Attachment 4 - RFQ Pricing Sheet.xlsx

XLSX spreadsheet 33 KB Posted

Attached to
JB Charleston Railroad Maintenance and Repair IDIQ
Solicitation number
FA441826Q0022
Issued by

About this file

This is a Request for Quotation (RFQ) pricing sheet for an Indefinite-Delivery Indefinite-Quantity (IDIQ) railroad maintenance and repair contract at Joint Base Charleston Naval Weapons Station in Goose Creek, South Carolina. The contract is set-aside for 8(a) small business concerns under NAICS code 237990 with a $45 million size standard, issued by the Department of the Air Force Air Mobility Command.

The pricing sheet contains 69 line items covering comprehensive railroad maintenance and repair services, including track installation and replacement, turnout and switch maintenance, rail anchoring, concrete and asphalt work, drainage pipe installation, traffic control, vegetation management, and herbicide treatment. Unit costs are to be submitted for the base period with quantities provided for bid evaluation purposes only. Contractors must propose escalation rates for three option years (CLINs 1001-3001) and a six-month extension option (CLIN 4001), with subsequent option year unit prices calculated by multiplying the previous period's unit cost by the proposed line item escalation rate. All direct and indirect costs and expenses required to complete work in an acceptable manner must be included in the unit cost column. The contract structure includes a base period (CLIN 0001) and optional renewal periods, with the total evaluated price serving as the basis for contract award consideration.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule Bid Evaluation

JB CHS RAILROAD IDIQ CONTRACT PRICE SCHEDULE - RFQ Pricing Sheet
GENERAL NOTES
1Quanities are presented for bid evaluation purposes only.
2Include in Unit Cost Column E all direct and indirect costs and expenses required to complete the work in an acceptable manner.
3Input proposed escalation rates for Option Years 1 through 4 and the six month extention in Column C at the bottom of the sheet for the corresponding option years.
4CLIN 0001 Base Period unit prices shall be the unit prices submitted as part of this Price Schedule. For CLIN 1001-3001 Option Years 1-3, the Unit Cost for the Price Schedule for Each Line Item shall be calculated by multiplying the Unit Cost from the Previous Period by the proposed Line Item Escalation and rounding to the nearest cent.
ITEM NODESCRIPTIONBID EVALUATION
QUANTITYUNITUNIT PRICEAMOUNT
0001INSTALL 90LB & 115LB TURNOUT GOVT FURNISHED1.00EACH$0.00$0.00
0002SURFACE, LINE & LEVEL TRACK10000.00TRK FT$0.00$0.00
0003REGAUGE EXISTING TRACK500.00TRK FT$0.00$0.00
0004PROVIDE & LAY NEW GRANITE BALLAST300.00NET TON$0.00$0.00
0005REPLACE JOINT BARS (PAIR PROVIED SIZED TOP) - MATCH EXISTING RAIL INCLUDING BOLTS NUTS AND WASHERS2.00PAIR$0.00$0.00
0006NEW GUAGE RODS, FFP22.00EACH$0.00$0.00
0007NEW BOLT ASSEMBLIES20.00EACH$0.00$0.00
0008STRIPPING50.00LN FT$0.00$0.00
0009CRIBBING FOR CROSS TIES300.00TRK FT$0.00$0.00
0010CRIBBING FOR SWITCH TIES50.00TRK FT$0.00$0.00
0011NEW GROUND ASSEMBLIES2.00EACH$0.00$0.00
0012NEW GROUND TIMBER CROSS TIES (PINE) TIES SHALL INCLUDE SPIKES AS REQUIRED400.00EACH$0.00$0.00
0013NEW TIMBER CROSS TIES (OAK) TIES SHALL INCLUDE SPIKES AS REQUIRED1100.00EACH$0.00$0.00
0014NEW SWITCH TIES TIES SHALL INCLUDE SPIKES AS REQUIRED100.00EACH$0.00$0.00
0015INSTALL CROSS TIES (GOVT FURNISHED)28.00EACH$0.00$0.00
0016INSTALL SWITCH TIES (GOVT FURNISHED)2.00EACH$0.00$0.00
0017NEW PAIR COMPROMISE JOINTS1.00PAIR$0.00$0.00
0018NEW TIE PLATES TO MATCH EXISTING RAILS6.00EACH$0.00$0.00
0019REMOVE RAIL (INCLUDE TIE & ACCESSORIES)160.00TRK FT$0.00$0.00
0020NEW SWITCH STANDS1.00EACH$0.00$0.00
0021NEW SWITCH POINTS1.00PAIR$0.00$0.00
0022NEW SPIKES50.00EACH$0.00$0.00
0023REMOVING EXISTING ASPHALT PAVING20.00CU YD$0.00$0.00
0024COLD MILLING OF BITUMINOUS PAVEMENT UP TO 2" (Includes removal and disposition)200.00SY$0.00$0.00
0025SAW CUT ASPHALT (Full depth)150.00LF$0.00$0.00
0026SAW CUT CONCRETE (Full depth)100.00LF$0.00$0.00
0027INSTALL NEW 115 LB RAIL, REPLACE JOINT BARS PLATES,BOLTS & SPIKES32.00TRK FT$0.00$0.00
0028REPAIR SWITCH & FROG POINTS (WELDING & GRINDING)1.00EACH$0.00$0.00
0029MAINTENANCE TO SWITCHS & FROGS (ADJUSTING FFP-THROW, CLEAN ING,LUBRICATION, ETC)30.00EACH$0.00$0.00
0030INSTALL GOVT FURNISHED RAILS 90LB TO 115LB (ALSO INCLUDES TIE PLATES, JOINT BARS ALIGNMENT & GAUGING) RA32.00TRK FT$0.00$0.00
0031NEW ASPHALTIC CONCRETE30.00NET TON$0.00$0.00
0032MACADAM GRADED AGGREGATE
(SCDOT § 305)23.00CY$0.00$0.00
0033MARINE LIMESTONE GRADED AGGREGATE BASE COURSE
(SCDOT § 305)25.00CY$0.00$0.00
0034STRAIGHTEN SKEWED CROSS TIES7.00EACH$0.00$0.00
0035NEW FILTRATION FABRIC90.00SQ YD$0.00$0.00
0036PROVIDE NEW RAIL ANCHORS TO MATCH EXISTING RAIL50.00EACH$0.00$0.00
0037WELD & GRIND RAILHEAD1.00EACH$0.00$0.00
0038PROVIDE 115LB TURNOUT. PROVIDE COMPLETE RAILS WITH STAND1.00EACH$0.00$0.00
0039PROVIDE & INSTALL STEEL DRIVE (BOLTS) SPIKES FFP-IN PARKO RUBBER CROSSING5.00EACH$0.00$0.00
0040THERMITE WELDED JOINTS-90LBS RAILS1.00EACH$0.00$0.00
0041THERMITE WELDED JOINTS 115LB RAILS1.00EACH$0.00$0.00
0042PROVIDE REINFORCED CONCRETE PIPE CL 3 w/GASKET FFP-12" DIAMETER8.00LN FT$0.00$0.00
0043PROVIDE REINFORCED CONCRETE PIPE CL 3 w/GASKET FFP-18"DIAMETER8.00LN FT$0.00$0.00
0044PROVIDE REINFORCED CONCRETE PIPE CL 3 w/GASKET FFP-24" DIAMETER8.00LN FT$0.00$0.00
0045PROVIDE REINFORCED CONCRETE PIPE CL 3 w/GASKET FFP-30" DIAMETER8.00LN FT$0.00$0.00
0046PROVIDE REINFORCED CONCRETE PIPE CL 3 w/GASKET FFP-36" DIAMETER8.00LN FT$0.00$0.00
0047PROVIDE FLOWABLE FILL5.00CU YD$0.00$0.00
0048PROVIDE NEW WASHERS ON EXISTING BOLTS30.00EACH$0.00$0.00
0049CONCRETE TUB CROSSING FOR TANGENT TRACKAGE8.00LN FT$0.00$0.00
0050CONCRETE TUB CROSSING FOR CURVED TRACKAGE8.00LN FT$0.00$0.00
0051TANGENT TRACKAGE - removal of existing track/earthwork & replacement20.00LN FT$0.00$0.00
0052CURVED TRACKAGE - removal of existing track/earthwork & replacement20.00LN FT$0.00$0.00
0053SWITCH AREA TRACKAGE - removal of existing track/earthwork & replacement10.00LN FT$0.00$0.00
0054REMOVE AND RE-INSTALL PANELS56.00LN FT$0.00$0.00
0055TRAFFIC CONTROL, 36" CONES W/REFLECTIVE RINGS8.00EA$0.00$0.00
0056TRAFFIC CONTROL, DRUMS W/REFLECTIVE RINGS AND LIGHTS8.00EA$0.00$0.00
0057FLAGMAN W/VEST AND FLAG100.00HR$0.00$0.00
0058TRAFFIC CONTROL PLAN - PER LOCATION2.00EA$0.00$0.00
0059STRIPING (REFLECTIVE) YELLOW 4"180.00LF$0.00$0.00
0060STRIPING (REFLECTIVE) WHITE 4"90.00LF$0.00$0.00
0061TRIM TREES WITHIN RIGHT OF WAY - leave debris along wooded area50.00EA$0.00$0.00
0062REMOVE PINE STRAW w/ regulator2500.00LF$0.00$0.00
0063REPLACE SWITCH WITH GOVT FURNISHED SWITCH1.00EA$0.00$0.00
0064REPLACE BROKEN OR MISSING SWITCH TARGET REFLECTORS - govt furnished4.00EA$0.00$0.00
0065REPLACE SWITCH HANDLE WITH BACKSAVER-STYLE SWITCH THROW HANDLE1.00EA$0.00$0.00
0066CONCRETE CROSSING PANELS50.00TF$0.00$0.00
0067REPLACE EXISTING RAIL SIGNS20.00SF$0.00$0.00
0068APPLY HERBICIDE TREATMENT TO RAILROAD FROM CENTERLINE TO 15 FEET ON EACH SIDE30000.00TF$0.00$0.00
0069REMOVE BRUSH AND TRIM TREE LIMBS FROM LINE OF SIGHT ALONG TRACK 15 FEET FROM CENTERLINE UP TO 20 FEET ABOVE THE TRACK15000.00TF$0.00$0.00
SUBTOTALS
CLIN 0001Base Period TotalSUBTOTAL$0.00
Proposed Line Item

Escalation Rates (See General Note 3)

CLIN 1001Option Year 1 Total0.00%SUBTOTAL$0.00
CLIN 2001Option Year 2 Total0.00%SUBTOTAL$0.00
CLIN 3001Option Year 3 Total0.00%SUBTOTAL$0.00
CLIN 40016 Month Extension Option Total (Option Year 3 Total Price Multipled By Escalation, Divided by 2)0.00%SUBTOTAL$0.00

CONTRACT TOTAL EVALUATED PRICE $0.00

File details come from the government source that posted it. Updated .