Attachment 4 Mobile Construction Equipment Checklist.pdf
PDF 771 KB Posted
- Attached to
- NSWCPD BLDG 77H Remove/Replace HP Split-Systems Federal contract opportunity
- Solicitation number
- N6449823R4040
About this file
This document contains an attachment to a solicitation for mobile construction equipment. The Naval Sea Systems Command is seeking bids to remove and replace split-system heat pumps in Building 77H at the Naval Surface Warfare Center Panama City Division, as outlined in Solicitation N6449823R4040. Attachment 4 provides a two-page checklist of required mobile construction equipment for the project, including equipment types, estimated quantities, minimum specifications, and inspection requirements. Bidders must ensure their proposed equipment meets the standards listed in order to be deemed acceptable. The solicitation response date is not provided in this attachment.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6449823R4040 Amendment 0001.pdf | ||
| Attachment 14 Jobsite Pictures.pdf | ||
| N6449823R4040.pdf | ||
| Attachment 13 Bid Bond SF24.pdf | ||
| Attachment 8 Condenser Layout.pdf | ||
| Attachment 5 Activity Hazard Analysis Form.docx | DOCX document | |
| Attachment 10 Integrated Ship Control and Diagnostic Facility 03051999.pdf | ||
| Attachment 3 Requirements for Contractor Lift Operations.pdf | ||
| Attachment 7 AHU Layout.pdf | ||
| Attachment 1 Site Map - PNBC.pdf | ||
| Attachment 6 SECNAV 5512.pdf | ||
| Attachment 12 Past Performance Questionnaire (PPQ).doc | DOC document | |
| Attachment 9 HP Main Distribution Panel between Columns D13 and D14.pdf | ||
| Attachment 2 Contractor Production Report Form.doc | DOC document | |
| Attachment 11 HP-data.xlsx | XLSX spreadsheet |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOW Attachment 4 Mobile Construction Equipment
Checklist Page 1 of 2
SOW Attachment 4 Mobile Construction Equipment
Checklist Page 2 of 2
File details come from the government source that posted it. Updated .