Attachment_4__Day_Use_Sites_Phase_2_Bid_Schedule___Estimated_Quantities.pdf

PDF 1 MB Posted

Attached to
GAOA GILA BOX DAY USE SITES PHASE II Federal contract opportunity
Solicitation number
140L0626B0003
Issued by
Department of the Interior Bureau of Land Management National Office

About this file

This is a Bid Schedule document for federal construction work issued by the Bureau of Land Management (BLM) under solicitation number 140L0626B0003 for GAOA Gila Box Day Use Site Improvements Phase II.

The contract encompasses construction improvements across five separate sites: Dry Canyon Boat Take Out, Serna Cabin Picnic Area, Old Safford Bridge Picnic Area, Spring Canyon Picnic Area, and West Entrance Overlook. Each site includes mobilization/site preparation, site improvements (such as gravel scarification and recompaction, aggregate base topping, concrete work, picnic tables, grills, and kiosks), general requirements for supervision and job site facilities, and mark-ups for sales tax, bonds, insurances, and overhead/profit. The estimated construction costs include escalation factors based on a third quarter 2026 construction notice-to-proceed and a location factor approximating 95 miles from Globe, Arizona. Specific quantities are provided for each site—ranging from 230 to 1,160 square yards of scarification work, 2 to 4 picnic tables and grills per location, and specialized items such as tube steel rail replacement (230-600 linear feet across sites), shade structures, kiosks, interpretative panels, and trash receptacles. The document explicitly states that estimated quantities are for information purposes only and that contractors are responsible for determining actual quantities. Cost totals and line-item pricing are left blank for bidder completion.

View the file

Other files for this federal contract opportunity

Other files attached to GAOA GILA BOX DAY USE SITES PHASE II, newest first.
File Type Posted
Sol_140L0626B0003_Amd_0002.pdf PDF
Attachment_8_Q_A_26B0003_0001.xlsx XLSX spreadsheet
Sol_140L0626B0003_Amd_0001.pdf PDF
Attachment_7_Sign_In_Sheet_26B0003_0001.pdf PDF
Attachment_5_Day_Use_Sites_Phase_2_Limitations_on_SubK_Breakout.xlsx XLSX spreadsheet
Synopsis_Day_Use_Sites_Phase_2.pdf PDF
Attachment_6_Day_Use_Sites_Phase_2_RFI_Form.xlsx XLSX spreadsheet
Sol_140L0626B0003.pdf PDF
Attachment_2_Day_Use_Sites_Phase_2_GeoTech_Report.pdf PDF
Attachment_3_Day_Use_Sites_Phase_2_Wage_Determination_AZ20260054.pdf PDF
Attachment_1_Day_Use_Sites_Phase_2__Statement_of_Work.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Scope Estimated Cost Dry Canyon Boat Take Out

ESTIMATE:

- Mobilization/Site Preparation

- Site Improvements

- General Requirements

- Mark Up's & Add-On's

- Escalation to 3rd Qtr 2026

Total Estimated Construction Cost:

Scope Estimated Cost Scope Estimated Cost Serna Cabin Picnic Area Old Safford Bridge Picnic Area

ESTIMATE: ESTIMATE:

- Mobilization - Mobilization

- Site Improvements - Site Improvements

- General Requirements - General Requirements

- Mark Up's & Add-On's - Mark Up's & Add-On's

- Escalation to 3rd Qtr 2026 - Escalation to 3rd Qtr 2026

Total Estimated Construction Cost: Total Estimated Construction Cost:

Scope Estimated Cost Scope Estimated Cost Spring Canyon Picnic Area West Entrance Overlook

ESTIMATE: ESTIMATE:

- Mobilization/Site Preparation - Mobilization/Site Preparation

- Site Improvements - Site Improvements

- General Requirements - General Requirements

- Mark Up's & Add-On's - Mark Up's & Add-On's

- Escalation to 3rd Qtr 2026 - Escalation to 3rd Qtr 2026

Total Estimated Construction Cost: Total Estimated Construction Cost:

TOTAL COST

Estimated quantities are for information purposes only, contractor is responsible for determining quantities.

Bureau of Land Management 140L0626B0003 GAOA Gila Box Day Use Site Improvements Phase II

BID SCHEDULE

Dry Canyon Boat Take Out

Description Estimated Quantitities Unit

Mobilization/Site Preparation Mobilization /site set up 1 ls Site Improvements SWPP scope (allowance based on narrative) 1 ls Demolitions incl haul off site 1 ls Scarify & recompact existing Gravel Scarify & recompact 6" 1,080 sy 2" Aggregate base topping 70 sy 5" Aggregate base topping 1,010 sy Replace damaged tube steel rail section a detail; 36" high 450 lf Concrete in small quantities 1 ls 2- sided Kiosk incl footings 1 ea Picnic Table 2 ea Grill 2 ea Misc Patch repairs to areas disturbed & Vegetation trimming/removal 1 ls

General Requirements; Supervision/Job site facilities etc Sub Total:

Mark Up's & Add-On's Add Sales Tax Add Bonds and Insurances Add Overhead & Profit (5% + 10%)

Sub Total:

Add Estimating Contingency Add Location Factor (approx 95 miles from Globe,AZ) Add Escalation based upon a 3rd Qtr 2026 construction NTP

Estimated Total To Summary:

Bureau of Land Mangement 140L0626B0003 GAOA Gila Box Day Use Site Improvements Phase II

ESTIMATED QUANTITIES

Estimated quantities are for information purposes only, contractor is responsible for determining quantities.

Old Safford Bridge Picnic Area

Estimated Quantitities Unit

Mobilization/Site Preparation Mobilization /site set up 1 ls Site Improvements SWPP scope (allowance based on narrative) 1 ls Scarify & recompact existing Gravel Scarify & recompact 6" 700 sy 5" Aggregate base topping 700 sy Picnic Table 4 ea Grill 4 ea Concrete in small quantities 1 ls Misc Patch repairs to areas disturbed & Vegetation trimming/removal 1 ls

General Requirements; Supervision/Job site facilities etc

Sub Total:

Mark Up's & Add-On's Add Sales Tax Add Bonds and Insurances Add Overhead & Profit (5% + 10%)

Sub Total:

Add Estimating Contingency Add Location Factor (approx 95 miles from Globe,AZ) Add Escalation based upon a 3rd Qtr 2026 construction NTP

Estimated Total To Summary:

Bureau of Land Mangement 140L0626B0003 GAOA Gila Box Day Use Site Improvements Phase II

ESTIMATED QUANTITIES

Estimated quantities are for information purposes only, contractor is responsible for determining quantities.

Serna Cabin Picnic Area

Estimated Quantitities Unit

Mobilization/Site Preparation Mobilization /site set up 1 ls Site Improvements SWPP scope (allowance based on narrative) 1 ls Site preparation/grading/demo existing equipment & remove 1 ls Replace tube steel rail section a detail; 36" high 600 lf 2- sided Kiosk incl footings 1 ea Concrete in small quantities 1 ls Picnic Table 4 ea Grill 4 ea Interprtative panel allowance 3 ea Misc Patch repairs to areas disturbed & Vegetation trimming/removal 1 ls

General Requirements; Supervision/Job site facilities etc Sub Total:

Mark Up's & Add-On's Add Sales Tax Add Bonds and Insurances Add Overhead & Profit (5% + 10%)

Sub Total:

Add Estimating Contingency Add Location Factor (approx 95 miles from Globe,AZ) Add Escalation based upon a 3rd Qtr 2026 construction NTP

Estimated Total To Summary:

Estimated quantities are for information purposes only, contractor is responsible for determining quantities.

Bureau of Land Mangement 140L0626B0003 GAOA Gila Box Day Use Site Improvements Phase II

ESTIMATED QUANTITIES

Spring Canyon Picnic Area

Estimated Quantitities Unit

Mobilization/Site Preparation Mobilization /site set up 1 ls Site Improvements SWPP scope (allowance based on narrative) 1 ls Demolitions incl haul off site 1 ls Shade structure 12'x12' incl footings 2 ea Scarify & recompact 6" 1,160 sy

2" Aggregate base topping 25 sy 5" Aggregate base topping 1,135 sy Replace damaged tube steel rail section a detail; 36" high 230 lf Concrete in small quantities 1.0 ls Picnic Table 2 ea Grill 2 ea Misc Patch repairs to areas disturbed & Vegetation trimming/removal 1 ls

General Requirements; Supervision/Job site facilities etc Sub Total:

Mark Up's & Add-On's Add Sales Tax Add Bonds and Insurances Add Overhead & Profit (5% + 10%)

Sub Total:

Add Estimating Contingency Add Location Factor (approx 95 miles from Globe,AZ) Add Escalation based upon a 3rd Qtr 2026 construction NTP

Estimated Total To Summary:

Bureau of Land Mangement 140L0626B0003 GAOA Gila Box Day Use Site Improvements Phase II

ESTIMATED QUANTITIES

Estimated quantities are for information purposes only, contractor is responsible for determining quantities.

West Entrance Overlook

Estimated Quantitities Unit

Mobilization/Site Preparation Mobilization/Site Preparation 1 ls Site Improvements SWPP scope (allowance based on narrative) 1 ls Demolitions (Kiosk/Trash receptacle) incl haul off site 1 ls 2-sided Kiosk incl footings 1 ea Interprtative panel allowance 1 ea Trash receptacle 1 ea Concrete in small quanitities 1 ls Misc Patch repairs to areas disturbed 1 ls

General Requirements; Supervision/Job site facilities etc

Sub Total:

Mark Up's & Add-On's Add Sales Tax Add Bonds and Insurances Add Overhead & Profit (5% + 10%)

Sub Total:

Add Estimating Contingency Add Location Factor (approx 95 miles from Globe,AZ) Add Escalation based upon a 3rd Qtr 2026 construction NTP

Estimated Total To Summary:

Estimated quantities are for information purposes only, contractor is responsible for determining quantities.

Bureau of Land Mangement 140L0626B0003 GAOA Gila Box Day Use Site Improvements Phase II

ESTIMATED QUANTITIES

Page 1
Page 2
Page 3
Page 4

File details come from the government source that posted it. Updated .