Attachment 4 - Price Worksheet.xlsx

XLSX spreadsheet 555 KB Posted

Attached to
(AFDW/CCP) Toilet Partition Replacement
Solicitation number
FA701426Q0052
Issued by

About this file

This is a Price Worksheet template in CSI (Construction Specifications Institute) format designed for contractors to submit cost estimates for the bathroom partition replacement project at Joint Base Andrews, Maryland. The spreadsheet is structured with 50 construction divisions, allowing contractors to input labor and material costs for each relevant division, with the template automatically calculating subtotals, overhead, profit margins, and final pricing. Contractors are permitted to include missing items not listed in the prefilled division sheets and may add items to divisions as needed; however, if disagreements exist with prefilled elements, contractors should leave those items blank and include alternative suggestions at the bottom of the respective division tabs.

The worksheet includes pre-populated overhead and profit percentage fields on the summary page (10% General Contractor overhead, 15% General Contractor profit, 5% subcontractor overhead, 11% subcontractor profit, 6% sales tax, and 2% risk/bonding) that automatically flow to all division tabs. The template notes that if individual subcontractors have different overhead and profit rates, adjustments must be made to specific division pages. The summary page requires contractors to complete several "Fill Here" fields including company name, project number, date, and location, with all other information automatically populating from the individual division tabs. Sample inputs are provided in Divisions 1, 2, and 3 to illustrate worksheet functionality.

View the file

Other files

File Type Posted
Solicitation Amendment - FA701426Q00520005.pdf PDF
Solicitation Amendment FA701426Q00520005 SF 30.pdf PDF
Attachment 5 - ITO - 28Sep26.pdf PDF
Site-Visit-Sign-In.pdf PDF
Attachment 3 - SOO - 25Sep26.pdf PDF
2nd-floor-combined.png PNG image
Solicitation Amendment - FA701426Q00520004.pdf PDF
Attachment 1 - SOW Template - 25Sep26.docx DOCX document
Questions-Answers.pdf PDF
1st-floor-womens.png PNG image
1st-floor-mens.png PNG image
Solicitation Amendment FA701426Q00520004 SF 30.pdf PDF
Attachment 5 - Instructions to Offerors - 25Sep26.pdf PDF
Attachment 5 - Instructions to Offerors - Amendment 3 - 24Sep26.pdf PDF
Solicitation Amendment - FA701426Q00520003.pdf PDF
Solicitation Amendment FA701426Q00520003 SF 30.pdf PDF
Solicitation Amendment FA701426Q00520002 SF 30.pdf PDF
Solicitation Amendment - FA701426Q00520002.pdf PDF
Attachment 5 - Instructions to Offerors - Amendment 2 - 17Sep26.pdf PDF
Solicitation Amendment FA701426Q00520001 SF 30.pdf PDF
Solicitation Amendment - FA701426Q00520001.pdf PDF
Attachment 5 - Instructions to Offerors - Amendment 1 - 16Sep26.pdf PDF
Solicitation - FA701426Q0052.pdf PDF
Attachment 1 - Statement of Work Template.docx DOCX document
Attachment 3 - Statement of Objectives.pdf PDF
Attachment 2 - Wage Determination MD20260121.pdf PDF
Attachment 5 - Instructions to Offerors.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Instructions Use the information from the prefilled division sheets below to complete the 50 Divisions Cost Estimate CSI* Format tool to build your proposal. The information from the prefilled division sheets may not be all inclusive. The contractor is allowed to include any missing items from each division and is allowed to fill in other divisions that are not listed in the prefilled division sheets. If there is a disagreement with the prefilled division sheets, the contractor should not delete the element(s), but instead leave it blank and then include their suggested element(s) at the bottom of that division tab. Please note that on the summary page there is a place to fill in overhead and profit percentages for both the prime and the subcontractor that will self-populate the summary page and all the division tabs.

Exceptions:

(1) if each subcontractor has a different overhead and profit rates than the percentage placed on the summary page, an adjustment will have to be made to that specific division page. The spreadsheet will still calculate correctly.

(2) If the prime is self-performing the work for that division then the profit and overhead will need to be zeroed for that particular division, because the primes overhead and profit is already captured on the summary page.

The ktr is required to complete the areas marked "Fill Here" in the summary tab. The rest of the information in the summary tab will automatically tabulate from the individual division tabs except for the few exceptions listed above.

Divisions 1, 2, and 3 show sample inputs to illustrate how the spreadsheet works.

* CSI = Construction Specifications Institute

&"Verdana,Bold"Construction Cost Estimate

&P of &N

Summary

CONSTRUCTION COST ESTIMATEDate:
Fill Here
COMPANY
Fill Here
PROJECT
(AFDW/CCPS) Bathroom Partition Replacements
LOCATIONPROJECT NO.Fill Here
Joint Base Andrews, Maryland
DIVISIONDESCRIPTION% by
DivisionDivision Total
DIVISION 01GENERAL REQUIREMENTS45.7%50.00
DIVISION 02EXISTING CONDITIONS54.3%59.48
DIVISION 03CONCRETE WORK0.0%- 0FILL IN AS REQUIRED (this will link to the entire document)

davisjam: davisjam:

Percentages listed are place fillers. Please complete as required

DIVISION 04MASONRY0.0%- 0
DIVISION 05METALS0.0%- 0
DIVISION 06WOOD, PLASTICS AND COMPOSITES0.0%- 0GC Overhead10.00%
DIVISION 07THERMAL AND MOISTURE PROTECTION0.0%- 0GC Profit15.00%
DIVISION 08OPENINGS0.0%- 0Sub Overhead5.00%
DIVISION 09FINISHES0.0%- 0Sub Profit11.00%
DIVISION 10SPECIALTIES0.0%- 0Sales Tax6.00%
DIVISION 11EQUIPMENT0.0%- 0Risk/Bonding2.00%
DIVISION 12FURNISHINGS0.0%- 0
DIVISION 13SPECIAL CONSTRUCTION0.0%- 0This spreadsheet contains many formulas... please save a copy prior to editting in case you make a mistake. All shaded areas are either linked or contain formulas
DIVISION 14CONVEYING EQUIPMENT0.0%- 0
DIVISION 15RESERVED0.0%- 0
DIVISION 16RESERVED0.0%- 0
DIVISION 20RESERVED0.0%- 0
DIVISION 21FIRE SUPRESSION0.0%- 0
DIVISION 22PLUMBING0.0%- 0
DIVISION 23HEATING, VENTILATING AND A/C0.0%- 0
DIVISION 24RESERVED0.0%- 0
DIVISION 25INTEGRATED AUTOMATION0.0%- 0
DIVISION 26ELECTRICAL0.0%- 0
DIVISION 27COMMUNICATIONS0.0%- 0
DIVISION 28ELECTRONIC SAFETY AND SECURITY0.0%- 0
DIVISION 29RESERVED0.0%- 0
DIVISION 30RESERVED0.0%- 0
DIVISION 31EARTHWORK0.0%- 0
DIVISION 32EXTERIOR IMPROVEMENTS0.0%- 0
DIVISION 33UTILITIES0.0%- 0
DIVISION 34TRANSPORTATION0.0%- 0
DIVISION 35WATERWAYS AND MARINE CONSTRUCTION0.0%- 0
DIVISION 36RESERVED0.0%- 0
DIVISION 37RESERVED0.0%- 0
DIVISION 38RESERVED0.0%- 0
DIVISION 39RESERVED0.0%- 0
DIVISION 40PROCESS INTEGRATION0.0%- 0
DIVISION 41MATERIAL PROCESING AND HANDLING EQUIPMENT0.0%- 0
DIVISION 42PROCESS HEATING, COOLING AND DRYING EQUIPMENT0.0%- 0
DIVISION 43PROCESS GAS & LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT0.0%- 0
DIVISION 44POLLUTION CONTROL EQUIPMENT0.0%- 0
DIVISION 45INDUSTRY-SPECIFIC MANUFACTURING EQUIPMENT0.0%- 0
DIVISION 46RESERVED0.0%- 0
DIVISION 47RESERVED0.0%- 0
DIVISION 48ELECTRICAL POWER GENERATION0.0%- 0
DIVISION 49RESERVED0.0%- 0

HARD COST TOTAL 100% 109.48

PRIME GENERAL CONTRACT OFFICE OVERHEAD (Fill in%)10%10.95
SUBTOTAL120.42
PRIME GENERAL CONTRACTOR'S PROFIT(Fill in%)15%18.06
SUBTOTAL138.49
BUILDER'S RISK / PERFORMANCE BONDS (Fill in%)2%2.77
CONTRACT TOTAL$ 141.26

&"Verdana,Bold"Construction Cost Estimate

Div1

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
GENERAL REQUIREMENTS
- 0- 0- 0
- 0- 0- 0
Sample Input2- 010.0020.0020.00
Sample Input31.0010.0030.00- 030.00
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS30.0020.00
SUBTOTAL50.00
Sub-Contractor's Overhead0.00%- 0
Sub-Contractor's Profit0.00%- 0
FL State Sales Tax0.00%- 0
TOTAL$ 50.00

&"Verdana,Bold"Construction Cost Estimate

Div2

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EXISTING CONDITIONS
- 0- 0- 0
- 0- 0- 0
Sample Input2- 010.0020.0020.00
Sample Input310.0030.00- 030.00
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS30.0020.00
SUBTOTAL50.00
Sub-Contractor's Overhead5.00%2.50
Sub-Contractor's Profit11.00%5.78
FL State Sales Tax6.00%1.20
TOTAL$ 59.48

&"Verdana,Bold"Construction Cost Estimate

Div3

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
CONCRETE WORK
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead10.00%- 0
Sub-Contractor's Profit15.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div4

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
MASONRY
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div5

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
METALS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div6

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
WOOD, PLASTICS AND COMPOSITES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div7

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
THERMAL AND MOISTURE PROTECTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div8

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
OPENINGS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div9

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FINISHES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div10

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
SPECIALTIES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div11

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div12

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FURNISHINGS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div13

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
SPECIAL CONSTRUCTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div14

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
CONVEYING EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div15

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div16

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div20

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div21

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
FIRE SUPRESSION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div22

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PLUMBING
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div23

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
HEATING, VENTILATING AND A/C
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div24

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div25

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
INTEGRATED AUTOMATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div26

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
ELECTRICAL
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div27

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
COMMUNICATIONS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div28

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
ELECTRONIC SAFETY AND SECURITY
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div29

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div30

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div31

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EARTHWORK
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div32

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
EXTERIOR IMPROVEMENTS
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div33

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
UTILITIES
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div34

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
TRANSPORTATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div35

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
WATERWAYS AND MARINE CONSTRUCTION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
RESERVED$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div36

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div37

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div38

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div39

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
RESERVED
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div40

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PROCESS INTEGRATION
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div41

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
MATERIAL PROCESING AND HANDLING EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL- 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div42

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PROCESS HEATING, COOLING AND DRYING EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div43

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
PROCESS GAS & LIQUID HANDLING, PURIFICATION AND STORAGE EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
TOTAL LABOR/MATERIALS- 0- 0
SUBTOTAL$ - 0
Sub-Contractor's Overhead5.00%- 0
Sub-Contractor's Profit11.00%- 0
FL State Sales Tax6.00%- 0
TOTAL$ - 0

&"Verdana,Bold"Construction Cost Estimate

Div44

CONSTRUCTION COST ESTIMATEDATE
Fill Here
PROJECTBASIS FOR ESTIMATE
(AFDW/CCPS) Bathroom Partition ReplacementsCODE A (No design completed)
LOCATIONCODE B (Preliminary design)
EGLIN AIR FORCE BASE, FLORIDACODE C (Final design)
COMPANYPROJECT NO.OTHER (Specify)
Fill HereFill Here
DRAWING NO.ESTIMATORCHECKED BY
QUANTITYLABORMATERIAL
ITEM DESCRIPTIONNO. UNITSUNIT MEAS.PER UNITTOTALPER UNITTOTALTOTAL COST
POLLUTION CONTROL EQUIPMENT
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0
- 0- 0- 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .