Attachment_5_Day_Use_Sites_Phase_2_Limitations_on_SubK_Breakout.xlsx

XLSX spreadsheet 91 KB Posted

Attached to
GAOA GILA BOX DAY USE SITES PHASE II Federal contract opportunity
Solicitation number
140L0626B0003
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This is a Limitations on Subcontracting Breakout template for a small business set-aside contract. The document is associated with solicitation number 140L0626B0003 for GAOA Gila Box Day Use Sites Phase II, issued by the Department of the Interior Bureau of Land Management. The contract has a performance period of 240 days after Notice to Proceed and requires a minimum of 15% self-performance by the prime contractor under FAR 52.219-14(e)(3) or (4).

The template establishes a structured breakdown for tracking labor and material costs to ensure compliance with subcontracting limitations. It requires contractors to itemize total amount proposed, total material cost, self-performed labor, and payments to small business subcontractors (first-tier only) and large business subcontractors (second-tier and beyond). The limitation on subcontracting percentage is calculated by dividing total labor cost minus payments to large business subcontractors by total labor cost, and this percentage must exceed the required 15% self-performance threshold for compliance. Material costs include special tooling, special testing equipment, and construction equipment, while total labor costs encompass all contractual costs other than materials.

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Lim on Sub Breakout Limitations on Subcontracting Breakout FAR 52.219-14(e)(3) or (4)

Solicitation Number140L0626B0003
Type of Set-AsideSmall Business
Performance Period240 days after Notice to Proceed
Required Self-Performance15%

(A) Total Amount Proposed¹

(B) Total Material Cost2

(C) Self Performed Labor

(D) Small Business Subcontractor (SSS) Labor3
Total Amount Paid to [Insert First SSS Name]
Total Amount Paid to [Insert Second SSS Name]
Total Amount Paid to [Insert Third SSS Name]
Total Amount Paid to [Insert Fourth SSS Name]
Total Amount Paid to [Insert Fifth SSS Name]
Total Amount Paid to [Insert Sixth SSS Name]
Total Amount Paid to SSS Companies$0.00
(E) Large Business Subcontractor (LBS) Labor
Total Amount Paid to [Insert First LBS Name]
Total Amount Paid to [Insert Second LBS Name]
Total Amount Paid to [Insert Third LBS Name]
Total Amount Paid to [Insert Fourth LBS Name]
Total Amount Paid to [Insert Fifth LBS Name]
Total Amount Paid to [Insert Sixth LBS Name]
Total Amount Paid to LBS Companies$0.00

(F) Total Labor Cost4 $0.00

(G) Limitation on Subcontracting Percentage5
(Total Labor Cost - Total Amount Paid to LBS Companies) / Total Labor CostERROR:#DIV/0!
*Note 1: (A) Total Amount Proposed = (B) Total Material Cost + (F) Total Labor Cost
*Note 2: Total Material Cost includes special tooling, special testing equipment, and construction equipment. Additional definition of material cost can be found at 13 CFR 125.1.
*Note 3: Subcontractors must be first tier and qualify as a small business under the solicitation NAICS. All second tier subcontractors are counted as LBS labor.
*Note 4: Total labor costs consist of all contractual costs other than material.
*Note 5: To be compliant, limitation percentage must be greater than the required self-performance percentage.