Attachment 2 - Form 66 - VYHK 17-1145.pdf

PDF 125 KB Posted

Attached to
Solicitation for Bldg. 168 Boiler, Heat Distribution, and Ventilation Replacement on Spangdahlem AB
Solicitation number
FA560625B0001
Issued by

About this file

The document is an AF Form 66 Schedule of Material Submittals for Project VYHK 17-1145, which involves replacing an outdated heating boiler in Building 168. The schedule outlines four key material submittal categories requiring documentation before installation: 1) Heat Pump, 2) Fan Coil Units (FCUs) and radiators, 3) Air Handling Unit (AHU) for the locker room, and 4) Control Concept. For each category, the form requires one copy each of shop drawings, samples, manufacturer's recommendations, warranties, catalog data, operating instructions, equipment details, technical descriptions, and certifications. The form provides a structured tracking mechanism for the project engineer and contract administration to review and approve material submittals prior to equipment installation.

View the file

Other files

Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT NUMBER

VYHK 17-1145

PROJECT TITLE

REPLACE OUTDATED

HEATING BOILER B 168

SOLICITATION/CONTRACT

TO BE COMPLETED BY PROJECT ENGINEER

NO. OF COPIES REQUIRED

TO BE COMPLETED BY CONTRACT

ADMINISTRATION

LIN

E N

U M

B

ER

ITEM OR

DESCRIPTION

OF ITEM,

CONTRACT

REFERENCE,

TYPE OF

SUBMITTALS

C

ER

T. O F

C O

M

LIA

N C

E

SH

O

P D R

A W

IN

G

S

SA

M

PLES

C O

LO

R

SELEC

TIO

N

M A

N U

FA

C

TU

R

ER

S

R

EC

O M

M

EN

D A

TIO

M

N U

FA

C

TU

R

ER

S W

A R

R A

N

TY

C A

TA

LO

G D

TA

O

PER

A

TIN

G

IN

STR

U C

TIO

N

S

EQ

U

IPM

EN

T U

SED

TEC

H

N

IC

A L

D

ESC

R

IPTIO

C

ER

TIFIC

A

TIO

N

S

R

EQ

U

IR

ED

SU

B

M

ISSIO

N D

A

TE

D A

TE R

EC

EIVED

N

TR

A

C

TIN

D

TE TO

C

IVIL

EN

G

IN

EER

R

ETU

R N

SU

SPEN

SE

D

A

TE

SU

B

M

ITTA

L N U

M

ER

DATE CONTRACTOR NOTIFIED

APPROVED DISAPPROVED

N

TR

A C

TO

ESU

B

M

ITTA

L

FIN

A

L A

PPR

O

VA

L

REMARKS

1 Heat Pump 1 1 1 1

B efore installation

FCUs and radiators

1 1 1 1

3 AHU for locker room 1 1 1 1

B

4 Control Concept 1 1 1 1

B

AF Form 66

SOLICITATION/CONTRACT
NO. OF COPIES REQUIRED
LINE NUMBER
COLOR SELECTION
MANUFACTURERS RECOMMENDATION
MANUFACTURER’S WARRANTY
CATALOG DATA
OPERATING INSTRUCTIONS
EQUIPMENT USED
TECHNICAL DESCRIPTION
CERTIFICATIONS
REQUIRED SUBMISSION DATE
DATE RECEIVED IN CONTRACTING
DATE TO CIVIL ENGINEERING
RETURN SUSPENSE DATE
SUBMITTAL NUMBER
DISAPPROVED
CONTRACTOR RESUBMITTAL
FINAL APPROVAL
REMARKS
1
1
1
1
1
Before installation
2
1
1
1
1
Before installation
3
1
1
1
1
Before installation
4
1
1
1
1
Before installation
PROJECT TITLE
PROJECT NUMBER
SCHEDULE OF MATERIAL SUBMITTALS

File details come from the government source that posted it. Updated .