Attachment 4 - Utility Map - VYHK 17-1145.pdf
PDF 938 KB Posted
- Attached to
- Solicitation for Bldg. 168 Boiler, Heat Distribution, and Ventilation Replacement on Spangdahlem AB
- Solicitation number
- FA560625B0001
About this file
The image is a detailed utility map for Fairchild Holloman Lane, showing various infrastructure and utility lines across multiple building areas numbered 107-219. The map includes a comprehensive legend detailing different types of utility systems such as segmented cables, conduit systems, electrical lines (primary and secondary), pipelines, drainage lines, pressurized and gravity mains, and casing pipes. The map uses color-coded lines and symbols to represent different types of underground and surface infrastructure, with precise measurement scales and intersecting street/building references like Arnold Blvd and Holloman Lane. The map appears to be a technical schematic for infrastructure planning and utility mapping, likely supporting the broader boiler and heat distribution replacement project at Spangdahlem Air Base detailed in the related federal contract opportunity.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FAIRCHILD AVE
HOLLOMAN LN
ARNOLD BLVD 107
138 111
0 75 15037.5 Meters
Legend
T-KOM
CSegmentedCable_L CServiceLoop_L EConduitSystem_L ECounterpoiseSystem_L GROUNDING EUGPrimary_L EUGSecondary_L OInstallationPipeline_L SCasing_L (Dosing Pipe) SPressurizedMain_L SGravityMain_L Combination SwCulvert_L Culvert SwGravityLine_L main SwOpenDrainage_L Force TCasing_L TConventionalHighTempWSupply_L Pump Pressure Distribution Main Commercial
File details come from the government source that posted it. Updated .