Attachment 2 Schedule of Items.pdf
PDF 455 KB Posted
- Attached to
- FY26 ANGELES NATIONAL FOREST ROAD MAINTENANCE
- Solicitation number
- 127EAY26Q0124
- Issued by
-
Department of Agriculture Forest Service
About this file
This document is a pricing template for road maintenance work on Angeles National Forest roads for Fiscal Year 26. The contract encompasses eight work categories with itemized tasks across multiple forest roads in the San Gabriel Mountains region.
The work is organized into the following categories: Mobilization (Base Items), Blading of 11 road segments totaling 71.4 miles, Spot Surfacing using 3" Class 2 Road Base (485 cubic yards on Gould Mesa Road), Asphalt Pavement Patching with 2" Hot Mix Asphalt on two roads (3,900 square feet total), Paved Surface Cleaning on two roads (3.5 miles total), Remove and End Haul Materials for drainage repairs (4 each locations), Restore Drainage Function across 11 road segments (71.4 miles), and Corrugated Metal Spillway and Flume installations with three subcategories: standard installations with 24" headwall and starter sections (13 locations totaling 157 each units), drop inlet installations (4 each units), and culvert replacement installations (4 each units on Warm Springs Road/Sawtooth). Specific roads include 2N40 Big Santa Anita Canyon, 2N69 Gould Mesa Road, 2N66 Brown Mountain Road, 2N65.1 Millard Canyon Road, 3N56 Wilson Canyon Road, 7N23 Sawmill Libre Road, 7N08 Maxwell Truck Trail, 6N32 Warm Springs Road, 4N37 Indian Canyon Road, 4N33 Moody Canyon Road, and Rowher Flats OHV trails. The contract total represents the sum of all eight bid sub-totals (805+811+813+814+815+832+839+840), with all unit prices currently shown as blank pending bidder submission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
.01 BASE ITEMS MOBILIZATION LS 1.0 -$
.01 2N40 BIG SANTA ANITA CANYON MILE 0.5 -$
.02 2N69 GOULD MESA RD MILE 0.5 -$
.03 2N66 BROWN MTN RD MILE 5.4 -$
.04 2N65.1 MILLARD CANYON RD MILE 2.1 -$
.05 3N56 WILSON CANYON ROAD MILE 4.3 -$
.06 7N23 SAWMILL LIBRE ROAD MILE 17.5 -$
.07 7N08 MAXWELL TRUCK TRAIL MILE 9.8 -$
.08 6N32 WARM SPRINGS ROAD/7N13 SAWTOOTH MILE 6.4 -$
.09 4N37 INDIAN CANYON ROAD MILE 5.4 -$
.10 4N33 MOODY CANYON ROAD MILE 5.6 -$
.11 ROWHER FLATS OHV (5N14,5N18,6N07) MILE 10.8 -$
.01 2N69 GOULD MESA RD CY 485.0 -$
.01 3N24.1 COLBY RANCH ROAD SF 1350.0 -$
.02 2N50 MT LOWE ROAD SF 2550.0 -$
.01 3N24.1 COLBY RANCH ROAD MILE 1.0 -$
.02 2N50 MT LOWE ROAD MILE 2.5 -$
.01 2N50 MT LOWE ROAD EA 4.0 -$
815 BID SUB-TOTAL
ANF ROAD MAINTENANCE FY 26
ANGELES NATIONAL FOREST ROADS
MOBILIZATION
805 BID SUB-TOTAL
BLADING
811 BID SUB-TOTAL
SPOT SURFACING (3" CLASS 2 ROAD BASE)
813 BID SUB-TOTAL
ASPHALT PAVEMENT PATCHING (2" HMA, Hot Mix Asphalt Caltrans 1/2 in. type A, PG 64-16 RAP Okay)
814 BID SUB-TOTAL
PAVED SURFACE CLEANING
REMOVE AND END HAUL MATERIALS (2.D FILL OF SLUMPS/WASHOUTS AT DRAINAGE LOCATIONS WITH ROADSLUMP MATERIAL)
832 BID SUB-TOTAL
.01 2N40 BIG SANTA ANITA CANYON MILE 0.5 -$
.02 2N69 GOULD MESA RD MILE 0.5 -$
.03 2N66 BROWN MTN RD MILE 5.4 -$
.04 2N65.1 MILLARD CANYON RD MILE 2.1 -$
.05 3N56 WILSON CANYON ROAD MILE 4.3 -$
.06 7N23 SAWMILL LIBRE ROAD MILE 17.5 -$
.07 7N08 MAXWELL TRUCK TRAIL MILE 9.8 -$
.08 6N32 WARM SPRINGS ROAD/7N13 SAWTOOTH MILE 6.4 -$
.09 4N37 INDIAN CANYON ROAD MILE 5.4 -$
.10 4N33 MOODY CANYON ROAD MILE 5.6 -$
.11 ROWHER FLATS OHV (5N14,5N18,6N07) MILE 10.8 -$
840 (1)
.01 2N69 GOULD MESA RD EA 3.0 -$
.02 2N66 BROWN MTN RD EA 35.0 -$
.03 2N65.1 MILLARD CANYON RD EA 6.0 -$
.04 3N56 WILSON CANYON ROAD EA 24.0 -$
.05 7N23 SAWMILL LIBRE ROAD EA 10.0 -$
.06 7N08 MAXWELL TRUCK TRAIL EA 10.0 -$
.07 6N32 WARM SPRINGS ROAD/7N13 SAWTOOTH EA 13.0 -$
.08 4N37 INDIAN CANYON ROAD EA 11.0 -$
.10 4N33 MOODY CANYON ROAD EA 16.0 -$
.11 ROWHER FLATS OHV (5N14,5N18,6N07) EA 49.0 -$
.01 3N24.1 COLBY RANCH ROAD (20' FLUME) EA 3.0 -$
.02 2N50 MT LOWE ROAD (80' FLUME) EA 4.0 -$
840 (2)
0.01 6N32 WARM SPRINGS ROAD/7N13 SAWTOOTH EA 4.0 -$
840 (3)
0.01 6N32 WARM SPRINGS ROAD/7N13 SAWTOOTH EA 4.0 -$
CORRUGATED METAL SPILLWAY (RE-INSTALL NEW 36" CULVERT, CONTRACTOR FURNISHED, 80' LONG EACH)
840 BID SUB-TOTAL
CONTRACT TOTAL (805+811+813+814+815+832+839+840)
RESTORE DRAINAGE FUNCTION
839 BID SUB-TOTAL
CORRUGATED METAL SPILLWAY AND FLUME (24" HEADWALL AND STARTER SECTION) (30' Flume unless otherwise noted)
CORRUGATED METAL SPILLWAY (RE-INSTALL NEW CULVERT DROP INLETS 36", CONTRACTOR FURNISHED)
File details come from the government source that posted it. Updated .