Attachment 2 Contractor Production Report Form.doc
DOC document 61 KB Posted
- Attached to
- NSWCPD BLDG 77H Remove/Replace HP Split-Systems Federal contract opportunity
- Solicitation number
- N6449823R4040
About this file
This document contains a contractor production report form and details of a related federal contract opportunity for building services. The contractor production report form requires details of work performed each day such as weather, staffing levels, safety inspections, equipment used, materials received and remarks.
The related federal contract opportunity is a solicitation from the Department of the Navy Naval Sea Systems Command to remove and replace split-system air conditioning units at Building 77H. The solicitation number is N6449823R4040 and seeks these building services at the NSWCPD facility. No further specifics are provided on response dates, pricing terms, set asides or other contract details.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 14 Jobsite Pictures.pdf | ||
| N6449823R4040 Amendment 0001.pdf | ||
| N6449823R4040.pdf | ||
| Attachment 9 HP Main Distribution Panel between Columns D13 and D14.pdf | ||
| Attachment 11 HP-data.xlsx | XLSX spreadsheet | |
| Attachment 8 Condenser Layout.pdf | ||
| Attachment 5 Activity Hazard Analysis Form.docx | DOCX document | |
| Attachment 4 Mobile Construction Equipment Checklist.pdf | ||
| Attachment 13 Bid Bond SF24.pdf | ||
| Attachment 10 Integrated Ship Control and Diagnostic Facility 03051999.pdf | ||
| Attachment 3 Requirements for Contractor Lift Operations.pdf | ||
| Attachment 7 AHU Layout.pdf | ||
| Attachment 1 Site Map - PNBC.pdf | ||
| Attachment 6 SECNAV 5512.pdf | ||
| Attachment 12 Past Performance Questionnaire (PPQ).doc | DOC document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR PRODUCTION REPORT
(ATTACH ADDITIONAL SHEETS IF NECESSARY)
DATE
| CONTRACT NO |
| TITLE AND LOCATION |
REPORT NO
Building 77H – Fuel System Project
CONTRACTOR
SUPERINTENDENT
AM WEATHER
PM WEATHER
| MAX TEMP (F) |
| MIN TEMP (F) |
WORK PERFORMED TODAY
Schedule
Activity No.
| WORK LOCATION AND DESCRIPTION |
| EMPLOYER |
| NUMBER |
| TRADE |
| HRS |
JOB
SAFETY
WAS A JOB SAFETY MEETING HELD THIS DATE?
FORMCHECKBOX
YES
FORMCHECKBOX
NO
TOTAL WORK HOURS ON JOB SITE,
THIS DATE, INCL CON'T SHEETS
WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?
(If YES attach copy of completed OSHA report)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
CUMULATIVE TOTAL OF WORK
HOURS FROM PREVIOUS REPORT
WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/ HAZMAT WORK DONE?
(If YES attach statement or checklist showing inspection performed.)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
TOTAL WORK HOURS FROM
START OF CONSTRUCTION
WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT?
(If YES attach description of incident and proposed action.)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
Schedule
Activity No.
| LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED |
| FORMCHECKBOX |
SAFETY REQUIREMENTS HAVE BEEN MET.
EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER)
Schedule
Activity No.
| Submittal # |
| Description of Equipment/Material Received |
CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.
Schedule
Activity No.
| Owner |
| Description of Construction Equipment Used Today (incl Make and Model) |
| Hours Used |
Schedule
Activity No.
REMARKS
| CONTRACTOR/SUPERINTENDENT |
| DATE |
SOW Attachment 2 Contractor Production Report Form
Sheet 1 of 1