This is a Project Costs Submission Template for the New Hampshire Department of Business and Economic Affairs' Request for Proposals for Broadband Build for Unserved Locations, funded through Coronavirus Capital Project Funds. Applicants must submit detailed project costs using this standardized Excel template, with proposals due electronically by December 23, 2025, at 4:00 PM EDT. The template requires applicants to complete two fillable tabs: Project Info and Project Cost Details. Applicants must provide granular cost breakdowns for individual line items, identifying each cost component, selecting the appropriate budget category, specifying total costs and grant funds requested, and supplying narrative justification for each cost estimate. The Project Cost Summary tab automatically populates from the submitted detail data and displays totals by nine budget categories. Vendor selection is anticipated for January 13, 2026, with a targeted Governor and Executive Council meeting on February 11, 2026, and all projects must be completed by December 31, 2026.

The nine eligible budget categories for cost allocation include Planning/Project Management, Design Engineering, Permitting, Real Property, Network Deployment, Network Equipment, Subscriber Activations, Contingencies, and Miscellaneous. Applicants must demonstrate understanding of project costs through sufficient descriptive detail to verify cost item eligibility, including proposed construction methodologies and material specifications with cost estimate bases and justifications. The total funding available does not exceed $2,096,771, subject to Governor and Executive Council approval. All submissions must contain project and applicant information matching identical fields in the primary application, including project name, organization name and address, Unique Entity Identifier, primary contact information, and complete cost documentation to support evaluation under the procurement's 100-point scoring system that includes budget approach and cost per passing considerations.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Document Instructions

Project Costs Submission Template Instructions
To allow the Office of Broadband Initiatives to assess your proposed Project Costs in a consistent and concise manner, they must be submitted via this standard program template.

Below you will find instructions to properly complete this form. The Project Info and Project Cost Details tabs must be completed by the Applicant.

Tab NameFillable by ApplicantTab Instructions
1. Project InfoYesApplicants shall fill out their project and applicant information in the designated fields. This should be entered with the exact information as entered into the identical fields in the application.
2. Cost CategoriesNoThis tab provides a description of the cost categories and is not editable by the Applicant.
3. Project Cost DetailsYesApplicants must enter individual cost items into the “Project Cost Details” tab. The “Project Cost Summary” tab will be automatically populated via the information entered directly into the “Project Cost Details” tab. Applicants shall provide cost details with sufficient granularity to demonstrate an understanding of the project and its associated costs. The provided cost details must include sufficient descriptiveness to verify the eligibility of each cost item proposed.

For each proposed cost item, the applicant must fill out the following information fields:

Cost Item – A simple description of the cost item. (i.e. Labor – Directional Drilling, Material - 24”x26”x26” handhole, Contractor Fees - OSP design engineering).
Category – This is a drop-down field for each of the program cost categories. Applicant selects the field that is appropriate for the proposed cost item. Descriptions of the costs categories can be found in the "Cost Categories" tab.
Total Cost – The Applicant’s estimated cost for each item that will be required to complete the project.
Grant Funds Requested – Amount of grant funding that the Applicant is requesting for this cost item.
Cost Details and Budget Narrative Justification – Where the Applicant provides sufficient narrative supporting their estimated costs. The Applicant can use this field to provide additional details such as proposed construction methodologies and materials specifications. The narrative should include the basis of the cost estimate and justification for why it is needed for the project.
3. Project Cost SummaryNoThis tab is automatically populated via the information submitted in the “Detailed Cost” tab and is not editable by the Applicant. Refer to this tab to ensure your proposed project costs category totals are accurately reflected.

Project Info

New Hampshire - Application Information
Applicants shall fill out their project and applicant information in the designated fields. This should be entered with the exact information as entered into the identical fields in the application.
A. Applicant Information
Project Name
Organization Name
Organization Address
Unique Entity Identifier (UEI)
Primary Contact Name and Title
Primary Contact email
Primary Contact Phone Number

Cost Categories

New Hampshire - Project Cost Categories

Program Budget CategoryDescription
Planning/Project ManagementTo include items pertaining to the management of the Applicant’s internal staff or third-party contractors. Items could include but are not limited to; internal project management hours, legal counsel obtained by the applicant for purposes of the proposed project, and administrative staff hours associated with grant compliance.
Design EngineeringTo include items pertaining to the design of the Applicant’s proposed project. Items could include but are not limited to; OSP engineering contractor costs, in-house field surveys and CAD designs, the preparation of permit application documentation, or civil engineering costs for structural attachments.
PermittingTo include all costs and fees associated with permitting. Items could include but are not limited to; fees associated with right-of-way permits, environmental permits, special crossings permits, and pole application permits.
Real PropertyTo include the purchase of any land or infrastructure to facilitate the network deployment. Items could include but are not limited to; the purchase of land, permanent structures, private easements, and the purchasing of colocation space for network equipment.
Network DeploymentTo include all costs associated with the deployment of the proposed network, excluding components exclusive to subscriber activations (i.e. network drop construction, customer premises equipment). Items could include but are not limited to; make ready costs, directional drilling labor, conduit material, fiber optic cable material, placement of vault, messenger stand, PON equipment, etc.
Network EquipmentTo include all costs associated with the purchase of network electronics and active equipment. Items could include but are not limited to; network switches, network routers, and Optical Line terminals.
Subscriber ActivationsTo include all costs associated with the connection of subscribers. Items could include but are not limited to; subscriber drop construction, subscriber drop materials, and customer premises equipment.
ContingenciesTo include any contingency costs the applicant anticipates along with a narrative description of why the costs are anticipated.
MiscellaneousTo include any costs not captured by the other categories. The Applicant must provide sufficient narrative describing each item listed under this category.

Project Cost Details New Hampshire - Project Cost Details

Cost ItemCategoryTotal Cost
Grant Funds RequestedCost Details and Budget Narrative Justification

Project Cost Summary

New Hampshire - Project Cost Summary
CategoryGrant Funds
RequestedProject

Cost

Planning/Project Management$ - 0$ - 0
Design Engineering$ - 0$ - 0
Permitting$ - 0$ - 0
Real Property$ - 0$ - 0
Network Deployment$ - 0$ - 0
Network Equipment$ - 0$ - 0
Subscriber Activations$ - 0$ - 0
Contingencies$ - 0$ - 0
Miscellaneous$ - 0$ - 0
Total$ - 0$ - 0