This document is an attachment titled "Attachment_4_Price_Breakout.pdf" related to the federal contract opportunity "GAOA Jupiter Inlet Unit D Renovations" (Solicitation Number: 140L0624R0056).

The attachment provides a price breakout for various divisions of work required under this firm-fixed price, lump sum contract, including General Requirements, Sitework, Concrete, Masonry, Metals, Wood and Plastics, Thermal and Moisture, Doors and Windows, Finishes, Specialties, Special Construction, Plumbing, HVAC, Electrical, Clearing and Grubbing, and Pipeline Restoration. The contract is being issued by the Department of the Interior, Bureau of Land Management National Office. Specific line items are identified for concrete work associated with the new ADA-compliant entry ramp, metal handrail for the ramp, impact-resistant picture windows, and the HVAC system installation.

View the file

Other files for this federal contract opportunity

Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4

Jupiter Inlet Lighthouse Outstanding Natural

Area Unit D Renovation

Price Breakout

This is a firm-fixed price lump sum contact; however, a Price Breakout is required in the following

Divisions. Note, some divisions have work divided to allow for tracking of specific contract items.

Division Price

01 General Requirements

02 Sitework

03 Concrete

03 Concrete (NON-GAOA) *

04 Masonry

05 Metals

05 Metals (NON-GAOA) **

06 Wood and Plastics

07 Thermal and Moisture

08 Doors and Windows

08 Doors and Windows (NON-GAOA) ***

09 Finishes

10 Specialties

13 Special Construction

22 Plumbing

23 HVAC (NON-GAOA) ****

26 Electrical

31 Clearing and Grubbing

33 Pipeline Restoration

Total

* 03 Concrete (Non-GAOA) – Include in this line item only the total cost of the concrete work associated within the New ADA-Compliant Entry Ramp and any exterior pathway (Drawings Page

A-202).

** 05 Metals (Non-GAOA) – Include in this line item only the total cost of the metal handrail associated within the ““New ADA-Compliant Entry Ramp (Drawings Page A-202)

*** 08 Doors and Windows (Non-GAOA) – Include in this line item only the total cost of materials and installation for Impact Resistant Picture-Windows (Specification Section 085113 – Aluminum Windows)

**** 23 HVAC (Non-GAOA) – Include in this line item the total cost of all components associated with the installation of the HVAC system including compressor, air handler, thermostat, and replacement duct work, vents etc.

File details come from the government source that posted it. Updated .