Attachment 14 - Pneumatic Tube Location Drawing.pdf

PDF 188 KB Posted

Attached to
636-130 - Expand and Remodel Lab - Minor - Des Moines, IA VACIHCS
Solicitation number
36C77625B0043_1
Issued by

About this file

This image is a floor plan or architectural drawing showing a section of a facility's lower level. The drawing specifically highlights a pneumatic tube station (PTS Station) located in the wall between room MICROBIOLOGY B213 and UNISEX RESTROOM B214. Surrounding rooms include an ANTE ROOM B215A, an OFFICE B216, and a CORRIDOR C216. The floor plan uses room codes and includes annotations with a specific note (#44) detailing the pneumatic tube station's location. The drawing includes additional room codes like B213, B214, B215B, B216, and reference markers such as FL8, FL4, and AE540, which appear to be part of a larger facility or laboratory complex.

View the file

Other files

File Type Posted
RFI Responses - Des Moines VACIHCS 8-20-25.xlsx XLSX spreadsheet
S06 - Amendment 0004 36C77625B0043_1.pdf PDF
RFI Responses - Des Moines VACIHCS 8-19-25.xlsx XLSX spreadsheet
S06 - Amendment 0003 36C77625B0043_1.pdf PDF
Attachment 2 - Davis-Bacon Act WR - Polk Ctny - Rev09 - 8-8-25 - Building.pdf PDF
S06 - Amendment 0001 36C77625B0043_1.pdf PDF
Attachment 2 - Davis-Bacon Act WR - Polk Ctny - Rev08 - 7-25-25 - Building.pdf PDF
Attachment 13 - Narrative - Addendum 1 and drawings.pdf PDF
RFI Responses - Des Moines VACIHCS 8-7-25.xlsx XLSX spreadsheet
S06 - Amendment 0002 36C77625B0043_1.pdf PDF
S04 - Site Visit Sign-in Sheet 636-130 - Des Moines 7-22-2025.pdf PDF
Attachment 3 - Site Visit Instructions - Minor Lab Expnd and Remod - VACIHCS.pdf PDF
Attachment 1 - VA Notice of LOS-Cert of Compliance for Construction.docx DOCX document
Attachment 12 - Brand Name Justification - Des Moines VACIHCS - Redacted.pdf PDF
Attachment 10 - Appendix B3 - Lead Paint Report.pdf PDF
Attachment 6 - 15569-Spec Vol II-R1 - 5-29-2025.pdf PDF
Attachment 7 - Appendix A - Geotechnical Engineering Report.pdf PDF
36C77625B0043_1 - Des Moines VACIHCS - Expand and Remodel Lab_.docx DOCX document
Attachment 8 - Appendix B1 - Pre-demolition Hazardous Materials Survey.pdf PDF
Attachment 4 - 15569-Bid Documents-R1 - 5-29-2025.pdf PDF
Attachment 11 - 636-130 PCRA LAB_executed.pdf PDF
Attachment 5 -15569-Spec Vol I-R2 - 6-23-2025.pdf PDF
Attachment 2 - Davis-Bacon Act WR - Polk Ctny - Rev06 - 6-27-25 - Building.pdf PDF
Attachment 9 - Appendix B2 - Asbestos Report.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

#44, There is a pneumatic tube station that is located on the lower level, that is part of the project. It is in room MICROBIOLOGY B213 at the wall of

UNISEX RESTROOM B214.

File details come from the government source that posted it. Updated .