP file
RFQ No. 19SP5026Q0008.pdf PDF
Signed invitation letter.pdf PDF
ATTACHMENT 8 - TOTALCOST BREAKDOWN.pdf PDF
ATTACHMENT 6 - SPECIFICATIONS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .