The document is an AF Form 66 Schedule of Material Submittals for Project VYHK 17-1145, which involves replacing an outdated heating boiler in Building 168. The schedule outlines four key material submittal categories requiring documentation before installation: 1) Heat Pump, 2) Fan Coil Units (FCUs) and radiators, 3) Air Handling Unit (AHU) for the locker room, and 4) Control Concept. For each category, the form requires one copy each of shop drawings, samples, manufacturer's recommendations, warranties, catalog data, operating instructions, equipment details, technical descriptions, and certifications. The form provides a structured tracking mechanism for the project engineer and contract administration to review and approve material submittals prior to equipment installation.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCHEDULE OF MATERIAL SUBMITTALS
PROJECT NUMBER
VYHK 17-1145
PROJECT TITLE
REPLACE OUTDATED
HEATING BOILER B 168
SOLICITATION/CONTRACT
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
TO BE COMPLETED BY CONTRACT
ADMINISTRATION
LIN
E N
U M
B
ER
ITEM OR
DESCRIPTION
OF ITEM,
CONTRACT
REFERENCE,
TYPE OF
SUBMITTALS
C
ER
T. O F
C O
M
LIA
N C
E
SH
O
P D R
A W
IN
G
S
SA
M
PLES
C O
LO
R
SELEC
TIO
N
M A
N U
FA
C
TU
R
ER
S
R
EC
O M
M
EN
D A
TIO
M
N U
FA
C
TU
R
ER
S W
A R
R A
N
TY
C A
TA
LO
G D
TA
O
PER
A
TIN
G
IN
STR
U C
TIO
N
S
EQ
U
IPM
EN
T U
SED
TEC
H
N
IC
A L
D
ESC
R
IPTIO
C
ER
TIFIC
A
TIO
N
S
R
EQ
U
IR
ED
SU
B
M
ISSIO
N D
A
TE
D A
TE R
EC
EIVED
N
TR
A
C
TIN
D
TE TO
C
IVIL
EN
G
IN
EER
R
ETU
R N
SU
SPEN
SE
D
A
TE
SU
B
M
ITTA
L N U
M
ER
DATE CONTRACTOR NOTIFIED
APPROVED DISAPPROVED
N
TR
A C
TO
ESU
B
M
ITTA
L
FIN
A
L A
PPR
O
VA
L
REMARKS
1 Heat Pump 1 1 1 1
B efore installation
FCUs and radiators
1 1 1 1
3 AHU for locker room 1 1 1 1
B
4 Control Concept 1 1 1 1
B
AF Form 66
| SOLICITATION/CONTRACT |
| NO. OF COPIES REQUIRED |
| LINE NUMBER |
| COLOR SELECTION |
| MANUFACTURERS RECOMMENDATION |
| MANUFACTURER’S WARRANTY |
| CATALOG DATA |
| OPERATING INSTRUCTIONS |
| EQUIPMENT USED |
| TECHNICAL DESCRIPTION |
| CERTIFICATIONS |
| REQUIRED SUBMISSION DATE |
| DATE RECEIVED IN CONTRACTING |
| DATE TO CIVIL ENGINEERING |
| RETURN SUSPENSE DATE |
| SUBMITTAL NUMBER |
| DISAPPROVED |
| CONTRACTOR RESUBMITTAL |
| FINAL APPROVAL |
| REMARKS |
| 1 |
| 1 |
| 1 |
| 1 |
| 1 |
| Before installation |
| 2 |
| 1 |
| 1 |
| 1 |
| 1 |
| Before installation |
| 3 |
| 1 |
| 1 |
| 1 |
| 1 |
| Before installation |
| 4 |
| 1 |
| 1 |
| 1 |
| 1 |
| Before installation |
| PROJECT TITLE |
| PROJECT NUMBER |
| SCHEDULE OF MATERIAL SUBMITTALS |
File details come from the government source that posted it. Updated .