Attachment 5 - Drawings 100 Percent - Mathers VAMC - Part 1 - Final.pdf
PDF 13 MB Posted
- Attached to
- Y1DZ--Facility for Mental Health Primary Care Modalities - Minor Construction - Mather VAMC
- Solicitation number
- 36C77624B0005
About this file
This document provides details for a federal contract opportunity with the Department of Veterans Affairs. The solicitation seeks proposals for a facility for mental health and primary care services at the Mathers Veterans Affairs Medical Center in Cincinnati, Ohio. Solicitation number 36C77624B0005 calls for minor construction work related to modifying existing spaces to accommodate new clinical modalities. Proposals are due by intentionally left blank deadline. The work will support the expansion of mental health and primary care services for veterans served by the Mathers VAMC.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
08.18.23
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542 designgroup
Architecture, Engineering, and Sustainable DesignAESUS
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Construct Facility for Mental Health and Primary Care Alternative Modalities
Location:
100% Bid Set Submittal
August 18, 2023 o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
612-908
VANCHCS
10535 HOSPITAL WAY MATHER, CA 95655
AESUSAESUS
G.002
DRAWING INDEX
SHEET NUMBER SHEET NAME 0
/0
/2
S U
B M
IT
T
A L
/0
/2
S U
B M
IT
T
A L
/1
/2
S
U B
M
IT
T A
L
GENERAL
G.001 COVER SHEET X X X
G.002 DRAWING INDEX X X X
G.003 GENERAL NOTES X X
G.004 GENERAL NOTES X X
CIVIL
C100 EXISTING CONDITIONS X X
C101 DEMOLITION & EROSION CONTROL PLAN X X
C102 SITE PLAN X X X
C103 UTILITY PLAN X X X
C104 STORM PLAN & PROFILE X X
C105 GRADING PLAN X X
C106 DETAILS X X
LANDSCAPE
LA101 HARDSCAPE PLAN X X
LA201 CONSTRUCTION DETAILS X X
ARCHITECTURAL
ALS.01 LIFE SAFETY PLANS X X X
A1.0 SITE PLAN X X X
A1.1 SITE DETAILS X X
A2.00 EXTERIOR DIMENSION PLANS X X X
A2.01 EDGE OF SLAB X X X
A2.10 LEVEL 01 FLOOR PLAN X X X
A2.20 LEVEL 02 - SLEEP & HR X X X
A2.23 LEVEL 02 - FLOOR PLAN (DEDUCTIVE ALTERNATE 3) X X
A2.24 LEVEL 02 - FLOOR PLAN (DEDUCTIVE ALTERNATE 4) X X
A2.25 LEVEL 02 - FLOOR PLAN (DEDUCTIVE ALTERNATE 3) X X
A2.30 ROOF PLAN X X X
A2.40 LEVEL 01 REFELCTIVE CEILING PLAN X X X
A2.41 LEVEL 02 REFLECTIVE CEILING PLAN X X X
A2.50 LEVEL 01 ENLARGED PLANS X X X
A2.51 LEVEL 01 ENLARGED PLANS X X X
A2.52 LEVEL 01 ENLARGED PLANS X X X
A2.53 LEVEL 01 ENLARGED PLANS X X X
A2.54 LEVEL 02 ENLARGED PLANS X X X
A2.55 LEVEL 02 ENLARGED PLANS X X X
A2.56 LEVEL 02 ENLARGED PLANS X X X
A3.01 PARTITION TYPES & HEAD DETAILS X X X
A3.02 PARTITION FRAMING DETAILS X X X
A3.03 GYP BD DETAILS X X X
A3.23 STANDARD ACCESSORIES X X X
A3.24 LOCKERS, ACCESSORIES, WALL PROT, EQUIP X X X
A3.31 DOOR, SAFETY GLAZING AND LOUVER INFORMATION X X X
A3.33 DOOR SCHEDULE & DETAILS X X X
A3.50 CABINET DETAILS X X X
A3.60 CEILING DETAILS X X X
A4.1 ELEVATIONS X X X
A4.2 ALUMINUM FRAME TYPES X X
A5.1 BUILDING SECTIONS X X X
A6.1 WALL SECTIONS X X X
A7.01 EIFS DETAILS 01 X X X
A7.10 DETAILS X X X
A7.51 SINGLE PLY ROOFING DETAILS 01 X X X
A7.52 SINGLE PLY ROOFING DETAILS 02 X X
A8.10 STAIR PLANS & SECTIONS X X X
A8.20 STEEL STAIR DETAILS X X
A8.31 ELEVATOR GENERAL NOTES X X
A8.32 ELEVATOR PLANS AND DETAILS X X
AI.01 ROOM FINISH LEGEND AND SCHEDULE X X X
AI.02 FLOOR FINISH PLANS X X
AI.03 FINISH PLANS X X X
AI.04 INTERIOR ELEVATIONS AND DETAILS X X
AI.05 COLOR BOARD X X
Q-2.1 LEVEL 01 EQUIPMENT & FURNITURE PLAN X X X
Q-2.2 LEVEL 02 EQUIPMENT & FURNITURE PLAN X X X
Q-3.0 EQUIPMENT LIST X X
STRUCTURAL
S000 COVER SHEET X X X
S001 GENERAL STRUCTURAL NOTES X X X
S002 GENERAL STRUCTURAL NOTES X X X
S003 SPECIAL INSPECTION MATRICES X X X
S004 TYPICAL DETAILS T1 - T15 X X X
S005 TYPICAL DETAILS T16 - T30 X X X
S006 TYPICAL DETAILS T31 - T45 X X X
S007 TYPICAL DETAILS T46 - T60 X X X
S008 TYPICAL DETAILS T61 - T75 X X X
S020 SCHEDULES AND ABBREVIATIONS X X X
S101 FOUNDATION PLAN X X X
S102 FLOOR FRAMING PLAN X X X
S102A FLOOR REINFORCING PLAN X X
S103 ROOF FRAMING PLAN X X X
S104 ELEVATIONS - MOMENT FRAMES X X X
S105 ELEVATIONS - MOMENT FRAMES X X X
S106 ELEVATIONS - MOMENT FRAMES X X X
S107 ELEVATIONS - MOMENT FRAMES X X X
S201 FOUNDATION DETAILS 101 - 115 X X X
S301 FRAMING DETAILS 201 - 215 X X X
S302 FRAMING DETAILS 216 - 230 X X X
S303 FRAMING DETAILS 231 - 245 X X
S304 FRAMING DETAILS 246 - 260 X X
MECHANICAL
M0.1 MECHANICAL GENERAL INFORMATION X X X
M2.1 MECHANICAL LEVEL 1 PLAN - HVAC X X X
M2.2 MECHANICAL LEVEL 2 PLAN - HVAC X X X
M2.23 MECHANICAL LEVEL 2 PLAN - HVAC (DEDUCTIVE ALTERNATE 3) X X
M2.24 MECHANICAL LEVEL 2 PLAN - HVAC (DEDUCTIVE ALTERNATE 3 & 4) X X
M2.25 MECHANICAL LEVEL 2 PLAN - HVAC (DEDUCTIVE ALTERNATE 3, 4 & 5) X X
M2.3 MECHANICAL ROOF PLAN - HVAC X X X
M5.1 MECHANICAL DETAILS X X X
M5.2 MECHANICAL DETAILS X X X
M5.3 MECHANICAL DETAILS X X
M6.1 MECHANICAL SCHEDULES X X X
M8.1 MECHANICAL CONTROLS X X X
PLUMBING
P0.1 PLUMBING GENERAL INFORMATION X X X
P2.1 PLUMBING LEVEL 1 PLAN X X X
P2.2 PLUMBING LEVEL 2 PLAN X X X
P2.23 PLUMBING LEVEL 2 PLAN (DEDUCTIVE ALTERNATE 3) X X
P2.24 PLUMBING LEVEL 2 PLAN (DEDUCTIVE ALTERNATE 3 & 4) X X
P2.25 PLUMBING LEVEL 2 PLAN (DEDUCTIVE ALTERNATE 3, 4 & 5) X X
P3.3 PLUMBING ROOF PLAN X X X
P5.1 PLUMBING DETAILS X X X
P5.2 PLUMBING DETAILS X X
P5.3 PLUMBING DETAILS X X
P6.1 PLUMBING SCHEDULES X X X
ELECTRICAL
E0.01 GENERAL INFORMATION - ELECTRICAL X X X
E1.01 SITE PLAN - ELECTRICAL X X X
E2.01 FLOOR PLANS - POWER X X X
E2.02 ROOF PLAN - ELECTRICAL X X X
E2.03 FLOOR PLANS - ELEC/MECH COORDINATION X X
E3.01 FLOOR PLANS - LIGHTING X X X
E4.01 FLOOR PLANS DEDUCT ALT - LIGHTING X X
E4.02 FLOOR PLANS DEDUCT ALT - LIGHTING X
E5.01 ELECTRICAL ONE-LINE X X X
E6.01 ELECTRICAL DETAILS X X X
E7.01 ELECTRICAL SCHEDULES X X X
TELECOMM
T001 TELECOMMUNICATIONS COVER SHEET X X X
T100 TELECOMMUNICATIONS SITE PLAN X X X
T111 1ST FLOOR TELECOMMUNICATIONS FLOOR PLAN X X X
T112 1ST FLOOR TELECOMMUNICATIONS REFLECTED CEILING PLAN X X X
T121 2ND FLOOR TELECOMMUNICATIONS FLOOR PLAN X X X
T121D 2ND FLOOR TELECOMMUNICATIONS FLOOR PLAN (DEDUCTIVE ALT) X X
T122 2ND FLOOR TELECOMMUNICATIONS REFLECTED CEILING PLAN X X X
T401 2ND FLOOR MDF FLOOR PLAN & ELEVATIONS X X X
T801 TELECOMMUNICATIONS TYPICAL DETAILS X X
T802 TELECOMMUNICATIONS TYPICAL DETAILS X X
T803 TELECOMMUNICATIONS TYPICAL DETAILS X X
T804 ACCESS CONTROL TYPICAL DETAILS X X X
T805 ACCESS CONTROL TYPICAL DETAILS X X
FIRE ALARM
FA-001 FIRE ALARM LEGENDS, ABBREVIATIONS AND RISER X X X
FA-201 FIRE ALARM FLOOR PLANS X X X
FA-202 FIRE ALARM FLOOR PLANS DEDUCTIVE ALTERNATES 3 & 4 X X
FA-203 FIRE ALARM FLOOR PLANS DEDUCTIVE ALTERNATES 3, 4, & 5 X X
FA-502 FIRE ALARM DETAILS X X X
FIRE PROTECTION
FP2.1 FIRE PROTECTION PLAN - SPRINKLERS X X
FP2.23 FIRE PROTECTION PLAN - SPRINKLERS (DEDUCTIVE ALTERNATE 3) X X
FP2.24 FIRE PROTECTION PLAN - SPRINKLERS (DEDUCTIVE ALTERNATE 3 & 4) X X
FP2.25 FIRE PROTECTION PLAN - SPRINKLERS (DEDUCTIVE ALTERNATE 3, 4, & 5) X X
INDEX OF DRAWINGS
Architecture, Engineering, and Sustainable DesignAESUS
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Construct Facility for Mental Health and Primary Care Alternative Modalities
Location:
100% Bid Set Submittal
August 18, 2023 o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
612-908
VANCHCS
10535 HOSPITAL WAY MATHER, CA 95655
AESUSAESUS
G.003
GENERAL NOTES
Architecture, Engineering, and Sustainable DesignAESUS
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Construct Facility for Mental Health and Primary Care Alternative Modalities
Location:
100% Bid Set Submittal
August 18, 2023 o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
612-908
VANCHCS
10535 HOSPITAL WAY MATHER, CA 95655
AESUSAESUS
G.004
GENERAL NOTES
FE
M
O Y
E R
S T
R E
E T
APPROVED/FUTURE
SOCIAL
SERVICES
BUILDING
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
CONSTRUCT FACILITY FOR
MENTAL HEALTH AND
PRIMARY CARE
Location:
95% Re-Submittal - Not for Construction o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
612-908
10535 HOSPITAL WAY
MATHER, CA 95655
CALIBREAESUS
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc. 35754
JA
MES A LA N GUSKYCO
LO
RADO REGI STERED
PROFESS IONA L ENGIN
EE
R
SHEET NOTES:
1-800-642-2444
NORTH
C100
EXISTING CONDITIONS
MAY 30, 2023
LEGEND:
# KEY NOTES:
100% Bid Set Submittal
O Y
E R
S T
R E
E T
APPROVED/FUTURE
SOCIAL
SERVICES
BUILDING
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
CONSTRUCT FACILITY FOR
MENTAL HEALTH AND
PRIMARY CARE
Location:
95% Re-Submittal - Not for Construction o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
612-908
10535 HOSPITAL WAY
MATHER, CA 95655
CALIBREAESUS
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc. 35754
JA
MES A LA N GUSKYCO
LO
RADO REGI STERED
PROFESS IONA L ENGIN
EE
R
1-800-642-2444
NORTH
C101
DEMOLITION & EROSION
CONTROL PLAN
MAY 30, 2023
LEGEND:
# KEY NOTES:
SHEET NOTES:
O Y
E R
S T
R E
E T
PRRC
BUILDING
APPROVED/FUTURE
SOCIAL
SERVICES
BUILDING
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
CONSTRUCT FACILITY FOR
MENTAL HEALTH AND
PRIMARY CARE
Location:
95% Re-Submittal - Not for Construction o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
612-908
10535 HOSPITAL WAY
MATHER, CA 95655
CALIBREAESUS
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc. 35754
JA
MES A LA N GUSKYCO
LO
RADO REGI STERED
PROFESS IONA L ENGIN
EE
R
MAY 30, 2023
1-800-642-2444
NORTH
C102
SITE PLAN
LEGEND:
# KEY NOTES:
O Y
E R
S T
R E
E T
PRRC
BUILDING
APPROVED/FUTURE
SOCIAL
SERVICES
BUILDING
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
CONSTRUCT FACILITY FOR
MENTAL HEALTH AND
PRIMARY CARE
Location:
95% Re-Submittal - Not for Construction o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
612-908
10535 HOSPITAL WAY
MATHER, CA 95655
CALIBREAESUS
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc. 35754
JA
MES A LA N GUSKYCO
LO
RADO REGI STERED
PROFESS IONA L ENGIN
EE
R
1-800-642-2444
NORTH
C103
UTILITY PLAN
MAY 30, 2023
LEGEND:
KEY NOTES:
SHEET NOTES:
P R
R C
B U
ILD
IN
G
A P
P R
O V
E D
/FU
T
U R
E S
O C
IA
L
S E
R V
IC
E
S B
U
ILD
IN
G
FEMOYER STREET
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
CONSTRUCT FACILITY FOR
MENTAL HEALTH AND
PRIMARY CARE
Location:
95% Re-Submittal - Not for Construction o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
612-908
10535 HOSPITAL WAY
MATHER, CA 95655
CALIBREAESUS
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc. 35754
JA
MES A LA N GUSKYCO
LO
RADO REGI STERED
PROFESS IONA L ENGIN
EE
R
1-800-642-2444
NORTH
C104
STORM PLAN & PROFILE
MAY 30, 2023
LEGEND:
O Y
E R
S T
R E
E T
PRRC
BUILDING
APPROVED/FUTURE
SOCIAL
SERVICES
BUILDING
FF=99.16
98.66
98.55
98.73
98.56
98.08
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
CONSTRUCT FACILITY FOR
MENTAL HEALTH AND
PRIMARY CARE
Location:
95% Re-Submittal - Not for Construction o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
612-908
10535 HOSPITAL WAY
MATHER, CA 95655
CALIBREAESUS
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc. 35754
JA
MES A LA N GUSKYCO
LO
RADO REGI STERED
PROFESS IONA L ENGIN
EE
R
1-800-642-2444
NORTH
C105
GRADING PLAN
MAY 30, 2023
LEGEND:
KEY NOTES:
SHEET NOTES:
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542designgroup
Architecture, Engineering, and Sustainable Design
AESUS
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
CONSTRUCT FACILITY FOR
MENTAL HEALTH AND
PRIMARY CARE
Location:
95% Re-Submittal - Not for Construction o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
612-908
10535 HOSPITAL WAY
MATHER, CA 95655
CALIBREAESUS
Calibre 9090 South Ridgeline Boulevard, Suite 105 Highlands Ranch, CO 80129 (303) 730-0434 www.calibre-engineering.com Construction Management Civil Engineering Surveying
Calibre Engineering, Inc.
C106
DETAILS
MAY 30, 2023
DETAIL 13:
AREA DRAIN INSTALLATION
N.T.S
100% Bid Set Submittal
35754
JA
MES A LA N GUSKYCO
LO
RADO REGI STERED
PROFESS IONA L ENGIN
EE
R
PRRC
11,480 SF
FOOTPRINT
EXISTING
SOCIAL
SERVICES
FACILITY
FUTURE PARKING
AREA NOT IN SCOPE
SCOPE OF WORK
SCOPE OF WORK
S C
O P
E
O
F
W
O R
K
S C
O P
E
O
F
W
O R
K
FUTURE (3) VEHICLE CHARGING
STATIONS. REFER TO
ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION
EXISTING PARKING LOT
NOT IN CONTRACT
EXISTING PARKING LOT
NOT IN CONTRACT
PARKING LOT NOT
IN CONTRACT
UNDERGROUND
CONDUIT FOR
VEHICLE CHARGING
NEW SIDEWALK
NEW
SIDEWALK
END OF
PARKING LOT
25' - 0"
NO PARKING ZONE FOR 25'
SETBACK. BOLLARDS AT
5FT O.C. TO PREVENT
TRAFFIC
25' - 0"
25' - 0"
19' - 10"
EXISTING
SIDEWALK
SYMBOL PRODUCT QTY.
BOULDERS
PSRDM RATED, 3' X 3' MINIMUM.
LASSEN FIELD BOULDERS. MUYMOSS.
FINAL SELECTION TO BE APPROVED BY
CLIENT OR LANDSCPAE ARCHITECT.
SEE DETAIL LA201-1
UNITS
RIP RAP
3 - 6", SONOMA RIP RAP. 3" MINIMUM
DEPTH. PLANT BARRIER BASE
3000 SF
SCREENED ROCK
1 1/2", CALIFORNIA GOLD. 2" MINIMUM
DEPTH. PLANT BARRIER BASE
7300 SF
CONCRETE
ACID FINISH. POURED IN PLACE.
RADII TOOLED JOINTS. 4500 PSI
1300 SF
5 GABION BASKET WALLS
MATCH RIP RAP. SEE DETAIL LA201-3
200 LF
6 CONCRETE
POURED IN PLACE
STEEL EDGE
", RAW FINISH. SEE DETAIL LA201-2
250 LF
RETENTION ZONES
PER REQUIREMENTS. SCREENED ROCK
FILL.
9 EXISTING SIDEWALK
BOLLARDS
REMOVEABLE, MATCH TO
ARCHITECTURE
UNITS
HARDSCAPE SCHEDULE
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542
Architecture, Engineering, and Sustainable Design
KEY PLAN NTS
Drawing
Title:
Project
Title:
Date
Location
Checked
Building
Number:
Project
Number:
Drawing
Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management
Construct Facility for Mental Health and
Primary Care Alternative Modalities
Location:
100% SUBMITTAL
August 16, 2023 o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM
08-6231
Dwg.
of
612-908
VANCHCS
10535 HOSPITAL WAY MATHER, CA 95655
AESUS
PROJECT
AREA
MAIN
HOSPITAL
LAYOUT PLAN
INERT GENERAL NOTES:
ANGULAR GRANITE RIP-RAP
1. INSTALL GRANITE RIP-RAP IN ALL DRAINAGE SWALES, AND
WHERE INDICATED ON PLANS (TYPICAL). REFER TO MATERIALS
SCHEDULE / PLANTING LEGEND FOR COLOR AND SIZE OF
GRANITE RIP-RAP.
2. THE CONTRACTOR SHALL SUBMIT SAMPLES TO LANDSCAPE
ARCHITECT FOR REVIEW AND APPROVAL PRIOR TO
INSTALLATION.
3. THE CONTRACTOR SHALL REFER TO CIVIL PLANS FOR
ADDITIONAL INFORMATION.
HARDSCAPE GENERAL NOTES:
1. FOOTINGS, WALLS AND FENCES SHALL BE PLACED OUTSIDE OF
THE PUBLIC RIGHT-OF-WAY.
2. REFER TO CIVIL PLANS PREPARED BY CIVIL ENGINEERS FOR
ALL INFORMATION REGARDING HORIZONTAL AND VERTICAL
CONTROLS.
3. ALL DETAILS SHALL BE REVIEWED BY A STRUCTURAL ENGINEER
AND MODIFIED (IF NECESSARY) PRIOR TO CONSTRUCTION.
4. ALL DIMENSIONS SHOWN ON THIS PLAN ARE BASED ON THE
CIVIL PLAN SUBMITTED BY THE ARCHITECT. SHOULD
DISCREPANCIES OCCUR, FIELD REVISIONS SHALL BE REQUIRED.
5. THE CONTRACTOR SHALL HAVE SIDEWALK SURVEYED AND
STAKED FOR REVIEW BY THE LANDSCAPE ARCHITECT PRIOR TO
INSTALLATION.
6. IN ADDITION TO SUBMITTING MATERIAL SAMPLES OF ALL SITE
RELATED MATERIALS, THE CONTRACTOR SHALL PREPARE A
4'X4' SAMPLE PANEL FOR EACH TYPE OF CONSTRUCTION, I.E., A)
CONCRETE PAVERS, B) EXPOSED AGGREGATE PAVING, C)
INTEGRAL COLORED CONCRETE, ETC., FOR APPROVAL BY THE
LANDSCAPE ARCHITECT AND OWNER'S AUTHORIZED
REPRESENTATIVE PRIOR TO FINAL CONSTRUCTION.
LANDSCAPE HARDSCAPE
PLAN
LA 101
06.30.24
SCALE 1"=20'
1050 E SOUTHERN AVE, SUITE #8
TEMPE, AZ 85282
CONSTRUCTION DETAILS
Architecture, Engineering, and Sustainable Design
KEY PLAN NTS
Drawing
Title:
Project
Title:
Date
Location
Checked
Building
Number:
Project
Number:
Drawing
Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS:
Office of
Construction and Facilities
Management
Construct Facility for Mental Health and
Primary Care Alternative Modalities
Location:
100% SUBMITTAL
August 16, 2023 o n e e i g h t h i n c h o n e f o o t t h r e e i n c h e s o n e f o o t o n e a n d o n e h a l f i n c h e s o n e f o o t o n e i n c h o n e f o o t t h r e e q u a r t e r s i n c h o n e f o o t o n e h a l f i n c h o n e f o o t t h r e e e i g h t h s i n c h o n e f o o t o n e q u a r t e r i n c h o n e f o o t
VA FORM
08-6231
Dwg.
of
612-908
VANCHCS
10535 HOSPITAL WAY MATHER, CA 95655
AESUS
PROJECT
AREA
MAIN
HOSPITAL
LANDSCAPE CONSTRUCTION
DETAILS
SCALE: 1
4" = 1'-0"
STEEL LANDSCAPE EDGING. 3
16"
X 4"
12" REBAR STAKE WELDED 16"
0.C.
FINISHED GRADE MATERIAL 1
FINISHED GRADE MATERIAL 2
FINISHED GRADE MATERIAL 3
EXISTING GROUND
NOTE : DIMENSIONS
EXAGGERATED FOR VISIBILITY
STEEL EDGE
2" LIP ABOVE GROUND COVER. TOP OF STEEL TO BE FLUSH WITH TOP OF MEETING HARDSCAPE
4"
PSRDM RATED BOULDER SET 13
INTO EXISTING GROUND
BOULDERS STAGGERED IN
LOCATION AS WELL AS ANGLE
TO APPEAR MORE NATURAL
ROCK GROUND COVER
EXISTING GROUND
BOULDER POSITIONING
SCALE: NTS
1 3
TO
TA
L
H
EI
G H
T
2" X 4" WELD WIRE MESH.
2-3/4 GUAGE WIRE
UTILIZE GABION CLIPS. NO
SPIRALS
GABION C RINGS FOR
JOINING BASKETS
3' X 3' X 5' UNITS
1' X 3' BAFFLE AT CENTER POINT
TO MINIMIZE FLEX
3" RIP RAP FILL
COMPACTED SUB-GRADE
3' GABION WALL
SCALE: 1
2" = 1'-0"
3'-0" 5'-0"
2'-9"
3"
LA 201
1 2
06.30.24
1050 E SOUTHERN AVE, SUITE #8
TEMPE, AZ 85282
FEC
FEC
FEC
134 SF
RECEPTION
104 SF
SECURITY
OFFICE
54 SF
NON-GENDER
RESTROOM
123 SF
VESTIBULE
801 SF
WAITING
ROOM
120 SF
QUIET ROOM
118 SF
OFFICE
120 SF
OFFICE
118 SF
OFFICE
119 SF
OFFICE
119 SF
OFFICE
149 SF
OFFICE
62 SF
ELEVATOR
50 SF
HAC
58 SF
ELEVATOR
EQUIPMENT
ROOM
275 SF
STORAGE
61 SF
NON GENDER
RESTROOM
257 SF
CONFERENCE
ROOM
348 SF
STAFF WORK
AREA
339 SF
SMALL GROUP
338 SF
SMALL GROUP
337 SF
SMALL GROUP
344 SF
SMALL GROUP
193 SF
FOOD
STORAGE
149 SF
RESOURCE
LIBRARY
155 SF
MEN'S TOILETS
162 SF
WOMEN'S
TOILETS
119 SF
OFFICE
119 SF
OFFICE
118 SF
EXAM
536 SF
OCCUPATIONAL
THERAPY
119 SF
OT OFFICE
175 SF
KITCHEN
1596 SF
MULTI-PURPOSE
ROOM
120 SF
OFFICE
225 SF
COMPUTER
LAB
162 SF
MECH
240 SF
STAFF
CORRIDOR
29 SF
HAC
D
IS
T A
N C
E T
O E
X
IT
D
IS
T A
N C
E T
O E
X
IT
56' - 6"
DISTANCE TO EXIT
D
IS
T A
N C
E T
O E
X
IT
STAIR 01
STAIR 02
EXIT 01
EXIT 02
EXIT 03
EXIT 04
1857 SF
CORRIDOR
116 SF
ELEC
61 SF
NON GENGER
RESTROOM
178 SF
VESTIBULE
EXIT 05
EXIT 06
EXIT
STAIR
EXIT
STAIR
ELEVATOR
HAC
ELEC
OFFICE
VESTIBULE
IDF
OFFICE
OFFICE
SHARED
OFFICE
OFFICE
CLEAN UTILITY
& SUPPLY
SHAFT
SOILED
UTILITY
OFFICE
EXAM
CONTROL
STATION
OFFICE
OFFICE OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
PIV LAB
PIV LAB
EXAM
OFFICE
CONFERENCE
ROOM
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
BARIATRIC
SLEEP
BARIATRIC
SLEEP
BARIATRIC
TOILET
BARIATRIC
TOILET
SLEEP,
TYPICAL
SLEEP
TOILET
TOILET
SHARED
OFFICE
CPAP
STORAGE
CLEAN LINEN
CHECK-IN /
WAITING AREA
FEMALE
MALE
OFFICE
D
IS
T
A N
C E
T O
E X
IT
D
IS
T
A N
C E
T O
E X
IT
D
IS
T
A N
C E
T O
E X
IT
FEC
FEC
FEC
FEC
FEC
FEC
FEC
1935 SF
OUTPATIENT SUITE
2164 SF
CORRIDOR
414 SF
STORAGE
270 SF
IDF
221 SF
EXAM
334 SF
CONFERENCE ROOM
871 SF
OFFICES
991 SF
OFFICES
460 SF
OFFICES
1045 SF
WAITING ROOM
210 SF
OFFICES
300 SF
TOILETS
162 SF
ELECTRICAL ROOM
113 SF
LACTATION ROOM
53 SF
STORAGE
126 SF
OFFICES
72 SF
SHAFT
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542 designgroup
Architecture, Engineering, and Sustainable DesignAESUS
KEY PLAN NTS
NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Construct Facility for Mental Health and Primary Care Alternative Modalities
Location:
100% Bid Set Submittal
August 18, 2023 o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
612-908
VANCHCS
10535 HOSPITAL WAY MATHER, CA 95655
AESUS
PROJECT
AREA
MAIN
HOSPITAL
AESUS
ALS.01
LIFE SAFETY PLANS
LIFE SAFETY LEGEND
ROOM NAME
NAME AND AREA
1 HR FIRE BARRIER
1 HR FIRE/SMOKE BARRIER
2 HR FIRE BARRIER
2 HR FIRE/SMOKE BARRIER
SMOKE PARTITION (NON RATED)
NON RATED WALL
FIRE EXTINGUISHER CABINET
EXIT SYMBOL
FEC
FIRE EXTINGUISHER
FE
EXIT SIGN - HATCH
INDICATES EXIT
TEXT & ARROW
INDICATES
DIRECTION
XXX' - X"
TRAVEL DISTANCE FROM
THE MOST REMOTE POINT
TO THE CLOSEST
XXX' - X"TRAVEL DISTANCE WITHIN
A SMOKE ZONE TO AN
ADJACENT SMOKE ZONE
150 SF
FIRE DEPARTMENT CONNECTION
FDC
EXIT ENCLOSURE
SUITE
BUS. OCCUPANCY
ASSEMBLY
STORAGE
OUTPATIENT
EXIT SUMMARY
EXIT
TYPE EXIT
EXIT
FACTOR
WIDTH
PROVIDED
IN INCHES
CAPACITY IN
PERSONS
EXIT 01 0.2 80" 399
EXIT
STAIR
01 0.3 44" 147
EXIT 02 0.2 80" 399
EXIT
STAIR
02 0.3 48" 160
EXIT 03 0.2 36" 180
EXIT 04 0.2 80" 399
EXIT 05 0.2 36" 180
EXIT 06 0.2 36" 180
Grand total 2044
1/8" = 1'-0"01 LEVEL 01 LIFE SAFETY
1/8" = 1'-0"02 LEVEL 02 LIFE SAFETY
FIRST LEVEL OCCUPANT LOAD SUMMARY
Name AREA SF
OCCUPANT
LOAD
FACTOR PER
PERSON
OCCUPANT
LOAD
CORRIDOR 1857 SF 0
ELECTRICAL ROOM 125 SF 0
ELEVATOR EQUIPMENT ROOM 63 SF 0
FOOD STORAGE ROOM 199 SF 300 SF 1
MECHANICAL ROOM 176 SF 0
MULTI-PURPOSE ROOM 1785 SF 15 SF 119
OFFICES 2746 SF 100 SF 27
SMALL GROUP ROOMS 2034 SF 100 SF 20
STORAGE ROOM 287 SF 300 SF 1
WAITING ROOM 882 SF 15 SF 59
10154 SF 227
SECOND LEVEL OCCUPANT LOAD SUMMARY
Name AREA SF
OCCUPANT
LOAD
FACTOR PER
PERSON
OCCUPANT
LOAD
CONFERENCE ROOM 334 SF 100 SF 3
CORRIDOR 2164 SF 0
ELECTRICAL ROOM 162 SF 0
EXAM 221 SF 100 SF 2
IDF 270 SF 0
LACTATION ROOM 113 SF 100 SF 1
OFFICES 2659 SF 100 SF 27
OUTPATIENT SUITE 1935 SF 100 SF 19
SHAFT 72 SF 0
STORAGE 468 SF 300 SF 2
TOILETS 300 SF 0
WAITING ROOM 1045 SF 15 SF 70
9744 SF 124
MAIN
ENTRY
2ND FLOOR
ENTRY
PRRC
11,480 SF
FOOTPRINT
EXISTING
SOCIAL
SERVICES
FACILITY
FUTURE PARKING
AREA NOT IN SCOPE
SCOPE OF WORK
SCOPE OF WORK
S C
O P
E O
F W
O R
K
S C
O P
E O
F W
O R
K
FUTURE (3) VEHICLE CHARGING
STATIONS. REFER TO
ELECTRICAL DRAWINGS FOR
ADDITIONAL INFORMATION
EXISTING PARKING LOT
NOT IN CONTRACT
EXISTING PARKING LOT
NOT IN CONTRACT
PARKING LOT NOT
IN CONTRACT
UNDERGROUND
CONDUIT FOR
VEHICLE CHARGING
NEW SIDEWALK
NEW
SIDEWALK
END OF
PARKING LOT
25' - 0"
NO PARKING ZONE FOR 25'
SETBACK. BOLLARDS AT
5FT O.C. TO PREVENT
TRAFFIC
25' - 0"
NEW
CONCRETE
PATIO
NEW CONCRETE
STAIR
/A1.1 05
EXISTING
SIDEWALK
25' - 0"
BOLLARDS
5FT O.C.
BACK OF
EXISTING
CURB
EXISTING
SIDEWALK
PSRDM LF
SETBACK
P S
R D
M L
F
S E
T B
A C
K
P S
R D
M L
F
S E
T B
A C
K
PSRDM LF
SETBACK
PSRDM LF
SETBACK
/A1.1 01
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542 designgroup
Architecture, Engineering, and Sustainable DesignAESUS
KEY PLAN NTS
NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Construct Facility for Mental Health and Primary Care Alternative Modalities
Location:
100% Bid Set Submittal
August 18, 2023 o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
612-908
VANCHCS
10535 HOSPITAL WAY MATHER, CA 95655
AESUS
PROJECT
AREA
MAIN
HOSPITAL
AESUS
A1.0
SITE PLAN
1" = 30'-0"01 SITE PLAN
0' 15' 60'30'
CLEAR
1 1/2”
3"
1 1/4" ID STL
PIPE
HANDRAIL
3/8" STL
BRACKET
BALUSTERS
BEYOND
1 1/4" ID STL
PIPE
GUARDRAIL
A B
O V
E N
O S
IN
G
O R
F L
O O
R
A B
O V
E N
O S
IN
G
O R
F L
O O
R
/2
M
IN
NOTE: SPACE BETWEEN PIPE
RAILS AND BALLUSTRADES
AND BETWEEN PICKETS SHALL
BE 4" OC MAX. SEE GUARDRAIL
ELEVATION FOR ADDITIONAL
INFORMATION. NUMBER OF
TREADS PER CIVIL DRAWINGS.
1' - 0"
LOCATE BRACKETS AT
SPACING REQ'D TO
SUPPORT STRUCTURAL
LOADS NOT TO EXCEED
5' - 0" OC.
LINES OF TREADS AND
RISERS
ALL RAIL
INTERSECTIONS
TO BE
RADIUSED (TYP)
1 1/4" ID STL PIPE
GUARDRAIL. TOP AND
BOTTOM RAILS AND
POSTS
HANDRAIL
EXTENSION
GUARDRAIL WITH
HANDRAIL AT OPEN
SIDE OF STAIR
DEPTH MIN.
TREAD
5' - 0" O.C. MAX 5' - 0" O.C. MAX
6" RISE, 11" TREAD
A1.1
3/4" STEEL
POSTS
4" MAX
/A1.1 03
DEPTH
TREAD
R 1/4"
STAIR NOSING (TYP
AT EACH RISER
UNO)
CONC
1"
3”
/4
1"
GRADE
PAINT TO MATCH EXISTING
FACILITY STANDARD
FILL WITH GROUT
AND CROWN TOP 1"
6" DIA. STEEL POST,
SCHEDULE 40,
GALVANIZED FILLED WITH
CONCRETE
4" 4"
1' - 0"
REFER TO CIVIL
FOR SPOT
ELEVATIONS
EXISTING
SIDEWALK
TO BUILDING
NEW
SIDEWALK
MONOLITHIC
CONCRETE STAIR
WITH RAILING
6' - 0"
A1.1/01
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542 designgroup
Architecture, Engineering, and Sustainable DesignAESUS
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Construct Facility for Mental Health and Primary Care Alternative Modalities
Location:
100% Bid Set Submittal
August 18, 2023 o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
612-908
VANCHCS
10535 HOSPITAL WAY MATHER, CA 95655
AESUSAESUS
A1.1
SITE DETAILS
1 1/2" = 1'-0"04 HANDRAIL AND GUARDRAIL SECTION
3/8" = 1'-0"02 STAIR RAILING ELEVATION
1" = 1'-0"03 TREAD DETAIL
1/2" = 1'-0"05 BOLLARD
3/8" = 1'-0"01 SITE STAIR - ENLARGED PLAN
UP
1 2 3
J
H
G
F
E
A
B
C
A.4
61.5
D
2.5
A5.1
A5.1
A5.1
A5.1
18' - 6" 29' - 6" 25' - 0"
2' - 9 1/4"
84' - 3"
1' - 0"
16' - 5"
16' - 0" 25' - 0" 32' - 0" 9' - 6"
1' - 9"
/8
/4 "2
/8
8' - 5" 9' - 1 1/4" 11' - 5 1/2" 6' - 0 1/4"
8"
A6.1
A6.1
A6.1
/8
1' - 4 1/4" 1' - 7" 38' - 3"
1' - 2" 1' - 5 5/8" 12' - 10 3/8" 16' - 3" 3' - 2"
" 7
/4
/2
D E
E P
E
IF
S
D
E E
P E
IF
S
/A7.01 12 /A7.01 12
/A7.01 10
/A7.01 10
/A7.01 10
/A7.01 10
/A7.01 10
/A7.01 10
/A7.01 10
/A7.01 10
/A7.01 10
RECESSED
WALK-OFF
MAT
1' - 6"
5 3/4"
/A7.01 12
4" DEEP EIFS
1' - 4 1/4" 75' - 9 1/4"
/A7.01 02
/A7.01 04
/A7.01 10
/A8.10 02
/A8.10 05
STAIR 2
GENERAL NOTES
1. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE.
LARGER SCALE DRAWING SHALL HAVE PRECEDENCE OVER
SMALLER SCALE DRAWINGS. THE GC SHALL NOTIFY THE VA OF ANY
DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THAT PORTION
OF THE WORK.
2. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND MATERIAL
TRAFFIC AND STORAGE WITH COR.
3. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL, PLUMBING,
ELECTRICAL, AND FIRE PROTECTION.
4. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION PHASING
SHALL BE APPROVED BY COR.
7.
8.
PRIOR TO THE START OF ANY WORK. THE CONTRATOR IS REQUIRED TO
VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH THE
EXTENT AND NATURE OF WORK TO BE PERFORMED. EXISTING CONDITIONS
MAY SLIGHTLY VARY FROM THOSE SHOWN ON THE DRAWINGS. THE
CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, DIMENSIONS AND
MATERIALS IN THE FIELD AND GENERATE A LIST OF DISCREPANCIES IN WRITING
AND REPORT TO THE COR. REFER TO SPECIFICATIONS FOR FURTHER
INFORMATION.
CONTRACTOR TO COORDINATE FIREPROOFING PRIOR TO SHEATHING AND
DRYWALL.
PRIOR TO SAW CUTTING AND/OR CORE DRILLING CONCRETE, THE
CONTRACTOR SHALL X-RAY USING "A MODERN DETECTION SYSTEMS" TO
LOCATE REINFORCING AND OBSTRUCTIONS IN THE CONCRETE.
ALL EIFS TO BE 2" THICK UNLESS NOTED OTHERWISE.5.
6.
A4.1/01
A
.1 /0
A4.1/02
A
.1 /0
1 2 3
J
H
G
F
E
A
BB
CC
A.4
61.5
D
2.5
A5.1
A5.1
A5.1
A5.1
18' - 6" 29' - 6" 25' - 0"
/8
1' - 4 1/4" 46' - 4 3/4"
/4
/2
/4
/8
/2
/8
6' - 8 1/4" 22' - 8 1/4"
1' - 6 1/2"
2' - 6" 7' - 6" 2' - 6" 7' - 6" 2' - 6"
A6.1
A6.1
/A8.10 01
A6.1
1' - 6" 32' - 7" 7' - 5" 1' - 11"
A7.10
/A7.01 10
/A7.01 10
/A7.01 10
/A7.01 10
/A7.01 10
/A7.01 10
/A7.01 10
/A7.01 10
/A7.01 10
/4
/4
/8
/8
/8
/8
/8
/8
/8
/8
/8
/8
/4
1' - 4 1/4" 16' - 0" 25' - 0" 32' - 0" 11' - 5"
1' - 4 1/4" 41' - 0"
ROOF BELOW
2' - 9 1/4" 9' - 4"
/A8.10 04
1' - 8"
STAIR 2
0' 4' 16'8'
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542 designgroup
Architecture, Engineering, and Sustainable DesignAESUS
KEY PLAN NTS
NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Construct Facility for Mental Health and Primary Care Alternative Modalities
Location:
100% Bid Set Submittal
August 18, 2023 o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
612-908
VANCHCS
10535 HOSPITAL WAY MATHER, CA 95655
AESUS
PROJECT
AREA
MAIN
HOSPITAL
A2.00
EXTERIOR DIMENSION PLANS
1/8" = 1'-0"02 LEVEL 1 - EXTERIOR DIMENSION PLAN
0' 4' 16'8'
1/8" = 1'-0"01 Level 2 - EXTERIOR DIMENSION PLAN
SF-11
1 2 3
J
H
G
F
E
A
B
C
A.4
61.5
D
2.5
A5.1
A5.1
A5.1
A5.1
18' - 6" 29' - 6" 25' - 0"
43' - 2" 32' - 8" 9' - 6"
/8
/8
/4
/4
/8
85' - 4"
48' - 7 3/8" 6' - 1 7/8" 21' - 5 3/4"
7 1/4"
/4
7 3/4"
1' - 8"
9' - 6"
0"
75' - 10" this edge needs to shift left with the exterior wall this edge needs to shift left with the exterior wall
16' - 0" 25' - 0" 32' - 0" 9' - 6"
1' - 1"
1' - 1"1
1' - 9"
1' - 9"
1' - 9"
2' - 9"
1' - 1"
1' - 9"
9' - 2 1/2" 6 1/4"
.7
E Q
E Q
/2
/8
16' - 6 1/2" 5' - 1 3/4"
1 2 3
J
H
G
F
E
A
BB
CC
A.4
61.5
D
2.5
A5.1
A5.1
A5.1
A5.1
A6.1
18' - 6" 29' - 6" 25' - 0"
SHAFT
ELEVATOR
SHAFT
47' - 9" 29' - 1 7/8"
/8
/8
/8
/8
43' - 2 5/8" 32' - 8"
5 5/8"
5 5/8"
/4
7' - 1" 9' - 4 3/4"
1' - 3"
7 1/8"
/8
4' - 2" 8' - 0"
/8
/2
75' - 10 5/8"
16' - 0" 25' - 0" 32' - 0" 9' - 6"
18' - 11 3/4" 2' - 5 1/4"
/8
/8
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542 designgroup
Architecture, Engineering, and Sustainable DesignAESUS
KEY PLAN NTS
NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Construct Facility for Mental Health and Primary Care Alternative Modalities
Location:
100% Bid Set Submittal
August 18, 2023 o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
Dwg. of
612-908
VANCHCS
10535 HOSPITAL WAY MATHER, CA 95655
AESUS
PROJECT
AREA
MAIN
HOSPITAL
A2.01
EDGE OF SLAB PLANS
1/8" = 1'-0"01 LEVEL 1 - EDGE OF SLAB PLAN
1/8" = 1'-0"02 Level 2 - EDGE OF SLAB PLAN
RECEPTION
1A-102
SECURITY
OFFICE
1A-105
NON-GENDER
RESTROOM
1A-104
VESTIBULE
1A-100
WAITING
ROOM
1A-101
QUIET ROOM
1A-106
OFFICE
1A-108
OFFICE
1A-110
OFFICE
1A-112
OFFICE
1A-114
OFFICE
1A-116
OFFICE
1A-118
ELEVATOR
1A-121
HAC
1A-119
ELEVATOR
EQUIPMENT
ROOM
1A-123
STORAGE
1A-128
NON GENDER
RESTROOM
1A-126
CONFERENCE
ROOM
1A-129
STAFF WORK
AREA
1A-131
SMALL GROUP
1A-135
SMALL GROUP
1A-133
SMALL GROUP
1A-137
SMALL GROUP
1A-139
FOOD
STORAGE
1A-141
RESOURCE
LIBRARY
1A-142
MEN'S TOILETS
1A-136
WOMEN'S
TOILETS
1A-134
OFFICE
1A-113
OFFICE
1A-111
EXAM
1A-107
OCCUPATIONAL
THERAPY
1A-132
OT OFFICE
1A-115
KITCHEN
1A-143
MULTI-PURPOSE
ROOM
1A-144
1 2 3
J
H
G
F
E
A
B
C
A.4
OFFICE
1A-109
COMPUTER
LAB
1A-138
MECH
1A-127
STAFF
CORRIDOR
1A-130
STAIR 1
1A-145
18' - 6" 29' - 6" 25' - 0"
HAC
1A-103
1.5
D
2.5 3.5
16' - 0" 25' - 0" 21' - 6" 10' - 6" 9' - 6"
VESTIBULE
1A-120
A2.53 06
A2.5006
03A2.51 04
A2.52
A2.53
A2.53
EWC3
/8
/8
/8
/8
/8
/8
/8
/4
/8
/8
/4
/8
/8
/8
/8
/8
/2
/8
/4
/4
/8
/8
/8
/8
/8
/8
/8
/8
/8
/8
/4
9' - 5 1/8" 15' - 7 5/8" 11' - 4 7/8" 10' - 8 3/8"
11' - 1 7/8" 4' - 7 1/4" 4' - 7 3/4" 3' - 4 3/4" 4' - 7 5/8"
1' - 3 3/8"
6' - 9" 11' - 8 3/8"
9 7/8"
8' - 6 3/8" 19' - 11 7/8" 10 7/8"5' - 6 7/8"
CORRIDOR
6' - 4 7/8" 16' - 11 3/8" 12' - 4 7/8" 6' - 5 3/4"
8' - 1 1/4" 4' - 5 1/8" 7' - 4 1/8" 12' - 4 7/8"
C
115A
115B132B
144B
9 -
A
130B
B
A3
A
A
A3
A
A3
A3
A3
A3
A3
A
A
A3
A
A3
A3
A3
A3
A
A3
A3
A3
A3
A3
A3
A3
A
A
A
A3
A
A
A3
A
EE
A
A
A3
A3
A3
EE
A3
A3
A3
A
A
H1
H
H
H1
H
H1
H
H
H1
H
H1
A3
A
EE
H1
H1
H1
H
H1
A
H
H1
A
A
A3
H
H1
A3
A
H
A
A3A3H1
H
H1
H
H
H1
H1
H
H1
H1
H
H1
H1
H
H1
H
H
H1
H1
H
H1
A
A
6' - 4 7/8" 16' - 11 3/8" 12' - 4 7/8" 6' - 5 3/4"
6' - 11 3/8" 13' - 7 3/8" 12' - 6 3/8" 7' - 4 1/8"
A3
A6
CORRIDOR
H1
H1
H1
H1
H1
H1
H
FEC
A2.51
H
/8
/8
ELEC
1A-140
NON GENGER
RESTROOM
1A-124
5 1
120A
100A100B
A
/A2.53 04
/A2.53 11
/A2.53 09
/A2.53 01
/A2.52 14
A2.52 16
/A2.52 04
A2.52
A2.52
A2.52 0607
/A2.52 11
/A2.50 01
/A2.51 01
/A2.52 01
/A2.52 08
CR
CR
CR
T1 T1
T1
/A3.23 01
REFER TO
TYPICAL
PB
PB
REFER TO
TYPICAL
REFER TO
TYPICAL
REFER TO
TYPICAL
TYPICAL
TYPICAL
CR
CR
CR
CR
CR
CONCRETE
BOLLARD
CONCRETE
BOLLARD
CONCRETE
BOLLARD
4' - 0"
/A8.32 03
A8.20/02
A8.20 / 05
H
4' - 0"
CR
/A3.03 06
TYP.
5' - 0"
12' - 0"
16' - 6 1/2"
2' - 7 3/8"
9' - 9 1/2" 19' - 3 1/4"
/A3.03 05
CR
2 -
STAIR 2
1A-122
1' - 5"
FLOOR PLAN GENERAL NOTES
1. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE.
LARGER SCALE DRAWING SHALL HAVE PRECEDENCE OVER
SMALLER SCALE DRAWINGS. THE GC SHALL NOTIFY THE VA OF ANY
DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THAT PORTION
OF THE WORK. ALL DOORS TO BE 6" FROM NEAREST WALL U.N.O.
2. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND MATERIAL
TRAFFIC AND STORAGE WITH COR.
3. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL, PLUMBING,
ELECTRICAL, AND FIRE PROTECTION.
4. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION PHASING
SHALL BE APPROVED BY COR.
5. PRIOR TO THE START OF ANY WORK. THE CONTRATOR IS REQUIRED TO
VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH THE
EXTENT AND NATURE OF WORK TO BE PERFORMED. EXISTING CONDITIONS
MAY SLIGHTLY VARY FROM THOSE SHOWN ON THE DRAWINGS. THE
CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, DIMENSIONS AND
MATERIALS IN THE FIELD AND GENERATE A LIST OF DISCREPANCIES IN WRITING
AND REPORT TO THE COR. REFER TO SPECIFICATIONS FOR FURTHER
INFORMATION.
7. ALL DIMENSIONS ARE TAKEN FROM FACE OF WALL FINISH.
THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ANY OPENINGS AND
RESPONSIBLE FOR ANY DAMAGE THAT MAY RESULT FROM SUCH OPENINGS
BEING LEFT UNPROTECTED OR THOSE THAT HAVE OCCURED AS A RESULT OF
PROTECTING THE OPENINGS.
REFERENCE A3.01 FOR PARTITION TYPES AND PARTITION HEAD DETAILS.
REFERENCE A3.02 FOR PARTITION FRAMING DETAILS .
8.
9.
6. ALL INTERIOR AND EXTERIOR SIGNAGE ARE TO BE PROVIDED AND INSTALLED
BY OWNER.
1/8" = 1'-0"01 LEVEL 1 - FLOOR PLAN
0' 4' 16'8'
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542 designgroup
Architecture, Engineering, and Sustainable DesignAESUS
KEY PLAN NTS
NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Construct Facility for Mental Health and Primary Care Alternative Modalities
Location:
100% Bid Set Submittal
August 18, 2023 o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
612-908
VANCHCS
10535 HOSPITAL WAY MATHER, CA 95655
AESUS
PROJECT
AREA
MAIN
HOSPITAL
AESUS
A2.10
LEVEL 01 FLOOR PLAN
HAC
2A-205
ELEC
2A-203
OFFICE
2E-268
ELEVATOR
2A-201
1 2 3 4
J
H
G
F
E
A
B
C
A.4
VESTIBULE
2A-200
IDF
2E-263
ROOF BELOW
OFFICE
2E-266
OFFICE
2E-264
SHARED
OFFICE
2E-262
OFFICE
2E-274
18' - 6" 29' - 6"
CLEAN UTILITY
& SUPPLY
2D-232
1.5
D
2.5
25' - 0"
3.5
SHAFT
2D-227
5' - 0"
OFFICE
2E-270
6' - 0"
EXAM
2D-224
CONTROL
STATION
2D-248
SOILED
UTILITY
2D-236
EXAM
2D-222
OFFICE
2D-237
OFFICE
2D-235
OFFICE
2D-233
OFFICE
2D-231
OFFICE
2C-221
OFFICE
2D-225
PIV LAB
2C-218
OFFICE
2E-265
CONFERENCE
ROOM
2E-261
SLEEP,
TYPICAL
2D-244
SHARED
OFFICE
2D-239
CLEAN LINEN
2D-241
BARIATRIC
TOILET
2D-245
BARIATRIC
SLEEP
2D-243
OFFICE
2C-219
OFFICE
2C-217
OFFICE
2C-215
OFFICE
2C-213
OFFICE
2C-212
OFFICE
2C-214 LACTATION
ROOM
2B-207
PIV LAB
2C-216
SLEEP
2D-250
BARIATRIC
SLEEP
2D-247
BARIATRIC
TOILET
2D-249
TOILET
2D-246
TOILET
2D-252
OFFICE
2E-272
CHECK-IN /
WAITING AREA
2B-206
CPAP
STORAGE
2D-234
FEMALE
2B-211
MALE
2B-209
OFFICE
2D-223
A2.5405
A2.55
EWC3
CORRIDOR
2C-210
CORRIDOR
2D-220
CORRIDOR
2E-260
CORRIDOR
2D-240
NOURISHMENT
2D-242
CORRIDOR4
9' - 6 5/8" 8' - 0"
6' - 4 7/8" 11' - 1 3/4" 9' - 10 1/4"
20' - 4 7/8" 6' - 4 7/8"
11' - 6 5/8" 14' - 11 3/4" 21' - 8 1/4"
6' - 4 7/8" 10' - 4 7/8" 10' - 7 1/8" 16' - 11 3/4"
3' - 5 1/8"
6' - 4 7/8"
6' - 4 7/8" 9' - 5 3/4" 9' - 4 7/8" 5' - 6 5/8" 6' - 6 3/4" 6' - 11 5/8" 3' - 5 1/4" 6' - 4 7/8"
6' - 4 7/8" 10' - 2 1/4" 31' - 2 5/8"
6' - 4 7/8"
6' - 4 7/8" 10' - 3" 10' - 0" 9' - 4 5/8" 10' - 4 7/8"
/4
/8
/8
/8
/8
/8
/8
/4
/8
/8
/8
/8
/8
/8
/8
/8
/8
/8
/8
/8
/8
/4
/2
/8
/4
/8
/8
/8
/2
/8
/8
/8
/8
/8
B
A
9 -
1 -
7 -
212213
A
220B
5 -
A
A
200A
5 -
2 -
6 -
9 -
261B
2 -
3 -
A
A3
H
H1
H
H1
H
H
A
A3
A3
A
A
A3
A3
A
H
H1
A3
H
A3
A3
A3
C
C6A3
C
C6
H1
H
A3
H1
H
H
H1
A3
A3
H1
H
H1
H
A3
H
H1
A3
A
A
A
H1
A3
A
A3
A3 E E
A
A
A3
A3 A3
A3
A3
A3
A3
A3
A3
A
A3
A3
A3
A
A3
A3
A
H1
H
A3
A
A
A3
A
A3
A
H
A3
A
A3
A
A3
A3
A3
A3
H1
A3
A3
EE
A
A3
A3
A
A
A
H1
H
A3
A
H
E E
E E
H1
H
H1
A3
A
H1
H1
H
H1
H
H1
H
H1
H
H1
H
H1
H
H
H1
A
A
A
A
A3
A
A2.54 08
/A2.54 06
/A2.55 01
/A2.55 09
/A2.55 07
/A2.56 07
/A2.54 01
/A2.52 04 /A2.52 04 sim
/A2.56 05
/A2.56 01/A2.56 03
/A2.56 12
/A2.56 12
A
CR
CR
CR
CR
CR
CR
CR
CR
A2.56 sim
/A3.23 02
/A2.56 10
/A2.55 11
PB
PB
PB
PB
CR
CR
A8.20 / 01
REFER TO
TYPICAL
REFER TO
TYPICAL
REFER TO
TYPICAL
T1
T1
T1
T1
/8
1' - 0"
C
H 1 H
H
H
STIAR 2
2A-202
STAIR 1
2D-254
16' - 0" 25' - 0" 21' - 6" 20' - 0"
A8.20 / 04
FLOOR PLAN GENERAL NOTES
1. WRITTEN DIMENSIONS SHALL HAVE PRECEDENCE.
LARGER SCALE DRAWING SHALL HAVE PRECEDENCE OVER
SMALLER SCALE DRAWINGS. THE GC SHALL NOTIFY THE VA OF ANY
DISCREPANCIES OR CONFLICTS BEFORE PROCEEDING WITH THAT PORTION
OF THE WORK. ALL DOORS TO BE 6" FROM NEAREST WALL U.N.O.
2. THE CONTRACTORS SHALL COORDINATE EQUIPMENT AND MATERIAL
TRAFFIC AND STORAGE WITH COR.
3. ALL UTILITY WORK SHALL BE COORDINATED WITH MECHANICAL, PLUMBING,
ELECTRICAL, AND FIRE PROTECTION.
4. ALL ASPECTS OF CONTRACTOR STAGING AND CONSTRUCTION PHASING
SHALL BE APPROVED BY COR.
5. PRIOR TO THE START OF ANY WORK. THE CONTRATOR IS REQUIRED TO
VISIT THE SITE TO FAMILIARIZE THEMSELVES WITH THE
EXTENT AND NATURE OF WORK TO BE PERFORMED. EXISTING CONDITIONS
MAY SLIGHTLY VARY FROM THOSE SHOWN ON THE DRAWINGS. THE
CONTRACTOR SHALL VERIFY EXISTING CONDITIONS, DIMENSIONS AND
MATERIALS IN THE FIELD AND GENERATE A LIST OF DISCREPANCIES IN WRITING
AND REPORT TO THE COR. REFER TO SPECIFICATIONS FOR FURTHER
INFORMATION.
7. ALL DIMENSIONS ARE TAKEN FROM FACE OF WALL FINISH.
THE CONTRACTOR IS RESPONSIBLE FOR PROTECTING ANY OPENINGS AND
RESPONSIBLE FOR ANY DAMAGE THAT MAY RESULT FROM SUCH OPENINGS
BEING LEFT UNPROTECTED OR THOSE THAT HAVE OCCURED AS A RESULT OF
PROTECTING THE OPENINGS.
REFERENCE A3.01 FOR PARTITION TYPES AND PARTITION HEAD DETAILS.
REFERENCE A3.02 FOR PARTITION FRAMING DETAILS .
8.
9.
6. ALL INTERIOR AND EXTERIOR SIGNAGE ARE TO BE PROVIDED AND INSTALLED
BY OWNER.
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542 designgroup
Architecture, Engineering, and Sustainable DesignAESUS
KEY PLAN NTS
NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Construct Facility for Mental Health and Primary Care Alternative Modalities
Location:
100% Bid Set Submittal
August 18, 2023 o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
612-908
VANCHCS
10535 HOSPITAL WAY MATHER, CA 95655
AESUS
PROJECT
AREA
MAIN
HOSPITAL
AESUS
A2.20
LEVEL 02 - SLEEP & HR
1/8" = 1'-0"01 Level 2 - FLOOR PLAN
0' 4' 16'8'
1 2 3 4
J
H
G
F
E
A
B
C
A.4
61.5
D
2.5 3.5
A2.5405
A2.55
A2.54 08
A2.56
HAC
2A-205
ELEC
2A-203
ELEVATOR
2A-201
VESTIBULE
2A-200
IDF
2E-263
ROOF BELOW
18' - 6" 29' - 6"
CLEAN UTILITY
& SUPPLY
2D-232
25' - 0"
SHAFT
2D-227
5' - 0"
6' - 0"
EXAM
2D-224
CONTROL
STATION
2D-248
SOILED
UTILITY
2D-236
EXAM
2D-222
OFFICE
2D-237
OFFICE
2D-235
OFFICE
2D-233
OFFICE
2D-231
OFFICE
2C-221
OFFICE
2D-225
PIV LAB
2C-218
OFFICE
2E-265
CONFERENCE
ROOM
2E-261
SLEEP,
TYPICAL
2D-244
SHARED
OFFICE
2D-239
CLEAN LINEN
2D-241
BARIATRIC
TOILET
2D-245
BARIATRIC
SLEEP
2D-243
OFFICE
2C-219
OFFICE
2C-217
OFFICE
2C-215
OFFICE
2C-213
OFFICE
2C-212
OFFICE
2C-214 LACTATION
ROOM
2B-207
PIV LAB
2C-216
SLEEP
2D-250
BARIATRIC
SLEEP
2D-247
BARIATRIC
TOILET
2D-249
TOILET
2D-246
TOILET
2D-252
CHECK-IN /
WAITING AREA
2B-206
CPAP
STORAGE
2D-234
FEMALE
2B-211
MALE
2B-209
OFFICE
2D-223
EWC3
CORRIDOR
2C-210
CORRIDOR
2D-220
CORRIDOR
2E-260
CORRIDOR
2D-240
NOURISHMENT
2D-242
CORRIDOR4
9' - 6 5/8" 8' - 0"
6' - 4 7/8" 11' - 1 3/4" 9' - 10 1/4"
20' - 4 7/8" 6' - 4 7/8"
11' - 6 5/8" 14' - 11 3/4" 21' - 8 1/4"
6' - 4 7/8" 10' - 4 7/8" 10' - 7 1/8" 16' - 11 3/4"
3' - 5 1/8"
6' - 4 7/8"
6' - 4 7/8" 9' - 5 3/4" 9' - 4 7/8" 5' - 6 5/8" 6' - 6 3/4" 6' - 11 5/8" 3' - 5 1/4" 6' - 4 7/8"
6' - 4 7/8" 10' - 2 1/4" 31' - 2 5/8"
6' - 4 7/8"
6' - 4 7/8" 10' - 3" 10' - 0" 9' - 4 5/8" 10' - 4 7/8"
/4
/8
/8
/8
/8
/8
/8
/4
/8
/8
/8
/8
/8
/8
/8
/8
/8
/8
/8
/8
/8
/4
/2
/8
/4
/8
B
A
9 -
1 -
7 -
A
220B
5 -
A
A
200A
5 -
2 -
6 -
9 -
261B
2 -
3 -
A
H
H1
H
H1
H
H
A
A
A
A3
A
H
H1
A3
H
A3
A3
A3
C
C6A3
C
C6
H1
H
A3
H1
H
H
H1
A3
H1
H
H1
H
A3
A3
A
A
A
H1
A
A3
A3 E E
A
A
A3
A3 A3
A3
A3
A3
A3
A3
A3
A
A3
A3
A3
A
A3
A3
A
H1
H
A3
A
A
A3
A
A3
A
H
A3
A
A3
A
A3
A3
A3
A3
H1
A3
A3
EE
A
A3
A3
A
A
A
H1
H
A3
A
H
E E
E E
H1
H
H1
A3
A
H1
H1
H
H1
H
H1
H
H1
H
H
H1
A
A
A
A
A3
A
/A2.54 06
/A2.55 01
/A2.55 09
/A2.55 07
/A2.56 07
/A2.54 01
/A2.52 04 /A2.52 04 sim
/A2.56 05
/A2.56 01/A2.56 03
/A2.56 12
/A2.56 12
A
CR
CR
CR
CR
CR
CR
CR
sim
/A3.23 02
/A2.56 10
/A2.55 11
PB
PB
PB
PB
CR
CR
REFER TO
TYPICAL
REFER TO
TYPICAL
REFER TO
TYPICAL
T1
T1
T1
T1
/8
1' - 0"
D E
D U
C T
IV
E
A L
T E
R N
A T
E
A D
M
IN
IS
T
R A
T
IV
E O
F F
IC
E
S
/8
/2
16' - 0" 25' - 0" 21' - 6" 20' - 0"
A8.20 / 01
A8.20 / 04
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542 designgroup
Architecture, Engineering, and Sustainable DesignAESUS
KEY PLAN NTS
NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Construct Facility for Mental Health and Primary Care Alternative Modalities
Location:
100% Bid Set Submittal
August 18, 2023 o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
612-908
VANCHCS
10535 HOSPITAL WAY MATHER, CA 95655
AESUS
PROJECT
AREA
MAIN
HOSPITAL
AESUS
A2.23
LEVEL 02 - FLOOR PLAN (DEDUCTIVE
ALTERNATE 3)
1/8" = 1'-0"01 Level 2 - FLOOR PLAN - DEDUCT ALT 3
DEDUCTIVE ALTERNATES NOTES:
A. REFER TO COST ESTIMATE FOR COMPLETE LIST OF DEDUCTIVE ALTERNATES
B. DEDUCTIVE ALTNERATES SHOWN ON THIS SHEET ARE RELATIVE TO PHASED
BUILD OUT OF LEVEL 02 ONLY
DEDUCTIVE ALTERNATE #3:
-REMOVE TILE WALL FINISH IN ALL BATHROOMS & REPLACE WITH WALL PROTECTION
PER FINISH SCHEDULE NOTES
-REPLACE COUNTERS AND UNDERMOUNT SINKS IN BATHROOMS WITH WALL
MOUNTED PORCELAIN LAVATORIES
-REMOVE GYPSUM BOARD CEILINGS IN BATHROOMS AND REPLACE WITH ACT 02
-REMOVE THE OFFICES ALONG GRIDLINE 4.
• NO FINISHES. UTILIZE EXPOSED CONCRETE AND EXPOSED CEILINGS
• NO WALLS
• FOR REMOVED DOORS REFER TO DOOR SCHEDULE COMMENTS ON A3.33
• KEEP CODE REQUIRED LIGHTING, EXIT SIGNAGE, FIRE ALARM, AND FIRE
PROTECTION PER ENGINEERING DRAWINGS
• PROVIDE HVAC PER MECHANICAL DRAWINGS
• PROVIDE DRYWALL WITH TAPED JOINTS ON EXTERIOR WALLS TO CONCEAL
INSULATION
• NO DATA, REFER TO LOW VOLTAGE DRAWINGS
J
H
G
F
E
A
B
C
A.4
61.5
D
2.5 3.5
A2.5405
A2.55
A2.54 08
A2.56
HAC
2A-205
ELEC
2A-203
ELEVATOR
2A-201
VESTIBULE
2A-200
IDF
2E-263
ROOF BELOW
18' - 6" 29' - 6"
CLEAN UTILITY
& SUPPLY
2D-232
25' - 0"
SHAFT
2D-227
5' - 0"
6' - 0"
EXAM
2D-224
CONTROL
STATION
2D-248
SOILED
UTILITY
2D-236
EXAM
2D-222
OFFICE
2D-237
OFFICE
2D-235
OFFICE
2D-233
OFFICE
2D-231
OFFICE
2D-225
OFFICE
2E-265
CONFERENCE
ROOM
2E-261
SLEEP,
TYPICAL
2D-244
SHARED
OFFICE
2D-239
CLEAN LINEN
2D-241
BARIATRIC
TOILET
2D-245
BARIATRIC
SLEEP
2D-243
LACTATION
ROOM
2B-207
SLEEP
2D-250
BARIATRIC
SLEEP
2D-247
BARIATRIC
TOILET
2D-249
TOILET
2D-246
TOILET
2D-252
CHECK-IN /
WAITING AREA
2B-206
CPAP
STORAGE
2D-234
FEMALE
2B-211
MALE
2B-209
OFFICE
2D-223
EWC3
CORRIDOR
2D-220
CORRIDOR
2E-260
CORRIDOR
2D-240
NOURISHMENT
2D-242
CORRIDOR4
9' - 6 5/8" 8' - 0"
6' - 4 7/8" 11' - 1 3/4" 9' - 10 1/4"
20' - 4 7/8" 6' - 4 7/8"
11' - 6 5/8" 14' - 11 3/4" 21' - 8 1/4"
6' - 4 7/8" 10' - 4 7/8" 10' - 7 1/8" 16' - 11 3/4"
3' - 5 1/8"
6' - 4 7/8"
6' - 4 7/8" 9' - 5 3/4" 9' - 4 7/8" 5' - 6 5/8" 6' - 6 3/4" 6' - 11 5/8" 3' - 5 1/4" 6' - 4 7/8"
31' - 2 5/8"
6' - 4 7/8"
10' - 0" 9' - 4 5/8" 10' - 4 7/8"
/4
/8
/8
/8
/8
/8
/8
/4
/8
/8
/8
/8
/8
/4
/2
/8
/4
/8
B
A
9 -
1 -
7 -
A
220B
5 -
A
A
200A
5 -
2 -
6 -
9 -
261B
2 -
3 -
A
H
H1
H
H1
H
H
A
A
A3
A
H
H1
A3
H
A3
A3
A3
C
C6A3
C
C6
H1
H
A3
H1
H
H
H1
A3
H1
H
H1
H
A3
A3
A
A
A
H1
A3
A3 E E
A
A
A3
A3
A3
A3
A3
A3
A
A
A3
A
A
A3
A
A3
H
A3
A
A3
A
A3
A3
A3
A3
H1
A3
A3
EE
A
A3
A3
A
A
A
H1
H
A3
A
H
E E
E E
H1
H
H1
A3
A
H1
H1
H
H1
H
H
H1
A
A
A
A
A3
A
/A2.54 06
/A2.55 01
/A2.55 09
/A2.55 07
/A2.56 07
/A2.54 01
/A2.52 04 /A2.52 04 sim
/A2.56 05
/A2.56 01/A2.56 03
A
CR
CR
CR
CR
CR
CR
CR
sim
/A3.23 02
/A2.55 11
PB
PB
PB
CR
CR
REFER TO
TYPICAL
REFER TO
TYPICAL
REFER TO
TYPICAL
T1
T1
T1
T1
DEDUCTIVE ALTERNATE 4 -
HUMAN RESOURCES
D E
D U
C T
IV
E
A L
T E
R N
A T
E
A D
M
IN
IS
T
R A
T
IV
E O
F F
IC
E
S
/2
/8
16' - 0" 25' - 0" 21' - 6" 20' - 0"
A8.20 / 04
A8.20 / 01
CR
1050 E. Southern Ave, Suite #D, Tempe, Arizona 85282, (480) 751-9542 designgroup
Architecture, Engineering, and Sustainable DesignAESUS
KEY PLAN NTS
NORTH
Drawing Title: Project Title:
Date
Location
Checked
Building Number:
Project Number:
Drawing Number:
Drawn
Revisions: Date
CONSULTANTS: ARCHITECT/ENGINEERS: Office of Construction and Facilities Management
Construct Facility for Mental Health and Primary Care Alternative Modalities
Location:
100% Bid Set Submittal
August 18, 2023 o n e e ig h th in c h o n e fo o t
B
A
C
D
E
F th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
VA FORM
08-6231
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
612-908
VANCHCS
10535 HOSPITAL WAY MATHER, CA 95655
AESUS
PROJECT
AREA
MAIN
HOSPITAL
AESUS
A2.24
LEVEL 02 - FLOOR PLAN (DEDUCTIVE
ALTERNATE 3 & 4)
DEDUCTIVE ALTERNATES NOTES:
1/8" = 1'-0"01 Level 2 - FLOOR PLAN - DEDUCT ALT 3 & 4
A. REFER TO COST ESTIMATE FOR COMPLETE LIST OF DEDUCTIVE ALTERNATES
B. DEDUCTIVE ALTNERATES SHOWN ON THIS SHEET ARE RELATIVE TO PHASED
BUILD OUT OF LEVEL 02 ONLY
DEDUCTIVE ALTERNATE #3:
-REMOVE TILE WALL FINISH IN ALL BATHROOMS & REPLACE WITH WALL PROTECTION
PER FINISH SCHEDULE NOTES
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .