This is a General Decision (Wage Determination) document issued by the U.S. Department of Labor for heavy construction work in Arizona, specifically in Apache, Graham, Greenlee, and Navajo Counties.
The document establishes prevailing wage rates for various construction classifications, effective January 2, 2026, superseding the previous General Decision AZ20250054. Wage rates are provided for electricians (ranging from $33.00 to $62.08 per hour), power equipment operators ($27.38 to $46.56 per hour), truck drivers ($30.88 to $32.29 per hour), laborers ($27.41 to $31.98 per hour), carpenters ($31.98 per hour), and pipefitters/steamfitters ($54.15 per hour), with fringe benefit percentages ranging from 0.00% to 21.5%. The document includes explanations of rate identifiers (union rates, union average rates, survey rates, and state-adopted rates) and their effective dates. Additionally, it specifies requirements under Executive Order 13706 regarding paid sick leave for federal contractors and Executive Order 13658 establishing minimum wage thresholds of $13.30 per hour for covered workers in 2025. The document provides contact information for the Branch of Wage Surveys and Branch of Construction Wage Determinations at the U.S. Department of Labor for inquiries and appeals of wage determinations.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140L0626B0003_Amd_0002.pdf | ||
| Attachment_8_Q_A_26B0003_0001.xlsx | XLSX spreadsheet | |
| Attachment_7_Sign_In_Sheet_26B0003_0001.pdf | ||
| Sol_140L0626B0003_Amd_0001.pdf | ||
| Attachment_5_Day_Use_Sites_Phase_2_Limitations_on_SubK_Breakout.xlsx | XLSX spreadsheet | |
| Sol_140L0626B0003.pdf | ||
| Attachment_2_Day_Use_Sites_Phase_2_GeoTech_Report.pdf | ||
| Attachment_1_Day_Use_Sites_Phase_2__Statement_of_Work.pdf | ||
| Attachment_4__Day_Use_Sites_Phase_2_Bid_Schedule___Estimated_Quantities.pdf | ||
| Synopsis_Day_Use_Sites_Phase_2.pdf | ||
| Attachment_6_Day_Use_Sites_Phase_2_RFI_Form.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .