Attachment_4_-__Technical_Capability_Submittals.docx

DOCX document 48 KB Posted

Attached to
INDE BISHOP WHITE HOUSE FIRE SUPPRESSION Federal contract opportunity
Solicitation number
140P4226R0027
Issued by
Department of the Interior National Park Service Northeast Region

About this file

This is a Technical Capability Submittals attachment document for the fire suppression system installation project at the Independence Bishop White House in Philadelphia, Pennsylvania. The solicitation is a 100% small business set-aside with an estimated construction magnitude between $100,000 and $250,000, using a firm-fixed price contract awarded through the Lowest Price Technically Acceptable process. The NAICS code is 238220 (Plumbing, Heating, and Air-Conditioning Contractors) with a small business size standard of $19 million. Performance is expected to be completed within 90 calendar days from notice to proceed, with Davis Bacon prevailing wage rates applicable under General Wage Decision Number PA20260003 for Philadelphia County, Pennsylvania.

Interested vendors must be certified small businesses and are encouraged to attend the organized site visit scheduled for Monday, August 31, 2026, at 10 AM Eastern. Points of contact for the site visit are wendy_deleon@nps.gov and kathleen_pelszynski@nps.gov. The contracting agency is the Department of the Interior National Park Service Northeast Region. This technical capability submittals attachment requires bidders to demonstrate their qualifications and capability to execute the fire suppression system installation work in accordance with the project specifications and technical requirements outlined in the solicitation.

View the file

Other files for this federal contract opportunity

Other files attached to INDE BISHOP WHITE HOUSE FIRE SUPPRESSION, newest first.
File Type Posted
Sol_140P4226R0027_Amd_0002.pdf PDF
B11_Site_Visit_sign_in_sheet_0002.pdf PDF
Sol_140P4226R0027_Amd_0001.pdf PDF
Sol_140P4226R0027.pdf PDF
Attachment_2_-_Bishop_White_Drawings_2026_04_13.pdf PDF
Attachment_1_-_Bishop_White_Specifications_2026_0812.pdf PDF
Attachment_5_-_Certifications_From_Section_K.docx DOCX document
Attachment_3_-_Wage_Determination__PA20260003.pdf PDF
Attachment_6_-_Limitations_on_Subcontracting_compliance_worksheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Experience Questionnaire

Submit responses to the questions below that address experience relative to the elements noted under the Project Experience evaluation subfactor in solicitation section L. Limit submittals to the quantity of projects and timeframes required in the solicitation. Expand the response sections shown below as needed to adequately address each question (this questionnaire may be expanded to multiple pages if needed).

Offeror
Company Name

REFERENCED PROJECT INFORMATION

Project Title
Title
Project Location
City, State
Brief Project Description
Description
Project Owner
Company Name
POC:
First & Last Name
Phone:
(XXX) XXX-XXXX

CONTRACTOR LIST

List Contractor(s) whose experience on the referenced project is being submitted for evaluation on this proposed project. If more than one contractor is listed (i.e. prime and subcontractors), provide information specific to that contractor.

Contractor Name
Role on Referenced Project

(Prime or Sub)

Trade
Price

(list for each contractor’s specific work) Performance Period (calendar days) (list for each contractor’s specific work)

Original
Final
Original
Final
Sparky’s Electrical Company
Prime
Prime
$XXX,XXX
$X,XXX,XXX
XX
XX
ABC Plumbing & Heating, Co
Subcontractor
Plumbing & Mechanical
$X,XXX,XXX
$X,XXX,XXX
XXX
XXX

Subcontractor

PROJECT EXPERIENCE QUESTIONS

1. Describe the project work performed by all contractors listed above.

Response

2. Identify which Project Experience elements listed in section L of the solicitation each contractor’s work addresses.

Response

3. Describe & provide reasons for any changes to the original price for the work described in question 2 above.

Response

4. Describe and provide reasons for any changes to the original schedule for the work described in question 2 above.

Response

5. Describe problems, associated with the work described in question 2 above, which were encountered and how they were resolved. Describe how the offeror’s proposal accounts for similar issues.

Response

6. Describe the means and methods, associated with the work described in question 2 above, which were successful. Would you implement the same means and methods on the proposed project? Why or why not?

Response

7. Provide any other additional project information you believe should be presented.

Response

PERSONNEL RESUME TEMPLATE

Employee’s Name:

PROPOSED POSITION TITLE:

SUPERVISOR'S NAME:

CURRENT POSITION WITH THE CONTRACT FIRM:

TIME IN CURRENT POSITION: (Yrs. Mos.)

RESPONSIBLE FOR THE WORK OF: PERSONS

DESCRIPTION OF SCOPE OF CURRENT JOB: (Use attached sheet if necessary)

WORK EXPERIENCE: (Beginning with the most recent for the past 5 years.)

Dates (From – To)
Position or Title
Company Name and Address
Reference and Phone Number

EDUCATION SUMMARY:

Name and Address of Institution
Dates Attended
Diploma or Certificate

High School

College

Technical

Trade Schools

PROVIDE A BRIEF STATEMENT OF WHY THIS PERSON IS BELIEVED TO BE QUALIFIED FOR THIS CONTRACT

140P4226R0025 INDE interior finish repairs and sprinkler system remediation at the Bishop White House

SAM Unique Entity ID #:

TIN #:

Biobased Certification

1. Offerors shall identify the Biobased products to be purchased and used under this contract. For each Biobased product. the offeror shall specify the percentage of Biobased content, and for the USDA-designated Biobased content products, the offeror shall demonstrate that the products to be used under this contract will contain the percentage specified in the USDA recommendations or the highest level of Biobased material practicable, consistent with USDA's recommended percentages of Biobased content Product Description % Biobased Content

2. The offeror shall document prior experience in specifying, purchasing, using, and installing Biobased products. The offeror shall provide a list for all relevant contracts over the past two years involving the specification, purchase, and/or use of Biobased products. The offeror shall include a list of the Biobased products specified, purchased, used, and installed.

The following is a list of categories for biopreferred products that may be required in performance of this construction contract:

· 2-Cycle Engine Oils – 34% Minimum BioBased Content

· Adhesive and Mastic Removers – 58% Minimum BioBased Content

· Adhesives - 24% Minimum BioBased Content

· Bathroom and Spa Cleaners – 74% Minimum BioBased Content

· Bioremediation Materials – 86% Minimum BioBased Content

· Carpets – 7% Minimum BioBased Content

· Cleaning Tools – 22% Minimum BioBased Content

· Composite Panels – Acoustical – 37% Minimum BioBased Content

· Composite Panels – Countertops – 89% Minimum BioBased Content

· Composite Panels – Structural Wall Panels – 94% Minimum BioBased Content

· Concrete Curing Agents – 59% Minimum BioBased Content

· Concrete Repair Materials - Concrete Materials – 23% Minimum BioBased Content

· Concrete Repair Materials – Concrete Patching – 69% Minimum BioBased Content

· Concrete and Asphalt Cleaners – 70% Minimum BioBased Content

· Concrete and Asphalt Release Fluids – 87% Minimum BioBased Content

· Corrosion Preventatives – 53% Minimum BioBased Content

· Dust Suppressants – 85% Minimum BioBased Content

· Electronic Components Cleaners – 91% Minimum BioBased Content

· Epoxy Systems – 23% Minimum BioBased Content

· Erosion Control Materials – 77% Minimum BioBased Content

· Exterior Paints and Coatings – 83% Minimum BioBased Content

· Floor Cleaners and Protectors – 77% Minimum BioBased Content

· Floor Coverings (Non-Carpet) – 91% Minimum BioBased Content

· Gear Lubricants – 58% Minimum BioBased Content

· Glass Cleaners – 49% Minimum BioBased Content

· Greases – Multipurpose– 72% Minimum BioBased Content

· Hand Cleaners and Sanitizers – Hand Cleaners – 64% Minimum BioBased Content

· Hand Cleaners and Sanitizers – Hand Sanitizers – 73% Minimum BioBased Content

· Inks – Printer Toner (Greater Than 25 Pages Per Minute) – 20% Minimum BioBased Content

· Inks – Printer Toner (Less Than 25 Pages Per Minute) – 34% Minimum BioBased Content

· Interior Paints and Coatings – Latex and Waterborne Alkyd – 20% Minimum BioBased Content

· Intermediates - Paint and Coating Components – 22% Minimum BioBased Content

· Metal Cleaners and Corrosion Removers – Other Metal Cleaners – 56% Minimum BioBased Content

· Multipurpose Cleaners – 56% Minimum BioBased Content

· Multipurpose Lubricants – 88% Minimum BioBased Content

· Surface Guards, Molding, and Trim – 26% Minimum BioBased Content

· Wall Coverings – 62% Minimum BioBased Content

· Wood and Concrete Sealers – Membrane Concrete Sealers – 11% Minimum Biobased Content

· Wood and Concrete Sealers – Penetrating Liquids – 79% Minimum Biobased Content

· Wood and Concrete Stains – 39% Minimum BioBased Content

Other BioBased Products not stated above that may be used as identified by Contractor.

File details come from the government source that posted it. Updated .