This attachment provides a submittal narrative for a minor construction project at the Mathers Veterans Affairs Medical Center. The related federal contract opportunity seeks to establish an indefinite delivery/indefinite quantity contract to construct a new facility for mental health and primary care services. Key details include a solicitation number of 36C77624B0005, with responses due to the Department of Veterans Affairs Technology Acquisition Center in Austin. The construction project aims to provide additional space to expand access to mental health and primary care modalities at the Mathers VAMC.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Veterans Affairs

VA Northern California Health Care System

“Construct Facility for Mental Health and

Primary Care Alternative Modalities”

PRRC Building

VA Mather Facility

100% Bid Set Design Narrative

Project No. 612-908

October 20, 2023

Mather – PRRC Building 100% Submittal Narrative

Department of Veterans Affairs

VA Northern California Health Care System

PRRC Building

VA Mather Facility

100% Bid Set Design Narrative

Project No. 612-908

Project Location:

Feymour & Peter A. McCuen

VA Mather Campus

Contracting Officer’s Representative (COR):

Mr. Israel Modesto

(916)-843-9319

Mather – PRRC Building 100% Submittal Narrative

Table of Contents

I. Design Schedule

II. Civil & Landscape Narrative

III. Architectural Narrative

IV. Interior Design Narrative and Finish Board

V. Structural Narrative

VI. Mechanical Narrative

VII. Electrical Narrative

VIII. Telecommunication Narrative

IX. Attachments

a. Geotech Report

b. LEED Checklist

c. Space Program

d. Equipment data sheets

X. RFIs & Action Items

XI. Meeting Notes & Review comments

Updated: 8/3/2023

NTP Thursday, May 28, 2020

Site Investigations Thursday, June 18, 2020

Civil Survey TDB

Programming

Programming Progress set to VA 14 calendar days Thursday, June 11, 2020

Programming Meeting 1 (on-site 6 hours) 7 calendar days Thursday, June 18, 2020

Programming Submission Due to VA 7 calendar days Thursday, June 25, 2020

SD 25% Submission

SD Meeting 1 32 calendar days Monday, July 27, 2020

SD Meeting 2 56 calendar days Monday, September 21, 2020

Aesus Send Drawings to Cost Estimator 30 calendar days Wednesday, October 21, 2020

SD Submission Due to VA 14 calendar days Wednesday, November 4, 2020

SD VA Review Notes Returned to Aesus 30 calendar days Friday, December 4, 2020

SD Client Review Meeting 3 calendar days Monday, December 7, 2020

SD 35% Submission

SD Meeting 3 31 calendar days Thursday, January 7, 2021

SD Meeting 4 21 calendar days Thursday, January 28, 2021

Aesus Send Drawings to Cost Estimator 21 calendar days Thursday, February 18, 2021

& Consultant Drawings Due to AESUS

SD Submission Due to VA 7 calendar days Thursday, February 25, 2021

SD VA Review Notes Returned to Aesus 30 calendar days Saturday, March 27, 2021

VA Delay 235 calendar days

35% Resubmittal Wednesday, November 17, 2021

NTP Wednesday, March 2, 2022

65% DD Submission

DD Meeting 1 (1 hr) 43 calendar days Thursday, April 14, 2022

DD Meeting 2 (1 hr RFI review) 28 calendar days Thursday, May 12, 2022

DD Meeting 3 (1 hr RFI Review) 7 calendar days Thursday, May 19, 2022

Consultant Drawings Due to AESUS 14 calendar days Thursday, June 2, 2022

DD Submission Due to VA 4 calendar days Monday, June 6, 2022

Cost estimate to be sent to VA 14 days after submission

DD VA Review Notes Returned to Aesus 31 calendar days Thursday, July 7, 2022

DD Client Review Meeting 4 calendar days Friday, September 16, 2022

65% Client Follow Up Review Meeting - For Interior open items Monday, November 14, 2022

95% CD Submission

Redesign Period 45 calendar days Thursday, December 29, 2022

AE Collaboaration Meeting 7 calendar days Thursday, January 5, 2023

Consultant Drawings Due to AESUS 32 calendar days Monday, February 6, 2023

CD Submission Due to VA 18 calendar days Friday, February 24, 2023

CD VA Review Meeting 41 calendar days Thursday, April 6, 2023

VA Review Meeting with Travis & Jon 13 calendar days Wednesday, April 19, 2023

95% Resubmittal

Meeting with Travis & Jon - Deduct overview 7 calendar days Wednesday, April 26, 2023

Meeting with Travis & Jon - Engineering items 14 calendar days Wednesday, May 10, 2023

Meeting with Travis & Jon - as needed 7 calendar days Wednesday, May 17, 2023

Consultant Drawings Due to AESUS 9 calendar days Friday, May 26, 2023

CD ReSubmission Due to VA 7 calendar days Friday, June 2, 2023

VA Review Meeting with Travis & Jon 62 calendar days Thursday, August 3, 2023

100% FINAL CD Submission

Consultant drawings due to AESUS 13 calendar days Wednesday, August 16, 2023

Final Submission Due to VA 2 calendar days Friday, August 18, 2023

PRRC - Facility for Mental Health and Primary Care Alternative Modalities

Project Number 612-908

VA Mather, CA

VA MATHER – MENTAL HEALTH AND PRIMARY CARE Civil Narrative

AESUS Design Group C - 1

Introduction

The scope of work for this project will include the construction of a new facility for mental health and primary care on the Mather VA Campus. The southern portion of the parking lot is not within the scope of this project and as such will not be included in this design.

The proposed location of the new facility is located on the eastern portion of the campus. The new facility will be constructed between Femoyer Street and an existing parking lot, just south of the approved Social Services Building that is currently under construction. There are water, sanitary sewer and storm utilities within Femoyer Street as well as electrical and overhead lines that run parallel to Femoyer Street adjacent to our design location.

There are several design constraints that were considered during our design. The construction of the existing parking lot was incorrect and as a result, the 25’ setback for blast consideration was modified and as a result adjusting our design. The drainage design for the Social Services building was also not built per design documents and is currently being redesigned to satisfy drainage

Grading The existing grades on the project site are relatively flat. The proposed entrance and building finish floor will be set based on the elevations from the existing parking lot. Grading to the north will tie into the revised Social Services grading. The east side will sheet flow to Femoyer Street. The southern portion of the building will be set based on previously designed grades for the parking lot and the east tie into the existing parking lot.

Drainage The drainage concept is intended to flow away from the building and utilize the existing infrastructure of the parking lot on the east and south sides of the building. The west side will sheet flow to Femoyer Street and captured in the existing storm sewer systems. The north side will utilize a combination of area inlets and swale designed with the Social Services building to convey flows to the Femoyer Street storm system. Roof drains will convey runoff from three roof drain connections to the existing storm pipe south of the site.

Water The water connections for this project will include tapping into the water main on Femoyer Street to the north of the building and stubbing an 8” Water main into the site. A 3” domestic water and 6” fire service will connect to the 8” stub. These lines will run between the new building and Femoyer Street to tie into the building connections on the south end.

Sanitary sewer A new sanitary sewer service will connect the building to an existing sanitary main in Femoyer Street.

Storm Sewer 6” PVC pipes will convey storm runoff from roof connections and an area inlet to the existing 18” storm pipe to the south of the site.

VA Mather – PRRC Building Landscape Architectural Narrative

The Design Laboratory LA - 1

Landscape Architecture

Scope of Work

The scope of work of this project will involve the construction of a new two-story building of approximately . The exterior improvements that are part of this project include perimeter sidewalk, walkways, landscaping, and a small asphalt parking area for three charging stations for GSA vehicles. The parking lot and site access will be provided as part of a separate contract to be completed prior to this project. The site allows for adequate setbacks (25’-0” from building to curb line) per PSDM requirements for “Life Safety” building projects.

The Landscape Architectural package includes two layout/hardscape plans – an original and a deductive alternate. Both iterations adhere to PSRDM safety requirements through the use of boulders and gabions. The placement of landscape rock and material allows for water shed and retention away from the structure through functional and aesthetic measures. A seating area/courtyard to the North combined with sittable gabion walls along the pathway add to the function of the site. PSRDM boulders are positioned in a functional yet aesthetically pleasing manner in appropriate positions along the site. The designs allow for easy future modification based on phasing to expand the use of the site. Included among these future opportunities are the addition of landscape as desired.

Existing Conditions

The project area is located on an undeveloped piece of land along Femoyer St. between Airpark Dr. and Peter A McCuen Blvd. The project will be adjacent to the new Social Services Facility. The Social Services Facility project design was completed in April 2020. The Social Services Facility is currently under construction. It will extend the Peter A. McCuen Blvd east across the undeveloped land, creating a parking lot and extending utilities to the site.

The site survey was completed in the Social Services Facility project by Kier & Wright Civil Engineers & Surveyors in September 2018. The geotechnical report was completed in the Social Services Facility project by Kleinfelder in September 2018. While no groundwater was encountered during the borings, the State of California Department of Water Resources Water Library estimates that groundwater onsite could likely be expected at a depth of 70-80 feet below ground surface (bgs). Soil stripping across the site are expected to be 1-3inches in depth and shall be stockpiled for use in landscaped areas. The geotechnical report recommends over-excavation of soils below all foundations. Over-excavation should proceed to a depth of 5 feet below existing ground surface and extend 2 feet on all sides of the foundation.

22,000 bgsf

The Design Laboratory LA - 2

Landscape Narrative

Scope of Work

The scope of work will involve the construction of a new two-story building of approximately BGSF. The landscape architectural scope of this project includes landscape surrounding the building, outdoor dining area, outdoor garden area, and modifications to the Social Work Facility landscaping to successfully merge the two buildings around the PRRC entrance and boulder gardens. Vegetated landscape was removed due to budget and maintenance restrictions on site, but boulders, gabions, and rock cover were positioned to still add dimension, function, and character to the site while minimizing cost and maintenance.

Existing Conditions

The project area is located on an undeveloped piece of land along Femoyer St. between Airpark Dr. and Peter A McCuen Blvd. The project will be adjacent to the new Social Services Facility. The Social Services Facility project design was completed in April 2020. The Social Services Facility is currently under construction. It will extend the Peter A. McCuen Blvd east across the undeveloped land, creating a parking lot and landscaping within that parking area.

Soil

Soil testing has been performed in conjunction with the geotechnical analysis to determine the suitability of the site soils. Landscape will incorporate gray/tan angular rock of specified sizing to match surrounding landscapes and mitigate erosion.

Physical Security

Stationary and passive barriers for the site will be provided by means of the landscape by use of boulders and gabion walls. In addition to the landscaping barrier features, a series of bollards will be placed across the concrete plaza at the front of the building, as well as entrance walkways wide enough to pose risk.

Where spacing between landscape-barriers exceeds those outlined for ATFP and PSDM criteria, bollards will be added to the site.

Parking and vehicles will not be within the 25 feet of the facility to provide adequate protection from the site. No drop off locations are proposed as part of this project and parking will be mixed use for patients and staff.

Courtyard Spaces

A courtyard space was developed to the North of the structure, off of the multipurpose room to provide a space for both staff and patients to relax in an outdoor environment. The courtyard uses compacted ¼” minus to be affordable, permeable, and accessible.

Irrigation

Due to the lack of vegetation on site, no irrigation is included or necessary until future phases if desired.

22,000

The Design Laboratory LA - 3

Seating

Strategically positioned gabions double as seating in addition to their security functions. Compacted, wheelchair accessible areas are positioned adjacent to gabion “bench” opportunities for shared access.

Ground Cover

Rock ground cover is used to mitigate erosion and direct water along the site. Rip Rap is positioned along the structure and downspouts to quickly disperse and slow water along the foundation – directing the flow to adjacent retention areas. ¼” Minus is used for access areas. Screende d

VA Mather – PRRC Building Architectural Narrative

AESUS Design Group A - 1

Introduction

The scope of work will involve the construction of a new two-story building of approximately BGSF. The ground level will function as a Psychosocial Rehabilitation Recovery Center (PRRC) while the second level will be Outpatient Sleep and Human Resources.

The parking lot is part of a separate project to be built prior to this project. The scope of this project includes providing empty conduits to future charging stations for GSA vehicles south of the building. The utilities for this building will feed from the adjacent site of the Social Services Facility to minimize coordination with the city street utilities.

This work shall include but not be limited to civil, landscape, architectural, structural, mechanical, plumbing, and electrical. All fire life safety systems will be designed per the NFPA 99 and 101.

Design Criteria

All aspects of the design shall be in full compliance with VA design criteria as listed in VA design guides and manuals which can be found on the web at the VA Office of Facilities Management technical information library – site address: http://www.cfm.va.gov/TIL/.

The following codes and design criteria shall be utilized to the extent applicable:

VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) http://www.cfm.va.gov/til/.

International Building Code (IBC) (Only when specifically referenced in VA Design Documents, see notes below)

NFPA 101 Life Safety Code

NFPA National Fire Codes with the exception of NFPA 5000 and NFPA 900

Occupational, Safety and Health Administration (OSHA) Standards.

VA Seismic Design Requirements, H-18-8

National Electrical Code (NEC)

International Plumbing Code (IPC)

Safety Code for Elevators and Escalators, American Society of Mechanical Engineers

(ASME) A 17.1.

ASME Boiler and Pressure Vessel Code

ASME Code for Pressure Piping

Architectural Barriers Act Accessibility Standards (ABAAS) including VA supplement, Barrier Free Design Guide (PG-18-13)

Building Code Requirements for Reinforced Concrete, American Concrete Institute and Commentary (ACI 318)

Manual of Steel Construction, Load and Resistance Factor Design Specifications for Structural Steel Buildings, American Institute of Steel Construction (AISC)

Energy policy Act of 2005 (EPAct)

DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435.

Federal Leadership in High Performance and Sustainable Buildings: Memorandum of Understanding (MOU) http://www.cfm.va.gov/til/

AESUS Design Group A - 2

Executive Order 13423: Strengthening Federal Environmental, Energy, and Transportation Management.

The Provisions for Construction and Safety Signs. Stated in the General Requirements Section 01010 of the VA Master Construction Specification.

Ventilation for Acceptable Indoor Air Quality – ASHRAE Standard 62.1- 2004.

Safety Standard for Refrigeration Systems – ASHRAE Standard 15 – 2007.

Project Phasing

The contractor shall be required to perform construction operations during time frames approved by the hospital. Ultimately, the precise sequence will be determined after a building contractor has been selected and consultations among the hospital staff, facilities personnel, contractor, and architect can be arranged.

The following items shall be considered for this project prior to the start of construction:

Staging for construction materials and access information for contractor.

In-depth site walks with COR

Phasing and safety plans

Coordination drawing

Existing Conditions

The project area is located on an undeveloped piece of land along Femoyer St.

between Airpark Dr.

and Peter A McCuen Blvd. The project will be adjacent to the new Social Services Facility.

The Social Services Facility project design was completed in April 2020. It will extend the Peter A. McCuen Blvd east across the undeveloped land, creating a parking lot and extending utilities to the site. The site also has existing parking, therefore, this project does not include a new parking lot. The existing parking lot is curbless.

AESUS Design Group A - 3

Building Design

The two-story building design will be Occupancy Class B, Business, for outpatient clinics. The building will be divided into two separate areas with two separate entrances. Level 01 is dedicated to the PRRC program, which will be the primary entrance to the building. Level 02 programmed function is to be determined. It will have a separate smaller entrance with elevators and stairs to the second floor. The VA is still confirming level 02 program and schematic layout, but it will most likely be Sleep and HR departments. The building IDF room will be located on Level 02.

There will be two stairs. One will be an exterior stair, while the other will be an enclosed rated stair. The exterior stair will go up to the roof with secured gate to prevent public access past 2nd floor. It will be a deductive alternate to have stair only go to 2nd floor. The enclosed stair will go only to 2nd floor and it will have a roof access hatch.

There will be a single elevator. Elevator will be specified as a hole-less hydraulic elevator to meet Mather standards.

The building will be fully sprinklered. It will use Type V-A construction, per the latest IBC, to match the adjacent Social Services Facility.

All exterior doors and utility doors shall be Hollow Metal frames and doors.

All interior doors shall be solid core. Use door protection on heavy use areas like storage and restrooms.

Basis of design for automatic doors to be Stanley or Marty.

No ceilings in any Mechanical, Electrical, IDF, or Elevator Equipment rooms.

All single occupancy restrooms to be non-gender.

A roof service crane for lifting equipment onto roof will be used. The design is to match the adjacent Social Services building.

PSRDM

This facility has been designed per the PSRDM requirements for a “Life Safety Protected” facility, and incorporates the following PSRDM items:

The building is designed to be Type V-A construction type per the latest IBC. Per direction provided by the VA to follow the Social Services Facility, this building was designed to meet the 2015 PSRDM and is exempt from the requirement for Blast Resistance and Progressive Collapse requirements as outlined in the PSRDM Chapter 6.1.3 and Chapter 7.1.2.

Windows will be blast resistant using laminated glass or film for protection

Building setback is maintained at 25’-0” (or more) from face of building to the edge of the curb around the building. Where the entrance does not meet this requirement, steel bollards have been added to prevent cars from entering into the 25ft zone.

Bollards, boulders, retention ponds, and concrete site walls are planned to prevent building ramming.

All mechanical equipment is located on the roof to prevent tampering and protect them from damage.

Building has exterior lighting at all exit / entrance doors

All entrances and corners of the buildings will be covered by cameras.

Per VA direction, site lighting and parking lot lighting will not be provided.

All single exits will have delayed egress alarms.

AESUS Design Group A - 4

Building Envelope

The building will comply with California Energy Efficiency Standards Title 24 and IECC climate zone 3B requirements. The building will aim for LEED Silver requirements.

The exterior materials will include EIFS/Stucco panels. Exterior curtain wall windows have been designed to fit EFCO Series 5600 Outside Glazed system, Vista-wall and Kawneer.

Roofing will be TPO single ply membrane (white) over tapered insulation, minimum R30 value.

The building will be steel structure, metal studs, and concrete slab floors. The first floor will be slab on grade, and the second floor will use metal decking.

Energy Considerations

The project will be designed towards LEED Silver equivalent. LEED certification is not required. A formal LEED Healthcare checklist has been provided as an attachment for reference only. The following will be used to help achieve this goal:

Insulation on the exterior of the exterior walls to prevent thermal bridging at the metal studs.

Polyurethane foam insulation will be used on the interior side of the exterior walls as the vapor barrier, to add further insulation (R value), and to help with noise

Sunshades will be used at all the windows. As part of the Value Engineering efforts, these will be VA provided and installed.

Windows will be low-E, double glazed, thermally broken units, with laminated glass or film for blast protection

Roof and walls will be designed to meet or exceed minimum R-values (R30 for roof and R19 for walls).

TPO roof is a “cool” roof reflecting heat

Interior and exterior lighting will be LED lighting fixtures

Large number of windows will help with day lighting, reducing the need for artificial lighting

Lighting will be on multiple switches for better lighting control

Per the specifications, all materials will be low VOCs and meet sustainability requirements

Interior Building Design

The functions of this building will serve as a Medical Office Building with outpatient services. Level 01 is the PRRC, while level 02 is still being designed. Currently, second floor program and schematic design is lagging behind Level 01 PRRC and it will be considered a TI at this time. For maximum flexibility, the structural grids are being maximized in span and the IDF and shafts are centered in the floor.

Level 01 - PRRC

Level 4B Outpatient Mental Health Facility

Durability is greater concern than ligature/tamper proof

6 ft corridors are standard for clinics

8 ft ceilings standard

No nurse-call

No anti-ligature

No metal detectors

Handrails and Acrovyn wall protection required as specified

AESUS Design Group A - 5

Level 02 Human Resources

Business Occupancy

The HR Department will be designed as a separate suite from the Sleep Department.

A shared second entrance with elevator vestibule, dedicated stair, and lobby with receptionist

Level 02 Sleep There is not a VA TIL Design Guide for Sleep, Design of department based on the VA San Francisco Outpatient Sleep Clinic.

o No procedures will be done here o All patients will be held 23 hrs or less o 2 exam rooms o 6 Offices o 1 shared office o 1 Sleep Monitoring Control Station o 1 Clean Utility o 1 Soiled Utility o 1 CPAP Storage o 4 sleep study rooms with bathrooms (no showers)

Elevator Options:

Acceptable Manufacturers: Otis, Kone, Thyssenkrupp Type: hole-less hydraulic elevator Size: 6’9” wide x 5’6” deep Door: center, 42” clear

Aluminum Storefront Doors:

Basis of Design: Stanley

Lactation Room:

The VA Mather in the 65% review comments has directed us to remove the refrigerator and second station with curtain dividers. This is in direct conflict with the Lactation Room Guide provided to us.

VA Mather – PRRC Building Interior Design Narrative

ID-1

Introduction

The two story PRRC Building Interior Design Package consists of a complete, cohesive design.

Emphasis is placed on creating a comforting, durable, easy to maintain facility.

Interior Finish Design

Flooring finishes throughout the facility are primarily resilient flooring with carpet tile at the

Offices, Conference Room, and Group Rooms. A large, recessed entry mat with heavy duty carpet inserts is provided at the Vestibules. Rubber baseboard is the predominate base board finish.

Three different field colors are provided on this project, depending on the room type. Accent paint is provided in the Corridors and Circulation spaces to aid in wayfinding. One wall painted with an accent color will be provided at all Offices, Group Rooms, Exam Rooms, Patient Areas, and Sleep Rooms.

The multi occupant restrooms have ceramic floor tile and ceramic tile baseboard. White wall tile in a 3”x6” size, in a running bond pattern will extend to 54” A.F.F. and painted drywall will be located above the wall tile wainscot. At single occupant restrooms the flooring will be a ceramic tile floor and baseboard with white 3” x 6” wall tile, in a running bond pattern that extends to 54”

A.F.F. Finish above the wall tile wainscot is painted drywall. Restrooms will be finished at all exposed corners and edges with metal trims.

Corridors have a rigid wall wainscot finish as well as a wood and metal handrail.

Ceilings throughout the facility are primarily 2’ x 2’ acoustical ceiling tile. There is painted gypsum board ceiling at the Reception, Waiting Room, Restrooms, Vestibules and several other service areas.

Although this is a mental health facility, no finishes are required to be tamper resistant or anti-ligature.

ACT-2 ,Acoustical Ceiling Tile Armstrong,Optima Health Zone

P-2, Paint (Accent), Benjamin Moore, Cathedral Gray

P-1, Typical Wall Paint, Benjamin Moore, Decorator’s White

P-1A, Typical Wall Paint, Kelly Moore, Tufted Tan

P-1B, Typical Paint, Dunn Edwards, DE6205 Stucco Tan

AS-1, Solid Surface, Corian, Clam Shell

RB-1, Rubber Base, Johnsonite, 32 Pebble

P-3, Paint (Accent), Dunn Edwards, DET

591 Silver Screen

P-4, Paint (Accent), Dunn Edwards, DE 6319 Gray Flannel

CG-1 and TP-1, Corner Guards and

Toilet Partitons Stainless Steel

EM-1, Recessed Entry Mat, CS Construction Specialties, Caste Grey

WP-1 Vinyl Wainscot, Inpro, Natural Maple

T-1, Wall Tile, Dal Tile, Artic White 0190

FP-1, FRP Board, Marlite P100 White

PL-1, Plastic Laminate, Wilsonart, Kennsington Maple

HR-1, Hand Rail, Inpro, Sugar Maple 0548

GT-1, Grout, Laticrete, 89 Smoke Grey

RSF-1 and RSFB-1, Vinyl Flooring and Integral Vinyl Base, Mannington, Biospec Choices, Biospec MD, New Glacier 68364

RSF-2, Sheet Flooring, Mannington, Paradigm III, Style: Intersect, Color: Vanguard PD119

LVT-1, Luxury Vinyl Tile, Interface, Textured Woodgrains, Level Set, A00207 Washed Wheat

SV-1, Resilient Flooring, Tarkett, IQ Optima 897, Color:

Slate

CPT-1, Carpet Tile, Patcraft, Isle of Skye, Edinburgh, IO456, Color: Geary 00525

MD-1, Midmark, Dune

ACT-1 ,Acoustical Ceiling Tile Armstrong, Optima

CT-1 and CTB-1, Ceramic Floor Tile, and Base, Dal Tile, Haute Monde, Glitterati Grande

HMO3

VA Mather – PRRC Building Structural Narrative

AESUS Design Group S - 1

Introduction

The structural scope of work will involve the construction of a new two-story building of approximately SF. The ground level will function as a Psychosocial Rehabilitation Recovery Center (PRRC) while the second level will be Outpatient Sleep and offices

Design Criteria

The following codes and design criteria shall be utilized to the extent applicable:

International Building Code (IBC 2018)

VA Design Manuals

VA Seismic Design Requirements, H-18-8

Physical Security Design Manual 2015

Vertical Loads (per VA Structural Design Manual for Ancillary Structures):

Roof Live Load = 20 psf

Roof Snow Load = 0 psf

Second Floor Live Load = 80 psf plus 20 psf partition allowance

Second Floor Live Load at Corridors = 100 psf

First Floor Live Load = 100 psf

Lateral Load Criteria:

VA Facility Occupancy Category (FOC) = Ancillary Facility (Outpatient Mental Health)

IBC Building Risk Category = II

Wind Speed = 94 mph

Wind Exposure = C

SS = 0.458, SD1 = 0.224; Site Class D; SDS = 0.439, SD1 = 0.323

Seismic Design Category: D

Seismic Importance Factor = 1.0

Lateral Force Resisting System: Steel Special Moment Frames

Building Structural Design

The two-story building design will be a steel framed structure. The roof framing will consist of steel deck spanning between steel wide flange beams, supported by steel wide flange girders and steel wide flange columns. In areas of the roof below mechanical units, there are likely to be areas of concrete curbs. The second floor will consist of lightweight concrete over composite steel floor deck spanning between composite steel wide flange beams and girders. The design will also include one enclosed exterior stair tower and one open stair tower.

The foundation system will be isolated concrete spread footings at each column location with tie beams between individual footings. The slab on grade will be 5” thick concrete with reinforcing steel. Small depressions (2” thick +/-) are expected at restrooms, kitchen and food storage areas on the ground floor. A 12” thick mat foundation approximately 5’-0” below the ground floor slab will occur at the elevator.

The exterior façade of the building will consist of steel studs spanning between floor slabs. Studs will be clad with EIFS, metal panel, or stone veneer. Based on the proposed floor-to-floor heights, studs are expected to be 600S162-54 at 16” o.c. Exterior steel stud design is a deferred submittal.

VA Mather – PRRC Building Structural Narrative

AESUS Design Group S - 2

The lateral force-resisting system will be comprised of steel moment frames. A more economical option could be steel braced frames, but braced frames have more of an impact on architectural layout as they need to be located within walls and would limit the VA’s ability to adapt the building to changing layouts in the future. Because the building is classified as Seismic Design Category D, the steel moment frames will be required to be Steel Special Moment Frames (SMF) with prequalified connections per AISC 358. There are several options available for prequalified connections, including traditional field welded connections such as Reduced Beam Section (RBS), Welded Unreinforced Flange-Welded Web (WUF-W), as well as proprietary bolted systems by SidePlate, Durafuse Simpson Yield-Link and others. Because of the size of the building at less than 25,000 SF, we expect that a traditional welded connection will be most economical and, as such, special moment frame moment connections will incorporate RBS beam-column connections.

Because this building will be classified as type V construction per 2018 International Building Code, it will be exempt from the blast and progressive collapse design requirements of Chapter 6 and 7 of the Physical Security Design Manual (PSDM). Note this exception applies per the 2015 version of the PSDM which was in effect at the point when the project was awarded. The connections of primary structural members will be designed to develop the flexural capacity of the members, and the balanced design approach of ASCE 59-11 is used to prevent brittle modes of failure. The result of these requirements is that girders and columns are larger than otherwise required, and connections are more robust than in a typical building.

The second floor will consist of 3 ¼” lightweight concrete over 2” x 18GA composite steel deck with composite steel beams at 11’-0” o.c. maximum. Composite beams will be a maximum of 18” deep steel wide flange beams and girders. Roof framing will consist of 1 ½” x 18GA steel deck with steel wide flange beams at 7’-0” o.c. maximum. Steel deck gauge was increased from 20GA to 18GA at the request of the owner. Roof level beams will be 14”-18” deep steel wide flange sections, and columns are typically maximum of 14” x 10” wide flange steel shapes.

VA Mather – PRRC Building Mechanical Narrative

AESUS Design Group M - 1

Introduction

The scope of work will involve the construction of a new two-story building of approximately BGSF. The ground level will function as a Psychosocial Rehabilitation Recovery Center (PRRC) while the second level will be Outpatient Sleep and Human Resources.

Design Criteria

All aspects of the design shall be in full compliance with VA design criteria as listed in VA design guides and manuals which can be found on the web at the VA Office of Facilities Management technical information library – site address: http://www.cfm.va.gov/TIL/.

The following codes and design criteria shall be utilized to the extent applicable:

• VA Directives, Design Manuals, Master Specifications, VA National CAD Standard Application Guide, and other Guidance on the Technical Information Library (TIL) http://www.cfm.va.gov/til/.

• International Mechanical Code (IMC) (Only when specifically referenced in VA Design Documents, see notes below)

• DOE Interim Final Rule: Energy Conservation Standards for New Federal, Commercial and Multi-Family High-Rise Residential Buildings and New Low-Rise Residential Buildings, 10 CFR Parts 433, 434 and 435.

• California Title 24

• Ventilation for Acceptable Indoor Air Quality – ASHRAE Standard 62.1- 2016.

• Safety Standard for Refrigeration Systems – ASHRAE Standard 15 – 2007.

• Energy Reference Documents: ASHRAE 90.1-2013, VA Sustainability Guide, Green Guide for Health Care

• Smoke and Fire Control: HVAC design and equipment shall be in compliance with NFPA 90A and shall be equipped with devices such as fire dampers, smoke dampers, and duct mounted smoke detectors where required. Compliance with the following codes is also mandatory:

o NFPA 99: Standard for Health Care Facilities o NFPA 101: Life Safety Code

• Outside air requirements: Minimum Outside Air quantities for ventilation shall be the highest of the following:

o ASHRAE Standard 62.1-2016 o ASHRAE 170 o VA TIL Requirements

Design Conditions

• Mechanical cooling is provided for occupied spaces with indoor cooling design temperatures given by the VA TIL requirements (generally between 72°F to 74°F).

• Heating is provided for occupied spaces to maintain a minimum indoor heating design temperature of 70°F within the ASHRAE winter comfort zone.

• Weather Data: ASHRAE – Mather AFB o Latitude: 38.55 o Elevation: 95 ft.

• Annual Cooling, Dehumidification, and Enthalpy:

http://www.cfm.va.gov/til/

AESUS Design Group M - 2 o ASHRAE 0.4% Drybulb: 101.6°F Db, 68.8°F Wb o ASHRAE 0.4% Wetbulb: 70.9°F Wb

• Annual Heating & Humidification:

o ASHRAE 0.4% Drybulb: 29.7°F Db

HVAC Systems & Distribution

The cooling loads for the given building location were calculated and included in the appendix figures.

Two packaged rooftop units will be provided on the roof, one for each floor (35-ton and 30-ton). The unit will need return fan or power exhaust option to maintain building pressurization during economizer operations. The AC units will have MERV-16a filters to meet the latest requirements of VA TIL and Title 24.

Any rooms with IT equipment that requires 24/7 cooling will be provided with Split-Type DX AC systems.

Working with the VA to reduce initial cost, the building system was changed to electric heat VAVs.

Accordingly, the boiler and distribution piping was eliminated.

All packaged AC units shall meet the prescriptive energy-efficiency requirements of Title 24.

Energy Considerations

As stated above the project will be designed to meet LEED Silver Certification. The following will be used to help achieve this goal:

• Refer to the architectural narrative. It is anticipated that building construction will follow the following criteria:

o Windows will be low-E, double glazed, thermally broken units, with laminated glass or film for blast protection o Roof and walls will be designed to meet or exceed minimum R-values (R30 for roof and R19 for walls).

o Interior and exterior lighting will be LED lighting fixtures

• All packaged equipment meets the prescriptive requirements of the following standards, whichever is higher.

o California Title 24 (2019) o ASHRAE 90.1 – 2013

• All mechanical and plumbing systems shall be Commissioned per VA requirements.

• Where applicable, all plumbing fixtures shall be high-efficiency meeting and exceeding the requirements of LEED v4.

• Water shall be monitor hot water consumption, irrigation, and make-up water for hydronic system.

• All refrigerants shall meet Enhanced Refrigerant Management requirements of LEED v4.

Humidification, UV Light, Filtration

To address the concerns that came about with the 2020 pandemic, several features have been included with the AHU ventilation system.

- Rooftop humidifiers are included to serve each AHU. ASHRAE recommends that humidifiers be sized to maintain room humidity at 40%.

AESUS Design Group M - 3

- Rooftop AHUs are provided with UV light at the cooling coil section. The UV light neutralizes both bacteria and viruses.

- Rooftop AHUs are provided with a 12” final filter section. Per the schedule, MERV-16a filters are to be installed in the final section per VA guidelines. However, having this larger 12” section allows the installation of 12” HEPA filters (MERV17) during a pandemic event.

Building Management System

A complete direct digital control BMS system will be provided for the HVAC systems. The system will be able to control, monitor, alarm and website accessible. The BACnet system will be compatible with the existing nearby building (JCI Metasys). The BACnet interface will be accessible from the via IP Tunnel main Mather campus.

AESUS Design Group M - 4

Appendix

Space Types

Room Type Cooling deg-F

Heating deg-F

% RH

MAX

% RH

MIN

Min

ACH

Return /

Exhaust

Max

Noise

Level

NC

Room

Air

Balance

T-Stat

EXRG3: Exam Room 75 70 60 20 6 Return 35 (o) Yes

TRGM1: Treatment Room 75 70 60 20 6 Return 35 (o) Yes

OPMH1: Group Therapy

Room 75 70 60 20 6 Return 35 (o) Yes

OFD01: Counselor Office 75 70 60 20 4 Return 35 (o) Yes

SL001: Social Activities/

Dining/Multi-Purpose 75 70 60 20 6 Return 40 (o) Yes

CRA02: Classroom / Group

Room 75 70 60 20 6 Return 35 (o) Yes

OTGC1: Occupational

Therapy 75 70 60 20 4 Return 35 (o) Yes

OPPF6: Sleep Study Room 75 70 60 20 4 Return 40 (o) Yes

OPPF7: Sleep Study

Monitor Room 75 70 60 20 4 Return 35 (o) Yes

Admission 75 70 60 20 6 Return 40 (0) Yes

Class Room 75 70 60 20 6 Return 35 (o) Yes

Conference Room 75 70 60 20 4 Return 35 (o) Yes

Corridors 75 70 60 20 4 Return 40 (+) Yes

Dressing Room NA NA NA NA 4 Return 35 (o) No

Lounge 75 70 60 20 4 Exhaust (G) 40 (-) Yes

Medical Records 75 70 60 20 4 Return 40 (o) Yes

Medication Room 75 70 60 20 4 Return 40 (+) Yes

Multipurpose Room 75 70 60 20 4 Return 40 (o) Yes

Offices 75 70 60 20 4 Return 40 (o) Yes

Toilets - Public (Interior) NA NA NA NA 10 Exhaust (G) 40 (- -) No

Toilets - Public

(Perimeter) NA 68 NA NA 10 Exhaust (G) 40 (- -) Yes

Waiting Rooms 75 70 60 20 6 Return 40 (0) Yes

Clean Utility/Storage

Room NA NA NA NA 4 Return 40 (+) No

Computer Lab Room 75 70 60 20 4 Return 40 (o) Yes

Copy/Printing Room

(Small) NA NA NA NA 6 Exhaust (G) 40 (-) No

Electrical Equipment

Closets without Internal

Heat Gain

NA NA NA NA NA NA NA NA NA

Satellite and Main

Electrical Rooms with

Internal Heat Gain

86 40 NA NA NA Return 45 (o) Yes

Elevator Machine Room 77 NA NA NA NA Return 45 (o) Yes

Exterior Stairs NA 50 NA NA NA NA NA NA Yes

Housekeeping Aid Closet

(HAC)

NA NA NA NA 10 Exhaust (G) 40 (- -) No

Kitchenette NA NA NA NA 6 Exhaust (G) 40 (- -) No

Soiled Utility and Storage

Room NA NA NA NA 10 Exhaust (G) 40 (- -) No

Trash Collection Room NA 50 NA NA 10 Exhaust (G) 40 (- -) Yes

Vestibules NA 50 NA NA NA NA 40 (+) Yes

AESUS Design Group M - 5

Psychrometric Calculations

Provide 0.01854 lbs/hr of humidification per 1 CFM of outside air.

AESUS Design Group M - 6

Water Calculations

AESUS Design Group M - 7

AESUS Design Group M - 8

HVAC Calculations

AESUS Design Group M - 9

AESUS Design Group M - 10

AESUS Design Group M - 11

AESUS Design Group M - 12

Mechanical Cutsheets

AESUS Design Group M - 13

AESUS Design Group M - 14

AESUS Design Group M - 15

AESUS Design Group M - 16

AESUS Design Group M - 17

AESUS Design Group M - 18

AESUS Design Group M - 19

AESUS Design Group M - 20

VA Mather – PRRC Building Electrical Narrative

AESUS Design Group E - 1

Electrical Narrative

This narrative describes the electrical scope for the construction of a new two-story building of approximately BGSF. The ground level will function as a Psychosocial Rehabilitation Recovery Center (PRRC) while the second level will be either Option A: IT & Human Resources, or Option B: Sleep & Neurology.

The new design and all associated systems and equipment shall meet government requirements for such structures. The facility is to be part of the VA Northern California Health Care System. VA Design Guides, Design Manuals, and Master Specifications will also be used on this project.

Code Information

• Latest Edition of International Building Code (IBC)

• Latest Edition of NFPA 70 National Electrical Code (NEC)

• Latest Edition of International Fire Code

• VA Design Manuals and Specifications

• TIL – Design and Construction Procedures (PG-18-3)

• Latest Edition of NFPA 99 Healthcare Facilities Code

• Latest Edition of NFPA 101 Life Safety Code

• Latest Edition of NFPA 110 Standard for Emergency and Standby Power Systems

• Latest Edition of American National Standards Institute (ANSI)

• Latest Edition of American Society for testing Materials (ASTM)

• Latest Edition of Illuminating Engineering Society of North America (IESNA)

Electrical Service

Power will be provided underground from the southwest corner of the adjacent Social Services Facility. A new 800A distribution board will be provided in the first-floor electrical room fed from the existing MUSB.

Meter shall be located on the main switchboard. The normal power distribution system downstream shall consist of distribution panelboards and branch circuit panelboards. Refer to E5.01 and E7.01 for additional downstream panelboard information.

Emergency Power

Emergency Egress Lighting and Exit Path Illumination will be provided using integral batteries in light fixtures, complete with automatic normal power sensing equipment, transfer switch, batteries and charger to provide a minimum of 90 minutes continuous emergency operation.

The elevator will have an integral battery back up lowering system that will active during power outages.

This infrastructure will be provided by the elevator manufacturer and has been approved by the COR.

Switchboards/Panelboards

All switchboards and panelboards shall be specified with copper busses. The Main Switchboard will be furnished with Transient Voltage Surge Suppression.

AESUS Design Group E - 2

Wiring Branches

• Branch wiring system will be installed in accordance with NFPA 70. Each branch circuit will utilize a dedicated neutral conductor. All branch circuits shall utilize an equipment grounding conductor in each conduit. The conduit will not be allowed to be used as the sole grounding path.

• All branch circuiting will be copper conductors in conduit. Minimum conduit size will be 3/4”.

• HCF-MC Cable will be allowed to be used for normal power circuits from a junction box in the ceiling space in a room to devices located in the walls. The HCF-MC cable is to be concealed in the walls. MC is not to be used for homeruns or for emergency circuits.

• Typical branch circuit wiring will be minimum #12 AWG CU, installed in EMT conduit for power and lighting systems. Rigid conduits shall be used for all exposed conduit runs where EMT would be subject to physical damage as defined by the National Electrical Code (NEC). Conduits to be installed concealed, except where installed in electrical rooms, mechanical rooms or other unfinished areas.

• All empty conduits shall have a pull stings installed in them.

• All panelboard feeders shall be copper conductors installed in conduits.

• All mechanical equipment feeders including elevators shall be copper conductors installed in conduits.

• All electrical equipment shall be bonded with a dedicated equipment grounding conductor.

Wiring Devices

Wiring devices shall be identified by system with plate finish matching device color. All devices shall have the feeding panel and circuit identified on the plate.

• All devices shall be ivory unless specified otherwise by Architect on special finishes.

• All receptacles shall be installed with the Ground Prong facing up.

• Receptacle cover plate to match color of receptacle.

• Wiring Devices shall be medical grade duplex receptacles rated for 120V with 5-20 NEMA configuration, nylon type, with finishes determined by architect. Device faceplates shall be thermoplastic.

• Exterior receptacles shall be provided with ground fault circuit interrupter (GFCI) and installed in a weather rated enclosure and “IN USE” weather rated cover plates.

• Interior receptacles located within 6 feet of a water source or in vehicle bay shall be provided with

GFCI.

• Wiring devices to be mounted in 4” square x 2-1/8” deep minimum boxes with appropriate gang mud ring.

• Where wiring devices are surface mounted or in unfinished areas, devices to be mounted in a 4” square outlet box with matching industrial raised cover plates.

• Device wall plates to have extra strength laminated adhesive tape labels indicating the source panel and circuit number. Tape to be clear with back letters.

• Receptacles to be installed in accordance with the electrical drawings.

Feeders/Conductors

All conductors in this facility are to be single copper conductors routed in conduit.

Conductors 600V and below shall be copper solid conductors up to #12 AWG and stranded larger than #12 AWG.

AESUS Design Group E - 3

Power for Mechanical Equipment

• All mechanical equipment will be served at 480 volts, 3 phase for motors ½ horsepower and greater. Smaller loads will be served at 208 volts or 120 volts, single phase.

• Division 26 will provide all disconnect switches. Division 23 will specify motor starters and Variable Frequency Drives (VFD)

Lighting and Lighting Control Systems

• LED lighting will be utilized to reduce energy and maintenance costs.

• Lighting levels will be designed to meet recommended level listed by the Illumination Engineering Society (IES).

• High abuse lighting will be used in the specialized areas as required.

• High Abuse lighting will be used in the areas as required.

• Local control of the lights will be provided in each room. Enclosed rooms will be automatically controlled via occupancy sensors and include a manual override switch. Occupancy sensors will utilize passive infrared, ultrasonic and dual technology sensor based on the application.

• Interior daylighting sensors for continuous dimming of light fixtures will be utilized where daylight harvesting is required by code.

• Emergency egress lighting will also be controlled but will incorporate a UL 924 listed transfer relay to override any lighting controls in the event of a power outage.

• The low voltage relay panel will monitor fire alarm and security systems to turn on core lighting in the event of an emergency.

• Exterior Lighting will be comprised of LED source luminaires.

• Exterior lighting will be controlled by a low voltage relay panel.

Recommended Lighting Changes from TIL

• The TIL documents for this space appears to have an outdated layout based on older lighting strategies. Now that the industry has moved to LED fixtures, light fixture spacing, and quantities can be updated and still meet the IES recommended light levels. See below for a list of rooms and their TIL layouts. These layouts will be drastically reduced to save on construction cost and still meet adequate footcandle levels. VA has confirmed that deviating from TIL Standards is acceptable.

o Small Group Room 131, 133, 135, 137 and 139 o Occupational Therapy 132

AESUS Design Group E - 4 o Multi-Purpose Room 144 o Conference Room 261

• The lighting layout for all sleep rooms have been modified to 2x4 fixtures per direction from the

John Bassignani.

AESUS Design Group E - 5

Fire Alarm System

New Fully Automatic Fire Alarm System shall be provided for the Building. This will include new Fire Alarm Control Panel, power supplies, strobes, horns, smoke detector etc. provided per IFC, NFPA and City standards.

• Control relays shall be provided, where fire/smoke dampers and HVAC shut-down are required.

• Photoelectric smoke detectors or heat detectors will be used as required.

• Fire alarm audible and visual alarms will provide alarm indication as required. The audible circuit will be separate from the visual circuit, so the sound can be turned off while the visual is still alarming.

• Each space will have visual notification.

• Duct detectors will be provided for air handling equipment greater than 2,000 cfm. The duct detectors will be interlocked with the HVAC equipment to shut it down in case of smoke.

• Any fire smoke dampers will be controlled by the fire alarm system based on the area smoke detectors.

• Design drawings will provide locations of fire alarm devices and specifications. Fire alarm vendor will be required to produce fire alarm shop drawings which will include riser diagrams, battery load calculations and confirmation of required location of initiation and notification devices.

Devices will be installed per NFPA 72.

Information Technology Systems

The project proposed will include the installation of Telecommunications system, WIFI installation, Access control, and CCTV systems for the new construction of a two story square foot Mather PRRC Building. VA Design Guides, Design Manuals, Master Specifications, and BICSI Standards will be used on this project.

Building will be provided with new Telecommunication system to include new MDF /IDF rooms as required. All telecommunication rooms will have telephone backboard, ladder racking, telecommunication racks and grounding bus bar for a complete system. Backbone infrastructure including switches and routers for Fiber connections will be by VA I.T. IMEG to provide in building systems only.

Telecommunication grounding system provided for all telecommunication rooms.

New cable tray or conduit system will be provided throughout each floor above ceiling spaces. Where ceilings spaces do not allow for cable tray IMEG will provide conduit system infrastructure.

Data/telephone outlets will be provided with VOIP telephone system and DATA connections per VA current standards.