Attachment 4 Road Maintenance Specs.pdf

PDF 591 KB Posted

Attached to
FY26 ANGELES NATIONAL FOREST ROAD MAINTENANCE
Solicitation number
127EAY26Q0124
Issued by

About this file

This document is a specification guide for road and drainage maintenance work on National Forest System lands, containing detailed technical requirements for multiple work sections.

The specifications cover seven primary maintenance activities: mobilization and equipment moving (Section 805), surface blading of roadbeds (Section 811), spot surfacing with aggregate materials (Section 813), asphalt pavement patching including pothole repair (Section 814), paved surface cleaning (Section 815), removal and end haul of materials to disposal sites (Section 832), restoration of drainage function (Section 839), and installation or replacement of corrugated metal spillways and flumes (Section 840). Each section establishes specific maintenance requirements, measurement methodologies, and payment structures. For example, blading work is measured in single-lane miles with payment per mile; spot surfacing is measured by weight in tons, volume in cubic yards, or area in square yards depending on the task order; pothole patching is measured in square feet; and drainage restoration is measured in miles. Payment is typically lump sum for mobilization and haul operations, with per-unit pricing for material placement and installation work. The specifications emphasize environmental compliance, such as requiring equipment to be weed-free before entering National Forest lands, prohibiting hydraulic flushing within 200 feet of live streams, and mandating proper drainage restoration to ensure roads remain hydrologically functioning and safe for public use.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

805 MOBILIZATION/ EQUIPMENT MOVING (10/16)

1. DESCRIPTION

This Section consists of one or more mobilizations of personnel, equipment, supplies, and incidentals to the project site, or sites listed in the Schedule of Items.

2. REQUIREMENT

a. Make equipment available for inspection before it is used on National Forest System lands.

b. Moving is complete, when the contractor has moved from the present work site to the ordered work site and returned to the previous location.

c. Equipment will be clean and weed free before it arrives on National Forest System lands.

3. LOCATION OF WORK

As specified on roads listed on the Road Listing, Shown on the Plans, or as ordered by the

Contracting Officer.

4. MEASUREMENT

Measurement under this Section will be made Lump Sum as listed in the Schedule of Items completed and accepted.

PAYMENT

a. The accepted quantities will be paid at the contract price per unit of measurement for the Section 805 pay items listed in the schedule of items. Mobilization is complete when all equipment, personnel, and materials are moved to the project site and work has been started. Payment will be full compensation for the work prescribed in this Section. Mobilization is incidental unless ordered for a specific project at a specific time.

b. Payment will be made under:

Pay Item DescriQtion Pay Unit

805 (1)

Mobilization

Lump Sum

811 BLADING (10/16)

c. This work consists of

d. Surface blading native or aggregate roadbed to a condition to facilitate traffic and provide proper drainage.

e. Smooth blading to remove loose surfacing materials from the wheel paths and store the removed materials in a recoverable windrow.

f. Where material fill is need to fill in rutting and washouts, utilize the materials that are stored in the recoverable windrow.

g. Blading includes shaping the crown or slope of traveled way, berms, and drainage dips in accordance with this specification. Compaction is required when ordered by the Contracting Officer.

2. MAINTENANCE REQUIREMENTS

h. Timing

i. Surface blading shall be performed during the contract period as ordered by the Government.

j. General

k. The existing traveled way and shoulders, including turnouts unless otherwise ordered, shall be bladed and shaped to produce a surface which is uniform, consistent to grade, and crowned or cross-sloped as indicated by the character of the existing surface to at least one half inch (1 /2") per foot of width, but not more than three quarter inch (3/4") per foot of width. In general, the road shall have a cross slope with ranging percentages typically 3-6%, although that may be higher based on road conditions, that shall provide for proper drainage. Surfacing materials shall be thoroughly loosened to no less than 2 inch depth or the depth of potholes or corrugations.

Scarification to facilitate cutting to the full depth of potholes or corrugations may be elected by the Contractor but will be considered incidental to blading. Scarification shall not go deep enough to cause contamination of the surfacing.

l. When Section 891 is included in the Road Listing, the Contractor shall apply water during blading when sufficient moisture is not present to prevent segregation. Water supply, hauling, and application shall be in accordance with Section 891 and shall be incidental to blading unless Pay Items for Section 891 are included in the Schedule of Items.

m. Existing native, rock or aggregate surfaced drainage dips shall be shaped incidental to blading to divert surface runoff to existing outlet devices, ditches and discharge locations.

n. The Contractor shall establish a blading pattern which provides a uniform driving surface, retains the surfacing on the roadbed and provides a thorough mixing of the materials within the completed surface width. Upon final blading, no disturbed rock shall protrude more than two (2) inches above the adjacent surface unless otherwise provided in the contract. Material not meeting this dimension shall be removed and placed outside the roadbed so as not to obstruct drainage ways or structures. This material may be scattered off the roadbed if there is free drainage.

1) Watering will not be required for smooth blading. Smooth blading shall be accomplished without distorting the existing cross-slope or crown of the traveled way. Loose surfacing materials shall be moved and stored on the high side of super-elevated curves and sections with uniform inslope or outslope. In crowned sections, the material shall be stored on either or both sides as elected. Stored materials shall be windrowed and shall be placed to provide not less than eleven (11) feet of smoothed traveled way on one- lane segments or twenty

(20) feet of smoothed traveled way on two-lane or sections with turnouts. Windrows which may collect water on the road shall have holes cut through for drainage at least every 500 feet.

o. Routine Blading

1) Upon completion of blading, the surfaces shall conform to the dimensions shown in the Special Project Specifications 811-3.

2) Roadbed width in excess of the dimensions shown shall be shaped only as needed to provide drainage away from the traveled way. Established grasses and other vegetation shall not be removed from the excess width except as incidental to providing drainage or unless otherwise provided in the contract.

p. Compaction

Roads requiring compaction will be included in the Road Listing. Unless otherwise specified, all traveled ways requiring compaction shall be compacted by breaking track while operating equipment on the traveled way.

q. Intrusions

Where the minimum width shown in the Special Project Specifications is not available, the Contractor will construct berms where ordered and marked on the ground. Material to provide berms will come from sources designated in the Special Project Specifications.

r. Undercutting

Roadway back slope shall not be undercut.

s. Intersections

1) At intersections, the roadbeds of side roads which are not closed or restricted from vehicular use shall be bladed to assure smooth transitions.

2) Field evidence of closure or restrictions shall be considered to be signing, cross ditching in the road surface (traveled way), earth berms or other devices placed to discourage or eliminate use by passenger cars, also roads listed for work under Sections 835 or 838 shall be considered restricted.

3) Side roads listed for work under this Section shall be considered as not restricted.

t. Cleaning of Structures

Materials resulting from work under this Section shall not be allowed to remain on or in structures, such as bridges, culverts, cattleguards, or drainage dips.

u. Berms

Existing berms shall be maintained to the condition of adjacent segments when ordered by the Government.

3. MEASUREMENT

a. Measurement under this Section will be made by the total number of units for each item listed in the Schedule of Items completed and accepted.

b. Measurement for blading will be single-lane mile measured along the centerline of the roadway (see quantity measurement terms). Two-lane roads will be measured as two

(2) single-lane miles. Measurement will be measured to the nearest one-tenth (0.1) mile.

c. Each intersection bladed under 2.g. will be equivalent to one-tenth (0.1) single-lane mile;

however, when the intersecting side road is scheduled for subsequent blading under this Section, no measurement will be made.

d. Berm maintained or established will be measured by linear foot.

e. No measurement will be made under this Section for compaction method specified in 2.d. For roads needing compaction with special compaction equipment (ie. pneumatic or steel roller), use pay items in Section 807 for additional compaction efforts.

4. PAYMENT

a. The quantities measured and accepted will be paid for at the contract unit price shown in the Schedule of Items.

Pay Item Description Pay Unit

811 (1) Blading Surfaced Roads Mile

813 SPOT SURFACING (10/16)

This work consists of placing surface aggregate as staked on the ground, or designated by the Government. It includes preparing the area, furnishing, hauling, and placing all necessary materials and other work necessary to blend with the adjacent road cross section.

2. MATERIALS

a. Materials will be Government furnished when stated in the task order.

b. Materials furnished by the Contractor shall conform to the gradation requirements shown in the task order and the quality requirements of Section 893.

3. MAINTENANCE REQUIREMENTS

The area to be spot surfaced shall be thoroughly loosened to a minimum depth of one inch (1") prior to placement of aggregate.

4. MIXING AND PLACING

a. When scheduled coincident with work under Section 811, spot surfacing and existing aggregate, when ordered, shall be mixed with water until a uniform mixture is obtained prior to final shaping and compaction.

b. The material shall otherwise be spread on the prepared area in layers no more than four

(4) inches in depth. When more than one (1) layer is required, each layer shall be shaped and compacted before the succeeding layer is placed. Upon completion, the spot surfacing shall reasonably conform to the adjacent cross section and provide smooth transitions in the road profile.

c. Compaction shall be accomplished by breaking track while operating equipment on the traveled way

5. MEASUREMENT

a. The quantity will be the weight of the actual aggregate placed in tons, cubic yards of aggregate measured in place, or square yards of aggregate measured in place, whichever is shown in the Schedule of Items.

b. Hauling is considered incidental.

6. PAYMENT

a. The accepted quantities will be paid for at the contract unit prices shown in the Schedule of Items

b. For payment by weight, certified weight ticket shall be submitted to the Contracting Officer.

c. Payment will be made under:

Pay Item Descri12tion Pay Unit

813 (1) Spot Surfacing, Grading_, Commercial Source Ton

813(2) Spot Surfacing, Grading_, Commercial Source Cubic Yard

813(3) Spot Surfacing, Grading_, Commercial Source Square Yard

813 (4) Spot Surfacing, Grading_, Government Source Ton

813 (5) Spot Surfacing, Grading_, Government Source Cubic Yard

813 (6) Spot Surfacing, Grading_, Government Source Square Yard

814 ASPHALT PAVEMENT PATCHING (10/16)

This work consists of patching potholes and skin patching of asphalt surfaces. The work includes preparing the area to be patched, furnishing and placing all necessary materials and work. All areas to be patched will be marked by the Government.

2. MATERIALS

Materials used for asphalt patching shall conform to the requirements in Sections 892 and 893.

Bituminous mixture material shall conform to requirements of Special Project Specifications.

3. MAINTENANCE REQUIREMENTS

a. Potholes

1) Existing materials shall be removed to a minimum of two (2) inches or as necessary to reach firm support, but limited to maximum twelve (12) inch depth. If firm support for a patch is not available, the hole shall be barricaded and the Government shall be notified. Prior to Contractor placing any materials, Government will determine corrections to be made.

2) The edges of the prepared hole shall be extended to form a vertical face in un-fractured asphalt surfacing. The prepared hole shall generally be round or rectangular in shape and cleaned of all loose material. The bottom and sides shall be sprayed with an emulsified asphalt.

3) Prepared potholes shall be patched or barricaded immediately.

4) The bituminous mixture shall be placed in layers not exceeding four (4) inches. Each layer shall be compacted thoroughly with hand tampers, mechanical tampers, or rollers.

5) Finished surface shall, as a minimum, be compacted with a tamper or an 8- to 10-ton steel roller or comparable vibratory roller. Upon completion, the compacted pothole patch shall be flush with or not more than one quarter (1/4) inch above the level of the adjacent pavement.

b. Disposal

All materials removed from pothole and skin patching operations shall be removed to a disposal site designated by the COR or shown on the drawings.

4. MEASUREMENT

a. Bituminous Mixture

1) Hot and cold bituminous mixture acceptable placed will be measured by the ton.

Bituminous materials incorporated into the mixture will be incidental to the item.

2) Ton Measure - The quantity of mixture will be the number of tons in the accepted work.

Any material rejected in the field as not meeting specifications shall be deducted based on estimated quantities. Rejected quantities shall be reconciled between the Government and the Contractor each day. If not reconciled each day, the Government's figures will apply.

b. The following work is incidental:

1) Cleaning of surfaces.

2) Haul and compaction of bituminous mixture.

3) Material removal and disposal.

4) Emulsified asphalt used on existing surfaces will be measured by the gallon prior to dilution. Dilution materials shall be considered incidental.

5. PAYMENT

a. The accepted quantities will be paid for at the contract unit price shown in the Schedule of Items.

814(1) Pothole Patching SF

814 (2) Emulsified Asphalt Gallon

815 PAVED SURFACE CLEANING (10/16)

This work consists of removing loose material from paved, traveled way, including bridge decks and paved shoulders.

2. EQUIPMENT

a. Equipment shall have the capability of removing all loose material from paved surfaces without damage to the surface.

b. Use of hydraulic flushing equipment will not be permitted within a horizontal distance of two hundred (200) feet from a live stream, unless approved by the Government.

3. MAINTENANCE REQUIREMENTS

The paved surface shall be cleaned to the full road width for the Pay Item. Materials shall be moved away from road centerline on double-lane roads. Bridge deck cleaning shall require all materials be moved longitudinally off the deck.

4. MEASUREMENT

a. Measurement for Pay Item 815(1), will be by the full width mile to the nearest one-tenth (0.1) mile.

b. Partial width passes ordered under Pay Item 815(1) will be measured as full five (5) foot passes.

Additional width incidentally produced by Contractor's equipment will not be considered as a partial pass.

c. Measurement for Pay Item 815(2) will be lane miles measured to the nearest one-tenth (0.1) miles for cleaning the entire width of the paved surface, including turnouts.

d. Measurement for Pay Item 815(3) will be for cleaning the entire length and width of the surface of each bridge and paved approaches.

5. PAYMENT

a. The ordered and accepted quantities shall be paid for at the unit price shown in the Schedule of Items.

815 (1) Paved Surface Cleaning Full Width Mile

815(2) Paved Surface Cleaning Single-lane Mile

815(3) Bridge Deck Cleaning Each

832 REMOVE AND END HAUL MATERIALS (10/16)

Work consists of ordered loading, hauling, and placing of slide, slough, or excess materials such as rock, soil, vegetation, and other materials to designated disposal sites.

2. MAINTENANCE REQUIREMENTS

a. Excess materials generated by work under other Sections of this contract may be ordered for removal, haul, and disposal under this Section. Removal and disposal under all Sections will be ordered without haul when a distance of less than two hundred (200) feet is involved.

b. Slide and slough materials to be removed shall include those in the area extending approximately six (6) feet vertically above the road surface and that area extending not more than four (4) feet down slope from the roadbed. Material shall be disposed of at designated sites as shown on Drawings or identified in Special Project Specifications.

c. The slope which generated the slide material shall be reshaped as nearly as practical to its original condition by equipment operating from road surface. Reshaping of roadside ditches in slide area shall be in accordance with Section 831.

d. When ordered by the Government, slumps shall be filled by compacting selected materials into roadway depressions. Compaction shall be by Method (2).

e. All materials removed and placed in disposal sites shall be placed by one or more of the following methods as shown in Road Listing, Special Project Specifications, or Drawing.

1) Method 1: Side Casting and End Dumping. Material may be placed by side casting and end dumping. Where materials include large rocks, a solid fill shall be provided by working smaller pieces and fines into voids. The finished surfaces shall be shaped to drain.

2) Method 2: Layer Placement - Surfaces on which materials are to be placed shall be stepped or roughened prior to placing any material. Materials shall be placed in approximately horizontal layers no more than twelve (12) inches thick. Each layer shall be compacted by operating hauling and spreading equipment over the full width of each layer.

3. MEASUREMENT

a. Removal will be measured by the Lump Sum, determined by equipment measure, for materials acceptably removed.

b. Except as provided in 2(a) of this Section, haul of materials will be measured by the Lump Sum.

c. Placement of materials in disposal sites will be measured by the cubic yard in the hauling vehicle for materials acceptably placed.

4. PAYMENT

a. The accepted quantity will be paid for at the contract unit price shown in the Schedule of Items.

Pay Item Descril:2tion Pay Unit

832 (1) Remove Lump Sum

832 (2) Haul Lump Sum

832 (3) Disposal, Placement Method 1 Cubic Yard

832 (4) Disposal, Placement Method 2 Cubic Yard

839 RESTORE DRAINAGE (10/16)

This work consists of log, limb and debris removal; blading and shaping of the roadbed to restore drainage function. This work includes shoulders, ditches, drainage dips, leadoff ditches, turnouts, and intersections; cleaning drainage facilities; removing washes and sloughs that inhibit drainage.

2. MAINTENANCE REQUIREMENTS

a. General

The existing traveled way and shoulders, including turnouts unless otherwise ordered, shall be bladed and shaped to produce a surface which is uniform, consistent to grade, and crowned or cross-sloped as indicated by the character of the existing surface unless otherwise Marked on the Ground, to at least one half inch (1/2") per foot of width, but not more than three quarter inch (3/4") per foot of width. In general, the road shall have a cross slope with ranging percentages typically 3-6%, although that may be higher based on road conditions, that shall provide for proper drainage. Surfacing materials shall be thoroughly loosened to a depth of no less than 2 inches or the depth of potholes or corrugations. Corrugations are wash boarding and similar defects.

Scarification to facilitate cutting to the full depth of potholes or corrugations may be elected by the Contractor but will be considered incidental to blading. Scarification shall not go deep enough to cause contamination of the surfacing.

When Section 891 is included in the Road Listing, the Contractor shall apply water during blading when sufficient moisture is not present to prevent segregation. Water supply, hauling, and application shall be in accordance with Section 891 and shall be incidental to blading unless Pay Items for Section 891 are included in the Schedule of Items.

Existing native, rock or aggregate surfaced drainage dips shall be cleaned and shaped incidental to blading to divert surface runoff to existing outlet devices, ditches and discharge locations. The creation of new drainage dips is also included and considered incidental to restoring drainage function.

The Contractor shall establish a blading pattern which provides a uniform driving surface, retains the surfacing on the roadbed and provides a thorough mixing of the materials within the completed surface width.

b. Drainage Facilities

Cleaning all existing drainage facilities includes roadside drainage ditches, drainage dips, inlet and outlet ditches, overside drains and flumes, inverts and interiors of culverts, culvert catch basins, drop inlets, trash racks, and sediment basins. Slash and debris shall be disposed of incidental and as needed. Sediment basin clean out shall be disposed of or stored as directed by the contract.

c. Ditches, Lead Off and Roadside

Wood, rock, trees, brush and other debris shall be removed from ditches to provide unobstructed flow of water. Slash and debris (woody or organic) shall be scattered in such a manner as not to impede the flow of water. The backslope of ditches shall not be undercut by cleaning operations.

Existing ditch blocks shall be restored, reshaped, and compacted as needed for effective drainage through culverts. Catch basins shall be cleaned of material above the invert of the culvert. Loose road materials and fines shall be removed from ditches, lead offs and roadside and reincorporated into the road bed. Lead off ditches shall be cleaned out and bladed to similar standard as the road with a slope. Lead off ditches should drain into culverts or in a manner that will not discharge water flows back into the road prism.

d. Dips (Also called intercepting dips or rolling dips)

Existing drainage dips shall be cleaned and the outslope gradient sufficiently restored to remove surface water from roadbed, conducting the water through drainage facilities. Rolling Dips shall be maintained to a height at least to the top of the corresponding drainage feature.

e. Culverts

Inlet and outlet ends, as well as four feet inside each end, of existing culvert, shall be cleaned to provide unobstructed flow of water. Natural drain culvert channels shall be cleared of all down trees, limbs, stumps, brush, rocks and other debris, that restricts the flow of water, 6 feet in width for 15 linear feet at each end. Slash and debris (woody or organic) shall be scattered in such a manner as not to impede the flow of water. The channel shall be shaped to natural streambed with constant grade at inlet and outlet ends.

f. Overside Drains and Flumes

Overside drains shall be cleaned of debris to provide an unobstructed flow of water. Debris (woody or organic) shall be scattered in such a manner as not to impede the flow of water.

g. Designed Earth Berms

Berm breaches yards shall be filled, shaped, and compacted by wheel rolling. Fill material shall be located within 500 feet of breach or by ripping to the depth and width necessary to obliterate such defects; providing a smooth transition to adjacent satisfactory roadbed. Filling with loose material will not be acceptable.

h. Settlements

Settlements shall be scarified and then repaired by cutting from the roadbed on each end of the settled area, filling and wheel rolling the material into the settled area providing a smooth transition to adjacent satisfactory roadbed.

i. Washouts

Washouts in roadway shall be filled and compacted by wheel rolling. Fill material shall be located within 500 feet of washout or as directed by the Contracting Officer.

j. Road Edge Failures and Road Edge Loss

All Road edge failures and road edge loss shall be addressed and the road shall be sloped away from these failures to encourage waterflow and drainage on the opposite side of the road. The road work shall produce a road that is hydrologically functioning and able to be open to the public or administrative use for safe travel.

METHOD OF MEASUREMENT

Measurement for maintenance will be "by the mile", measured by slope distance along the centerline of the roadway. Measurement will be to the nearest one-tenth mile. No separate measurement will be made for any of the elements of work described in the foregoing

3. PAYMENT

a. Payment will be made for all units inspected and accepted at the unit price shown on the schedule of items.

b. Payments will be made under:

Pay Item

Descri(;!tion

Pay Unit

839 (1) Restore Drainage Function, Without Water Mile

839(2) Restore Drainage Function, With Water Mile

840 CORRUGATED METAL SPILLWAYS AND FLUME (10/16)

This work consists of cleaning, reconditioning, and re-installing, or the replacement of existing corrugated metal spillway inlet assemblies, flume, and other appurtenances associated with the installation requirements.

2. MATERIALS

a. Materials shall be furnished by the contractor, unless otherwise indicated. Spillway inlet assemblies, flume, and connectors shall be of the type and thickness specified by the Task Order or shown in supplemental drawings, and shall be constructed of galvanized corrugated sheet metal meeting the requirements indicated on the drawings.

b. Anchors shall be as shown in the Task Order.

3. MAINTENANCE REQUIREMENTS

a. Re-installation of existing overside drains:

1) Re-install inlet and starter section to the grade and flow line established by the drainage dip.

2) Adjacent earth berms shall be filled shaped, and compacted to provide a continuous drainage channel to the inlet structure.

3) Structures not approved for reuse shall be removed from Government land at the Contractor's expense.

4) Prior to re-installing flume, ensure that voids have been filled and the embankment compacted to provide a smooth, continuous grade from the inlet to the outlet of drainage structure.

b. Replacement of existing overside drains:

1) Remove existing structure and backfill and compact any wash-outs beneath the inlet and starter.

2) Re-establish the embankment for flume replacement by backfilling wash-outs and voids, and compacting to provide a smooth, continuous grade from the inlet to the outlet of the drainage structure.

3) Install new drainage structure as specified by the Task Order.

4) Re-establish earth berm. Shape and compact to provide a continuous drainage channel to the inlet of the drainage structure.

4. MEASUREMENT

a. Measurement of inlet and starter assemblies will be for each unit specified and installed as a whole.

Costs included are for materials, labor for fabrication and installation, and delivery.

b. Measurement will be made for each lineal foot of flume specified and installed. Measurement for anchors shall be considered incidental to flume installation.

c. Cost for disposal of removed inlets, starters, flumes, and appurtenances shall be considered incidental to the work in this specification.

5. PAYMENT

a. Accepted quantities will be paid for at the contract unit prices shown in the Schedule of Items.

840 (1) Replace Inlet and Stater 24” Headwall with 30’ of Flume, unless otherwise noted

Each

840 (2) Reinstall 36” Diameter Drop Inlets Each

840 (3) Replace 36” Diameter Culvert 80’ Length

Each