Attachment 5 -15569-Spec Vol I-R2 - 6-23-2025.pdf
PDF 6 MB Posted
- Solicitation number
- 36C77625B0043_1
About this file
This document is a detailed technical specification for asbestos floor tile and mastic abatement at the VA Central Iowa Healthcare System in Des Moines, Iowa. The project involves removing approximately 1,820 square feet of flooring and mastic, 3,994 square feet of mastic, and 6 linear feet of black tar above an exterior door. The abatement work will be conducted under strict regulatory requirements, including compliance with OSHA, EPA, and state regulations for asbestos removal.
The specification outlines comprehensive requirements for the asbestos abatement contractor, including detailed protocols for site preparation, worker protection, respiratory safety, containment procedures, and waste disposal. Key requirements include establishing a regulated work area, using appropriate personal protective equipment, implementing negative air pressure systems, conducting thorough cleaning and decontamination, and performing visual and air clearance testing. The contractor must submit detailed documentation, including an Asbestos Hazard Abatement Plan, worker qualifications, medical surveillance records, and complete the project with final certification of proper asbestos removal.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VA Central Iowa, Des Moines, IA VA Project 636-130
Laboratory Remodel and Addition 10-02-2024
3600 30th Street Bid Documents
Des Moines, IA 50310
00 01 10-1
TABLE OF CONTENTS
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 03-20
01 23 00 Alternates
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 03-20
01 33 23 Shop Drawings, Product Data, and Samples 05-17
01 35 26 Safety Requirements 05-20
01 42 19 Reference Standards 09-19
01 45 00 Quality Control 03-19
01 45 29 Testing Laboratory Services 11-18
01 45 35 Special Inspections 03-19
01 57 19 Temporary Environmental Controls 01-11
01 58 16 Temporary Interior Signage 07-15
01 74 19 Construction Waste Management 09-13
01 81 13 Sustainable Construction Requirements 10-17
01 91 00 General Commissioning Requirements 10-15
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
02 82 13.13 Building 1W Glovebag Asbestos Abatement 09-15
02 82 13.19 Building 1W Asbestos Floor Tile and Mastic Abatement 09-15
02 82 13.31 Building 1W Asbestos Transite Abatement
02 82 13.41 Building 3 Asbestos Abatement for Total Demolition
02 83 33.13 Building 1 and 3 Lead-Based Paint Removal and Disposal 08-16
DIVISION 03 – CONCRETE
03 30 00 Cast-in-Place Concrete 02-16
DIVISION 04 – MASONRY
04 05 13 Masonry Mortaring 10-17
04 20 00 Unit Masonry 08-17
04 72 00 Cast Stone Masonry 02-15
00 01 10-2
DIVISION 05 – METALS
05 12 00 Structural Steel Framing 11-18
05 36 00 Composite Metal Decking 10-15
05 40 00 Cold-Formed Metal Framing 05-16
05 50 00 Metal Fabrications 08-18
05 51 00 Metal Stairs 10-15
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
06 20 00 Finish Carpentry 08-16
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 01 50.19 Preparation for Re-Roofing 02-16
07 08 00 Facility Exterior Closure Commissioning 11-16
07 13 52 Modified Bituminous Sheet Waterproofing 08-16
07 21 13 Thermal Insulation 10-17
07 22 00 Roof and Deck Insulation 02-16
07 27 26 Fluid-Applied Membrane Air Barrier, Vapor Permeable 02-16
07 54 23 Thermoplastic Polyolefin (TPO) Roofing 08-16
07 60 00 Flashing and Sheet Metal 07-14
07 81 00 Applied Fireproofing 10-17
07 84 00 Firestopping 02-16
07 92 00 Joint Sealants 10-17
07 95 13 Expansion Joint Cover Assemblies 02-16
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 08-16
08 14 00 Interior Wood Doors 02-16
08 31 13 Access Doors and Frames 02-16
08 34 53 Security Doors and Frames 05-15
08 44 13 Glazed Aluminum Curtain Walls 04-20
08 71 00 Door Hardware 04-20
08 71 13 Automatic Door Operators 02-16
08 80 00 Glazing 10-15
08 90 00 Louvers and Vents 05-15
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 02-15
09 22 16 Non-Structural Metal Framing 06-18
09 29 00 Gypsum Board 04-20
09 30 00 Specialty Trims and Moldings
09 30 13 Ceramic/Porcelain Tiling 09-15
09 30 50 Tile Setting Materials and Accessories
09 51 00 Acoustical Ceilings 12-18
00 01 10-3
SECTION NO. DIVISION AND SECTION TITLES DATE
09 65 13 Resilient Base and Accessories 02-16
09 65 16 Resilient Sheet Flooring 05-18
09 65 19 Resilient Tile Flooring
09 67 23.20 Resinous Epoxy Base Flooring (EPY-2) 07-14
09 67 23.30 Resinous High Performance Decorative Mortar Flooring
(EPY-1)
09 91 00 Painting 01-16
DIVISION 10 – SPECIALTIES
10 14 00 Signage 10-15
10 21 23 Cubicle Curtain Tracks 05-15
10 26 00 Wall and Door Protection 10-15
10 28 00 Toilet, Bath, and Laundry Accessories 02-16
10 44 13 Fire Extinguisher Cabinets 08-18
DIVISION 12 – FURNISHINGS
12 32 00 Manufactured Wood Casework 09-15
12 36 00 Countertops 12-18
DIVISION 13 - SPECIAL CONSTRUCTION
13 21 29 Constant Temperature Rooms 08-16
DIVISION 14– CONVEYING EQUIPMENT
14 21 00 New Traction Elevators 10-19
14 92 19 Pneumatic Tube System - Computerized
DIVISION 21- FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 07-16
22 05 19 Meters and Gages for Plumbing Piping 09-15
22 05 23 General-Duty Valves for Plumbing Piping 09-15
22 07 11 Plumbing Insulation 09-19
22 11 00 Facility Water Distribution 11-19
22 13 00 Facility Sanitary and Vent Piping 09-15
22 14 00 Facility Storm Drainage 09-15
22 14 29 Sump Pumps 09-15
22 40 00 Plumbing Fixtures 09-15
22 66 00 Chemical-Waste Systems for Laboratory and Healthcare
Facilities
09-15
00 01 10-4
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 02-20
23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment
02-20
23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment
02-20
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20
23 07 11 HVAC and Boiler Plant Insulation 02-20
23 08 00 Commissioning of HVAC Systems 02-20
23 09 23 Direct-Digital Control System for HVAC 09-11
23 21 13 Hydronic Piping 02-20
23 21 23 Hydronic Pumps 02-20
23 22 13 Steam and Condensate Heating Piping 02-20
23 22 23 Steam Condensate Pumps 04-20
23 23 00 Refrigerant Piping 02-20
23 25 00 HVAC Water Treatment 02-20
23 31 00 HVAC Ducts and Casings 02-20
23 34 00 HVAC Fans 02-20
23 36 00 Air Terminal Units 02-20
23 37 00 Air Outlets and Inlets 02-20
23 40 00 HVAC Air Cleaning Devices 03-20
23 72 00 Air-to-Air Energy Recovery Equipment 03-20
23 73 00 Indoor Central-Station Air-Handling Units 03-20
23 81 00 Decentralized Unitary HVAC Equipment 03-20
23 82 00 Convection Heating and Cooling Units 03-20
23 82 16 Air Coils 03-20
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16
26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17
26 05 26 Grounding and Bonding for Electrical Systems 01-17
26 05 33 Raceway and Boxes for Electrical Systems 01-18
26 05 73 Overcurrent Protective Device Coordination Study 01-18
26 08 00 Commissioning of Electrical Systems 11-16
26 09 23 Lighting Controls 01-18
26 22 00 Low-Voltage Transformers 01-18
26 24 16 Panelboards 01-18
26 24 19 Motor Control Centers 01-18
26 27 26 Wiring Devices 01-18
26 29 11 Motor Controllers 01-18
26 29 21 Enclosed Switches and Circuit Breakers 01-17
26 41 00 Facility Lightning Protection 01-17
26 43 13 Surge Protective Devices 01-17
26 51 00 Interior Lighting 01-18
26 56 00 Exterior Lighting 01-18
00 01 10-5
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19
27 05 26 Grounding and Bonding for Communications Systems 06-15
27 05 33 Raceways and Boxes for Communications Systems 10-18
27 10 00 Control, Communication and Signal Wiring 06-15
27 11 00 Communications Equipment Room Fittings 06-15
27 15 00 Communications Structured Cabling 01-16
27 52 23 Nurse Call and Code Blue Systems 10-18
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18
28 05 26 Grounding and Bonding for Electronic Safety and
Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and
Security
09-11
28 13 00 Physical Access Control System 10-11
28 23 00 Video Surveillance 09-11
28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK
31 20 11 Eathwork
31 63 16 Auger Cast Grout Piles 10-12
31 23 19 Dewatering
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 05 23 Cement and Concrete for Exterior Improvements
32 90 00 Planting
DIVISION 33 – UTILITIES
33 10 00 Water Utilities
33 40 00 Storm Sewer Utilities
Appendix A
Geotechnical Engineering Report
Appendix B
Pre-demolition Hazardous Materials Survey – Building 1w
- Laboratory
Pre-demolition Hazardous Materials Survey – Building 3
Modular Addition
Lead Paint testing at the Des Moines Veterans Affairs
Medical Center
00 01 15 - 1
LIST OF DRAWING SHEETS
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
GI000 COVER SHEET
GI001 SHEET INDEX
GI002 ABBREVIATIONS
GI101 LOWER LEVEL LIFE SAFETY PLAN
GI111 FIRST LEVEL LIFE SAFETY PLAN
GI121 SECOND LEVEL LIFE SAFETY PLAN
GC101 LOWER LEVEL INFECTION CONTROL & PHASING PLAN
GC111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN
GC121 SECOND & THIRD LEVEL INFECTION CONTROL & PHASING PLAN
SITE / CIVIL
D-001 DEMOLITION PLAN
C-001 SITE PLAN
C-002 GRADING AND EROSION CONTROL PLANS
C-003 UTILITY PLAN
C-004 CHILLED WATER AND STEAM UTILITY PLAN
C-500 CIVIL DETAILS
C-501 CIVIL DETAILS 2
L-001 LANDSCAPING PLAN
L-500 LANDSCAPING DETAILS
STRUCTURAL
S000 GENERAL NOTES
SB101 FOUNDATION PLAN
SB101.1 ALTERNATE FOUNDATION PLAN
SF102 LOWER LEVEL FLOOR FRAMING PLAN
SF102.1 ALTERNATE LOWER LEVEL FOOR FRAMING PLAN
SF111 FIRST FLOOR FRAMING PLAN
SF112 ENLARGED VIEWS
00 01 15 - 2
SF121 SECOND FLOOR FRAMING PLAN
SF131 THIRD FLOOR FRAMING PLAN
SB300 FOUNDATION DETAILS
SB301 FOUNDATION DETAILS
SB302 FOUNDATION DETAILS
SF500 DETAILS
SF501 DETAILS
SF502 STEEL DETAILS
SF503 DETAILS
ARCHITECTURAL
AS100 ARCHITECTURAL SITE PLAN
ASB111 FIRST LEVEL ABATEMENT REMEDIATION PLANS - BLDG 1W
ASB112 FIRST LEVEL ABATEMENT REMEDIATION PLANS -TEMP BLDG
AD101 SUB BASEMENT & LOWER LEVEL DEMOLITION PLAN
AD111 FIRST LEVEL DEMOLITION PLAN - BUILDING 1W AND TEMP BUILDING
AD121 SECOND LEVEL AND THIRD LEVEL DEMOLITION PLAN
AD520 DEMOLITION WALL SECTIONS
AE101 SUB BASEMENT & LOWER LEVEL FLOOR PLAN
AE102 LOWER LEVEL DIMENSION PLAN
AE111 FIRST LEVEL FLOOR PLAN
AE112 FIRST LEVEL DIMENSION PLAN
AE121 SECOND LEVEL FLOOR PLAN
AE131 THIRD LEVEL FLOOR PLAN & ROOF PLAN
AC111 LOWER & FIRST LEVEL REFLECTED CEILING PLAN
AE201 EXTERIOR ELEVATIONS
AE211 ENLARGED PLANS & INTERIOR ELEVATIONS
AE301 BUILDING SECTIONS
AE311 WALL SECTIONS
AE312 WALL SECTIONS
AE320 ENLARGED PLANS & SECTIONS - STAIR
AE321 ENLARGED PLANS & SECTIONS - ELEVATOR
AE411 ENLARGED PLANS & ELEVATIONS
AE501 EXTERIOR PLAN DETAILS
00 01 15 - 3
AE502 EXTERIOR PLAN DETAILS
AE520 EXTERIOR SECTION DETAILS
AE521 EXTERIOR SECTION DETAILS
AE530 ROOF DETAILS
AE531 ROOF DETAILS
AE540 INTERIOR PLAN DETAILS
AE550 INTERIOR SECTION DETAILS
AE551 INTERIOR SECTION DETAILS
AE552 INTERIOR SECTION DETAILS
AE553 INTERIOR SECTION DETAILS
AE560 CEILING DETAILS
AE601 EXTERIOR WALL TYPES & INTERIOR PARTITION TYPES
AE602 OPENING SCHEDULE, ELEVATIONS & DETAILS
AE603 CURTAIN WALL TYPES AND PROFILES AND LOUVER TYPES
AE640 MOUNTING HEIGHTS
INTERIOR
AF111 LOWER & FIRST LEVEL FINISH PLANS
AF121 SECOND & THIRD LEVEL FINISH PLANS
AF600 MATERIAL AND ROOM FINISH SCHEDULE
AW101 LOWER LEVEL WAYFINDING PLAN
AW111 FIRST & SECOND LEVEL WAYFINDING PLANS
AW601 WAYFINDING MESSAGE SCHEDULES & SIGNAGE DETAILS
IF111 LOWER LEVEL & FIRST LEVEL FURNITURE PLAN
EQUIPMENT
QH111 LOWER LEVEL & FIRST LEVEL EQUIPMENT PLAN
QH411 LOWER LEVEL ENLARGED EQUIPMENT PLANS & ELEVATIONS
QH412 LOWER LEVEL ENLARGED EQUIPMENT PLANS & ELEVATIONS
QH413 FIRST LEVEL ENLARGED EQUIPMENT PLANS & ELEVATIONS
FIRE PROTECTION
F000 FIRE PROTECTION COVERSHEET
FD100 FLOOR PLANS DEMOLITION - FIRE PROTECTION
FD101 FLOOR PLANS DEMOLITION - FIRE PROTECTION
00 01 15 - 4
FD200 FLOOR PLAN DEMOLITON - SYSTEMS
FD202 FLOOR PLAN DEMOLITION - SYSTEMS
F100 FLOOR PLANS - FIRE PROTECTION
F101 FLOOR PLANS - FIRE PROTECTION
F200 FLOOR PLANS - SYSTEMS
F201 FLOOR PLANS - SYSTEMS
F300 FIRE ALARM DETAILS
MECHANICAL
MP000 PIPING COVERSHEET
MPD10U SUB BASEMENT PLAN DEMOLITION - PIPING
MPD100 FLOOR PLANS DEMOLITION - PIPING
MPD102 FLOOR PLANS DEMOLITION - PIPING
MP10U SUB BASEMENT PLAN - PIPING
MP100 FLOOR PLANS - PIPING
MP101 FLOOR PLANS - PIPING
MP200 PIPING ENLARGED PLANS
MP300 PIPING DETAILS
MP301 PIPING DETAILS
MP400 PIPING FLOW DIAGRAMS
MP401 PIPING FLOW DIAGRAMS
MP402 PIPING FLOW DIAGRAMS
MP500 PIPING SCHEDULES
MP600 CONTROL DIAGRAMS
MP601 CONTROL DIAGRAMS
MP602 CONTROL DIAGRAMS
MH000 VENTILATION COVERSHEET
MHD100 FLOOR PLANS DEMOLITION - VENTILATION
MHD102 FLOOR PLANS DEMOLITION - VENTILATION
MH100 FLOOR PLANS - VENTILATION
MH101 FLOOR PLANS - VENTILATION
MH300 VENTILATION DETAILS
MH301 VENTILATION DETAILS
MH500 VENTILATION SCHEDULES
00 01 15 - 5
PLUMBING
P000 PLUMBING COVERSHEET
PD10U FLOOR PLANS DEMOLITION - PLUMBING
PD100 FLOOR PLANS DEMOLITION - PLUMBING
PD101 FLOOR PLANS DEMOLITION - PLUMBING
P10U SUB BASEMENT PLAN - PLUMBING
P100 FLOOR PLANS - PLUMBING
P101 FLOOR PLANS - PLUMBING
P200 ENLARGED PLANS - PLUMBING
P201 ENLARGED PLANS - PLUMBING
P300 PLUMBING DETAILS
P500 PLUMBING ISOMETRICS
P600 PLUMBING MATERIAL LISTS
ELECTRICAL
E000 ELECTRICAL COVERSHEET
ELD100 FLOOR PLANS DEMOLITION - LIGHTING
EPD100 FLOOR PLANS DEMOLITION - POWER
EPD101 FLOOR PLAN DEMOLTION - POWER
E10U SUB BASEMENT PLAN - ELECTRICAL
EL100 FLOOR PLANS - LIGHTING
EL101 FLOOR PLANS - LIGHTING
EP100 FLOOR PLANS - POWER
EP101 FLOOR PLANS - POWER
E200 ENLARGED PLANS - ELECTRICAL
E201 ENLARGED PLANS - ELECTRICAL
E300 ELECTRICAL DETAILS
E301 ELECTRICAL DETAILS
E302 ELECTRICAL DETAILS
E303 ELECTRICAL DETAILS
E400 ELECTRICAL ONE-LINE DIAGRAMS
E500 ELECTRICAL SCHEDULES
E600 ELECTRICAL PANEL SCHEDULES
E601 ELECTRICAL PANEL SCHEDULES
00 01 15 - 6
TECHNOLOGY
T000 TECHNOLOGY COVERSHEET
TD100 FLOOR PLANS DEMOLITION - TECHNOLOGY
TD102 FLOOR PLANS DEMOLITION - TECHNOLOGY
T100 FLOOR PLANS - TECHNOLOGY
T300 TECHNOLOGY DETAILS
T400 TECHNOLOGY RISER DIAGRAMS
T500 TECHNOLOGY SCHEDULES
- - - E N D - - -
01 00 00-0
GENERAL REQUIREMENTS
SECTION 01 00 00
SECTION 01 00 00
GENERAL REQUIREMENTS
1.1 SAFETY REQUIREMENTS
1.2 PRECONSTRUCTION CONFERENCE
1.3 PROGRESS MEETINGS
1.4 GENERAL INTENTION
1.5 STATEMENT OF BID ITEM(S) – NOT USED
1.7 CONSTRUCTION SECURITY REQUIREMENTS
1.8 OPERATIONS AND STORAGE AREAS
Site & Utility Phases:
1.9 ALTERATIONS
1.10 DISPOSAL AND RETENTION
1.11 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND
IMPROVEMENTS
(FAR 52.236-9)
1.12 RESTORATION
1.14 PROFESSIONAL SURVEYING SERVICES
1.15 LAYOUT OF WORK
(FAR 52.236-17)
1.16 AS-BUILT DRAWINGS
1.17 WARRANTY MANAGEMENT
1.18 USE OF ROADWAYS
1.18 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
1.22 AVAILABILITY AND USE OF UTILITY SERVICES
1.23 NEW TELEPHONE EQUIPMENT
1.24 TESTS
1.25 INSTRUCTIONS
1.26 GOVERNMENT-FURNISHED PROPERTY
1.29 CONSTRUCTION SIGN
1.30 SAFETY SIGN
1.31 HISTORIC PRESERVATION
01 00 00-1
01 00 00-2
1.1 SAFETY REQUIREMENTS
Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 PRECONSTRUCTION CONFERENCE
A. General: Prior to commencement of the Work the Contractor Project Manager and primary Project Superintendent will conduct a preconstruction conference to be held at a predetermined time and place mutually agreed on by the Contractor
Project Manager and COR.
B. Delineation of Responsibilities: The purpose of the conference is to designate responsible personnel, to establish a working relationship among the parties and to identify the responsibilities of the OWNER, plant personnel and the
CONTRACTOR/VENDOR. Matters requiring coordination will be discussed and procedures for handling such matters, established. The agenda will include:
1. Project scope and sequence
2. Schedules
3. ICRA responsibilities
4. Submittal procedures
5. Partial Payment procedures
6. Maintenance of Records
7. Maintenance of facility operations
8. Project phasing review
9. Safety and First Aid responsibilities
10. Change Orders and Field Directive Changes
11. Use of site
12. Housekeeping
13. Equipment delivery
C. Attendees: The preconstruction conference is to be attended by the representatives of the CONTRACTOR/VENDOR, the OWNER and plant personnel that will be associated with the project. Representatives of regulatory agencies, subcontractors, and principal suppliers may also attend when appropriate.
D. Chair and Minutes: The preconstruction conference will be chaired by the Owner who will also arrange for the keeping and distribution of minutes to all attendees.
01 00 00-3
1.3 PROGRESS MEETINGS
A. Meeting Frequency and Format: Schedule progress meetings on at least a basis or more frequently as warranted by the complexity of the Project, to review the Work, discuss changes in schedules, maintain coordination and resolve potential problems. Invite OWNER, ENGINEER
1.4 GENERAL INTENTION
A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for 636-130 Laboratory Remodel and Addition as required by drawings and specifications.
B. Normal working hours for this contract will be from 7:00AM to 4:30PM
(local time) Monday through Friday except for weekends and established
Federal Holidays.
C. Performing on-site work outside normal working hours will require approval from the Contracting Officer and the COR. Requests shall be submitted via email at least 72 hours prior to the requested date and at no additional cost to the Government. Approvals are subject to the availability of on-site staff
D. Visits to the site by Bidders may be made in accordance with what is listed in the solicitation and at the discretion of the Contracting
Officer.
E. Offices of Anderson Engineering of Minnesota, LLC, 13605 1st Avenue North, Plymouth, MN 55441, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting
Officer or their duly authorized representative.
F. All employees of general contractor and subcontractors shall comply with
VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.5 STATEMENT OF BID ITEM(S)
01 00 00-4
A. See specification section 01 23 00 ALTERNATES
1. GENERAL CONSTRUCTION: Work includes general construction, mechanical, electrical, and site development work to be performed consistent with Contract
Documents.
2. ALTERNATE DEDUCT No. 1: Omit pneumatic tube station at Microbiology B213.
3. ALTERNATE DEDUCT No. 2, Delete energy recovery system.
4. ALTERNATE DEDUCT No. 3, Delete elevator system and related equipment.
5. ALTERNATE DEDUCT No. 4, Reduce pipe basement size.
1.6 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense,.
1.7 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
C. Security Procedures:
1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.
2. Before starting work the General Contractor shall give two week’s notice
01 00 00-5 to the Contracting Officer Representative so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.
3. No photography of VA premises is allowed without written permission of the
Contracting Officer.
4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.
D. Key Control:
1. Ensure all doors leading to and from construction are either monitored or locked to prevent access to the area from unauthorized persons (i.e.
patients, staff).
2. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including toolboxes and parked machines and take any emergency action.
3. The General Contractor shall turn over all permanent lock cylinders to the
VA locksmith for permanent installation. See Section 08 71 00, DOOR
HARDWARE and coordinate.
E. Document Control:
1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”. Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the
01 00 00-6
Contracting Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information.
7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document
Management Software (EDMS).
a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
F. Motor Vehicle Restrictions
1. Contractor and associated sub-contractor vehicles shall be parked within designated staging area(s) of the project. The staging area(s) shall be determined at the time of the pre-bid meeting. Parking in patient/visitor/staff areas will require a request and approval for such parking through the COR. Vehicles parked outside of designated area(s) shall be restricted to a 30 minute time frame allowing only for the picking up and dropping off materials and supplies. Contractor and associated sub-contractor vehicles found to be parked outside of designated areas not conforming to the above stipulations may be subject to ticketing by VA Police.
G. General Safety:
1. Follow all federal, state and local safety and health regulations.
2. Maintain safety in the construction site/area in accordance with the provisions of the contract that includes the Occupational Safety and Health
Administration (OSHA) Regulations; National Electrical Codes; National Fire
Protection Association, etc. Work in a safe manner and take all proper
01 00 00-7 precautions while performing your work. Extra precautions shall be taken when working around persons occupying the building during construction.
3. Provide Personal Protective Equipment (PPE) for your employees.
4. Post appropriate signs in specific hazardous areas.
5. Tools, ladders, etc are to be secured when not in use.
6. Weekly Safety Inspections: The Construction Safety Committee at this facility will perform safety inspections of all contract operations periodically throughout the month. Written reports of unsafe practices or conditions will be reported to the COR and Contracting Officer for immediate attention and resolution.
H. Environmental Protection:
1. No hazardous materials will be disposed of on Government property. All waste will be hauled off-site or disposed in contractor owned and operated waste removal containers.
2. A copy of all waste manifests for special or hazardous wastes will be forwarded to the COR. Environmental requirements will be strictly enforced.
I. Fire Alarms:
1. The General Contractor is responsible for reviewing locations of fire alarm systems within their construction area.
2. In the event of a fire alarm sounding, you are to remain in your area, unless medical center personnel (Safety, Nursing or Engineering) instruct otherwise, or unless a fire situation is in your area, in which case you should immediately evacuate.
3. Any work involving the fire protection systems will require written permission to proceed from the COR and requires 5 business days’ notice. An impairment number will be issued through the COR by the Fire Safety
Manager.
4. Do not tamper with or otherwise disturb any fire alarm system components without prior written permission. To do so without written permission will result in an adverse action.
01 00 00-8
5. Storage of hazardous materials within buildings will be minimal with only enough on hand to perform daily work tasks. Flammable materials will either be removed from buildings at the end of the work shift or stored in approved flammable storage containers.
J. Housekeeping:
1. Protect patients and VA personnel in occupied areas from the hazards of dust, noise, construction debris and material associated with a construction environment. Keep work area clear, clean and free of loose debris, construction materials and partially installed work that would create a safety hazard or interfere with VA personnel duties and traffic.
2. Clean and remove any accumulation of dust/debris from any surface at the end of each workday.
3. Make every effort to keep dust and noise to a minimum at all times. Take special precautions to protect VA equipment from damage including excessive dust.
4. Maintain clear access to mechanical, electrical devices, equipment and main corridors. This will ensure access to existing systems in the event of an emergency.
5. Clean area of all construction debris and dust upon completion of demolition and/or renovation.
6. During construction operations, keep existing finishes protected from damage. Cover and protect all flooring materials during construction. Any flooring materials or surfaces damaged as a result of construction activities will be replaced at the expense of the contractor.
K. Emergency Medical Services: Emergency medical services for stabilization purposes are available for contractors at this facility. For medical emergencies, dial either “4444” when inside any building or 515.699.5839 from a cell phone. Report the nature of the emergency and location. The following information should be given to the VA Police:
1. Location
a. The Building
b. The Floor
01 00 00-9
c. The Room Number; or
d. The Specific Area (ICU, ED, OR, etc…)
Police will dispatch in-house personnel or coordinate an outside emergency assistance based on the nature of the emergency.
L. Use of Government-Owned Material and Equipment: Use of Government-owned material and equipment is prohibited.
M. Superintendent Communications: At all times during the performance of this contract, the Contractors Superintendent is to be on site and available by cellular phone. At the beginning of the contract and prior to beginning any construction, supply the COR with the telephone number for the Superintendent.
N. Traffic:
1. Traffic hazards are minimal at this facility. Drivers should be particularly concerned with pedestrian traffic.
2. Seat belt use is mandatory on the station.
3. Federal police officers maintain a 24-hour patrol of the area.
O. Contractor's Trailers: Contractor's trailers shall be located at the area assigned. All utility connections to the trailer shall be installed at the contractor expense. Trailer removal is required upon completion of the contract, unless approved by the CO to leave in place.
P. Smoking: There is no smoking allowed on the VA campus. Any smoking inside a government building is subject to a fine without warning.
1.8 OPERATIONS AND STORAGE AREAS
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the
Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. The Contractor shall, under regulations prescribed by the Contracting
Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When
01 00 00-10 materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
C. Working space and space available for storing materials shall be as shown on the drawings. Additional storage areas shall be as determined by the COR.
D. Workers are subject to rules of Medical Center applicable to their conduct.
E. Execute work so as to interfere as little as possible with normal functioning of the Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by Department of Veterans Affairs in quantities sufficient for not more than 5 work days. Provide unobstructed access to Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
F. Phasing:
The Medical Center must maintain its operation 24 hours a day 7 days a week.
Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule
01 00 00-11 defining the duration of the work with milestone subtasks.
1. Certain areas of building 1W will be occupied by Medical Center personal.
Off hours and weekend work will be required when working in/ adjacent to these areas as directed by COR.
Site & Utility Phases:
Contractor shall phase construction in a manner to minimize vehicular and pedestrian traffic impacts throughout the Medical Center campus facility.
A construction phasing plan and schedule shall be provided to the VA for approval prior to construction, two weeks prior to commencing construction.
The construction phasing plans shall indicate limits of construction, safety equipment (concrete barriers, cones, barrels, etc), signage, contractor access point, pedestrian and vehicle routes, and duration of construction.
The plan shall show emergency vehicle routes and ensure a clear path is maintained at all times. Public transportation, including but not limited to:
bus shelter access and loading zones, shall be provided throughout the duration of the project. Detour routes and alternative locations for public entities (i.e. bus shelter) shall be provided with drawings and approved by the VA and local agencies prior to implementation.
Local security, police, and fire departments shall be notified of the construction project and scheduling prior to starting. Refer to the project
Construction Document Plans for additional information on the staging process. Contractor to develop construction phasing plan and schedule work accordingly.
All materials, supplies, equipment, and construction staff required for each phase construction shall be at the site prior to beginning work.
Contractor shall substantially complete each phase construction within the duration of work identified.
With approval from the VA, Contractor may request alternate working hours to complete the work within the duration allowed.
2. Building 1W will be occupied during performance of work. Off hours and weekend work will be required when working in/ adjacent to these areas as directed by COR.
01 00 00-12
1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered.
Contractor shall permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment.
G. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings. Provide gates as required for access with necessary hardware, including hasps and padlocks.
Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches).
Bottom of fences shall extend to 25mm (one inch) above grade. Remove the fence when directed by COR.
H. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or
Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.
I. Utilities Services: Maintain existing utility services for Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
01 00 00-13
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26
05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR
COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR
ELECTRONIC SAFETY AND SECURITY for additional requirements.
2. Contractor shall submit a request to interrupt any such services to the
COR, in writing, 21 min to 28 workdays in advance of proposed interruption. Request shall state reason, date, exact time of, approximate duration of such interruption, and contingency plan if service interruption does not go as planned.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least
21 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
J. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or
01 00 00-14 plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
K. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles. Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
L. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.
1.9 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR, of the areas of the building in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout the affected areas of the building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of
01 00 00-15 access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE
CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR 52.243-4).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
01 00 00-16
1.10 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1. Reserved items which are to remain property of the Government are noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.
1.11 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,
AND IMPROVEMENTS
A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workers, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting
Officer.
B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the
Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the Contractor fails or refuses to repair the damage promptly, the Contracting Officer may have the necessary work performed and charge the cost to the Contractor.
(FAR 52.236-9)
C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional
01 00 00-17 requirements on protecting vegetation, soils and the environment. Refer to
Articles, "Alterations", "Restoration", and "Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.
1.12 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged. Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS" (FAR 52.236-2).
1.13 PHYSICAL DATA
A. Data and information furnished or referred to below is for the Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.
1.
2. The indications of physical conditions on the drawings and in the
01 00 00-18 specifications are the result of site investigations by
Terracon Consultants, Inc. of Des Moines, IA.
(FAR 52.236-4)
B. Subsurface conditions have been developed by core borings and test pits.
Logs of subsurface exploration are shown diagrammatically on drawings.
C. A copy of the soil report will be made available for inspection by bidders upon request to the Engineering Officer at the VA Medical Center and shall be considered part of the contract documents.
D. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.
1.14 PROFESSIONAL SURVEYING SERVICES
A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections. The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.
1.15 LAYOUT OF WORK
A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The Contractor shall furnish, at
Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established or indicated by the Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them. If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the Contracting Officer may replace them
01 00 00-19 and deduct the expense of the replacement from any amounts due or to become due to the Contractor.
(FAR 52.236-17)
B. Establish and plainly mark center lines for each building and corner of column lines and/or addition to each existing building, and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure and/or addition are in accordance with lines and elevations shown on contract drawings.
C. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark (through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities and elevations of floor slabs:
1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the COR before any work (such as footings, floor slabs, columns, walls, utilities and other major controlling features) is placed.
D. During progress of work, and particularly as work progresses from floor to floor, Contractor shall have line grades and plumbness of all major form work checked and certified by a registered land surveyor or registered civil engineer as meeting requirements of contract drawings. Furnish such certification to the COR before any major items of concrete work are placed.
In addition, Contractor shall also furnish to the COR certificates from a registered land surveyor or registered civil engineer that the following work is complete in every respect as required by contract drawings.
1. Lines of each building and/or addition.
2. Elevations of bottoms of footings and tops of floors of each building and/or addition.
01 00 00-20
3. Lines and elevations of sewers and of all outside distribution systems.
E. Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to COR.
F. The Contractor shall…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .