Attachment 2 Contractor Production Report Form.doc

DOC document 61 KB Posted

Attached to
NSWCPD BLDG 77H Remove/Replace HP Split-Systems Federal contract opportunity
Solicitation number
N6449823R4040
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This document contains a contractor production report form and details of a related federal contract opportunity for building services. The contractor production report form requires details of work performed each day such as weather, staffing levels, safety inspections, equipment used, materials received and remarks.

The related federal contract opportunity is a solicitation from the Department of the Navy Naval Sea Systems Command to remove and replace split-system air conditioning units at Building 77H. The solicitation number is N6449823R4040 and seeks these building services at the NSWCPD facility. No further specifics are provided on response dates, pricing terms, set asides or other contract details.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR PRODUCTION REPORT

(ATTACH ADDITIONAL SHEETS IF NECESSARY)

DATE

CONTRACT NO
TITLE AND LOCATION

REPORT NO

Building 77H – Fuel System Project

CONTRACTOR

SUPERINTENDENT

AM WEATHER

PM WEATHER

MAX TEMP (F)
MIN TEMP (F)

WORK PERFORMED TODAY

Schedule

Activity No.

WORK LOCATION AND DESCRIPTION
EMPLOYER
NUMBER
TRADE
HRS

JOB

SAFETY

WAS A JOB SAFETY MEETING HELD THIS DATE?

FORMCHECKBOX

YES

FORMCHECKBOX

NO

TOTAL WORK HOURS ON JOB SITE,

THIS DATE, INCL CON'T SHEETS

WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?

(If YES attach copy of completed OSHA report)

FORMCHECKBOX

YES

FORMCHECKBOX

NO

CUMULATIVE TOTAL OF WORK

HOURS FROM PREVIOUS REPORT

WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/ HAZMAT WORK DONE?

(If YES attach statement or checklist showing inspection performed.)

FORMCHECKBOX

YES

FORMCHECKBOX

NO

TOTAL WORK HOURS FROM

START OF CONSTRUCTION

WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT?

(If YES attach description of incident and proposed action.)

FORMCHECKBOX

YES

FORMCHECKBOX

NO

Schedule

Activity No.

LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED
FORMCHECKBOX

SAFETY REQUIREMENTS HAVE BEEN MET.

EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER)

Schedule

Activity No.

Submittal #
Description of Equipment/Material Received

CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.

Schedule

Activity No.

Owner
Description of Construction Equipment Used Today (incl Make and Model)
Hours Used

Schedule

Activity No.

REMARKS

CONTRACTOR/SUPERINTENDENT
DATE

SOW Attachment 2 Contractor Production Report Form

Sheet 1 of 1