Attachment 4 - Itemized Cost Breakdown 02.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- 679-19-101 Correct Critical Access and ADA Deficiencies B61 Federal contract opportunity
- Solicitation number
- 36C24726R0069
About this file
This is a Cost/Price Breakdown Worksheet template for Solicitation No. 36C24726R0069, which pertains to Project 679-19-101 at Tuscaloosa VA Medical Center. The template is structured according to the MasterFormat classification system and is designed for contractors to itemize costs across multiple construction divisions including General Requirements, Existing Conditions, Concrete, Metals, Wood and Plastic, Thermal and Moisture Protection, Openings, Finishes, Specialties, Equipment, Furnishings, Special Construction, Fire Suppression, Plumbing, HVAC, Electrical, and Communications. Each division provides separate line items for Material, Labor, Equipment, and Other costs, with subtotals calculated for each category.
The worksheet culminates in a summary section that captures the subtotal across all divisions and allows for the addition of Overhead, Profit, and Bonds and Insurance to arrive at the Total Proposal amount. As a blank template, it contains no pre-populated pricing data and serves as the standardized format that bidders must complete to submit their cost proposals for the renovation and modification work at Building 61, which includes corridor renovation, floor slope modification, new HVAC installation, lighting, fire protection, finishes, and railing systems.
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Solicitation No. 36C24726R0069 Attachment 4 – Cost/Price Breakdown Worksheet | |||||
| DESCRIPTION | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| Division 01 - General Requirements | |||||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| $ | $ | $ | $ - 0 | ||
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 02 – Existing Conditions | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 03 – Concrete | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 05 - Metals | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 06- Wood and Plastic | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 07- Thermal and Moisture Protection | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 08- Openings (Doors and Windows) | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 09- Finishes | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 10- Specialties | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 11- Equipment | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 12- Furnishings | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 13- Special Construction | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 21- Fire Suppression | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 22- Plumbing | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 23- Heating, Ventilating, and Air conditioning (HVAC) | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ - 0 | ||
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 26 Electrical | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Division 27- Communications | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Division Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Other (If applicable) | MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| $ | $ | $ | $ | $ - 0 | |
| Other Total | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| MATERIAL | LABOR | EQUIPMENT | OTHER | TOTAL | |
| SUB TOTAL | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
| Overhead | $ | $ | $ | $ | $ |
| Profit | $ | $ | $ | $ | $ |
| Bonds and Insurance | $ | $ | $ | $ | $ |
| Total Proposal | $ - 0 | $ - 0 | $ - 0 | $ - 0 | $ - 0 |
File details come from the government source that posted it. Updated .