Attachment 5 - Drawings 100 Percent - Mathers VAMC - Part 1 - Final.pdf

PDF 13 MB Posted

Attached to
Y1DZ--Facility for Mental Health Primary Care Modalities - Minor Construction - Mather VAMC
Solicitation number
36C77624B0005
Issued by

About this file

This document provides details for a federal contract opportunity with the Department of Veterans Affairs. The solicitation seeks proposals for a facility for mental health and primary care services at the Mathers Veterans Affairs Medical Center in Cincinnati, Ohio. Solicitation number 36C77624B0005 calls for minor construction work related to modifying existing spaces to accommodate new clinical modalities. Proposals are due by intentionally left blank deadline. The work will support the expansion of mental health and primary care services for veterans served by the Mathers VAMC.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

08.18.23

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542 designgroup

Architecture, Engineering, and Sustainable DesignAESUS

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

Construct Facility for Mental Health and Primary Care Alternative Modalities

Location:

100% Bid Set Submittal

August 18, 2023 o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

612-908

VANCHCS

10535 HOSPITAL WAY MATHER, CA 95655

AESUSAESUS

G.002

DRAWING INDEX

SHEET NUMBER SHEET NAME 0

/0

/2

S U

B M

IT

T

A L

/0

/2

S U

B M

IT

T

A L

/1

/2

S

U B

M

IT

T A

L

GENERAL

G.001 COVER SHEET X X X

G.002 DRAWING INDEX X X X

G.003 GENERAL NOTES X X

G.004 GENERAL NOTES X X

CIVIL

C100 EXISTING CONDITIONS X X

C101 DEMOLITION & EROSION CONTROL PLAN X X

C102 SITE PLAN X X X

C103 UTILITY PLAN X X X

C104 STORM PLAN & PROFILE X X

C105 GRADING PLAN X X

C106 DETAILS X X

LANDSCAPE

LA101 HARDSCAPE PLAN X X

LA201 CONSTRUCTION DETAILS X X

ARCHITECTURAL

ALS.01 LIFE SAFETY PLANS X X X

A1.0 SITE PLAN X X X

A1.1 SITE DETAILS X X

A2.00 EXTERIOR DIMENSION PLANS X X X

A2.01 EDGE OF SLAB X X X

A2.10 LEVEL 01 FLOOR PLAN X X X

A2.20 LEVEL 02 - SLEEP & HR X X X

A2.23 LEVEL 02 - FLOOR PLAN (DEDUCTIVE ALTERNATE 3) X X

A2.24 LEVEL 02 - FLOOR PLAN (DEDUCTIVE ALTERNATE 4) X X

A2.25 LEVEL 02 - FLOOR PLAN (DEDUCTIVE ALTERNATE 3) X X

A2.30 ROOF PLAN X X X

A2.40 LEVEL 01 REFELCTIVE CEILING PLAN X X X

A2.41 LEVEL 02 REFLECTIVE CEILING PLAN X X X

A2.50 LEVEL 01 ENLARGED PLANS X X X

A2.51 LEVEL 01 ENLARGED PLANS X X X

A2.52 LEVEL 01 ENLARGED PLANS X X X

A2.53 LEVEL 01 ENLARGED PLANS X X X

A2.54 LEVEL 02 ENLARGED PLANS X X X

A2.55 LEVEL 02 ENLARGED PLANS X X X

A2.56 LEVEL 02 ENLARGED PLANS X X X

A3.01 PARTITION TYPES & HEAD DETAILS X X X

A3.02 PARTITION FRAMING DETAILS X X X

A3.03 GYP BD DETAILS X X X

A3.23 STANDARD ACCESSORIES X X X

A3.24 LOCKERS, ACCESSORIES, WALL PROT, EQUIP X X X

A3.31 DOOR, SAFETY GLAZING AND LOUVER INFORMATION X X X

A3.33 DOOR SCHEDULE & DETAILS X X X

A3.50 CABINET DETAILS X X X

A3.60 CEILING DETAILS X X X

A4.1 ELEVATIONS X X X

A4.2 ALUMINUM FRAME TYPES X X

A5.1 BUILDING SECTIONS X X X

A6.1 WALL SECTIONS X X X

A7.01 EIFS DETAILS 01 X X X

A7.10 DETAILS X X X

A7.51 SINGLE PLY ROOFING DETAILS 01 X X X

A7.52 SINGLE PLY ROOFING DETAILS 02 X X

A8.10 STAIR PLANS & SECTIONS X X X

A8.20 STEEL STAIR DETAILS X X

A8.31 ELEVATOR GENERAL NOTES X X

A8.32 ELEVATOR PLANS AND DETAILS X X

AI.01 ROOM FINISH LEGEND AND SCHEDULE X X X

AI.02 FLOOR FINISH PLANS X X

AI.03 FINISH PLANS X X X

AI.04 INTERIOR ELEVATIONS AND DETAILS X X

AI.05 COLOR BOARD X X

Q-2.1 LEVEL 01 EQUIPMENT & FURNITURE PLAN X X X

Q-2.2 LEVEL 02 EQUIPMENT & FURNITURE PLAN X X X

Q-3.0 EQUIPMENT LIST X X

STRUCTURAL

S000 COVER SHEET X X X

S001 GENERAL STRUCTURAL NOTES X X X

S002 GENERAL STRUCTURAL NOTES X X X

S003 SPECIAL INSPECTION MATRICES X X X

S004 TYPICAL DETAILS T1 - T15 X X X

S005 TYPICAL DETAILS T16 - T30 X X X

S006 TYPICAL DETAILS T31 - T45 X X X

S007 TYPICAL DETAILS T46 - T60 X X X

S008 TYPICAL DETAILS T61 - T75 X X X

S020 SCHEDULES AND ABBREVIATIONS X X X

S101 FOUNDATION PLAN X X X

S102 FLOOR FRAMING PLAN X X X

S102A FLOOR REINFORCING PLAN X X

S103 ROOF FRAMING PLAN X X X

S104 ELEVATIONS - MOMENT FRAMES X X X

S105 ELEVATIONS - MOMENT FRAMES X X X

S106 ELEVATIONS - MOMENT FRAMES X X X

S107 ELEVATIONS - MOMENT FRAMES X X X

S201 FOUNDATION DETAILS 101 - 115 X X X

S301 FRAMING DETAILS 201 - 215 X X X

S302 FRAMING DETAILS 216 - 230 X X X

S303 FRAMING DETAILS 231 - 245 X X

S304 FRAMING DETAILS 246 - 260 X X

MECHANICAL

M0.1 MECHANICAL GENERAL INFORMATION X X X

M2.1 MECHANICAL LEVEL 1 PLAN - HVAC X X X

M2.2 MECHANICAL LEVEL 2 PLAN - HVAC X X X

M2.23 MECHANICAL LEVEL 2 PLAN - HVAC (DEDUCTIVE ALTERNATE 3) X X

M2.24 MECHANICAL LEVEL 2 PLAN - HVAC (DEDUCTIVE ALTERNATE 3 & 4) X X

M2.25 MECHANICAL LEVEL 2 PLAN - HVAC (DEDUCTIVE ALTERNATE 3, 4 & 5) X X

M2.3 MECHANICAL ROOF PLAN - HVAC X X X

M5.1 MECHANICAL DETAILS X X X

M5.2 MECHANICAL DETAILS X X X

M5.3 MECHANICAL DETAILS X X

M6.1 MECHANICAL SCHEDULES X X X

M8.1 MECHANICAL CONTROLS X X X

PLUMBING

P0.1 PLUMBING GENERAL INFORMATION X X X

P2.1 PLUMBING LEVEL 1 PLAN X X X

P2.2 PLUMBING LEVEL 2 PLAN X X X

P2.23 PLUMBING LEVEL 2 PLAN (DEDUCTIVE ALTERNATE 3) X X

P2.24 PLUMBING LEVEL 2 PLAN (DEDUCTIVE ALTERNATE 3 & 4) X X

P2.25 PLUMBING LEVEL 2 PLAN (DEDUCTIVE ALTERNATE 3, 4 & 5) X X

P3.3 PLUMBING ROOF PLAN X X X

P5.1 PLUMBING DETAILS X X X

P5.2 PLUMBING DETAILS X X

P5.3 PLUMBING DETAILS X X

P6.1 PLUMBING SCHEDULES X X X

ELECTRICAL

E0.01 GENERAL INFORMATION - ELECTRICAL X X X

E1.01 SITE PLAN - ELECTRICAL X X X

E2.01 FLOOR PLANS - POWER X X X

E2.02 ROOF PLAN - ELECTRICAL X X X

E2.03 FLOOR PLANS - ELEC/MECH COORDINATION X X

E3.01 FLOOR PLANS - LIGHTING X X X

E4.01 FLOOR PLANS DEDUCT ALT - LIGHTING X X

E4.02 FLOOR PLANS DEDUCT ALT - LIGHTING X

E5.01 ELECTRICAL ONE-LINE X X X

E6.01 ELECTRICAL DETAILS X X X

E7.01 ELECTRICAL SCHEDULES X X X

TELECOMM

T001 TELECOMMUNICATIONS COVER SHEET X X X

T100 TELECOMMUNICATIONS SITE PLAN X X X

T111 1ST FLOOR TELECOMMUNICATIONS FLOOR PLAN X X X

T112 1ST FLOOR TELECOMMUNICATIONS REFLECTED CEILING PLAN X X X

T121 2ND FLOOR TELECOMMUNICATIONS FLOOR PLAN X X X

T121D 2ND FLOOR TELECOMMUNICATIONS FLOOR PLAN (DEDUCTIVE ALT) X X

T122 2ND FLOOR TELECOMMUNICATIONS REFLECTED CEILING PLAN X X X

T401 2ND FLOOR MDF FLOOR PLAN & ELEVATIONS X X X

T801 TELECOMMUNICATIONS TYPICAL DETAILS X X

T802 TELECOMMUNICATIONS TYPICAL DETAILS X X

T803 TELECOMMUNICATIONS TYPICAL DETAILS X X

T804 ACCESS CONTROL TYPICAL DETAILS X X X

T805 ACCESS CONTROL TYPICAL DETAILS X X

FIRE ALARM

FA-001 FIRE ALARM LEGENDS, ABBREVIATIONS AND RISER X X X

FA-201 FIRE ALARM FLOOR PLANS X X X

FA-202 FIRE ALARM FLOOR PLANS DEDUCTIVE ALTERNATES 3 & 4 X X

FA-203 FIRE ALARM FLOOR PLANS DEDUCTIVE ALTERNATES 3, 4, & 5 X X

FA-502 FIRE ALARM DETAILS X X X

FIRE PROTECTION

FP2.1 FIRE PROTECTION PLAN - SPRINKLERS X X

FP2.23 FIRE PROTECTION PLAN - SPRINKLERS (DEDUCTIVE ALTERNATE 3) X X

FP2.24 FIRE PROTECTION PLAN - SPRINKLERS (DEDUCTIVE ALTERNATE 3 & 4) X X

FP2.25 FIRE PROTECTION PLAN - SPRINKLERS (DEDUCTIVE ALTERNATE 3, 4, & 5) X X

INDEX OF DRAWINGS

Architecture, Engineering, and Sustainable DesignAESUS

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

Construct Facility for Mental Health and Primary Care Alternative Modalities

Location:

100% Bid Set Submittal

August 18, 2023 o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

612-908

VANCHCS

10535 HOSPITAL WAY MATHER, CA 95655

AESUSAESUS

G.003

GENERAL NOTES

Architecture, Engineering, and Sustainable DesignAESUS

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

Construct Facility for Mental Health and Primary Care Alternative Modalities

Location:

100% Bid Set Submittal

August 18, 2023 o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

612-908

VANCHCS

10535 HOSPITAL WAY MATHER, CA 95655

AESUSAESUS

G.004

GENERAL NOTES

FE

M

O Y

E R

S T

R E

E T

APPROVED/FUTURE

SOCIAL

SERVICES

BUILDING

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup

Architecture, Engineering, and Sustainable Design

AESUS

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

CONSTRUCT FACILITY FOR

MENTAL HEALTH AND

PRIMARY CARE

Location:

95% Re-Submittal - Not for Construction o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Dwg. of

612-908

10535 HOSPITAL WAY

MATHER, CA 95655

CALIBREAESUS

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc. 35754

JA

MES A LA N GUSKYCO

LO

RADO REGI STERED

PROFESS IONA L ENGIN

EE

R

SHEET NOTES:

1-800-642-2444

NORTH

C100

EXISTING CONDITIONS

MAY 30, 2023

LEGEND:

# KEY NOTES:

100% Bid Set Submittal

O Y

E R

S T

R E

E T

APPROVED/FUTURE

SOCIAL

SERVICES

BUILDING

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup

Architecture, Engineering, and Sustainable Design

AESUS

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

CONSTRUCT FACILITY FOR

MENTAL HEALTH AND

PRIMARY CARE

Location:

95% Re-Submittal - Not for Construction o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Dwg. of

612-908

10535 HOSPITAL WAY

MATHER, CA 95655

CALIBREAESUS

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc. 35754

JA

MES A LA N GUSKYCO

LO

RADO REGI STERED

PROFESS IONA L ENGIN

EE

R

1-800-642-2444

NORTH

C101

DEMOLITION & EROSION

CONTROL PLAN

MAY 30, 2023

LEGEND:

# KEY NOTES:

SHEET NOTES:

O Y

E R

S T

R E

E T

PRRC

BUILDING

APPROVED/FUTURE

SOCIAL

SERVICES

BUILDING

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup

Architecture, Engineering, and Sustainable Design

AESUS

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

CONSTRUCT FACILITY FOR

MENTAL HEALTH AND

PRIMARY CARE

Location:

95% Re-Submittal - Not for Construction o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Dwg. of

612-908

10535 HOSPITAL WAY

MATHER, CA 95655

CALIBREAESUS

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc. 35754

JA

MES A LA N GUSKYCO

LO

RADO REGI STERED

PROFESS IONA L ENGIN

EE

R

MAY 30, 2023

1-800-642-2444

NORTH

C102

SITE PLAN

LEGEND:

# KEY NOTES:

O Y

E R

S T

R E

E T

PRRC

BUILDING

APPROVED/FUTURE

SOCIAL

SERVICES

BUILDING

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup

Architecture, Engineering, and Sustainable Design

AESUS

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

CONSTRUCT FACILITY FOR

MENTAL HEALTH AND

PRIMARY CARE

Location:

95% Re-Submittal - Not for Construction o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Dwg. of

612-908

10535 HOSPITAL WAY

MATHER, CA 95655

CALIBREAESUS

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc. 35754

JA

MES A LA N GUSKYCO

LO

RADO REGI STERED

PROFESS IONA L ENGIN

EE

R

1-800-642-2444

NORTH

C103

UTILITY PLAN

MAY 30, 2023

LEGEND:

KEY NOTES:

SHEET NOTES:

P R

R C

B U

ILD

IN

G

A P

P R

O V

E D

/FU

T

U R

E S

O C

IA

L

S E

R V

IC

E

S B

U

ILD

IN

G

FEMOYER STREET

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup

Architecture, Engineering, and Sustainable Design

AESUS

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

CONSTRUCT FACILITY FOR

MENTAL HEALTH AND

PRIMARY CARE

Location:

95% Re-Submittal - Not for Construction o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Dwg. of

612-908

10535 HOSPITAL WAY

MATHER, CA 95655

CALIBREAESUS

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc. 35754

JA

MES A LA N GUSKYCO

LO

RADO REGI STERED

PROFESS IONA L ENGIN

EE

R

1-800-642-2444

NORTH

C104

STORM PLAN & PROFILE

MAY 30, 2023

LEGEND:

O Y

E R

S T

R E

E T

PRRC

BUILDING

APPROVED/FUTURE

SOCIAL

SERVICES

BUILDING

FF=99.16

98.66

98.55

98.73

98.56

98.08

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup

Architecture, Engineering, and Sustainable Design

AESUS

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

CONSTRUCT FACILITY FOR

MENTAL HEALTH AND

PRIMARY CARE

Location:

95% Re-Submittal - Not for Construction o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Dwg. of

612-908

10535 HOSPITAL WAY

MATHER, CA 95655

CALIBREAESUS

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc. 35754

JA

MES A LA N GUSKYCO

LO

RADO REGI STERED

PROFESS IONA L ENGIN

EE

R

1-800-642-2444

NORTH

C105

GRADING PLAN

MAY 30, 2023

LEGEND:

KEY NOTES:

SHEET NOTES:

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup

Architecture, Engineering, and Sustainable Design

AESUS

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

CONSTRUCT FACILITY FOR

MENTAL HEALTH AND

PRIMARY CARE

Location:

95% Re-Submittal - Not for Construction o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Dwg. of

612-908

10535 HOSPITAL WAY

MATHER, CA 95655

CALIBREAESUS

Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying

Calibre Engineering, Inc.

C106

DETAILS

MAY 30, 2023

DETAIL 13:

AREA DRAIN INSTALLATION

N.T.S

100% Bid Set Submittal

35754

JA

MES A LA N GUSKYCO

LO

RADO REGI STERED

PROFESS IONA L ENGIN

EE

R

PRRC

11,480 SF

FOOTPRINT

EXISTING

SOCIAL

SERVICES

FACILITY

FUTURE PARKING

AREA NOT IN SCOPE

SCOPE OF WORK

SCOPE OF WORK

S C

O P

E

O

F

W

O R

K

S C

O P

E

O

F

W

O R

K

FUTURE (3) VEHICLE CHARGING

STATIONS. REFER TO

ELECTRICAL DRAWINGS FOR

ADDITIONAL INFORMATION

EXISTING PARKING LOT

NOT IN CONTRACT

EXISTING PARKING LOT

NOT IN CONTRACT

PARKING LOT NOT

IN CONTRACT

UNDERGROUND

CONDUIT FOR

VEHICLE CHARGING

NEW SIDEWALK

NEW

SIDEWALK

END OF

PARKING LOT

25' - 0"

NO PARKING ZONE FOR 25'

SETBACK. BOLLARDS AT

5FT O.C. TO PREVENT

TRAFFIC

25' - 0"

25' - 0"

19' - 10"

EXISTING

SIDEWALK

SYMBOL PRODUCT QTY.

BOULDERS

PSRDM RATED, 3' X 3' MINIMUM.

LASSEN FIELD BOULDERS. MUYMOSS.

FINAL SELECTION TO BE APPROVED BY

CLIENT OR LANDSCPAE ARCHITECT.

SEE DETAIL LA201-1

UNITS

RIP RAP

3 - 6", SONOMA RIP RAP. 3" MINIMUM

DEPTH. PLANT BARRIER BASE

3000 SF

SCREENED ROCK

1 1/2", CALIFORNIA GOLD. 2" MINIMUM

DEPTH. PLANT BARRIER BASE

7300 SF

CONCRETE

ACID FINISH. POURED IN PLACE.

RADII TOOLED JOINTS. 4500 PSI

1300 SF

5 GABION BASKET WALLS

MATCH RIP RAP. SEE DETAIL LA201-3

200 LF

6 CONCRETE

POURED IN PLACE

STEEL EDGE

", RAW FINISH. SEE DETAIL LA201-2

250 LF

RETENTION ZONES

PER REQUIREMENTS. SCREENED ROCK

FILL.

9 EXISTING SIDEWALK

BOLLARDS

REMOVEABLE, MATCH TO

ARCHITECTURE

UNITS

HARDSCAPE SCHEDULE

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542

Architecture, Engineering, and Sustainable Design

KEY PLAN NTS

Drawing

Title:

Project

Title:

Date

Location

Checked

Building

Number:

Project

Number:

Drawing

Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Construction and Facilities

Management

Construct Facility for Mental Health and

Primary Care Alternative Modalities

Location:

100% SUBMITTAL

August 16, 2023 o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t

VA FORM

08-6231

Dwg.

of

612-908

VANCHCS

10535 HOSPITAL WAY MATHER, CA 95655

AESUS

PROJECT

AREA

MAIN

HOSPITAL

LAYOUT PLAN

INERT GENERAL NOTES:

ANGULAR GRANITE RIP-RAP

1. INSTALL GRANITE RIP-RAP IN ALL DRAINAGE SWALES, AND

WHERE INDICATED ON PLANS (TYPICAL). REFER TO MATERIALS

SCHEDULE / PLANTING LEGEND FOR COLOR AND SIZE OF

GRANITE RIP-RAP.

2. THE CONTRACTOR SHALL SUBMIT SAMPLES TO LANDSCAPE

ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO

INSTALLATION.

3. THE CONTRACTOR SHALL REFER TO CIVIL PLANS FOR

ADDITIONAL INFORMATION.

HARDSCAPE GENERAL NOTES:

1. FOOTINGS, WALLS AND FENCES SHALL BE PLACED OUTSIDE OF

THE PUBLIC RIGHT-OF-WAY.

2. REFER TO CIVIL PLANS PREPARED BY CIVIL ENGINEERS FOR

ALL INFORMATION REGARDING HORIZONTAL AND VERTICAL

CONTROLS.

3. ALL DETAILS SHALL BE REVIEWED BY A STRUCTURAL ENGINEER

AND MODIFIED (IF NECESSARY) PRIOR TO CONSTRUCTION.

4. ALL DIMENSIONS SHOWN ON THIS PLAN ARE BASED ON THE

CIVIL PLAN SUBMITTED BY THE ARCHITECT. SHOULD

DISCREPANCIES OCCUR, FIELD REVISIONS SHALL BE REQUIRED.

5. THE CONTRACTOR SHALL HAVE SIDEWALK SURVEYED AND

STAKED FOR REVIEW BY THE LANDSCAPE ARCHITECT PRIOR TO

INSTALLATION.

6. IN ADDITION TO SUBMITTING MATERIAL SAMPLES OF ALL SITE

RELATED MATERIALS, THE CONTRACTOR SHALL PREPARE A

4'X4' SAMPLE PANEL FOR EACH TYPE OF CONSTRUCTION, I.E., A)

CONCRETE PAVERS, B) EXPOSED AGGREGATE PAVING, C)

INTEGRAL COLORED CONCRETE, ETC., FOR APPROVAL BY THE

LANDSCAPE ARCHITECT AND OWNER'S AUTHORIZED

REPRESENTATIVE PRIOR TO FINAL CONSTRUCTION.

LANDSCAPE HARDSCAPE

PLAN

LA 101

06.30.24

SCALE 1"=20'

1050 E SOUTHERN AVE, SUITE #8

TEMPE, AZ 85282

CONSTRUCTION DETAILS

Architecture, Engineering, and Sustainable Design

KEY PLAN NTS

Drawing

Title:

Project

Title:

Date

Location

Checked

Building

Number:

Project

Number:

Drawing

Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS:

Office of

Construction and Facilities

Management

Construct Facility for Mental Health and

Primary Care Alternative Modalities

Location:

100% SUBMITTAL

August 16, 2023 o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t

VA FORM

08-6231

Dwg.

of

612-908

VANCHCS

10535 HOSPITAL WAY MATHER, CA 95655

AESUS

PROJECT

AREA

MAIN

HOSPITAL

LANDSCAPE CONSTRUCTION

DETAILS

SCALE: 1

4" = 1'-0"

STEEL LANDSCAPE EDGING. 3

16"

X 4"

12" REBAR STAKE WELDED 16"

0.C.

FINISHED GRADE MATERIAL 1

FINISHED GRADE MATERIAL 2

FINISHED GRADE MATERIAL 3

EXISTING GROUND

NOTE : DIMENSIONS

EXAGGERATED FOR VISIBILITY

STEEL EDGE

2" LIP ABOVE GROUND COVER. TOP OF STEEL TO BE FLUSH WITH TOP OF MEETING HARDSCAPE

4"

PSRDM RATED BOULDER SET 13

INTO EXISTING GROUND

BOULDERS STAGGERED IN

LOCATION AS WELL AS ANGLE

TO APPEAR MORE NATURAL

ROCK GROUND COVER

EXISTING GROUND

BOULDER POSITIONING

SCALE: NTS

1 3

TO

TA

L

H

EI

G H

T

2" X 4" WELD WIRE MESH.

2-3/4 GUAGE WIRE

UTILIZE GABION CLIPS. NO

SPIRALS

GABION C RINGS FOR

JOINING BASKETS

3' X 3' X 5' UNITS

1' X 3' BAFFLE AT CENTER POINT

TO MINIMIZE FLEX

3" RIP RAP FILL

COMPACTED SUB-GRADE

3' GABION WALL

SCALE: 1

2" = 1'-0"

3'-0" 5'-0"

2'-9"

3"

LA 201

1 2

06.30.24

1050 E SOUTHERN AVE, SUITE #8

TEMPE, AZ 85282

FEC

FEC

FEC

134 SF

RECEPTION

104 SF

SECURITY

OFFICE

54 SF

NON-GENDER

RESTROOM

123 SF

VESTIBULE

801 SF

WAITING

ROOM

120 SF

QUIET ROOM

118 SF

OFFICE

120 SF

OFFICE

118 SF

OFFICE

119 SF

OFFICE

119 SF

OFFICE

149 SF

OFFICE

62 SF

ELEVATOR

50 SF

HAC

58 SF

ELEVATOR

EQUIPMENT

ROOM

275 SF

STORAGE

61 SF

NON GENDER

RESTROOM

257 SF

CONFERENCE

ROOM

348 SF

STAFF WORK

AREA

339 SF

SMALL GROUP

338 SF

SMALL GROUP

337 SF

SMALL GROUP

344 SF

SMALL GROUP

193 SF

FOOD

STORAGE

149 SF

RESOURCE

LIBRARY

155 SF

MEN'S TOILETS

162 SF

WOMEN'S

TOILETS

119 SF

OFFICE

119 SF

OFFICE

118 SF

EXAM

536 SF

OCCUPATIONAL

THERAPY

119 SF

OT OFFICE

175 SF

KITCHEN

1596 SF

MULTI-PURPOSE

ROOM

120 SF

OFFICE

225 SF

COMPUTER

LAB

162 SF

MECH

240 SF

STAFF

CORRIDOR

29 SF

HAC

D

IS

T A

N C

E T

O E

X

IT

D

IS

T A

N C

E T

O E

X

IT

56' - 6"

DISTANCE TO EXIT

D

IS

T A

N C

E T

O E

X

IT

STAIR 01

STAIR 02

EXIT 01

EXIT 02

EXIT 03

EXIT 04

1857 SF

CORRIDOR

116 SF

ELEC

61 SF

NON GENGER

RESTROOM

178 SF

VESTIBULE

EXIT 05

EXIT 06

EXIT

STAIR

EXIT

STAIR

ELEVATOR

HAC

ELEC

OFFICE

VESTIBULE

IDF

OFFICE

OFFICE

SHARED

OFFICE

OFFICE

CLEAN UTILITY

& SUPPLY

SHAFT

SOILED

UTILITY

OFFICE

EXAM

CONTROL

STATION

OFFICE

OFFICE OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

PIV LAB

PIV LAB

EXAM

OFFICE

CONFERENCE

ROOM

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

BARIATRIC

SLEEP

BARIATRIC

SLEEP

BARIATRIC

TOILET

BARIATRIC

TOILET

SLEEP,

TYPICAL

SLEEP

TOILET

TOILET

SHARED

OFFICE

CPAP

STORAGE

CLEAN LINEN

CHECK-IN /

WAITING AREA

FEMALE

MALE

OFFICE

D

IS

T

A N

C E

T O

E X

IT

D

IS

T

A N

C E

T O

E X

IT

D

IS

T

A N

C E

T O

E X

IT

FEC

FEC

FEC

FEC

FEC

FEC

FEC

1935 SF

OUTPATIENT SUITE

2164 SF

CORRIDOR

414 SF

STORAGE

270 SF

IDF

221 SF

EXAM

334 SF

CONFERENCE ROOM

871 SF

OFFICES

991 SF

OFFICES

460 SF

OFFICES

1045 SF

WAITING ROOM

210 SF

OFFICES

300 SF

TOILETS

162 SF

ELECTRICAL ROOM

113 SF

LACTATION ROOM

53 SF

STORAGE

126 SF

OFFICES

72 SF

SHAFT

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542 designgroup

Architecture, Engineering, and Sustainable DesignAESUS

KEY PLAN NTS

NORTH

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

Construct Facility for Mental Health and Primary Care Alternative Modalities

Location:

100% Bid Set Submittal

August 18, 2023 o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

612-908

VANCHCS

10535 HOSPITAL WAY MATHER, CA 95655

AESUS

PROJECT

AREA

MAIN

HOSPITAL

AESUS

ALS.01

LIFE SAFETY PLANS

LIFE SAFETY LEGEND

ROOM NAME

NAME AND AREA

1 HR FIRE BARRIER

1 HR FIRE/SMOKE BARRIER

2 HR FIRE BARRIER

2 HR FIRE/SMOKE BARRIER

SMOKE PARTITION (NON RATED)

NON RATED WALL

FIRE EXTINGUISHER CABINET

EXIT SYMBOL

FEC

FIRE EXTINGUISHER

FE

EXIT SIGN - HATCH

INDICATES EXIT

TEXT & ARROW

INDICATES

DIRECTION

XXX' - X"

TRAVEL DISTANCE FROM

THE MOST REMOTE POINT

TO THE CLOSEST

XXX' - X"TRAVEL DISTANCE WITHIN

A SMOKE ZONE TO AN

ADJACENT SMOKE ZONE

150 SF

FIRE DEPARTMENT CONNECTION

FDC

EXIT ENCLOSURE

SUITE

BUS. OCCUPANCY

ASSEMBLY

STORAGE

OUTPATIENT

EXIT SUMMARY

EXIT

TYPE EXIT

EXIT

FACTOR

WIDTH

PROVIDED

IN INCHES

CAPACITY IN

PERSONS

EXIT 01 0.2 80" 399

EXIT

STAIR

01 0.3 44" 147

EXIT 02 0.2 80" 399

EXIT

STAIR

02 0.3 48" 160

EXIT 03 0.2 36" 180

EXIT 04 0.2 80" 399

EXIT 05 0.2 36" 180

EXIT 06 0.2 36" 180

Grand total 2044

1/8" = 1'-0"01 LEVEL 01 LIFE SAFETY

1/8" = 1'-0"02 LEVEL 02 LIFE SAFETY

FIRST LEVEL OCCUPANT LOAD SUMMARY

Name AREA SF

OCCUPANT

LOAD

FACTOR PER

PERSON

OCCUPANT

LOAD

CORRIDOR 1857 SF 0

ELECTRICAL ROOM 125 SF 0

ELEVATOR EQUIPMENT ROOM 63 SF 0

FOOD STORAGE ROOM 199 SF 300 SF 1

MECHANICAL ROOM 176 SF 0

MULTI-PURPOSE ROOM 1785 SF 15 SF 119

OFFICES 2746 SF 100 SF 27

SMALL GROUP ROOMS 2034 SF 100 SF 20

STORAGE ROOM 287 SF 300 SF 1

WAITING ROOM 882 SF 15 SF 59

10154 SF 227

SECOND LEVEL OCCUPANT LOAD SUMMARY

Name AREA SF

OCCUPANT

LOAD

FACTOR PER

PERSON

OCCUPANT

LOAD

CONFERENCE ROOM 334 SF 100 SF 3

CORRIDOR 2164 SF 0

ELECTRICAL ROOM 162 SF 0

EXAM 221 SF 100 SF 2

IDF 270 SF 0

LACTATION ROOM 113 SF 100 SF 1

OFFICES 2659 SF 100 SF 27

OUTPATIENT SUITE 1935 SF 100 SF 19

SHAFT 72 SF 0

STORAGE 468 SF 300 SF 2

TOILETS 300 SF 0

WAITING ROOM 1045 SF 15 SF 70

9744 SF 124

MAIN

ENTRY

2ND FLOOR

ENTRY

PRRC

11,480 SF

FOOTPRINT

EXISTING

SOCIAL

SERVICES

FACILITY

FUTURE PARKING

AREA NOT IN SCOPE

SCOPE OF WORK

SCOPE OF WORK

S C

O P

E O

F W

O R

K

S C

O P

E O

F W

O R

K

FUTURE (3) VEHICLE CHARGING

STATIONS. REFER TO

ELECTRICAL DRAWINGS FOR

ADDITIONAL INFORMATION

EXISTING PARKING LOT

NOT IN CONTRACT

EXISTING PARKING LOT

NOT IN CONTRACT

PARKING LOT NOT

IN CONTRACT

UNDERGROUND

CONDUIT FOR

VEHICLE CHARGING

NEW SIDEWALK

NEW

SIDEWALK

END OF

PARKING LOT

25' - 0"

NO PARKING ZONE FOR 25'

SETBACK. BOLLARDS AT

5FT O.C. TO PREVENT

TRAFFIC

25' - 0"

NEW

CONCRETE

PATIO

NEW CONCRETE

STAIR

/A1.1 05

EXISTING

SIDEWALK

25' - 0"

BOLLARDS

5FT O.C.

BACK OF

EXISTING

CURB

EXISTING

SIDEWALK

PSRDM LF

SETBACK

P S

R D

M L

F

S E

T B

A C

K

P S

R D

M L

F

S E

T B

A C

K

PSRDM LF

SETBACK

PSRDM LF

SETBACK

/A1.1 01

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542 designgroup

Architecture, Engineering, and Sustainable DesignAESUS

KEY PLAN NTS

NORTH

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

Construct Facility for Mental Health and Primary Care Alternative Modalities

Location:

100% Bid Set Submittal

August 18, 2023 o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

612-908

VANCHCS

10535 HOSPITAL WAY MATHER, CA 95655

AESUS

PROJECT

AREA

MAIN

HOSPITAL

AESUS

A1.0

SITE PLAN

1" = 30'-0"01 SITE PLAN

0' 15' 60'30'

CLEAR

1 1/2”

3"

1 1/4" ID STL

PIPE

HANDRAIL

3/8" STL

BRACKET

BALUSTERS

BEYOND

1 1/4" ID STL

PIPE

GUARDRAIL

A B

O V

E N

O S

IN

G

O R

F L

O O

R

A B

O V

E N

O S

IN

G

O R

F L

O O

R

/2

M

IN

NOTE: SPACE BETWEEN PIPE

RAILS AND BALLUSTRADES

AND BETWEEN PICKETS SHALL

BE 4" OC MAX. SEE GUARDRAIL

ELEVATION FOR ADDITIONAL

INFORMATION. NUMBER OF

TREADS PER CIVIL DRAWINGS.

1' - 0"

LOCATE BRACKETS AT

SPACING REQ'D TO

SUPPORT STRUCTURAL

LOADS NOT TO EXCEED

5' - 0" OC.

LINES OF TREADS AND

RISERS

ALL RAIL

INTERSECTIONS

TO BE

RADIUSED (TYP)

1 1/4" ID STL PIPE

GUARDRAIL. TOP AND

BOTTOM RAILS AND

POSTS

HANDRAIL

EXTENSION

GUARDRAIL WITH

HANDRAIL AT OPEN

SIDE OF STAIR

DEPTH MIN.

TREAD

5' - 0" O.C. MAX 5' - 0" O.C. MAX

6" RISE, 11" TREAD

A1.1

3/4" STEEL

POSTS

4" MAX

/A1.1 03

DEPTH

TREAD

R 1/4"

STAIR NOSING (TYP

AT EACH RISER

UNO)

CONC

1"

3”

/4

1"

GRADE

PAINT TO MATCH EXISTING

FACILITY STANDARD

FILL WITH GROUT

AND CROWN TOP 1"

6" DIA. STEEL POST,

SCHEDULE 40,

GALVANIZED FILLED WITH

CONCRETE

4" 4"

1' - 0"

REFER TO CIVIL

FOR SPOT

ELEVATIONS

EXISTING

SIDEWALK

TO BUILDING

NEW

SIDEWALK

MONOLITHIC

CONCRETE STAIR

WITH RAILING

6' - 0"

A1.1/01

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542 designgroup

Architecture, Engineering, and Sustainable DesignAESUS

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

Construct Facility for Mental Health and Primary Care Alternative Modalities

Location:

100% Bid Set Submittal

August 18, 2023 o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

612-908

VANCHCS

10535 HOSPITAL WAY MATHER, CA 95655

AESUSAESUS

A1.1

SITE DETAILS

1 1/2" = 1'-0"04 HANDRAIL AND GUARDRAIL SECTION

3/8" = 1'-0"02 STAIR RAILING ELEVATION

1" = 1'-0"03 TREAD DETAIL

1/2" = 1'-0"05 BOLLARD

3/8" = 1'-0"01 SITE STAIR - ENLARGED PLAN

UP

1 2 3

J

H

G

F

E

A

B

C

A.4

61.5

D

2.5

A5.1

A5.1

A5.1

A5.1

18' - 6" 29' - 6" 25' - 0"

2' - 9 1/4"

84' - 3"

1' - 0"

16' - 5"

16' - 0" 25' - 0" 32' - 0" 9' - 6"

1' - 9"

/8

/4 "2

/8

8' - 5" 9' - 1 1/4" 11' - 5 1/2" 6' - 0 1/4"

8"

A6.1

A6.1

A6.1

/8

1' - 4 1/4" 1' - 7" 38' - 3"

1' - 2" 1' - 5 5/8" 12' - 10 3/8" 16' - 3" 3' - 2"

" 7

/4

/2

D E

E P

E

IF

S

D

E E

P E

IF

S

/A7.01 12 /A7.01 12

/A7.01 10

/A7.01 10

/A7.01 10

/A7.01 10

/A7.01 10

/A7.01 10

/A7.01 10

/A7.01 10

/A7.01 10

RECESSED

WALK-OFF

MAT

1' - 6"

5 3/4"

/A7.01 12

4" DEEP EIFS

1' - 4 1/4" 75' - 9 1/4"

/A7.01 02

/A7.01 04

/A7.01 10

/A8.10 02

/A8.10 05

STAIR 2

GENERAL NOTES

1. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE.

LARGER SCALE DRAWING SHALL HAVE PRECEDENCE OVER

SMALLER SCALE DRAWINGS. THE GC SHALL NOTIFY THE VA OF ANY

DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THAT PORTION

OF THE WORK.

2. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND MATERIAL

TRAFFIC AND STORAGE WITH COR.

3. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL, PLUMBING,

ELECTRICAL, AND FIRE PROTECTION.

4. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION PHASING

SHALL BE APPROVED BY COR.

7.

8.

PRIOR TO THE START OF ANY WORK. THE CONTRATOR IS REQUIRED TO

VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH THE

EXTENT AND NATURE OF WORK TO BE PERFORMED. EXISTING CONDITIONS

MAY SLIGHTLY VARY FROM THOSE SHOWN ON THE DRAWINGS. THE

CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, DIMENSIONS AND

MATERIALS IN THE FIELD AND GENERATE A LIST OF DISCREPANCIES IN WRITING

AND REPORT TO THE COR. REFER TO SPECIFICATIONS FOR FURTHER

INFORMATION.

CONTRACTOR TO COORDINATE FIREPROOFING PRIOR TO SHEATHING AND

DRYWALL.

PRIOR TO SAW CUTTING AND/OR CORE DRILLING CONCRETE, THE

CONTRACTOR SHALL X-RAY USING "A MODERN DETECTION SYSTEMS" TO

LOCATE REINFORCING AND OBSTRUCTIONS IN THE CONCRETE.

ALL EIFS TO BE 2" THICK UNLESS NOTED OTHERWISE.5.

6.

A4.1/01

A

.1 /0

A4.1/02

A

.1 /0

1 2 3

J

H

G

F

E

A

BB

CC

A.4

61.5

D

2.5

A5.1

A5.1

A5.1

A5.1

18' - 6" 29' - 6" 25' - 0"

/8

1' - 4 1/4" 46' - 4 3/4"

/4

/2

/4

/8

/2

/8

6' - 8 1/4" 22' - 8 1/4"

1' - 6 1/2"

2' - 6" 7' - 6" 2' - 6" 7' - 6" 2' - 6"

A6.1

A6.1

/A8.10 01

A6.1

1' - 6" 32' - 7" 7' - 5" 1' - 11"

A7.10

/A7.01 10

/A7.01 10

/A7.01 10

/A7.01 10

/A7.01 10

/A7.01 10

/A7.01 10

/A7.01 10

/A7.01 10

/4

/4

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/4

1' - 4 1/4" 16' - 0" 25' - 0" 32' - 0" 11' - 5"

1' - 4 1/4" 41' - 0"

ROOF BELOW

2' - 9 1/4" 9' - 4"

/A8.10 04

1' - 8"

STAIR 2

0' 4' 16'8'

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542 designgroup

Architecture, Engineering, and Sustainable DesignAESUS

KEY PLAN NTS

NORTH

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

Construct Facility for Mental Health and Primary Care Alternative Modalities

Location:

100% Bid Set Submittal

August 18, 2023 o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Dwg. of

612-908

VANCHCS

10535 HOSPITAL WAY MATHER, CA 95655

AESUS

PROJECT

AREA

MAIN

HOSPITAL

A2.00

EXTERIOR DIMENSION PLANS

1/8" = 1'-0"02 LEVEL 1 - EXTERIOR DIMENSION PLAN

0' 4' 16'8'

1/8" = 1'-0"01 Level 2 - EXTERIOR DIMENSION PLAN

SF-11

1 2 3

J

H

G

F

E

A

B

C

A.4

61.5

D

2.5

A5.1

A5.1

A5.1

A5.1

18' - 6" 29' - 6" 25' - 0"

43' - 2" 32' - 8" 9' - 6"

/8

/8

/4

/4

/8

85' - 4"

48' - 7 3/8" 6' - 1 7/8" 21' - 5 3/4"

7 1/4"

/4

7 3/4"

1' - 8"

9' - 6"

0"

75' - 10" this edge needs to shift left with the exterior wall this edge needs to shift left with the exterior wall

16' - 0" 25' - 0" 32' - 0" 9' - 6"

1' - 1"

1' - 1"1

1' - 9"

1' - 9"

1' - 9"

2' - 9"

1' - 1"

1' - 9"

9' - 2 1/2" 6 1/4"

.7

E Q

E Q

/2

/8

16' - 6 1/2" 5' - 1 3/4"

1 2 3

J

H

G

F

E

A

BB

CC

A.4

61.5

D

2.5

A5.1

A5.1

A5.1

A5.1

A6.1

18' - 6" 29' - 6" 25' - 0"

SHAFT

ELEVATOR

SHAFT

47' - 9" 29' - 1 7/8"

/8

/8

/8

/8

43' - 2 5/8" 32' - 8"

5 5/8"

5 5/8"

/4

7' - 1" 9' - 4 3/4"

1' - 3"

7 1/8"

/8

4' - 2" 8' - 0"

/8

/2

75' - 10 5/8"

16' - 0" 25' - 0" 32' - 0" 9' - 6"

18' - 11 3/4" 2' - 5 1/4"

/8

/8

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542 designgroup

Architecture, Engineering, and Sustainable DesignAESUS

KEY PLAN NTS

NORTH

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

Construct Facility for Mental Health and Primary Care Alternative Modalities

Location:

100% Bid Set Submittal

August 18, 2023 o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

Dwg. of

612-908

VANCHCS

10535 HOSPITAL WAY MATHER, CA 95655

AESUS

PROJECT

AREA

MAIN

HOSPITAL

A2.01

EDGE OF SLAB PLANS

1/8" = 1'-0"01 LEVEL 1 - EDGE OF SLAB PLAN

1/8" = 1'-0"02 Level 2 - EDGE OF SLAB PLAN

RECEPTION

1A-102

SECURITY

OFFICE

1A-105

NON-GENDER

RESTROOM

1A-104

VESTIBULE

1A-100

WAITING

ROOM

1A-101

QUIET ROOM

1A-106

OFFICE

1A-108

OFFICE

1A-110

OFFICE

1A-112

OFFICE

1A-114

OFFICE

1A-116

OFFICE

1A-118

ELEVATOR

1A-121

HAC

1A-119

ELEVATOR

EQUIPMENT

ROOM

1A-123

STORAGE

1A-128

NON GENDER

RESTROOM

1A-126

CONFERENCE

ROOM

1A-129

STAFF WORK

AREA

1A-131

SMALL GROUP

1A-135

SMALL GROUP

1A-133

SMALL GROUP

1A-137

SMALL GROUP

1A-139

FOOD

STORAGE

1A-141

RESOURCE

LIBRARY

1A-142

MEN'S TOILETS

1A-136

WOMEN'S

TOILETS

1A-134

OFFICE

1A-113

OFFICE

1A-111

EXAM

1A-107

OCCUPATIONAL

THERAPY

1A-132

OT OFFICE

1A-115

KITCHEN

1A-143

MULTI-PURPOSE

ROOM

1A-144

1 2 3

J

H

G

F

E

A

B

C

A.4

OFFICE

1A-109

COMPUTER

LAB

1A-138

MECH

1A-127

STAFF

CORRIDOR

1A-130

STAIR 1

1A-145

18' - 6" 29' - 6" 25' - 0"

HAC

1A-103

1.5

D

2.5 3.5

16' - 0" 25' - 0" 21' - 6" 10' - 6" 9' - 6"

VESTIBULE

1A-120

A2.53 06

A2.5006

03A2.51 04

A2.52

A2.53

A2.53

EWC3

/8

/8

/8

/8

/8

/8

/8

/4

/8

/8

/4

/8

/8

/8

/8

/8

/2

/8

/4

/4

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/4

9' - 5 1/8" 15' - 7 5/8" 11' - 4 7/8" 10' - 8 3/8"

11' - 1 7/8" 4' - 7 1/4" 4' - 7 3/4" 3' - 4 3/4" 4' - 7 5/8"

1' - 3 3/8"

6' - 9" 11' - 8 3/8"

9 7/8"

8' - 6 3/8" 19' - 11 7/8" 10 7/8"5' - 6 7/8"

CORRIDOR

6' - 4 7/8" 16' - 11 3/8" 12' - 4 7/8" 6' - 5 3/4"

8' - 1 1/4" 4' - 5 1/8" 7' - 4 1/8" 12' - 4 7/8"

C

115A

115B132B

144B

9 -

A

130B

B

A3

A

A

A3

A

A3

A3

A3

A3

A3

A

A

A3

A

A3

A3

A3

A3

A

A3

A3

A3

A3

A3

A3

A3

A

A

A

A3

A

A

A3

A

EE

A

A

A3

A3

A3

EE

A3

A3

A3

A

A

H1

H

H

H1

H

H1

H

H

H1

H

H1

A3

A

EE

H1

H1

H1

H

H1

A

H

H1

A

A

A3

H

H1

A3

A

H

A

A3A3H1

H

H1

H

H

H1

H1

H

H1

H1

H

H1

H1

H

H1

H

H

H1

H1

H

H1

A

A

6' - 4 7/8" 16' - 11 3/8" 12' - 4 7/8" 6' - 5 3/4"

6' - 11 3/8" 13' - 7 3/8" 12' - 6 3/8" 7' - 4 1/8"

A3

A6

CORRIDOR

H1

H1

H1

H1

H1

H1

H

FEC

A2.51

H

/8

/8

ELEC

1A-140

NON GENGER

RESTROOM

1A-124

5 1

120A

100A100B

A

/A2.53 04

/A2.53 11

/A2.53 09

/A2.53 01

/A2.52 14

A2.52 16

/A2.52 04

A2.52

A2.52

A2.52 0607

/A2.52 11

/A2.50 01

/A2.51 01

/A2.52 01

/A2.52 08

CR

CR

CR

T1 T1

T1

/A3.23 01

REFER TO

TYPICAL

PB

PB

REFER TO

TYPICAL

REFER TO

TYPICAL

REFER TO

TYPICAL

TYPICAL

TYPICAL

CR

CR

CR

CR

CR

CONCRETE

BOLLARD

CONCRETE

BOLLARD

CONCRETE

BOLLARD

4' - 0"

/A8.32 03

A8.20/02

A8.20 / 05

H

4' - 0"

CR

/A3.03 06

TYP.

5' - 0"

12' - 0"

16' - 6 1/2"

2' - 7 3/8"

9' - 9 1/2" 19' - 3 1/4"

/A3.03 05

CR

2 -

STAIR 2

1A-122

1' - 5"

FLOOR PLAN GENERAL NOTES

1. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE.

LARGER SCALE DRAWING SHALL HAVE PRECEDENCE OVER

SMALLER SCALE DRAWINGS. THE GC SHALL NOTIFY THE VA OF ANY

DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THAT PORTION

OF THE WORK. ALL DOORS TO BE 6" FROM NEAREST WALL U.N.O.

2. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND MATERIAL

TRAFFIC AND STORAGE WITH COR.

3. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL, PLUMBING,

ELECTRICAL, AND FIRE PROTECTION.

4. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION PHASING

SHALL BE APPROVED BY COR.

5. PRIOR TO THE START OF ANY WORK. THE CONTRATOR IS REQUIRED TO

VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH THE

EXTENT AND NATURE OF WORK TO BE PERFORMED. EXISTING CONDITIONS

MAY SLIGHTLY VARY FROM THOSE SHOWN ON THE DRAWINGS. THE

CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, DIMENSIONS AND

MATERIALS IN THE FIELD AND GENERATE A LIST OF DISCREPANCIES IN WRITING

AND REPORT TO THE COR. REFER TO SPECIFICATIONS FOR FURTHER

INFORMATION.

7. ALL DIMENSIONS ARE TAKEN FROM FACE OF WALL FINISH.

THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ANY OPENINGS AND

RESPONSIBLE FOR ANY DAMAGE THAT MAY RESULT FROM SUCH OPENINGS

BEING LEFT UNPROTECTED OR THOSE THAT HAVE OCCURED AS A RESULT OF

PROTECTING THE OPENINGS.

REFERENCE A3.01 FOR PARTITION TYPES AND PARTITION HEAD DETAILS.

REFERENCE A3.02 FOR PARTITION FRAMING DETAILS .

8.

9.

6. ALL INTERIOR AND EXTERIOR SIGNAGE ARE TO BE PROVIDED AND INSTALLED

BY OWNER.

1/8" = 1'-0"01 LEVEL 1 - FLOOR PLAN

0' 4' 16'8'

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542 designgroup

Architecture, Engineering, and Sustainable DesignAESUS

KEY PLAN NTS

NORTH

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

Construct Facility for Mental Health and Primary Care Alternative Modalities

Location:

100% Bid Set Submittal

August 18, 2023 o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

612-908

VANCHCS

10535 HOSPITAL WAY MATHER, CA 95655

AESUS

PROJECT

AREA

MAIN

HOSPITAL

AESUS

A2.10

LEVEL 01 FLOOR PLAN

HAC

2A-205

ELEC

2A-203

OFFICE

2E-268

ELEVATOR

2A-201

1 2 3 4

J

H

G

F

E

A

B

C

A.4

VESTIBULE

2A-200

IDF

2E-263

ROOF BELOW

OFFICE

2E-266

OFFICE

2E-264

SHARED

OFFICE

2E-262

OFFICE

2E-274

18' - 6" 29' - 6"

CLEAN UTILITY

& SUPPLY

2D-232

1.5

D

2.5

25' - 0"

3.5

SHAFT

2D-227

5' - 0"

OFFICE

2E-270

6' - 0"

EXAM

2D-224

CONTROL

STATION

2D-248

SOILED

UTILITY

2D-236

EXAM

2D-222

OFFICE

2D-237

OFFICE

2D-235

OFFICE

2D-233

OFFICE

2D-231

OFFICE

2C-221

OFFICE

2D-225

PIV LAB

2C-218

OFFICE

2E-265

CONFERENCE

ROOM

2E-261

SLEEP,

TYPICAL

2D-244

SHARED

OFFICE

2D-239

CLEAN LINEN

2D-241

BARIATRIC

TOILET

2D-245

BARIATRIC

SLEEP

2D-243

OFFICE

2C-219

OFFICE

2C-217

OFFICE

2C-215

OFFICE

2C-213

OFFICE

2C-212

OFFICE

2C-214 LACTATION

ROOM

2B-207

PIV LAB

2C-216

SLEEP

2D-250

BARIATRIC

SLEEP

2D-247

BARIATRIC

TOILET

2D-249

TOILET

2D-246

TOILET

2D-252

OFFICE

2E-272

CHECK-IN /

WAITING AREA

2B-206

CPAP

STORAGE

2D-234

FEMALE

2B-211

MALE

2B-209

OFFICE

2D-223

A2.5405

A2.55

EWC3

CORRIDOR

2C-210

CORRIDOR

2D-220

CORRIDOR

2E-260

CORRIDOR

2D-240

NOURISHMENT

2D-242

CORRIDOR4

9' - 6 5/8" 8' - 0"

6' - 4 7/8" 11' - 1 3/4" 9' - 10 1/4"

20' - 4 7/8" 6' - 4 7/8"

11' - 6 5/8" 14' - 11 3/4" 21' - 8 1/4"

6' - 4 7/8" 10' - 4 7/8" 10' - 7 1/8" 16' - 11 3/4"

3' - 5 1/8"

6' - 4 7/8"

6' - 4 7/8" 9' - 5 3/4" 9' - 4 7/8" 5' - 6 5/8" 6' - 6 3/4" 6' - 11 5/8" 3' - 5 1/4" 6' - 4 7/8"

6' - 4 7/8" 10' - 2 1/4" 31' - 2 5/8"

6' - 4 7/8"

6' - 4 7/8" 10' - 3" 10' - 0" 9' - 4 5/8" 10' - 4 7/8"

/4

/8

/8

/8

/8

/8

/8

/4

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/4

/2

/8

/4

/8

/8

/8

/2

/8

/8

/8

/8

/8

B

A

9 -

1 -

7 -

212213

A

220B

5 -

A

A

200A

5 -

2 -

6 -

9 -

261B

2 -

3 -

A

A3

H

H1

H

H1

H

H

A

A3

A3

A

A

A3

A3

A

H

H1

A3

H

A3

A3

A3

C

C6A3

C

C6

H1

H

A3

H1

H

H

H1

A3

A3

H1

H

H1

H

A3

H

H1

A3

A

A

A

H1

A3

A

A3

A3 E E

A

A

A3

A3 A3

A3

A3

A3

A3

A3

A3

A

A3

A3

A3

A

A3

A3

A

H1

H

A3

A

A

A3

A

A3

A

H

A3

A

A3

A

A3

A3

A3

A3

H1

A3

A3

EE

A

A3

A3

A

A

A

H1

H

A3

A

H

E E

E E

H1

H

H1

A3

A

H1

H1

H

H1

H

H1

H

H1

H

H1

H

H1

H

H

H1

A

A

A

A

A3

A

A2.54 08

/A2.54 06

/A2.55 01

/A2.55 09

/A2.55 07

/A2.56 07

/A2.54 01

/A2.52 04 /A2.52 04 sim

/A2.56 05

/A2.56 01/A2.56 03

/A2.56 12

/A2.56 12

A

CR

CR

CR

CR

CR

CR

CR

CR

A2.56 sim

/A3.23 02

/A2.56 10

/A2.55 11

PB

PB

PB

PB

CR

CR

A8.20 / 01

REFER TO

TYPICAL

REFER TO

TYPICAL

REFER TO

TYPICAL

T1

T1

T1

T1

/8

1' - 0"

C

H 1 H

H

H

STIAR 2

2A-202

STAIR 1

2D-254

16' - 0" 25' - 0" 21' - 6" 20' - 0"

A8.20 / 04

FLOOR PLAN GENERAL NOTES

1. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE.

LARGER SCALE DRAWING SHALL HAVE PRECEDENCE OVER

SMALLER SCALE DRAWINGS. THE GC SHALL NOTIFY THE VA OF ANY

DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THAT PORTION

OF THE WORK. ALL DOORS TO BE 6" FROM NEAREST WALL U.N.O.

2. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND MATERIAL

TRAFFIC AND STORAGE WITH COR.

3. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL, PLUMBING,

ELECTRICAL, AND FIRE PROTECTION.

4. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION PHASING

SHALL BE APPROVED BY COR.

5. PRIOR TO THE START OF ANY WORK. THE CONTRATOR IS REQUIRED TO

VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH THE

EXTENT AND NATURE OF WORK TO BE PERFORMED. EXISTING CONDITIONS

MAY SLIGHTLY VARY FROM THOSE SHOWN ON THE DRAWINGS. THE

CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, DIMENSIONS AND

MATERIALS IN THE FIELD AND GENERATE A LIST OF DISCREPANCIES IN WRITING

AND REPORT TO THE COR. REFER TO SPECIFICATIONS FOR FURTHER

INFORMATION.

7. ALL DIMENSIONS ARE TAKEN FROM FACE OF WALL FINISH.

THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ANY OPENINGS AND

RESPONSIBLE FOR ANY DAMAGE THAT MAY RESULT FROM SUCH OPENINGS

BEING LEFT UNPROTECTED OR THOSE THAT HAVE OCCURED AS A RESULT OF

PROTECTING THE OPENINGS.

REFERENCE A3.01 FOR PARTITION TYPES AND PARTITION HEAD DETAILS.

REFERENCE A3.02 FOR PARTITION FRAMING DETAILS .

8.

9.

6. ALL INTERIOR AND EXTERIOR SIGNAGE ARE TO BE PROVIDED AND INSTALLED

BY OWNER.

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542 designgroup

Architecture, Engineering, and Sustainable DesignAESUS

KEY PLAN NTS

NORTH

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

Construct Facility for Mental Health and Primary Care Alternative Modalities

Location:

100% Bid Set Submittal

August 18, 2023 o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

612-908

VANCHCS

10535 HOSPITAL WAY MATHER, CA 95655

AESUS

PROJECT

AREA

MAIN

HOSPITAL

AESUS

A2.20

LEVEL 02 - SLEEP & HR

1/8" = 1'-0"01 Level 2 - FLOOR PLAN

0' 4' 16'8'

1 2 3 4

J

H

G

F

E

A

B

C

A.4

61.5

D

2.5 3.5

A2.5405

A2.55

A2.54 08

A2.56

HAC

2A-205

ELEC

2A-203

ELEVATOR

2A-201

VESTIBULE

2A-200

IDF

2E-263

ROOF BELOW

18' - 6" 29' - 6"

CLEAN UTILITY

& SUPPLY

2D-232

25' - 0"

SHAFT

2D-227

5' - 0"

6' - 0"

EXAM

2D-224

CONTROL

STATION

2D-248

SOILED

UTILITY

2D-236

EXAM

2D-222

OFFICE

2D-237

OFFICE

2D-235

OFFICE

2D-233

OFFICE

2D-231

OFFICE

2C-221

OFFICE

2D-225

PIV LAB

2C-218

OFFICE

2E-265

CONFERENCE

ROOM

2E-261

SLEEP,

TYPICAL

2D-244

SHARED

OFFICE

2D-239

CLEAN LINEN

2D-241

BARIATRIC

TOILET

2D-245

BARIATRIC

SLEEP

2D-243

OFFICE

2C-219

OFFICE

2C-217

OFFICE

2C-215

OFFICE

2C-213

OFFICE

2C-212

OFFICE

2C-214 LACTATION

ROOM

2B-207

PIV LAB

2C-216

SLEEP

2D-250

BARIATRIC

SLEEP

2D-247

BARIATRIC

TOILET

2D-249

TOILET

2D-246

TOILET

2D-252

CHECK-IN /

WAITING AREA

2B-206

CPAP

STORAGE

2D-234

FEMALE

2B-211

MALE

2B-209

OFFICE

2D-223

EWC3

CORRIDOR

2C-210

CORRIDOR

2D-220

CORRIDOR

2E-260

CORRIDOR

2D-240

NOURISHMENT

2D-242

CORRIDOR4

9' - 6 5/8" 8' - 0"

6' - 4 7/8" 11' - 1 3/4" 9' - 10 1/4"

20' - 4 7/8" 6' - 4 7/8"

11' - 6 5/8" 14' - 11 3/4" 21' - 8 1/4"

6' - 4 7/8" 10' - 4 7/8" 10' - 7 1/8" 16' - 11 3/4"

3' - 5 1/8"

6' - 4 7/8"

6' - 4 7/8" 9' - 5 3/4" 9' - 4 7/8" 5' - 6 5/8" 6' - 6 3/4" 6' - 11 5/8" 3' - 5 1/4" 6' - 4 7/8"

6' - 4 7/8" 10' - 2 1/4" 31' - 2 5/8"

6' - 4 7/8"

6' - 4 7/8" 10' - 3" 10' - 0" 9' - 4 5/8" 10' - 4 7/8"

/4

/8

/8

/8

/8

/8

/8

/4

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/8

/4

/2

/8

/4

/8

B

A

9 -

1 -

7 -

A

220B

5 -

A

A

200A

5 -

2 -

6 -

9 -

261B

2 -

3 -

A

H

H1

H

H1

H

H

A

A

A

A3

A

H

H1

A3

H

A3

A3

A3

C

C6A3

C

C6

H1

H

A3

H1

H

H

H1

A3

H1

H

H1

H

A3

A3

A

A

A

H1

A

A3

A3 E E

A

A

A3

A3 A3

A3

A3

A3

A3

A3

A3

A

A3

A3

A3

A

A3

A3

A

H1

H

A3

A

A

A3

A

A3

A

H

A3

A

A3

A

A3

A3

A3

A3

H1

A3

A3

EE

A

A3

A3

A

A

A

H1

H

A3

A

H

E E

E E

H1

H

H1

A3

A

H1

H1

H

H1

H

H1

H

H1

H

H

H1

A

A

A

A

A3

A

/A2.54 06

/A2.55 01

/A2.55 09

/A2.55 07

/A2.56 07

/A2.54 01

/A2.52 04 /A2.52 04 sim

/A2.56 05

/A2.56 01/A2.56 03

/A2.56 12

/A2.56 12

A

CR

CR

CR

CR

CR

CR

CR

sim

/A3.23 02

/A2.56 10

/A2.55 11

PB

PB

PB

PB

CR

CR

REFER TO

TYPICAL

REFER TO

TYPICAL

REFER TO

TYPICAL

T1

T1

T1

T1

/8

1' - 0"

D E

D U

C T

IV

E

A L

T E

R N

A T

E

A D

M

IN

IS

T

R A

T

IV

E O

F F

IC

E

S

/8

/2

16' - 0" 25' - 0" 21' - 6" 20' - 0"

A8.20 / 01

A8.20 / 04

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542 designgroup

Architecture, Engineering, and Sustainable DesignAESUS

KEY PLAN NTS

NORTH

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

Construct Facility for Mental Health and Primary Care Alternative Modalities

Location:

100% Bid Set Submittal

August 18, 2023 o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

612-908

VANCHCS

10535 HOSPITAL WAY MATHER, CA 95655

AESUS

PROJECT

AREA

MAIN

HOSPITAL

AESUS

A2.23

LEVEL 02 - FLOOR PLAN (DEDUCTIVE

ALTERNATE 3)

1/8" = 1'-0"01 Level 2 - FLOOR PLAN - DEDUCT ALT 3

DEDUCTIVE ALTERNATES NOTES:

A. REFER TO COST ESTIMATE FOR COMPLETE LIST OF DEDUCTIVE ALTERNATES

B. DEDUCTIVE ALTNERATES SHOWN ON THIS SHEET ARE RELATIVE TO PHASED

BUILD OUT OF LEVEL 02 ONLY

DEDUCTIVE ALTERNATE #3:

-REMOVE TILE WALL FINISH IN ALL BATHROOMS & REPLACE WITH WALL PROTECTION

PER FINISH SCHEDULE NOTES

-REPLACE COUNTERS AND UNDERMOUNT SINKS IN BATHROOMS WITH WALL

MOUNTED PORCELAIN LAVATORIES

-REMOVE GYPSUM BOARD CEILINGS IN BATHROOMS AND REPLACE WITH ACT 02

-REMOVE THE OFFICES ALONG GRIDLINE 4.

• NO FINISHES. UTILIZE EXPOSED CONCRETE AND EXPOSED CEILINGS

• NO WALLS

• FOR REMOVED DOORS REFER TO DOOR SCHEDULE COMMENTS ON A3.33

• KEEP CODE REQUIRED LIGHTING, EXIT SIGNAGE, FIRE ALARM, AND FIRE

PROTECTION PER ENGINEERING DRAWINGS

• PROVIDE HVAC PER MECHANICAL DRAWINGS

• PROVIDE DRYWALL WITH TAPED JOINTS ON EXTERIOR WALLS TO CONCEAL

INSULATION

• NO DATA, REFER TO LOW VOLTAGE DRAWINGS

J

H

G

F

E

A

B

C

A.4

61.5

D

2.5 3.5

A2.5405

A2.55

A2.54 08

A2.56

HAC

2A-205

ELEC

2A-203

ELEVATOR

2A-201

VESTIBULE

2A-200

IDF

2E-263

ROOF BELOW

18' - 6" 29' - 6"

CLEAN UTILITY

& SUPPLY

2D-232

25' - 0"

SHAFT

2D-227

5' - 0"

6' - 0"

EXAM

2D-224

CONTROL

STATION

2D-248

SOILED

UTILITY

2D-236

EXAM

2D-222

OFFICE

2D-237

OFFICE

2D-235

OFFICE

2D-233

OFFICE

2D-231

OFFICE

2D-225

OFFICE

2E-265

CONFERENCE

ROOM

2E-261

SLEEP,

TYPICAL

2D-244

SHARED

OFFICE

2D-239

CLEAN LINEN

2D-241

BARIATRIC

TOILET

2D-245

BARIATRIC

SLEEP

2D-243

LACTATION

ROOM

2B-207

SLEEP

2D-250

BARIATRIC

SLEEP

2D-247

BARIATRIC

TOILET

2D-249

TOILET

2D-246

TOILET

2D-252

CHECK-IN /

WAITING AREA

2B-206

CPAP

STORAGE

2D-234

FEMALE

2B-211

MALE

2B-209

OFFICE

2D-223

EWC3

CORRIDOR

2D-220

CORRIDOR

2E-260

CORRIDOR

2D-240

NOURISHMENT

2D-242

CORRIDOR4

9' - 6 5/8" 8' - 0"

6' - 4 7/8" 11' - 1 3/4" 9' - 10 1/4"

20' - 4 7/8" 6' - 4 7/8"

11' - 6 5/8" 14' - 11 3/4" 21' - 8 1/4"

6' - 4 7/8" 10' - 4 7/8" 10' - 7 1/8" 16' - 11 3/4"

3' - 5 1/8"

6' - 4 7/8"

6' - 4 7/8" 9' - 5 3/4" 9' - 4 7/8" 5' - 6 5/8" 6' - 6 3/4" 6' - 11 5/8" 3' - 5 1/4" 6' - 4 7/8"

31' - 2 5/8"

6' - 4 7/8"

10' - 0" 9' - 4 5/8" 10' - 4 7/8"

/4

/8

/8

/8

/8

/8

/8

/4

/8

/8

/8

/8

/8

/4

/2

/8

/4

/8

B

A

9 -

1 -

7 -

A

220B

5 -

A

A

200A

5 -

2 -

6 -

9 -

261B

2 -

3 -

A

H

H1

H

H1

H

H

A

A

A3

A

H

H1

A3

H

A3

A3

A3

C

C6A3

C

C6

H1

H

A3

H1

H

H

H1

A3

H1

H

H1

H

A3

A3

A

A

A

H1

A3

A3 E E

A

A

A3

A3

A3

A3

A3

A3

A

A

A3

A

A

A3

A

A3

H

A3

A

A3

A

A3

A3

A3

A3

H1

A3

A3

EE

A

A3

A3

A

A

A

H1

H

A3

A

H

E E

E E

H1

H

H1

A3

A

H1

H1

H

H1

H

H

H1

A

A

A

A

A3

A

/A2.54 06

/A2.55 01

/A2.55 09

/A2.55 07

/A2.56 07

/A2.54 01

/A2.52 04 /A2.52 04 sim

/A2.56 05

/A2.56 01/A2.56 03

A

CR

CR

CR

CR

CR

CR

CR

sim

/A3.23 02

/A2.55 11

PB

PB

PB

CR

CR

REFER TO

TYPICAL

REFER TO

TYPICAL

REFER TO

TYPICAL

T1

T1

T1

T1

DEDUCTIVE ALTERNATE 4 -

HUMAN RESOURCES

D E

D U

C T

IV

E

A L

T E

R N

A T

E

A D

M

IN

IS

T

R A

T

IV

E O

F F

IC

E

S

/2

/8

16' - 0" 25' - 0" 21' - 6" 20' - 0"

A8.20 / 04

A8.20 / 01

CR

1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542 designgroup

Architecture, Engineering, and Sustainable DesignAESUS

KEY PLAN NTS

NORTH

Drawing Title: Project Title:

Date

Location

Checked

Building Number:

Project Number:

Drawing Number:

Drawn

Revisions: Date

CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management

Construct Facility for Mental Health and Primary Care Alternative Modalities

Location:

100% Bid Set Submittal

August 18, 2023 o n e e ig h th in c h o n e fo o t

B

A

C

D

E

F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t

VA FORM

08-6231

1 2 3 4 5 6 87 9

F

E

D

C

B

A

97 8654321

612-908

VANCHCS

10535 HOSPITAL WAY MATHER, CA 95655

AESUS

PROJECT

AREA

MAIN

HOSPITAL

AESUS

A2.24

LEVEL 02 - FLOOR PLAN (DEDUCTIVE

ALTERNATE 3 & 4)

DEDUCTIVE ALTERNATES NOTES:

1/8" = 1'-0"01 Level 2 - FLOOR PLAN - DEDUCT ALT 3 & 4

A. REFER TO COST ESTIMATE FOR COMPLETE LIST OF DEDUCTIVE ALTERNATES

B. DEDUCTIVE ALTNERATES SHOWN ON THIS SHEET ARE RELATIVE TO PHASED

BUILD OUT OF LEVEL 02 ONLY

DEDUCTIVE ALTERNATE #3:

-REMOVE TILE WALL FINISH IN ALL BATHROOMS & REPLACE WITH WALL PROTECTION

PER FINISH SCHEDULE NOTES

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .