This document is a past performance questionnaire for solicitation N6449823R4040 from the Department of the Navy Naval Sea Systems Command. The solicitation is for the removal and replacement of split-system heat pumps at NSWCPD Building 77H and requires contractors to submit past performance examples and have their clients complete this questionnaire to assess the contractors' performance in areas such as technical performance, schedule delivery, quality, safety, coordination, proactivity, and security compliance. Responses are due by the closing date and time of the solicitation. The questionnaire also collects information on contract size and role, overall ratings, and an optional recommendation and additional references.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 14 Jobsite Pictures.pdf | ||
| N6449823R4040 Amendment 0001.pdf | ||
| N6449823R4040.pdf | ||
| Attachment 8 Condenser Layout.pdf | ||
| Attachment 5 Activity Hazard Analysis Form.docx | DOCX document | |
| Attachment 4 Mobile Construction Equipment Checklist.pdf | ||
| Attachment 13 Bid Bond SF24.pdf | ||
| Attachment 9 HP Main Distribution Panel between Columns D13 and D14.pdf | ||
| Attachment 2 Contractor Production Report Form.doc | DOC document | |
| Attachment 11 HP-data.xlsx | XLSX spreadsheet | |
| Attachment 10 Integrated Ship Control and Diagnostic Facility 03051999.pdf | ||
| Attachment 3 Requirements for Contractor Lift Operations.pdf | ||
| Attachment 7 AHU Layout.pdf | ||
| Attachment 1 Site Map - PNBC.pdf | ||
| Attachment 6 SECNAV 5512.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N00024-16-R-3208
Solicitation No. N6449823R4040
The Naval Surface Warfare Center Philadelphia Division (NSWCPD)
Bldg. 77H HP 7, 9, 10, 11 and 12 Replacement
Attachment 13 Past Performance Questionnaire
The Contractor shall complete the company specific information on this form for past performance project examples that the Contractor will be providing, contact their clients, forward this form to their clients and request that their clients complete it and send it via email to the listed individual before the closing time for receipt of offers: Michael Hunter; michael.j.hunter86.civ@us.navy.mil and David Rhoads; david.a.rhoads8.civ@us.navy.mil. This will expedite the response from each referenced source.
Please title the subject line of the e-mail to read “SOLICITATION NO. N6449823R4040 – Past Performance Questionnaire” *NOTE: IT IS THE RESPONSIBILITY OF THE OFFEROR TO ENSURE ALL PAST PERFORMANCE QUESTIONNAIRES ARE SUBMITTED TO THE GOVERNMENT BY THE CLOSING DATE AND TIME.
If you need more space than that provided, please attach additional pages. Responses will be treated as source selection sensitive information. If you have any questions, please contact the Contracting Officer at the above e-mail addresses.
1. Contract Information (Note: The CONTRACTOR SHALL COMPLETE THIS SECTION)
a) Contractor Name: ______________________________________________________________
b) Contract Number: ______________________________________________________________
c) Performed as Prime or Subcontractor (Circle or Highlight): PRIME SUBCONTRACTOR
d) Describe your role as Prime or Subcontractor under this effort: _______________________ __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
e) Total period of performance (Start/Completion date; month and year):
f) Total Contract Dollar Amount at Completion (or Current Contract Dollar Amount, if not Completed:___________________________________________________________________ g) Describe Project Location (town, city, state, building name, or building number, etc.): ______________________________________________________________________________
h) Describe the Project and Services provided. Provide any relevant information in regards to
Fuel Pump Control System Repairs. For example, the types, sizes, etc.:
i) Contract Type (FFP, Labor Hour, Time & Materials; Cost Reimbursement (CPFF, CPIF, CPAF, etc.): ___________________________________________________________________
CONTRACT ASSESSMENT
2. Contract Relevancy. For comparison with the size and scope of this acquisition, please provide the following information pertaining to the contract identified in Section 1 above.
Project Management Fuel Pump Control System Repair
Remove/Replace all power and control wiring
Provide New Conduit Pathways
Quality Control Acquisition and Contract Management Support
Technical Expertise
Other Support (please describe:_________________________________________)
3. Performance Assessment Values (Please Circle or Highlight Rating # 1-5 for examples below) 5 - Exceptional. Performance meets contractual requirements and exceeds many to the client’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
4 – Very Good. Performance meets contractual requirements and exceeds some to the client’s benefit. The contractual performance of the element or sub-element being evaluated was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
3 - Satisfactory. Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
2. – Marginal. Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being evaluated reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
1 - Unsatisfactory. Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.
0 - Not Applicable. Unable to provide a score. Performance in this area not applicable to effort assessed.
4. Assessment Elements. Please select/circle the appropriate performance assessment value for each item on the questionnaire and provide supporting narrative.
a. Overall Technical Performance. 5 4 3 2 1 0 Comments:
b. Delivered according to Schedule. 5 4 3 2 1 0 Comments:
c. Level of Quality Received. 5 4 3 2 1 0 Comments:
d.
Safety Environment. 5 4 3 2 1 0
Comments:
e. Coordination of outages with facility’s needs. 5 4 3 2 1 0 Comments:
f. Proactive to Potential Risks. 5 4 3 2 1 0 Comments:
g. Compliance with Security Requirements. 5 4 3 2 1 0 Comments:
h. Recommendation. To what extent would you recommend this contractor for additional contracts? Circle below
5 = Yes, definitely; 4 = Yes, likely; 3 = Maybe, 2 = No, not likely; 1 = No, not ever; 0 = N/A.
Comments:
5. Other References. If you are aware of any other contract or a Point of Contact (POC) who is familiar with the contractor’s performance under this contract, please identify.
Name, Phone, and E-Mail Address:
6. Assessor Information. Assessors shall provide the following information about yourself:
Name:
Title:
Address:
Phone Number:
E-Mail Address:
Thank you for your assistance.