Attachment_8_Q_A_26B0003_0001.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
GAOA GILA BOX DAY USE SITES PHASE II Federal contract opportunity
Solicitation number
140L0626B0003
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This is a Questions and Answers document for solicitation 140L0626B0003, GAOA Gila Box Day Use Sites Improvement Phase 2, issued by the Department of the Interior Bureau of Land Management. The Q&A addresses 17 inquiries from potential contractors regarding project execution, site access, and technical specifications.

Key operational details clarify that sites will remain open to the public during construction with BLM public notification, work may proceed concurrently across all sites without a required sequence, and no liquidated damages apply. Access constraints are significant: the Old Safford Bridge Picnic Area requires crossing multiple bridges with weight limits of 15 tons (Bridges 1 and 3) and 5 tons (Bridge 2), with an alternate 17-mile bypass route available. The remaining west-side sites (Spring Canyon, Dry Canyon Boat Take Out, West Entrance Kiosk, and Serna Cabin) are accessed via Bonita Creek Road, a narrow winding road unsuitable for vehicles and trailers exceeding 70 feet combined length. Technical specifications include a 10' x 12' x 4" concrete pad replacement at Dry Canyon, 3" x 3" x .250" steel tubing for structures, and compaction testing requirements for ABC material and concrete testing for all slabs and at least one footing per structure type at each site. The contractor is responsible for procuring water supply by contracting with local municipalities. Working hours are restricted to daylight only, and bids must be emailed to kassandra_hicks@ios.doi.gov and matthew_gilger@ios.doi.gov rather than mailed.

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Solicitation:140L0626B0003
Title:GAOA Gila Box Day Use Sites Improvement Phase 2, AZ
Company:Question and Answers
Inquiry numberSolicitation / Drawing / SOW / OtherSection/ Sheet/ PageQuestionGovernment Response
1Are there any liquidated damages? I do not see any listed.No.
2Can work be performed on all sites simultaneously?Yes. Sites will remain open to public with a public notice sent out by BLM to inform of construction. Contractor to work in site areas and be flexible with potential site visitors.
3Will the sites be closed during construction?No.
4At Spring Canyon picnic area, one of the shade structures sits on a slope, will the elevation be leveled by cutting the high side or raising the lower section?Cutting is expected to level area. Contractor to dispose of material on site in wash according to on-site BLM direction.
5On the Dry canyon boat take out bid walk it was mentioned that the concrete under the Kiosk that was being replaced would need to be removed and replaced, what is the square footage of the concrete to be demoed and replaced?Approximate dimensions are same as listed in SOW. 10' x 12' x 4" concrete pad.
6Is access to any of the work areas restricted due to bridge or road limitation requirements?Yes. The Old Safford Bridge Picnic Area is located past several bridges as mentioned in the response to question 8. See that response for details on bridge weight limits and alternate route via the Black Hills Back Country Byway. The remaining day use sites located on the west side of the Gila Box RNCA (Spring Canyon, Dry Canyon Boat Take Out, West Entrance Kiosk, and Serna Cabin) are accessed by Bonita Creek Road, which is a narrow, winding road that is not recommended for trucks and trailers over a combined length of 70'. There are also several steep hills that may be challenging for heavy loads. Speed limit is 10 mph and there are few pull outs. BLM recommends sending pilot/escort cars ahead of large/heavy loads to alert oncoming traffic.
7Will all the sites requiring dirt be accessible for the trucks delivering the fill dirt?All sites are accessible. Contractor to determine limits of trucks for each site.
8Can you provide the weight limits of the bridges that will need to be crossed?Bridge approximate locations are: bridge 1 (32°59'40.84"N, 109°17'19.25"W), bridge 2 (32°58'29.02"N, 109°18'2.78"W), and the Old Safford Bridge (32°57'54.41"N, 109°18'32.47"W). The Greenlee County Engineering Office performs inspections and has information on weight limits. County has given weight limits for the associated bridges. Bridge 1 – 15 tons. Bridge 2 – 5 tons. Bridge 3(Old Safford Bridge) – 15 tons. Call Reed Larson at (928) 865-4762 ext. 201 for more information. There is another way to the site that will bypass two of the bridges. South Entrance to Byway approximate Lat/Long: 32.84169885298562, -109.42270266696802. This route is dirt road maintained by the county with 1 bridge at approximately 32.946497 -

109.319394. This bridge has a posted limit of 15 tons. There is a short admin route to go around the bridge. Admin route is fenced off and BLM will be able to open gates. This route is approximately 17 miles to Old Safford Bridge Picnic Area. Road has a couple sharp turns and is not paved. BLM recommends scouting this route before commiting with large trailer. Utilizing this bypass route will have transportation only require passing over the Old Safford Bridge at 15 tons.

9attachment1n/alooking for the closest water supply for each site,Contractor's responsibility to procure water. Contractors may contact local municipalities (Safford and Clifton or closest towns to project sites).
10attachment 1pg. 4-5no gauge is specified for 3"x 3" steel tubingSquare Steel tubing to be 3" x 3" x .250" thickness
11attachment 1pg. 6third party testng, are we to test after the scarifing and then also after the abc, or can we test once abc is placed and compactedCompaction testing once ABC is placed and compacted.
12attachment 1pg.gthird party testing, are we to test the concrete both the slabs and footings for railing, ramada and kiosksEvery concrete slab, at least one footing for shade structure and kiosk, and for each site that requires railings at least 1 railing footing.
13Sol_140L0626B00031I want to clarifiy bid delivery, are we to mail the bids to the address on block 8Please email bids to kassandra_hicks@ios.doi.gov and matthew_gilger@ios.doi.gov. Do NOT physically mail any bids.
14Will a water source be available onsite for moisture conditioning, or should water be assumed to be supplied and hauled by the contractor?Water to be supplied and hauled by the contractor.
15Is there an anticipated sequence for completing the various sites, or will work be allowed to proceed concurrently as scheduling allows?There is no sequence requirement.
16Are there any restrictions on working hours, noise, or environmental limitations within the project area?No additional noise or environmental limitations exist outside of what is required per the contract & FAR. Working hours are set for daylight times only. Follow contract and FAR requirements.
17What is the FAR magnitude?Due to the Revolutionary FAR Overhaul (RFO) the government no longer posts the magnitude as the requirement has been removed completely from the Federal Acquisition Regulations. The government will not be providing a magnitude.