Attachment 4 - Itemized Cost Breakdown.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Z1DA--619A4-23-106 Correct the Mechanical/Fixtures & Piping for Buildings 2, 4 & 4A (VA-26-00016382)
- Solicitation number
- 36C24726R0070
About this file
This is an Itemized Cost Breakdown Worksheet template for federal construction solicitation 36C24726R0070 issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 7. The worksheet is designed for contractors to submit detailed pricing for the Z1DA--619A4-23-106 project, which involves correcting mechanical systems, fixtures, and piping for Buildings 2, 4, and 4A at a VA facility (VA-26-00016382).
The template organizes costs across multiple construction divisions using the MasterFormat classification system, including General Requirements, Existing Conditions, Concrete, Metals, Wood and Plastic, Thermal and Moisture Protection, Openings, Finishes, Specialties, Equipment, Furnishings, Special Construction, Fire Suppression, Plumbing, HVAC, Electrical, and Communications. For each division and line item, contractors must itemize costs in four categories: Material, Labor, Equipment, and Other, with totals calculated for each division. The worksheet also includes sections for overhead, profit, bonds and insurance, and a final total proposal amount. This is a blank template with no pre-populated values or specific pricing guidance provided.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 10 - Revised RFI Answers.docx | DOCX document | |
| Attachment 11 - Hazmat Survey Report.pdf | ||
| 36C24726R0070 0003.docx | DOCX document | |
| 36C24726R0070 0002.docx | DOCX document | |
| Attachment 10 - RFI Answers.docx | DOCX document | |
| 36C24726R0070 0001.docx | DOCX document | |
| Attachment 9 - Site Visit Attend.pdf | ||
| Attachment 1 - Experience Modification Rate Form.pdf | ||
| Attachment 2 - SBA Vet SB Cert Program Class Dev.pdf | ||
| Attachment 3 - PPQ.pdf | ||
| Attachment 7 - SPECS - 619A4-23-106.pdf | ||
| 36C24726R0070_1.docx | DOCX document | |
| Attachment 8 - Drawings FINAL.pdf | ||
| Attachment 5 - Wage Determinations.txt | TXT text file | |
| Attachment 6 - INVOICING.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Solicitation No. 36C24726R0070 Attachment 4 – Cost/Price Breakdown Worksheet | |||||
| DESCRIPTION | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| Division 01 - General Requirements | |||||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 02 – Existing Conditions | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 03 – Concrete | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 05 - Metals | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 06- Wood and Plastic | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 07- Thermal and Moisture Protection | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 08- Openings (Doors and Windows) | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 09- Finishes | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 10- Specialties | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 11- Equipment | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 12- Furnishings | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 13- Special Construction | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 21- Fire Suppression | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 22- Plumbing | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 23- Heating, Ventilating, and Air conditioning (HVAC) | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ - 0 | ||
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 26 Electrical | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 27- Communications | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Other (If applicable) | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Other Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL | |
| SUB TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Overhead | $ | $ | $ | $ | $ |
| Profit | $ | $ | $ | $ | $ |
| Bonds and Insurance | $ | $ | $ | $ | $ |
| Total Proposal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
File details come from the government source that posted it. Updated .