This is a Quality Assurance Surveillance Plan (QASP) for Kansas City Courier Services supporting the Internal Revenue Service (IRS) Kansas City Submission Processing Center (KCSPC). The QASP establishes systematic methods and procedures for monitoring contractor performance in delivering secure, timely, and accurate courier services for the transport of IRS deposits. The plan defines roles and responsibilities, with the Contracting Officer (CO) maintaining overall contract administration authority and the Contracting Officer's Representative (COR) conducting day-to-day performance monitoring and surveillance activities. The COR is responsible for reviewing pickup and delivery logs, Form 10160 documentation, conducting inspections and random checks, documenting performance using quality assurance monitoring forms, and preparing monthly performance reports summarizing surveillance results, compliance status, identified deficiencies, and trends.
The QASP establishes Acceptable Quality Levels (AQLs) for nine performance areas detailed in Attachment 1, with mission-critical functions requiring 100% compliance, including security of deposits, same-day delivery, and incident reporting. Courier pickup services must achieve 95% on-time arrivals (within 15 minutes), delivery services must achieve 95% on-time completions (within 20 minutes), documentation accuracy must reach 98% with proper form completion and return by next business day, and personnel must maintain 100% compliance with approved courier status (CDAL), background checks, identification display, and uniform requirements. Surveillance methods include 100% inspection for critical areas, random monitoring for security and personnel compliance, and periodic inspections of vehicle and personnel operations. The Government will document surveillance using quality assurance monitoring forms and conduct performance data analysis to identify trends and deficiencies. If contractors fail to meet performance standards, they may be required to submit a Corrective Action Plan, face increased surveillance, or be subject to contractual remedies; however, only the CO may authorize changes to contract requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 5 Questions_ Answer Responses.xlsx | XLSX spreadsheet | |
| Attachment 1 SOW.pdf | ||
| Attachment 5 Questions_Answers.xlsx | XLSX spreadsheet | |
| Attachment 6 Initial Staffing Plan.xlsx | XLSX spreadsheet | |
| Attachment 3 Past Performance.xlsx | XLSX spreadsheet | |
| Combined Synopsis Solicitation.pdf | ||
| Attachment 7 Monthly Workforce Report.xlsx | XLSX spreadsheet | |
| Attachment 2 Price Schedule.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KANSAS CITY COURIER REQURIEMENT
QUALITY ASSURANCE SURVEILLANCE PLAN
(QASP)
1 INTRODUCTION
This quality assurance surveillance plan (QASP) is pursuant to the requirements listed in the statement of work (SOW) entitled Kansas City Courier Services. This plan sets forth the procedures and guidelines Internal Revenue Service (IRS), Kansas City Submission Processing Center (KCSPC) will use in ensuring the required performance standards or services levels are achieved by the contractor.
1.1 Purpose
1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting the performance standards/quality levels identified in the PWS and the contractor’s quality control plan (QCP), and to ensure that the government pays only for the level of services received.
1.1.2 This QASP defines the roles and responsibilities of Government personnel involved in contract oversight, identifies performance objectives, defines the methodologies used to monitor and evaluate contractor performance, describes quality assurance documentation requirements, and outlines how performance results will be analyzed.
1.2 Performance Management Approach
1.2.1 The SOW structures the acquisition around the required outcomes for secure, timely, and accurate courier services supporting the transport of IRS deposits. This QASP defines the performance management approach used by the IRS KCSPC Receipt and Control Operations and the Contracting Officer’s Representative (COR) to monitor and manage contractor performance to ensure expected outcomes are achieved.
Performance management is based on the Government’s ability to collect, review, and analyze performance data such as pickup and delivery times, documentation accuracy, and compliance with security requirements. This analysis enables informed decision-making regarding contractor performance.
1.2.2 Performance management focuses on outcomes rather than the specific processes used by the contractor. The contractor is given flexibility in how services are performed, provided that all required performance standards are met. This approach supports innovation and efficiency while ensuring compliance with statutory, regulatory, and security requirements, including those related to taxpayer data protection and physical security of deposits.
1.3 Performance Management Strategy
1.3.1 The contractor is responsible for the quality of all work performed under the contract. The contractor shall implement a Quality Control Plan (QCP) to monitor its own performance, including timeliness, accuracy, security, and compliance with all SOW requirements. This includes work performed by both contractor personnel and any subcontractors.
1.3.2 The Government, through the COR and designated personnel, will monitor contractor performance using the surveillance methods described in this QASP. The Government will review contractor-provided data, internal records (e.g., pickup logs and Form 10160), and other performance indicators to determine compliance with performance standards.
1.3.3 If performance deficiencies are identified, the contractor may be required to implement corrective actions. Continued failure to meet performance standards may result in contractual remedies in accordance with the terms of the contract.
1.3.4 The contractor’s QCP shall establish processes for identifying deficiencies and implementing corrective actions.
2 ROLES AND RESPONSIBILITIES
2.1 The Contracting Officer
Contracting Officer is responsible for overall contract administration, ensuring compliance with contract terms, and resolving any contractual issues. The CO has the authority to modify the contract, enforce remedies for non-performance, and make final determinations regarding contractual matters.
The CO designates the Contracting Officer’s Representative (COR) to perform day-to-day performance monitoring and surveillance activities.
2.2 The Contracting Officer’s Technical Representative
The COR is designated in writing by the CO and is responsible for technical administration and surveillance of contractor performance.
The COR will:
• Monitor contractor performance against SOW requirements and QASP standards
• Review pickup and delivery logs, Form 10160, and other documentation
• Conduct surveillance activities, including inspections and random checks
• Document performance using quality assurance monitoring forms
• Report performance results and identify trends or deficiencies
• Coordinate with the contractor on performance issues and corrective actions
The COR is not authorized to make changes to contract terms, conditions, or pricing.
3 METHODOLOGIES TO MONITOR PERFORMANCE
3.1 Surveillance Techniques
To minimize administrative burden while ensuring effective oversight, the Government will use a combination of surveillance methods, including:
• 100% Inspection: Used for critical performance areas such as pickup timeliness, delivery timeliness, and documentation accuracy (e.g., Form 10160).
• Random Monitoring: Conducted by the COR or designated personnel to assess compliance with security, personnel, and vehicle requirements.
• Periodic Inspection: Scheduled or unscheduled reviews of contractor operations, including vehicle inspections and personnel verification.
3.2 Customer Feedback
The contractor is expected to maintain professional communication with IRS personnel. Customer satisfaction is a key indicator of performance and may be measured through feedback and complaints from IRS staff.
Customer complaints must:
• Be documented in writing
• Clearly describe the issue
• Be submitted to the COR
The COR will investigate complaints and document findings using appropriate quality assurance monitoring forms.
Customer feedback may also be obtained through direct observation and routine interaction with IRS personnel involved in receipt and control operations.
3.3 Acceptable Quality Levels
Acceptable Quality Levels (AQLs) are defined in Attachment 1: Performance Requirements Summary Table.
AQLs are established based on the criticality of each task. For mission-critical functions, the required performance level is 100% compliance.
• Security of deposits
• Same-day delivery
• Incident reporting
For other performance areas, such as timeliness and documentation accuracy, AQLs are set to ensure high reliability while allowing for minimal variance. Failure to meet AQLs may result in corrective action requirements or other contractual remedies.
4 QUALITY ASSURANCE DOCUMENTATION
4.1 The Performance Management Feedback Loop
Performance management begins with clearly defined expectations in the SOW. Contractor performance is monitored using the surveillance methods outlined in this QASP and measured against the standards and AQLs in Attachment 1.
Performance data is analyzed to identify trends, deficiencies, and areas for improvement. Results are communicated to the contractor to support continuous performance improvement.
4.2 Monitoring Forms
Government surveillance will be documented using quality assurance monitoring forms (Attachment 2).
These forms will:
• Record inspection results
• Document compliance or non-compliance
• Capture performance trends over time
4.2.1 The COR will retain all completed monitoring forms as part of the official contract file and quality assurance record.
5 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT
5.1 Determining Performance
5.1.1 The Government will use the surveillance methods described in this QASP to determine whether the contractor meets established performance standards and AQLs.
If the contractor fails to meet required performance levels:
• The contractor may be required to submit a Corrective Action Plan (CAP)
• Increased surveillance may be implemented
• Continued deficiencies may result in contractual remedies in accordance with the contract
5.2 Reporting
The COR will prepare a monthly performance report summarizing:
• Surveillance results
• Compliance with performance standards
• Identified deficiencies
• Trends and observations
This report will include supporting documentation such as monitoring forms and contractor performance data.
5.3 Reviews and Resolution
5.3.1 The COR may require meetings with the contractor to address performance issues, review trends, and discuss corrective actions.
Topics may include:
• Performance data and trends
• Identified deficiencies and root causes
• Corrective action plans
• Recommendations for improvement
The Government and contractor will work collaboratively to resolve issues; however, only the Contracting Officer may authorize changes to contract requirements.
ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY
Required Services (Tasks)
Performance Standards
Acceptable Quality Levels
Methods of
Surveillance
Pickup Services
Delivery Services
Same-Day Delivery
Shipment Security
Documentation Accuracy
Personnel Compliance
Incident Reporting
Schedule Adherence (Peak/Non-Peak & On- Call)
Delivery Documentation Return
Courier arrives within 15 minutes of pickup time
Delivery is completed within 20 minutes of pickup
All deposits delivered same day; no overnight storage
No unattended deposits; no unauthorized stops; two couriers present; no commingling with other deliveries
Forms are complete, accurate, signed, and returned by next business day
Couriers approved (CDAL), background checks complete, IDs displayed, uniforms worn
Incidents (loss, theft, delays, accidents) reported within required timeframe
Contractor follows all scheduled and on-call service requirements
Completed Form 10160 returned by next business day with required bank signatures/time stamps
95% on-time pickups per month
95% on-time deliveries per month
100% Compliance
≥ 98% accuracy
≥ 95% compliance
≥ 98% compliance
100% inspection of IRS pickup logs (arrival/departure register)
100% inspection using Form 10160 timestamps delivery records and Form 10160
Random inspections;
incident reports; COR oversight forms
Random checks; guard validation against
CDAL
Review of incident logs and reporting timelines
Review of schedules
vs. actual service logs returned forms
ATTACHMENT 2: SAMPLE QUALITY ASSURANCE
MONITORING FORM
SERVICE or STANDARD:
SURVEY PERIOD:
SURVEILLANCE METHOD (Check):
Random Sampling 100% Inspection Periodic Inspection Customer Complaint
LEVEL OF SURVEILLANCE (Check):
Monthly Quarterly As needed
PERCENTAGE OF ITEMS SAMPLED DURING SURVEY PERIOD: ______ %
ANALYSIS OF RESULTS:
Observed Service Provider Performance Measurement Rate: ______%
Service Provider’s Performance (Check): Meets Standards
Does Not Meet Standards
Narrative of Performance During Survey Period:
PREPARED BY: ___________________________________ DATE: _________________
| 1 INTRODUCTION |
| 1.1 Purpose |
| 1.1.1 The purpose of the QASP is to describe the systematic methods used to monitor performance and to identify the required documentation and the resources to be employed. The QASP provides a means for evaluating whether the contractor is meeting th... |
| 1.1.2 This QASP defines the roles and responsibilities of Government personnel involved in contract oversight, identifies performance objectives, defines the methodologies used to monitor and evaluate contractor performance, describes quality assuranc... |
| 1.2 Performance Management Approach |
| 1.2.1 The SOW structures the acquisition around the required outcomes for secure, timely, and accurate courier services supporting the transport of IRS deposits. This QASP defines the performance management approach used by the IRS KCSPC Receipt and C... |
| Performance management is based on the Government’s ability to collect, review, and analyze performance data such as pickup and delivery times, documentation accuracy, and compliance with security requirements. This analysis enables informed decision-... |
| 1.2.2 Performance management focuses on outcomes rather than the specific processes used by the contractor. The contractor is given flexibility in how services are performed, provided that all required performance standards are met. This approach supp... |
| 1.3 Performance Management Strategy |
| 1.3.1 The contractor is responsible for the quality of all work performed under the contract. The contractor shall implement a Quality Control Plan (QCP) to monitor its own performance, including timeliness, accuracy, security, and compliance with all... |
| 1.3.2 The Government, through the COR and designated personnel, will monitor contractor performance using the surveillance methods described in this QASP. The Government will review contractor-provided data, internal records (e.g., pickup logs and For... |
| 1.3.3 If performance deficiencies are identified, the contractor may be required to implement corrective actions. Continued failure to meet performance standards may result in contractual remedies in accordance with the terms of the contract. |
| 1.3.4 The contractor’s QCP shall establish processes for identifying deficiencies and implementing corrective actions. |
| 2 ROLES AND RESPONSIBILITIES |
| 2.1 The Contracting Officer |
| 2.2 The Contracting Officer’s Technical Representative |
| 3 METHODOLOGIES TO MONITOR PERFORMANCE |
| 3.1 Surveillance Techniques |
| 3.2 Customer Feedback |
| 3.3 Acceptable Quality Levels |
| 4 QUALITY ASSURANCE DOCUMENTATION |
| 4.1 The Performance Management Feedback Loop |
| 4.2 Monitoring Forms |
| 4.2.1 The COR will retain all completed monitoring forms as part of the official contract file and quality assurance record. |
| 5 ANALYSIS OF QUALITY ASSURANCE ASSESSMENT |
| 5.1 Determining Performance |
| 5.1.1 The Government will use the surveillance methods described in this QASP to determine whether the contractor meets established performance standards and AQLs. |
| If the contractor fails to meet required performance levels: |
| The contractor may be required to submit a Corrective Action Plan (CAP) |
| Increased surveillance may be implemented |
| Continued deficiencies may result in contractual remedies in accordance with the contract |
| 5.2 Reporting |
| 5.3 Reviews and Resolution |
| 5.3.1 The COR may require meetings with the contractor to address performance issues, review trends, and discuss corrective actions. |
| Topics may include: |
| The Government and contractor will work collaboratively to resolve issues; however, only the Contracting Officer may authorize changes to contract requirements. ATTACHMENT 1: PERFORMANCE REQUIREMENTS SUMMARY |
| ATTACHMENT 2: SAMPLE QUALITY ASSURANCE MONITORING FORM |
File details come from the government source that posted it. Updated .