Attachment_4_User_Stories_for_Terminated_Lease_1.docx

DOCX document 40 KB Posted

Attached to
Decommissioning Project
Solicitation number
DOIEFBO250004
Issued by

About this file

This document is a set of user stories describing the functional requirements for a system to manage the decommissioning of terminated oil and gas leases under the Bureau of Safety and Environmental Enforcement (BSEE). The key requirements include:

The system must track the status and details of wells, structures, and pipelines associated with terminated leases, including lease status, company information, infrastructure details, enforcement actions, orders, inspections, time extensions, future use determinations, and permitting. Users must be able to view this data and generate reports. The system must also support the submission and tracking of various decommissioning-related documents and notifications. Overall, the system aims to provide BSEE with comprehensive visibility and management capabilities for terminated lease infrastructure to facilitate the decommissioning process.

The related federal contract opportunity is a Special Notice for the development of this Decommissioning System within the BSEE's Technical Information Management System (TIMS). The Department of the Interior's Bureau of Safety and Environmental Enforcement is the issuing agency.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BSEE Decommissioning User Stories Terminated Lease As a User, I would like to view Wells, Structures and Pipelines in which the Lease has terminated, expired, or relinquished so that I can take the appropriate actions.

· Lease status is Terminated, Expired or Relinquished Data to be displayed/captured for the Terminated Lease Structures

· Display the Type of Data (Structure) and Lease Status

· Display Company Number and Company Name

· Display Surface Area Code and Surface Block Number

· Display Complex Number (CID#), Structure Name, and Structure Number

· Display Structure Type, Subtypes and Piles Count, Water Depth, Destroyed Date

· Display Authority Type: Authority Type, Number, Status

· Display Authority Termination Date

· Display Last Production Date

· Display Terminated Lease Remarks

· Display the Enforcement Category. The data pertaining to Enforcement Category is described in the Enforcement Category user story.

· Display the Operator Response Status. The data pertaining to Operator Response Status is described in the Operator Response Status user story.

· Display the Order information. The data pertaining to Order is described in the Order user story.

· Display any INCs that were issued. The data pertaining to INCs are described in the INCs user story.

· Display the Time Extensions received. The data pertaining to Time Extensions is described in the Time Extension user story.

· Display Future Use indicated. The data pertaining to Future Use is described in the Future Use user story.

· Display Civil Penalty information. The data pertaining to Civil Penalty is described in the Civil Penalty user story.

· Display any Permits received. The data pertaining to Permits is described in the Permits user story.

Data to be displayed/captured for the Terminated Lease Wells

· Display Type of Data (Well) and Lease Status

· Display Company Number and Company Name

· Display Surface Area Code and Surface Block Number

· Display Bottom Area Code and Bottom Block Number

· Display Current Borehole Status and Has SCP Installed?

· Display Well Name and API Well Number

· Display Surface Authority Type: Authority Type, Number, Status, Termination Date

· Display Bottom Authority Type: Authority Type, Number, Status, Termination Date

· Display Last Production Date

· Display Terminated Lease Remarks

· Display the Enforcement Category. The data pertaining to Enforcement Category is described in the Enforcement Category user story.

· Display the Operator Response Status. The data pertaining to Operator Response Status is described in the Operator Response Status user story.

· Display the Order information. The data pertaining to Order is described in the Order user story.

· Display any INCs that were issued. The data pertaining to INCs are described in the INCs user story.

· Display the Time Extensions received. The data pertaining to Time Extensions is described in the Time Extension user story.

· Display Future Use indicated. The data pertaining to Future Use is described in the Future Use user story.

· Display Civil Penalty information. The data pertaining to Civil Penalty is described in the Civil Penalty user story.

· Display any Permits received. The data pertaining to Permits is described in the Permits user story.

Data to be displayed/captured for the Terminated Lease Pipelines

· Display Type of Data (Pipeline) and Lease Status

· Display Company Number and Company Name

· Display Segment Number

· Display Initial Hydrostatic Date (HTP Date)

· Display Segment Status Code

· Display Segment Originating Infrastructure Name, Area Code, Block Number, Complex Id, Structure Number

· Display Segment Destination Infrastructure Name, Area Code, Block Number, Complex Id, Structure Number

· Display Segment Out of Service Date

· Display the Segment Decommissioned Date

· Display Originating Authority Type: Authority Type, Number, Status, Termination Date

· Display Destination Authority Type: Authority Type, Number, Status, Termination Date

· Display Terminated Lease Remarks

· Display the Enforcement Category. The data pertaining to Enforcement Category is described in the Enforcement Category user story.

· Display the Operator Response Status. The data pertaining to Operator Response Status is described in the Operator Response Status user story.

· Display the Order information for the Originating and Destination Lease. The data pertaining to Order is described in the Order user story.

· Display any INCs that were issued. The data pertaining to INCs are described in the INCs user story.

· Display the Time Extensions received. The data pertaining to Time Extensions is described in the Time Extension user story.

· Display Future Use indicated. The data pertaining to Future Use is described in the Future Use user story.

· Display Civil Penalty information. The data pertaining to Civil Penalty is described in the Civil Penalty user story.

· Display any Permits received. The data pertaining to Permits is described in the Permits user story.

As a User, I would like to capture the Enforcement Category, so that I can state the current category of the enforcement of the infrastructure.

· Enforcement Category Options

· 01 – Not Delinquent

· 02 – Decommissioning Time Extension

· 03 – Future Utility Pending

· 03 – Future Utility Approved (Idle Only)

· 04 – Order

· 05 – Order Time Extension

· 06 – INC with Deadline

· 07 – INC Correction Extension

· 08 – Recommended for Civil Penalty

· 09 – Orphan Liability

· 10 – Decommissioned Pending SCV

· 11 – INC Correction Pending

· Follow Up As a User, I would like to track the Operator Response Status so that I know where we are in the process. The Operator Response is associated with the Enforcement Category.

· Operator Response Status Option

· Appeal

· Informal Resolution As a User, for each Terminated Lease well/structure/pipeline, I would like to capture data pertaining to Orders issued to the entities and display responses to the order, so that I can track the Orders and responses.

· Capture the entities the order is issued to.

· Capture the date the order is issued.

· Capture the Plan Submission Deadline.

· Capture the Ordered Decommission Deadline.

· Capture the Extended Ordered Decommission Deadline

· Capture the Single Entity for Decommissioning Operations

· Capture the infrastructure associated with the Order per entity

· Display a list of wells, structure and lease term pipeline associated with Lease/RUE

· Allow user to add infrastructure as needed

· Allow user to remove infrastructure as needed

· Capture the 30 Day, 90 Day and 150 Submittals associated with the Orders

· 30 Day Identification of Single Entity for M&M per 30 CFR 250.1708(a)(1) - (30_DAY_NOTIF_MAINT_MON)

· 90 Day Notification 250.1708(a)(2) - (DCOM_90_DAY_NOTIF)

· 150 Day Decommissioning Plan 30 CFR 250.1708(a)(3) - (DCOM_150_DAY_PLAN)

· Quarterly Progress Report – (DCOM_QUARTER_PROGRESS)

· Display the TW Submittal information for each submittal. The data pertaining to TW Submittals is described in the TW Submittal user story.

· There can be multiple Orders for the terminated lease and infrastructure.

· Capture Tracking Mailing Notification. The data pertaining to Tracking Mailing Notification is described in the Tracking Mailing Notification user story.

As a User, for each infrastructure, I would like to track the INCs that are issued to the entities for failure to decommission the infrastructure within 1 year of the Lease expiration, termination and relinquishment or failure to comply with regulation.

· Associate the INC issued with the following criteria:

· INCs created using Lease Authority

· Regulation numbers includes at least one of the following: 30 CFR 250.1708(a)(1), 30 CFR 250.1708(a)(2), 30 CFR 250.1708(a)(3), 30 CFR 250.1710, 30 CFR 250.1725

· Display the INC Number and Description

· Display the INC Issued Date

· Display To Whom it is assigned.

· Display the INC Correction Deadline Date

· Display the INC Correction Deadline Extension Date (associated with a time extension request )

· Display the INC Correction Date

· Display INC Status

· Capture the infrastructure associated with the INC

· Display a list of wells, structure and lease term pipeline associated with Lease/RUE

· Well: Any Well spudded and not PA or ST

· Structure: (Platform Removal date is null or Site Clearance Verification is null)

· Pipeline: (PPL Status is Not decommission, not Proposed, Not Cancelled)

· Allow user to add infrastructure as needed

· Allow user to remove infrastructure as needed

· For each infrastructure, there can be multiple INCs.

· Capture Tracking Mailing Notification. The data pertaining to Tracking Mailing Notification is described in the Tracking Mailing Notification user story.

As a User, I would like to display data capture regarding the time extension requests received so that I can track the Time Extensions received in TW Submittals.

· Associate the TW Submittal Time Extension Request based on Lease_num/RUE (verify columns

· Time Extension for 30 Day Identification of Single Entity for M&M - (30_DAY_NOTIF_MAINT_MON_EXT)

· Time Extension From 90 Day Notification 250.1708(a)(2) - (DCOM_90_DAY_EXT)

· Time Extension From 150 Day Decommissioning Plan 30 CFR 250.1708(a)(2) - (DCOM_150_DAY_EXT)

· Time Extension Requests From 30 CFR 250.1710 and 1725 – (DCOM_TE_REG)

· Time Extension Requests From BSEE Order Deadline – (DCOM_TE_BSEEORDER)

· Decommissioning Orders Informal Resolution – (DCOM_ORDER_INF_RES)

· The submittals are based on the LEASE_NUM/RUE.

· Display the TW Submittal information for each submittal. The data pertaining to TW Submittals is described in the TW Submittal user story.

· Capture Decommissioning Time Extension Request Date

· Capture Extended Lease Term Regulation Delinquent Date

· Capture Extended Lease Term Ordered Decommissioning Deadline

· Allow for multiple requests.

· Capture Tracking Mailing Notification. The data pertaining to Tracking Mailing Notification is described in the Tracking Mailing Notification user story.

As a User, for each Terminated Lease infrastructure, I would like to capture the Future Use Determination as indicated by the operator, so I can track the future use of the Terminated Lease Infrastructure.

· Future use options:

· Currently In Use – The infrastructure currently being used.

· Denied – Denied after BSEE review (No further action required).

· In Review – Not yet approved and currently under BSEE review.

· No – Not intended for Future Use (No further action required). This option is the default.

· Possible – Proposed but with no support documentation. This option will not be used in the future.

· Yes – Intended for Future Use (Required BSEE Review and Verification).

· Enter Future Use Deadline – timeframe in which to perform the request.

· Capture which entity and lease the Future Use is applied to.

· If the lease is transferred, Future Use does not apply to the new company.

· The request should be expired.

· The default of the record would be set to No.

· Maintain the information for historical purposes.

· Display any DOCD submitted using the same Area/Block after the lease has been terminated. This information is retrieved from TIMS.

· Plan Code, Plan Id, Wells, Structure, Pipeline, Submitted Date, Status, Status Date

· Capture Remarks for Future Use.

· Associate the Submittal Id of the Future Use Submittal – Future Utility Requests (DCOM_FUTURE_UTILITY) – based on API Number (WELL_API_NUMBER)

· Display the TW Submittal information for each submittal. The data pertaining to TW Submittals is described in the TW Submittal user story.

· An indication of Future Use does not remove it from the Lease Term Well/Structure listing.

· There can be multiple Future Use submittals. User should have the ability to view the previous requests. There is one submittal per Well.

As a User, I would like to view a listing of Terminated Lease Wells and Platforms that have Future Use indicated, so that I can verify the information.

· Include where Future Use determination is one of the following: In Review, Yes, Currently in Use.

· Display the following data:

· Wells:

· Surface Lease, Area Code, Block Number

· Bottom Lease, Area Code, Block Number

· Well Name

· API Well Number

· Platforms:

· Lease

· Area Code

· Block Number

· Platform Name

· Complex Id Number

· Allow user to download the data to Excel formatted file.

As a User, for each terminated lease that has not been decommissioned within the specified timeframe, I would like to capture data regarding a recommendation for Civil Penalty, so that I can track the progress of the Civil Penalty.

· Capture Civil Penalty Recommendation

· Capture CP Recommended Date

· Associate Civil Penalty

· Display Civil Penalty Flag

· Display the Civil Penalty Issue Date

· Display Case Number

· Display Civil Penalty Status and Status Date As a User, for each Terminated Lease well, I would like to view the Permits associated with the well, so that I can view which Permits has been submitted. This information can be retrieved from eWell.

· Display the Application for Permit to Modify (APM) that are requesting Temporary Abandonment (TA) or Permanent Abandonment (PA) associated with the well.

· Info to query APM?

· Display the following data from the permit:

· Permit Type

· Submitted Date

· Current Status

· Current Status Date

· Display the End of Operation Report (EOR) associated with the well.

· Display the following data form the permit:

· Permit type

· Submitted Date

· Current Status

· Current Status Date

· Plug Top MD

· Plug Top TVD

· Plug Type

· Display the Rigmove Notification Report associated with the well.

· Display the following data from the permit:

· Permit Type

· Submitted Date

· Current Status

· Current Status Date As a User, for each Terminated Lease Structure, I would like to view the Permits associated with the structure, so that I can view which Permits has been submitted. This information can be retrieved from TW Submittal.

· Display the submittal information for each TW Submittal Application (subtype) associated with the Structure. This data is also entered into TIMS.

· Decommissioning (STRUC_INITIAL_REMOVAL)

· Post-Removal Report (STRUC_POST_REM_REPORT)

· Site Clearance Verification Report (STRUC_SITE_CLEAR_REPORT)

· 48-HR Notification prior to Platform Removal Operations (STRUC_ASSESS_ANALYSIS_REV)

· 48-Hour Site Clearance Verification Notice (STRUC_48_HOURS_SITE_CLEAR)

· Display the TW Submittal information for each submittal. The data pertaining to TW Submittals is described in the TW Submittal user story.

· From TIMS, display the following:

· Removal Date

· Site Clearance Date As a User, for each Terminated Lease Pipeline, I would like to view the Permits associated with the pipeline, so that I can view which Permits has been submitted. This information can be retrieved from TW Submittal.

· Display the submittal information for each TW Submittal Application (subtype) associated with the Structure. This data is also entered into TIMS.

· Decommissioning Completion Report (PPL_DECOM_REPORT)

· Lease Term Decommissioning Application (PPL_DECOM_LT_APP)

· Display the TW Submittal information for each submittal. The data pertaining to TW Submittals is described in the TW Submittal user story.

As a user, I would like to track when the Notifications are sent to the operators notifying them of a terminated Lease, so that I will have a record of it. The infrastructures must be decommissioned within one year of Lease termination.

· Capture Tracking Mailing Notification. The data pertaining to Tracking Mailing Notification is described in the Tracking Mailing Notification user story.

As a User, I would like to generate an Enforcement Report of all the past enforcement that have been issued for a specified lease. The past enforcement would include the INCs, Time Extension Requests, Orders. The report will be in chronological order.

· Allow the user to select a Lease.

· Display the Lease Number.

· Display the INCs associated with the Lease. This will include the data displayed for INC section.

· Display the Time Extension Requests associated with the Lease. This will include the data displayed for the Time Extension section.

· Display the Orders and Responses associated with the Lease. This will include the data displayed for the Orders section.

As a User, I would like to attachment documents to associate with the Terminated Lease infrastructure so that I can upload, view, and delete the documents.

· Upload an attachment of any type.

· View any documents that have been attached.

· Delete any documents that have been attached.

· The documents are to be stored in EDMS under Decommissioning Support (Doctype 650)

· The metadata to be assigned appropriately.

As a user, I would like to view the data associated with the TW Submittal, so that I can view the information associated with the submittal that was submitted.

· For each submittal, display the following:

· Display Submittal Id

· Display Company (Submitter)

· Display Submittal Types Description

· Display Submittal Date

· Display Request Description

· Display Current Status

· Display Current Status Date

· Display Submittal Attributes As a user, I would like to view and capture the Tracking Mailing Notification data associated with each notification, so that I can track the notifications.

· Tracking Mailing Notification includes the following:

· Capture Notification type (email, mail)

· Capture Mailing Address

· Capture Email address

· Capture Mailing Date

· Capture Tracking Number

· Capture Date Received by Company

· Capture Acceptance of Mailing (Yes/No/Refused)

· Allow for multiple notifications Migration:

· Attachments into EDMS from G Drive

· Orders