Attachment 5 - Drawings 100 Percent - Mathers VAMC - Part 5 - Final.pdf
PDF 315 KB Posted
- Attached to
- Y1DZ--Facility for Mental Health Primary Care Modalities - Minor Construction - Mather VAMC
- Solicitation number
- 36C77624B0005
About this file
This document contains drawings and specifications for a fire sprinkler system at the Mathers Veterans Affairs Medical Center in Mather, California. The drawings show the layout of sprinklers on level two and include notes specifying that upright sprinkler heads are to be provided in unfinished areas as indicated. Deductive alternates are shown for administrative offices, human resources offices, and a sleep study patient suite, with requirements to provide upright sprinkler heads in areas where ceilings are removed. The related federal contract opportunity is a solicitation for a minor construction project to construct a facility for mental health and primary care alternative modalities at the Mathers VAMC, to be awarded by the Department of Veterans Affairs Technology Acquisition Center in Austin, Texas.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
GENERAL NOTES
A. THESE DOCUMENTS REPRESENT THE DESIGN INTENT AND COVERAGE AREA FOR THE
FIRE SPRINKLER SYSTEM WITHIN THE PROJECT SCOPE. THE CONTRACTOR IS
RESPONSIBLE FOR PROVIDING A COMPLETE FIRE SPRINKLER SYSTEM APPROVED PER
NFPA AND BY THE AUTHORITY HAVING JURISDICTION. PROVIDE HYDRAULIC
CALCULATIONS, SHOP DRAWINGS, AND ANY ADDITIONAL EQUIPMENT NECESSARY TO
COMPLETE THE INSTALLATION AND COMPLY WITH THE SPECIFICATIONS AND ALL
APPLICABLE CODES AND CRITERIA.
B. THE SPACING AND SIZES OF SPRINKLERS AND PIPES SHALL CONFORM TO THE
REQUIREMENTS OF NFPA 13. SPRINKLERS SHALL BE INSTALLED BY PERSONNEL WHO
HAVE ENGINEERING FACILITIES AND EXPERIENCE IN SUCH WORK AND WHO ARE
REGULARLY EMPLOYED TO DO SUCH WORK.
C. PROVIDE A UL AND FM LISTED SPRINKLER GUARD IN LOCATIONS WHERE SPRINKLERS
ARE SUBJECT TO MECHANICAL DAMAGE; INCLUDING IN MECHANICAL ROOMS,
ELECTRICAL ROOMS, STAIRWELL LANDINGS, ELEVATOR SHAFTS, AND ON ALL
SPRINKLERS INSTALLED BELOW 7'-0" AFF.
D. PROVIDE SEISMIC PROTECTION IN ACCORDANCE WITH NFPA 13. CONTRACTOR SHALL
SUBMIT LOAD CALCULATIONS FOR SIZING OF SWAY BRACING FOR SYSTEMS THAT ARE
REQUIRED TO BE PROTECTED AGAINST DAMAGE FROM EARTHQUAKES.
E. HAZARD CLASSIFICATION IS LIGHT HAZARD UNLESS NOTED OTHERWISE. REFER TO
PLAN.
SPRINKLER LEGEND
REFER TO SPECIFICATION 21 13 13 FOR RESPONSE TYPE AND TEMPERATURE
RATING FOR EACH APPLICATION.
SEMI-RECESSED SPINKLER HEAD
UPRIGHT SPINKLER HEAD
SIDEWALL SPRINKLER HEAD
1 2 3 4
J
H
G
F
E
A
B
C
A.4
61.5
D
2.5 3.5
HAC
2A-205
ELEC
2A-203
ELEVATOR
2A-201
VESTIBULE
2A-200
IDF
2E-263
ROOF BELOW
CLEAN UTILITY
& SUPPLY
2D-232
SHAFT
2D-227
EXAM
2D-224
SOILED
UTILITY
2D-236
EXAM
2D-222
OFFICE
2D-237
OFFICE
2D-235
OFFICE
2D-233
OFFICE
2D-231
OFFICE
2D-225
OFFICE
2E-265
CONFERENCE
ROOM
2E-261
LACTATION
ROOM
2B-207
CHECK-IN /
WAITING AREA
2B-206
CPAP
STORAGE
2D-234
FEMALE
2B-211
MALE
2B-209
OFFICE
2D-223
EWC3
CORRIDOR
2D-220
CORRIDOR
2E-260
CORRIDOR
2D-240
CORRIDOR4
simsim
DEDUCTIVE ALTERNATE 4 -
HUMAN RESOURCES
DEDUCTIVE ALTERNATE 5 -
SLEEP STUDY PATIENT SUITE
D E
D U
C T
IV
E
A L
T E
R N
A T
E
A D
M
IN
IS
T
R A
T
IV
E O
F F
IC
E
S
A8.20 / 04
A8.20 / 01
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542 designgroup
Architecture, Engineering, and Sustainable DesignAESUS
KEY PLAN NTS
NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Construct Facility for Mental Health and Primary Care Alternative Modalities
Location:
100% Bid Set Submittal
8/18/2023 o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
612-908
VANCHCS
10535 HOSPITAL WAY MATHER, CA 95655
AESUS
PROJECT
AREA
MAIN
HOSPITAL
FP2.25
FIRE PROTECTION PLAN - SPRINKLERS
(DEDUCTIVE ALTERNATE 3, 4 & 5)
LEGEND NOTES
1 PROVIDE UPRIGHT SPINKLERS IN SHELLED AREAS, AS INDICATED.
1/8" = 1'-0"
FIRE PROTECTION LEVEL 2 (DEDUCT 3, 4 & 5)
DEDUCTIVE ALTERNATES NOTES:
A. REFER TO COST ESTIMATE FOR COMPLETE LIST OF DEDUCTIVE ALTERNATES
B. DEDUCTIVE ALTNERATES SHOWN ON THIS SHEET ARE RELATIVE TO PHASED
BUILD OUT OF LEVEL 02 ONLY
DEDUCTIVE ALTERNATE #3:
CEILINGS ARE REMOVED IN DEDUCT AREA. PROVIDE UPRIGHT SPINKLER HEADS AS
INDICATED.
DEDUCTIVE ALTERNATE #4:
CEILINGS ARE REMOVED IN DEDUCT AREA. PROVIDE UPRIGHT SPINKLER HEADS AS
INDICATED.
DEDUCTIVE ALTERNATE #5:
CEILINGS ARE REMOVED IN DEDUCT AREA. PROVIDE UPRIGHT SPINKLER HEADS AS
INDICATED.
File details come from the government source that posted it. Updated .