About this file
The document provided is an Attachment 5 - Cost Proposal for a state and local contract opportunity in Idaho. The Cost Proposal must be completed and submitted with the proposal, and it requires the offeror to provide a fully-burdened rate that includes all operating and personnel expenses, such as overhead, salaries, administrative expenses, travel, profit, and supplies. The contract opportunity involves Fixed and Variable Pricing of Freight Services, including a Fixed Charge, Stop Charge, Variable Mileage, and Miscellaneous Hourly Cost. The offeror must also provide estimates for the Initial Year Cost, Annual Miles, and Estimated Number of Stops.
The document also includes a detailed Fixed Charge Detail, which outlines the required quantities and unit costs for various equipment, such as Tandem axle Day Cab Tractors, Tandem axle Sleeper Tractors, 53' Trailers, 35' Trailers, 28' Pup Trailers, 26' Box Trucks, 28' Box Trucks, and Yard Tractors. The offeror must also provide estimates for Driver Fixed Expense, On-site Management, and Other Expenses. The total Fixed Cost is $0.00. Additionally, the offeror must assume a fuel cost of $4.00 per gallon and provide the impact on their estimate if only pallet loading is allowed, instead of floor loading.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 7 - Contract Template.docx | DOCX document | |
| Standard-Terms-and-Conditions_May-2021 (6).pdf | ||
| Request Form to Division of Purchasing (DOP).pdf | ||
| ATTACHMENT 1 PREPROPOSAL CONFERENCE.docx | DOCX document | |
| ATTACHMENT 3 MODIFICATIONS AND EXCEPTIONS.docx | DOCX document | |
| Attachment 6 Mandatory Technical Proposal Response.docx | DOCX document | |
| ATTACHMENT 2 BIDDERS QUESTIONS ANSWERED.docx | DOCX document | |
| ATTACHMENT 4 COVER FORM.docx | DOCX document | |
| Amendment 1.docx | DOCX document | |
| Event 106 Administrative Document Amended 1.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1 Attachment 5 - Cost Proposal
(ME) Attachment 5, Cost Proposal must be completed and submitted with your Proposal. The Offeror must provide a fully-burdened rate which must include, but not be limited to, all operating and personnel expenses, such as: overhead, salaries, administrative expenses, travel, profit, and supplies.
| Fixed and Variable Pricing of Freight Services | |||
| Schedule of Charges - 1st Year of Contract | |||
| Item/Description | Unit Cost | Units of Measure | Total Annual Cost |
| Fixed Charge - Covers all non-variable costs of the operation | Per Year Cost | ||
| Stop Charge - Covers driver-based pay for stop time | Per Stop-off and final delivery. Returns are included as part of store delivery and are not billed separately. | ||
| Tolls - If Applicable and approved by ISLD | Documented cost to Carrier | ||
| Variable Mileage - Covers the running cost of the operation including driver mileage-based pay | Per mile for all miles run | ||
| Miscellaneous - Hourly cost for all work not covered in Variable Mileage | Per hour for all driver hours worked not included above | ||
| Tolls - If Applicable and approved by ISLD | Documented cost to Carrier |
Initial Year Cost - Excluding Fuel Based on Appendix E Volumes $0.00
Annual Miles used in Your Cost Estimate ---->
Estimated Number of Stops ------------------>
| Fixed Charge Detail | ||||
| Description | Quantity | Unit Cost | Unit of Measure | Total Annual Cost |
| Tandem axle Day Cab Tractors | Per week | |||
| Tandem axle Sleeper Tractors | Per week | |||
| 53' Trailers | Per week | |||
| 35' Trailers | Per week | |||
| 28' Pup Trailer | Per week | |||
| 26' Box Truck | Per week | |||
| 28' Box Truck | Per week | |||
| Yard Tractors | Per week | |||
| Other Equipment: | Per week | |||
| Per week | ||||
| Per week | ||||
| Per week | ||||
| Per week | ||||
| Per week | ||||
| Per week | ||||
| Per week | ||||
| Driver Fixed Expense | Per week | |||
| On-site Management | Per week | |||
| Other Expenses | Per week |
Total Fixed Cost $0.00
Estimated Initial Year Cost for Fuel - Offerors must assume $4.00 gal ==>
If your estimate above assumes floor loading, what is annual impact to your estimate if only pallet loading is allowed? Higher/(Lower) ==>
| Offeror Company Name: |
| Individual Submitting Bid: |
| Email: |
| Phone: |
File details come from the government source that posted it. Updated .