Attachment 4 - RFQ Pricing Sheet.xlsx
XLSX spreadsheet 33 KB Posted
- Solicitation number
- FA441826Q0022
About this file
This is a Request for Quotation (RFQ) pricing sheet for an Indefinite-Delivery Indefinite-Quantity (IDIQ) railroad maintenance and repair contract at Joint Base Charleston Naval Weapons Station in Goose Creek, South Carolina. The contract is set-aside for 8(a) small business concerns under NAICS code 237990 with a $45 million size standard, issued by the Department of the Air Force Air Mobility Command.
The pricing sheet contains 69 line items covering comprehensive railroad maintenance and repair services, including track installation and replacement, turnout and switch maintenance, rail anchoring, concrete and asphalt work, drainage pipe installation, traffic control, vegetation management, and herbicide treatment. Unit costs are to be submitted for the base period with quantities provided for bid evaluation purposes only. Contractors must propose escalation rates for three option years (CLINs 1001-3001) and a six-month extension option (CLIN 4001), with subsequent option year unit prices calculated by multiplying the previous period's unit cost by the proposed line item escalation rate. All direct and indirect costs and expenses required to complete work in an acceptable manner must be included in the unit cost column. The contract structure includes a base period (CLIN 0001) and optional renewal periods, with the total evaluated price serving as the basis for contract award consideration.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Price Schedule Bid Evaluation
| JB CHS RAILROAD IDIQ CONTRACT PRICE SCHEDULE - RFQ Pricing Sheet | ||||||
| GENERAL NOTES | ||||||
| 1 | Quanities are presented for bid evaluation purposes only. | |||||
| 2 | Include in Unit Cost Column E all direct and indirect costs and expenses required to complete the work in an acceptable manner. | |||||
| 3 | Input proposed escalation rates for Option Years 1 through 4 and the six month extention in Column C at the bottom of the sheet for the corresponding option years. | |||||
| 4 | CLIN 0001 Base Period unit prices shall be the unit prices submitted as part of this Price Schedule. For CLIN 1001-3001 Option Years 1-3, the Unit Cost for the Price Schedule for Each Line Item shall be calculated by multiplying the Unit Cost from the Previous Period by the proposed Line Item Escalation and rounding to the nearest cent. | |||||
| ITEM NO | DESCRIPTION | BID EVALUATION | ||||
| QUANTITY | UNIT | UNIT PRICE | AMOUNT | |||
| 0001 | INSTALL 90LB & 115LB TURNOUT GOVT FURNISHED | 1.00 | EACH | $0.00 | $0.00 | |
| 0002 | SURFACE, LINE & LEVEL TRACK | 10000.00 | TRK FT | $0.00 | $0.00 | |
| 0003 | REGAUGE EXISTING TRACK | 500.00 | TRK FT | $0.00 | $0.00 | |
| 0004 | PROVIDE & LAY NEW GRANITE BALLAST | 300.00 | NET TON | $0.00 | $0.00 | |
| 0005 | REPLACE JOINT BARS (PAIR PROVIED SIZED TOP) - MATCH EXISTING RAIL INCLUDING BOLTS NUTS AND WASHERS | 2.00 | PAIR | $0.00 | $0.00 | |
| 0006 | NEW GUAGE RODS, FFP | 22.00 | EACH | $0.00 | $0.00 | |
| 0007 | NEW BOLT ASSEMBLIES | 20.00 | EACH | $0.00 | $0.00 | |
| 0008 | STRIPPING | 50.00 | LN FT | $0.00 | $0.00 | |
| 0009 | CRIBBING FOR CROSS TIES | 300.00 | TRK FT | $0.00 | $0.00 | |
| 0010 | CRIBBING FOR SWITCH TIES | 50.00 | TRK FT | $0.00 | $0.00 | |
| 0011 | NEW GROUND ASSEMBLIES | 2.00 | EACH | $0.00 | $0.00 | |
| 0012 | NEW GROUND TIMBER CROSS TIES (PINE) TIES SHALL INCLUDE SPIKES AS REQUIRED | 400.00 | EACH | $0.00 | $0.00 | |
| 0013 | NEW TIMBER CROSS TIES (OAK) TIES SHALL INCLUDE SPIKES AS REQUIRED | 1100.00 | EACH | $0.00 | $0.00 | |
| 0014 | NEW SWITCH TIES TIES SHALL INCLUDE SPIKES AS REQUIRED | 100.00 | EACH | $0.00 | $0.00 | |
| 0015 | INSTALL CROSS TIES (GOVT FURNISHED) | 28.00 | EACH | $0.00 | $0.00 | |
| 0016 | INSTALL SWITCH TIES (GOVT FURNISHED) | 2.00 | EACH | $0.00 | $0.00 | |
| 0017 | NEW PAIR COMPROMISE JOINTS | 1.00 | PAIR | $0.00 | $0.00 | |
| 0018 | NEW TIE PLATES TO MATCH EXISTING RAILS | 6.00 | EACH | $0.00 | $0.00 | |
| 0019 | REMOVE RAIL (INCLUDE TIE & ACCESSORIES) | 160.00 | TRK FT | $0.00 | $0.00 | |
| 0020 | NEW SWITCH STANDS | 1.00 | EACH | $0.00 | $0.00 | |
| 0021 | NEW SWITCH POINTS | 1.00 | PAIR | $0.00 | $0.00 | |
| 0022 | NEW SPIKES | 50.00 | EACH | $0.00 | $0.00 | |
| 0023 | REMOVING EXISTING ASPHALT PAVING | 20.00 | CU YD | $0.00 | $0.00 | |
| 0024 | COLD MILLING OF BITUMINOUS PAVEMENT UP TO 2" (Includes removal and disposition) | 200.00 | SY | $0.00 | $0.00 | |
| 0025 | SAW CUT ASPHALT (Full depth) | 150.00 | LF | $0.00 | $0.00 | |
| 0026 | SAW CUT CONCRETE (Full depth) | 100.00 | LF | $0.00 | $0.00 | |
| 0027 | INSTALL NEW 115 LB RAIL, REPLACE JOINT BARS PLATES,BOLTS & SPIKES | 32.00 | TRK FT | $0.00 | $0.00 | |
| 0028 | REPAIR SWITCH & FROG POINTS (WELDING & GRINDING) | 1.00 | EACH | $0.00 | $0.00 | |
| 0029 | MAINTENANCE TO SWITCHS & FROGS (ADJUSTING FFP-THROW, CLEAN ING,LUBRICATION, ETC) | 30.00 | EACH | $0.00 | $0.00 | |
| 0030 | INSTALL GOVT FURNISHED RAILS 90LB TO 115LB (ALSO INCLUDES TIE PLATES, JOINT BARS ALIGNMENT & GAUGING) RA | 32.00 | TRK FT | $0.00 | $0.00 | |
| 0031 | NEW ASPHALTIC CONCRETE | 30.00 | NET TON | $0.00 | $0.00 | |
| 0032 | MACADAM GRADED AGGREGATE | |||||
| (SCDOT § 305) | 23.00 | CY | $0.00 | $0.00 | ||
| 0033 | MARINE LIMESTONE GRADED AGGREGATE BASE COURSE | |||||
| (SCDOT § 305) | 25.00 | CY | $0.00 | $0.00 | ||
| 0034 | STRAIGHTEN SKEWED CROSS TIES | 7.00 | EACH | $0.00 | $0.00 | |
| 0035 | NEW FILTRATION FABRIC | 90.00 | SQ YD | $0.00 | $0.00 | |
| 0036 | PROVIDE NEW RAIL ANCHORS TO MATCH EXISTING RAIL | 50.00 | EACH | $0.00 | $0.00 | |
| 0037 | WELD & GRIND RAILHEAD | 1.00 | EACH | $0.00 | $0.00 | |
| 0038 | PROVIDE 115LB TURNOUT. PROVIDE COMPLETE RAILS WITH STAND | 1.00 | EACH | $0.00 | $0.00 | |
| 0039 | PROVIDE & INSTALL STEEL DRIVE (BOLTS) SPIKES FFP-IN PARKO RUBBER CROSSING | 5.00 | EACH | $0.00 | $0.00 | |
| 0040 | THERMITE WELDED JOINTS-90LBS RAILS | 1.00 | EACH | $0.00 | $0.00 | |
| 0041 | THERMITE WELDED JOINTS 115LB RAILS | 1.00 | EACH | $0.00 | $0.00 | |
| 0042 | PROVIDE REINFORCED CONCRETE PIPE CL 3 w/GASKET FFP-12" DIAMETER | 8.00 | LN FT | $0.00 | $0.00 | |
| 0043 | PROVIDE REINFORCED CONCRETE PIPE CL 3 w/GASKET FFP-18"DIAMETER | 8.00 | LN FT | $0.00 | $0.00 | |
| 0044 | PROVIDE REINFORCED CONCRETE PIPE CL 3 w/GASKET FFP-24" DIAMETER | 8.00 | LN FT | $0.00 | $0.00 | |
| 0045 | PROVIDE REINFORCED CONCRETE PIPE CL 3 w/GASKET FFP-30" DIAMETER | 8.00 | LN FT | $0.00 | $0.00 | |
| 0046 | PROVIDE REINFORCED CONCRETE PIPE CL 3 w/GASKET FFP-36" DIAMETER | 8.00 | LN FT | $0.00 | $0.00 | |
| 0047 | PROVIDE FLOWABLE FILL | 5.00 | CU YD | $0.00 | $0.00 | |
| 0048 | PROVIDE NEW WASHERS ON EXISTING BOLTS | 30.00 | EACH | $0.00 | $0.00 | |
| 0049 | CONCRETE TUB CROSSING FOR TANGENT TRACKAGE | 8.00 | LN FT | $0.00 | $0.00 | |
| 0050 | CONCRETE TUB CROSSING FOR CURVED TRACKAGE | 8.00 | LN FT | $0.00 | $0.00 | |
| 0051 | TANGENT TRACKAGE - removal of existing track/earthwork & replacement | 20.00 | LN FT | $0.00 | $0.00 | |
| 0052 | CURVED TRACKAGE - removal of existing track/earthwork & replacement | 20.00 | LN FT | $0.00 | $0.00 | |
| 0053 | SWITCH AREA TRACKAGE - removal of existing track/earthwork & replacement | 10.00 | LN FT | $0.00 | $0.00 | |
| 0054 | REMOVE AND RE-INSTALL PANELS | 56.00 | LN FT | $0.00 | $0.00 | |
| 0055 | TRAFFIC CONTROL, 36" CONES W/REFLECTIVE RINGS | 8.00 | EA | $0.00 | $0.00 | |
| 0056 | TRAFFIC CONTROL, DRUMS W/REFLECTIVE RINGS AND LIGHTS | 8.00 | EA | $0.00 | $0.00 | |
| 0057 | FLAGMAN W/VEST AND FLAG | 100.00 | HR | $0.00 | $0.00 | |
| 0058 | TRAFFIC CONTROL PLAN - PER LOCATION | 2.00 | EA | $0.00 | $0.00 | |
| 0059 | STRIPING (REFLECTIVE) YELLOW 4" | 180.00 | LF | $0.00 | $0.00 | |
| 0060 | STRIPING (REFLECTIVE) WHITE 4" | 90.00 | LF | $0.00 | $0.00 | |
| 0061 | TRIM TREES WITHIN RIGHT OF WAY - leave debris along wooded area | 50.00 | EA | $0.00 | $0.00 | |
| 0062 | REMOVE PINE STRAW w/ regulator | 2500.00 | LF | $0.00 | $0.00 | |
| 0063 | REPLACE SWITCH WITH GOVT FURNISHED SWITCH | 1.00 | EA | $0.00 | $0.00 | |
| 0064 | REPLACE BROKEN OR MISSING SWITCH TARGET REFLECTORS - govt furnished | 4.00 | EA | $0.00 | $0.00 | |
| 0065 | REPLACE SWITCH HANDLE WITH BACKSAVER-STYLE SWITCH THROW HANDLE | 1.00 | EA | $0.00 | $0.00 | |
| 0066 | CONCRETE CROSSING PANELS | 50.00 | TF | $0.00 | $0.00 | |
| 0067 | REPLACE EXISTING RAIL SIGNS | 20.00 | SF | $0.00 | $0.00 | |
| 0068 | APPLY HERBICIDE TREATMENT TO RAILROAD FROM CENTERLINE TO 15 FEET ON EACH SIDE | 30000.00 | TF | $0.00 | $0.00 | |
| 0069 | REMOVE BRUSH AND TRIM TREE LIMBS FROM LINE OF SIGHT ALONG TRACK 15 FEET FROM CENTERLINE UP TO 20 FEET ABOVE THE TRACK | 15000.00 | TF | $0.00 | $0.00 | |
| SUBTOTALS | ||||||
| CLIN 0001 | Base Period Total | SUBTOTAL | $0.00 | |||
| Proposed Line Item |
Escalation Rates (See General Note 3)
| CLIN 1001 | Option Year 1 Total | 0.00% | SUBTOTAL | $0.00 |
| CLIN 2001 | Option Year 2 Total | 0.00% | SUBTOTAL | $0.00 |
| CLIN 3001 | Option Year 3 Total | 0.00% | SUBTOTAL | $0.00 |
| CLIN 4001 | 6 Month Extension Option Total (Option Year 3 Total Price Multipled By Escalation, Divided by 2) | 0.00% | SUBTOTAL | $0.00 |
CONTRACT TOTAL EVALUATED PRICE $0.00