Attachment 4 Mobile Construction Equipment Checklist.pdf

PDF 771 KB Posted

Attached to
NSWCPD BLDG 77H Remove/Replace HP Split-Systems Federal contract opportunity
Solicitation number
N6449823R4040
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document contains an attachment to a solicitation for mobile construction equipment. The Naval Sea Systems Command is seeking bids to remove and replace split-system heat pumps in Building 77H at the Naval Surface Warfare Center Panama City Division, as outlined in Solicitation N6449823R4040. Attachment 4 provides a two-page checklist of required mobile construction equipment for the project, including equipment types, estimated quantities, minimum specifications, and inspection requirements. Bidders must ensure their proposed equipment meets the standards listed in order to be deemed acceptable. The solicitation response date is not provided in this attachment.

View the file

Other files for this federal contract opportunity

Other files attached to NSWCPD BLDG 77H Remove/Replace HP Split-Systems, newest first.
File Type Posted
N6449823R4040 Amendment 0001.pdf PDF
Attachment 14 Jobsite Pictures.pdf PDF
N6449823R4040.pdf PDF
Attachment 13 Bid Bond SF24.pdf PDF
Attachment 8 Condenser Layout.pdf PDF
Attachment 5 Activity Hazard Analysis Form.docx DOCX document
Attachment 10 Integrated Ship Control and Diagnostic Facility 03051999.pdf PDF
Attachment 3 Requirements for Contractor Lift Operations.pdf PDF
Attachment 7 AHU Layout.pdf PDF
Attachment 1 Site Map - PNBC.pdf PDF
Attachment 6 SECNAV 5512.pdf PDF
Attachment 12 Past Performance Questionnaire (PPQ).doc DOC document
Attachment 9 HP Main Distribution Panel between Columns D13 and D14.pdf PDF
Attachment 2 Contractor Production Report Form.doc DOC document
Attachment 11 HP-data.xlsx XLSX spreadsheet
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOW Attachment 4 Mobile Construction Equipment

Checklist Page 1 of 2

SOW Attachment 4 Mobile Construction Equipment

Checklist Page 2 of 2

File details come from the government source that posted it. Updated .