Attachment 5 - Accident Prevention and Safety Plan TOC.pdf
PDF 175 KB Posted
- Solicitation number
- W911QY25RA026
About this file
This is an Accident Prevention Plan and Health and Safety Plan from the US Army Installation Management Command for the Natick Soldiers Systems Center. The comprehensive document provides a detailed table of contents outlining safety protocols and requirements for a federal contract, including sections on background information, safety policy, responsibilities, subcontractor management, training, safety inspections, incident reporting, and multiple specific safety plans.
The document includes 43 distinct safety and health plans covering topics such as emergency response, medical support, hazard communication, stress monitoring, equipment safety, fall protection, confined space procedures, and specialized construction safety plans. The appendices include key personnel resumes, health and safety inspection forms, an emergency action plan, an accident prevention plan sign-off sheet, and OSHA-related fact sheets. The plan is designed to comprehensively address safety management across multiple potential work environments and scenarios for a military installation project.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE ARMY
US ARMY INSTALLATION MANAGEMENT COMMAND
US ARMY GARRISON DPW
NATICK SOLDIERS SYSTEMS CENTER
15 GENERAL GREENE AVENUE
NATICK MA 01760
1 | P a g e
ACCIDENT PREVENTION PLAN
HEALTH AND SAFETY PLAN
TABLE OF CONTENTS
A. Signature Sheet
1. Plan Preparer
2. Plan Approver
3. Plan Concurrence
B. Background Information
1. Contractor Name
2. Contract Number
3. Project Name
4. Brief Project Description
5. Location of the Project (Map)
6. Contractor Accident Experience
7. Phases of Work and Hazardous Activities Requiring an Activity Hazard Analyses (AHA).
C. Statement of Health and Safety Policy
1. Corporate Safety and Health Policy Statement
2. Contractor’s Written Safety Program Goals
3. Contractor’s Written Safety Program Objectives
4. Contractor Accident Experience
D. Responsibilities and Lines of Authority
1. Statement of Ultimate Responsibility
2. Identification and accountability of personnel responsible for safety and health at both the corporate and project level
3. Equivalent Training to the OSHA 30-Hour Classes is Being Presented as Qualification
4. Site Specific Competent Person(s)
5. Requirements and Details of the Employer’s Risk Management Process.
6. Requirements for Initial Activity-Specific AHAs to be Submitted and Accepted at
Preparatory Meetings, Prior to Work Being Performed
7. No Work Requirement
8. Policies and Procedures Regarding Non-Compliance with Safety Requirements
9. Lines of authority
10. Written company procedures for holding managers and supervisors accountable for safety.
E. Subcontractors and Suppliers
1. Identification of Subcontractors and Suppliers
2. Safety Responsibilities of Subcontractors and Suppliers
F. Training
1. Newcomer Safety Orientation Training
2. Requirements for Mandatory Training and Certifications that are Applicable to this Project.
3. Procedures for Periodic Safety and Health Training for Supervisors and Employees
US ARMY GARRISON DPW
NATICK SOLDIERS SYSTEMS CENTER
2 | P a g e
4. Emergency Response Training
G. Safety and Health Inspections
1. Specific Assignment of Responsibilities
1.a Name(s) of Individual(S) Responsible for Conducting Safety Inspections
1.b Documented Proof of Inspector's Training / Qualifications
1.c Frequency that Inspections Shall be Conducted.
1.d Procedures for Documentation
1.e Deficiency Tracking System and Follow-Up Procedures
2. External Inspections/Certifications
H. Incident Reporting and Investigation
1. Exposure Data
1.a Mishap Investigations, Reports and Logs
2.b Immediate Notification of Major Accidents
2.c KO/COR Notification
I. Plans, Programs and Procedures
1. Fatigue Management Plan
2. Emergency Response Plans
2.a Procedures & Test
2.b Spill Plans
2.c Fire Fighting Plan
2.d Posting of Emergency Telephone Numbers
2.e Man Overboard/Abandon Ship
2.f Plan for Prevention of Alcohol and Drug Abuse
3. Site Sanitation/Housekeeping Plan
4. Medical Support Agreement
5. Blood-Borne Pathogen Program
6. Exposure Control Plan
7. Automatic External Defibrillator (AED) Program
8. Site Layout Plan
9. Access and Haul Road Plan
10. Hearing Conservation Program
11. Respiratory Protection Plan
12. Health Hazard Control Program
13. Hazard Communication Program
14. Process Safety Management Plan
15. Lead Compliance Plan
16. Asbestos Abatement Plan
17. Abrasive Blasting
18. Heat Stress Monitoring Plan (HSMP)
19. Cold Stress Monitoring Plan (CSMP)
20. Indoor Air Quality Management Plan
21. Mold Remediation Plan
US ARMY GARRISON DPW
NATICK SOLDIERS SYSTEMS CENTER
3 | P a g e
22. Lighting Plan for Night Operations
23. Traffic Control Plan
24. Fire Prevention Plan
25. Arc Flash Hazard Analysis
26. Assured Equipment Grounding Control Program (AEGCP)
27. Hazardous Energy Control Program and Procedures
28. Standard Pre-Lift Plan – LHE
Critical Lift Plan – LHE
29. Fall Protection and Prevention Plan
30. Demolition/Renovation Plan
31. Rope Access Work Plan
32. Excavation/Trenching Plan
33. Fire Prevention and Protection Plan for Underground Construction
34. Compressed Air Work Plan for Underground Construction
35. Erection and Removal Plan for Formwork and Shoring
36. Precast Concrete Plan
37. Lift-slab Plans
38. Masonry Bracing Plan
39. Steel Erection Plan
40. Tree Felling/Maintenance Program
41. Site Safety and Health Plan (HTRW)
42. Confined Space Entry Procedures
43. Confined Space Program
J. Risk Management Processes
Appendixes
Appendix A – Key Personnel Resumes
Appendix B – Health and Safety Inspection Forms
Appendix C - Emergency Action Plan
Appendix D - Accident Prevention Plan Sign off Sheet.
Appendix E - OSHA Whistleblower Fact Sheet and OSHA Lightning Safety Fact Sheet
File details come from the government source that posted it. Updated .