This is a Request for Proposal (RFP) for construction services issued by the Department of Veterans Affairs, VISN 7 Network Contracting Office. The solicitation number is 36C24726R0069, and it is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs) only, with NAICS code 236220 and a small business size standard of $45 million.

The project, numbered 679-19-101 and titled "Correct Critical Access and ADA Deficiencies Bldg. 61," is located at the Tuscaloosa VA Medical Center in Tuscaloosa, Alabama. The scope of work includes renovation of the connecting corridor between Buildings 4 and 61, modification of floor slopes to comply with VA guidelines, installation of a new HVAC system, lighting, fire protection, finishes, railing systems, and demolition of portions of the existing connector/corridor. The contract is firm-fixed-price with a completion period of 365 calendar days from award. The magnitude of construction is between $1,000,000 and $5,000,000. The solicitation uses a competitive RFP process evaluated under FAR Subpart 15.1 with tradeoff methodology, with past performance weighted significantly more important than price. Proposals must include a minimum of one but no more than three past performance references, an itemized cost breakdown, and address relevant experience in similar projects. Offers are due May 8, 2026, at 1:00 PM EST via email, with an offer guarantee of not less than 20% of the proposal price but not exceeding $3,000,000 required. A mandatory site visit is scheduled for April 23, 2026, at 9:00 AM CST, and Requests for Information are due by April 29, 2026, at 1:00 PM EST. Performance and payment bonds of 100% penal sum are required within 10 days of award. Offerors must be registered in SAM.gov, certified with the SBA as an SDVOSB, comply with VETS 4212 reporting requirements, and submit an Experience Modification Rate (EMR) form. Wage rates must comply with General Decision AL20260098 dated 1/2/2026. Key clauses include VAAR 852.219-75 (Limitations on Subcontracting), 52.219-14 (general construction subcontracting limitations of 85%), Buy American Construction Materials requirements, and various security and personnel vetting requirements specific to VA facilities.

View the file

Other files for this federal contract opportunity

Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C24726R0069

X

679-26-1-5688-0002

679-19-101

36C247

Department of Veterans Affairs VISN 7 Network Contracting Office 501 Greene Street Hatcher Building - Suite 2 Augusta GA 30901

Email only. Send to contract specialist:

Cayley.Blommers@va.gov and CC: Ryan.Crispin@va.gov

No physical documents will be accepted.

Zachary Flynn Zachary.Flynn@va.gov

Project No./Title: 679-19-101, "Correct Critical Access and ADA Deficiencies B61" Project Location: Tuscaloosa, AL VAMC - 3701 Loop Rd East, Tuscaloosa, AL 35404

This acquisition is 100% Set-aside for Service Disabled Veteran Owned Small Businesses (SDVOSBs) only.

The SDVOSB Business must be 51% or more owned and controlled by one or more veterans.

Offerors are required to complete VAAR 852.219-75, Limitations on Subcontracting (See Attachment 2).

MAGNITUDE OF CONSTRUCTION: Between $1,000,000 and $5,000,000.

NAICS Code: 236220; Small Business Standard: $45 Million

To be eligible for award, the offeror shall be registered at the following websites: System for Award Management at sam.gov with completed electronic annual representations certifications, SBA at certifications.sba.gov and comply with VETS 4212, Federal Contractor Veterans Employment Report. Offerors MUST ensure registration in these websites are accurate, complete, and have not expired prior to proposal due date or thereafter.

Offerors who have not done business with VA must complete VA10091 to register in financial database (see Attachment 6).

Site Visit: An organized site visit is scheduled for 04-23-2026 at 9:00am CST.

Location: See project Location above – Attendees should meet at Building 5. See attached map for parking instructions.

Information provided at the site visit shall not alter the terms and conditions of the solicitation and terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. Offerors are required to submit all questions in writing to the Contracting Officer following the site visit.

Requests for Information (RFIs) are due by 04-29-2026 at 1:00pm EST via email to Cayley.Blommers@va.gov.

Late RFIs may not be accepted and offerors are responsible of ensuring questions are received on time.

Responses to RFIs will be provided in question and answer form via a posted amendment at www.sam.gov.

Offer guarantee will be accepted via email only if received before the date/time specified in block 13a below to the Email specified in block 8 above. Hand-delivered and/or mailed offer guarantees will not be accepted.

30 365 x x

X 10

1 electronic 1:00pm EST

05-08-2026

X

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO 10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

(4 copies unless otherwise specified)

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Complete Price Offer Schedule

36C247

Department of Veterans Affairs VISN 7 Network Contracting Office 700 19th St. S., Room 2708 Birmingham, AL 35233

Austin Payment Center Department of Veteran Affairs

PO Box 149971 Austin TX 78714-8971

(877) 353-9791 (512) 460-5545

Ryan Crispin

VA-VHA-RPOE-2026-0019

(To be completed by Government)

Table of Contents

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)

A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,

ALTERATION, OR REPAIR)– BACK

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 PRICE OFFER SCHEDULE

2.2 PROPOSAL PREPARATION AND EVALUATION INFORMATION

2.3 GENERAL SOLICITATION INFORMATION

2.4 52.216-1 TYPE OF CONTRACT (APR 1984)(DEVIATION NOV 2025)

2.5 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION

MATERIALS (MAY 2014)

2.6 52.233-2 SERVICE OF PROTEST (SEP 2006) (DEVIATION NOV 2025)

2.7 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

2.8 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020)

2.9 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED

BY REFERENCE (JAN 2008)

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

(DEVIATION NOV 2025)

3.2 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—

CERTIFICATION (NOV 2021) (DEVIATION NOV 2025)

3.3 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (FEB 2024)

(DEVIATION NOV 2025)

3.4 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE

OF THE WORK (MAY 2014) (DEVIATION NOV 2025)

3.5 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS

AND CERTIFICATIONS (NOV 2025) (DEVIATION)

GENERAL CONDITIONS

4.3 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020)

(DEVIATION NOV 2025)

4.4 52.219-14 LIMITATIONS ON SUBCONTRACTING (OCT 2022) (DEVIATION NOV

2025)

4.5 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION

(JAN 2025) (DEVIATION NOV 2025)

4.6 52.223-20 AEROSOLS (MAY 2024)

4.7 52.223-21 FOAMS (MAY 2024)

4.8 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (OCT 2022)

(DEVIATION NOV 2025)

4.9 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025)

(DEVIATION)

4.10 52.240-93 BASIC SAFEGAURDING OF COVERED CONTRACTOR

INFORMATION SYSTEMS (NOV 2025)(DEVIATION NOV 2025)

4.11 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

4.12 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020)

4.13 SUPPLEMENTAL INSURANCE REQUIREMENTS

4.14 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018)

4.15 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR

PERSONNEL (MAR 2026) (DEVIATION)

4.16 VAAR 852.204-72 PERSONNEL VETTING AND CREDENTIALING (MAR 2026)

(DEVIATION)

4.14 List of Attachments

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO

BIDDERS/OFFERORS

STATEMENT OF WORK

(VHA SOP 160-010-01 Item #4)

PROJECT NUMBER: 679-19-101

PROJECT TITLE: Correct Critical Access and ADA Deficiencies Bldg. 61

SCOPE OF WORK:

Contractor shall supply all materials, supervision, and labor to complete Project 679-19-101

Correct Critical Access and ADA Deficiencies Bldg. 61 per contract drawings and specifications.

Work includes the renovation of connecting corridor between Buildings 4 and 61, modification of the slope of the floor to comply with VA guidelines, installation of new HVAC system, lighting, fire protection, finishes, railing system, and demolition of portions of the existing connector/corridor as required to construct the new work.

In addition to the above requirements, Contractor shall abide by all VA safety rules and regulations, and ensure work is compliant with applicable NFPA and NEC codes.

COMPLETION TIME:

365 calendar days from date of award.

SAFETY:

Contractor to provide proof that all employees have tested negative for Tuberculosis prior to arriving on campus. Contractor to provide proof that the Supervisor has completed the 30-hour

OSHA course and proof that all subcontractors have completed the 10-hour OSHA course prior to arriving on campus.

IDENTIFICATION, PARKING, SMOKING, AND VA REGULATIONS:

The Contractor’s FSE shall always wear visible identification and face coverings (surgical masks, bandanas, reusable masks) while on the premises of the Tuscaloosa VA Medical

Center. Contractor shall only park in the appropriate designated parking areas. Information on parking is available from the Tuscaloosa VA Medical Center Police Section. Tuscaloosa VA

Medical Center will not invalidate or make reimbursements for parking violations of the contractor under any conditions. Smoking is prohibited on the campus of Tuscaloosa VA

Medical Center. Possession of weapons is prohibited. Enclosed containers, including tool kits, shall be subject to search. Violations of VA regulations may result in citation answerable in the

United States (Federal) District Court, not a local district, state, or municipal court.

OBTAINING VA IDENTIFICATION BADGE:

Contractor shall contact the Contracting Officer’s Representative (COR), upon contract award, to receive instructions on how to obtain a VA Identification Badge during the performance of this contract.

SECURITY:

The Contractor shall ensure compliance by its employees with the security regulations of the

Veterans Administration where work is performed under this Contract. Contracted employees shall self-register at https://www.tms.va.gov/SecureAuth35/ . Once registered, enroll in class

VA10176 VA Privacy and Information Security Awareness and Rules of Behavior. Contractors shall provide signed certifications of completion to the Contracting Officer’s Representative

(COR) prior to starting work on this contract.

Photography or Video on medical center premises is strictly prohibited. Additionally, pursuant to

38 CFR 1.218(b) (23): Use of recording devices of any kind to record patients or employees is strictly prohibited. VA-designated employee shall provide escort in sensitive areas (e.g. patient areas, MACPAC, HAS, or any areas where sensitive information is kept) and in OIT areas.

SITE VISITS:

Site visits will be available upon request.

POC: Zachary Flynn, Healthcare Engineer COR

Dept: Engineering Service

Desk Phone: (205) 657-9739

Email: Zachary.Flynn@va.gov

RECORDS AND INFORMATION MANAGEMENT

Project No. 679-19-101 Project Title: Correct Critical Access and ADA Deficiencies Bldg. 61

Upon completion or termination of the applicable contract(s) or agreement(s), return and/or destroy, at Covered Entity’s option, VA information gathered, created, received, or processed during the performance of the contract(s) or agreement(s). No data will be retained by Business Associate, or contractor, subcontractor, or other agent of Business Associate, unless retention https://www.tms.va.gov/SecureAuth35/ mailto:Zachary.Flynn@va.gov is required by law and specifically permitted by Covered Entity. As deemed appropriate by and under the direction of Covered Entity, Business Associate shall provide written assurance that all VA information has been returned to Covered Entity or destroyed by Business Associate. If immediate return or destruction of all data is not possible, Business Associate shall notify Covered Entity and assure that all VA information retained will be safeguarded to prevent unauthorized Uses or Disclosures.

Prior to termination or completion of this contract, contractor/subcontractor must not destroy information received from VA, or gathered/created by the contractor in the course of performing this contract without prior written approval by the VA. Any data destruction done on behalf of VA by a contractor/subcontractor must be done in accordance with National Archives and Records Administration (NARA) requirements as outlined in VA Directive 6300, Records and Information Management and its Handbook 6300.1 Records Management Procedures, applicable VA Records Control Schedules, and VA Handbook 6500.1, Electronic Media Sanitization. Self-certification by the contractor that the data destruction requirements above have been met must be sent to the VA Contracting Officer within 30 days of termination of the contract.

2.1 PRICE OFFER SCHEDULE

Description U/I QTY UNIT PRICE TOTAL PRICE

A. ITEM 1, BASE BID Contractor shall supply all materials, supervision, and labor to complete Project 679-19-101 Correct Critical Access and ADA Deficiencies Bldg. 61 per contract drawings and specifications. Work includes the renovation of connecting corridor between Buildings 4 and 61, modification of the slope of the floor to comply with VA guidelines, installation of new HVAC system, lighting, fire protection, finishes, railing system, and demolition of portions of the existing connector/corridor as required to construct the new work.

Period of Performance: 365 Calendar Days from the date of contract award or notice to proceed.

JB

B. ITEM 2, ALT. NO. 1 Same as Bid Item I, except the work identified as Alternate No.

1:_Omit the underground storm water drainage system, including the transition “boots” between the downspouts and the underground piping. Provide a sloped segment at the bottoms, an 18” by 24” (minimum) concrete splash block, and 20 square feet of sod at the base of each downspout instead.

C. ITEM 3, ALT. NO. 2 Same as Bid Item II, except the work identified as Alternate No.

2:_Omit painting of existing overhead piping/conduit and underside of roof deck.

D. ITEM 4, ALT. NO. 3 Same as Bid Item III, except the work identified as Alternate No.

3:_Omit copper gutters and downspouts and provide pre-finished aluminum gutters and downspouts instead.

E. ITEM 5, ALT. NO. 4 Same as Bid Item IV, except the work identified as Alternate No.

4:_Omit the epoxy coating system at the floor and provide sealed concrete instead.

A single award will be made on line item for which funds are determined available.

REFER TO VAAR Provision 852.236-92 “Notice to Bidders-Additive or Deductive Bid Line Items.”

Offerors shall price each item. Offerors who do not price each item may be determined non-responsive.

The Period of Performance includes submittal phase and the completion of all punch list items.

ATTACH YOUR ITEMIZED COST BREAKDOWN: Offerors are to include a construction price/cost breakdown using Attachment 4.

2.2 PROPOSAL PREPARATION AND EVALUATION INFORMATION

I. PROPOSAL SUBMISSION

This is a competitive Request for Proposal (RFP) that represents the best value to the Government conducted under Federal Acquisition Regulation (FAR) Subpart 15.1 using the tradeoff process and evaluated in accordance with FAR Overhaul Subpart 15.2, Evaluation and Award. This section describes the method for evaluating and selecting offers for this procurement.

A. Proposal Submission:

1. Submit one (1) Electronic Proposal to the email addresses indicated on page 1, block 8 of Standard Form 1442. The Subject Line of the email should include “Company Name, RFP number, Project Number and Project Title.”

2. The size of your file shall not exceed 10 MB. If you have multiple documents, please submit them as separate emails. Emails larger than this may be rejected by the network servers and will be considered non-responsive.

3. Interested firms are responsible for ensuring electronic submission delivery by the time and the date specified. It is highly recommended that interested firms confirm that the Contracting Officer has received electronic submissions.

Failure to provide a proposal in its entirety before the deadline will render the proposal non-compliant.

B. Proposal Preparation and Format Instructions:

Offerors must provide all requested information for each factor. Proposals must address each element of each factor as applicable to be considered responsive to this RFP. Factor headings should be highlighted in yellow or typed in bold text for identification. It is the contractor’s responsibility to ensure the submitted proposal is in the proper format and that the information provided is clearly understood and free of ambiguities.

Offerors’ proposals should consist of past performance and price proposals, as described below.

1. TAB A: General Information:

(1) Cover Page with Solicitation Number, Project Title

(2) Table of Contents

(3) Signed offer/Acknowledgement of Amendments (SF1442)

(4) Copy of current SDVOSB MySBA Certification.

(5) SAM UEI Number

(6) Offer Guarantee Bond (DO NOT SEND HARD COPY) Electronic copy acceptable and should be emailed to Point of Contact(s) listed on page 1, block 8.

(7) Safety or Environmental Violations and Experience Modification (EMR) Rate *Submit information regarding current experience modification rate form (See Attachment 1). An EMR of greater than 1.0 may disqualify the bidder/offeror.

(8) 852.219-75 VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction (Jan 2023) (Deviation), (See Attachment 2).

(9) Provide evidence of VETS-4212 Reporting (if applicable)

2. TAB B: Relevant and Recent Past Performance Experience

3. TAB C: Price Proposal

II. EVALUATION CRITERIA AND FACTORS

A. The evaluation is subjective based on the information provided in response to the information requested in the evaluation factors. The two (2) factors to be evaluated include past performance and price.

B. Relevant and Recent Past Performance Experience will be evaluated to assess recent and relevant past performance resulting in a performance confidence assessment rating. For evaluation purposes, past performance will be significantly more important than cost or price.

C. Offerors proposal shall address the following:

1. FACTOR 1 – RELEVANT AND RECENT PAST PERFORMANCE

EXPERIENCE:

***Relevant is defined as performance similar or greater in scope, magnitude, and complexity than the effort described in this solicitations scope of work, to include renovation of connecting corridors, modification of slopes of the floor to comply with VA https://certifications.sba.gov/ guidelines, installation of new HVAC system, lighting, fire protection, finishes, railing system, and demolition of portions of the existing connector/corridor as required to construct the new work, working within an active hospital. This relevant work can be a portion of a larger requirement, which was issued by the VA, Federal, State, Local Government agencies, and/or commercial facilities.

***Recent is defined as performance within the last five (5) years, to include ongoing projects.

Proposal shall include:

(1) Offeror must submit a minimum of one (1) but no more than three (3) references.

(2) The submission shall include a brief description of the project, the Contracting Officer’s Representative (COR) contact information for references, Contract Number, and Dollar Value.

(3) Provide a brief narrative describing the firms (primary and sub) specialized experience working on renovations of connecting corridors, modifications of slopes of the floor to comply with VA guidelines, installation of new HVAC system, lighting, fire protection, finishes, railing system, and demolition of portions of the existing connector/corridor as required to construct the new work, working within an active hospital, drawings, specifications, and solicitation documents.

i. Further note: If utilizing the past performance of a subcontractor, subcontractors identified in the proposal must remain on the contract for its duration unless there is a compelling reason to replace them. The prime contractor will need to obtain approval from the contracting officer before making changes to key subcontractors.

(4) Respondents with no previous past performance shall state this when addressing the selection criteria. Where there is no record of past performance, the proposal will be evaluated neither favorably nor unfavorably. Superior performance ratings on relevant projects may be considered more favorably in the evaluation.

(5) The Government will evaluate the offeror’s past performance on active and completed contracts. The Government will contact the offeror’s submitted references on contracts if deemed necessary. Past performance information may be obtained from any other sources available to the Government, to include, but not limited to: Contract Performance

Assessment Reporting System (CPARS) or other databases, past performance questionaries, and interviews with Program Managers, Contracting Officers, and/or Contracting Officer Representatives. The past performance evaluation will assess the relative risks associated with an offeror’s likelihood of success in performing the scope of work requirements as indicated by the offeror’s record of past performance.

(6) The following evaluation documents are acceptable:

i. Contractor Performance Assessment Report System (CPARS), or

ii. Past Performance Questionnaire (PPQ) evaluation (Attachment 3).

(7) If a completed CPARS evaluation is available, it shall be submitted with the proposal. If using Attachment 3 PPQ, it should be emailed to the construction contract administrator of the entity (Government or civilian) for which the construction was completed and emailed to Cayley Blommers at email Cayley.Blommers@va.gov , and CC: ryan.crispin@va.gov.

2. FACTOR 2 – PRICE PROPOSAL:

(1) Complete the price offer schedule in section A.3.

(2) Price shall be addressed using the attached price breakdown worksheet, which is included in Attachment 4 to include cost elements such as:

a. Labor (Direct & Indirect),

b. Materials, Material Markups, Materials overhead,

c. Equipment

d. Subcontractor Cost

e. Other Direct Costs

f. Overhead expenses

g. Indirect Cost

h. Profit

i. Bonds

j. Breakdown of G&A expenses inclusive of all project staff and general requirements of the Prime Contractor.

(3) Provide supporting documentation showing quotes/price breakdowns for both prime and subcontractors.

NOTE: Price breakdown shall be indicative of showing at least 15% percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible veteran-owned small business concerns in accordance with VAAR 852.219-74(d)(3).

mailto:Cayley.Blommers@va.gov mailto:ryan.crispin@va.gov

III. EVALUATION CRITERIA/OVERVIEW

A. Proposals will be evaluated on the basis of two evaluation criteria: Past Performance and Price. Past performance will be evaluated for relevancy and confidence levels. Past performance will be considered significantly more important than price.

B. Past Performance: The basis of the evaluation will be the degree to which past performance evaluations and all other past performance information reviewed by the Government reflect a trend of satisfactory performance considering 1) compliance with the contract requirements, 2) effectiveness of the Offeror's on-site management; 3) use of appropriate personnel for contract requirements); 4) timeliness in the submission of schedules, reports, and submittals; 5) adherence to the construction schedule; 6) coordination and control of subcontractors; 7) ability to effectively deal with the customer and other Government personnel; 8) cooperativeness in solving problems and negotiating changes; 9) response to warranty notifications, and other pertinent information obtained from past performance evaluations that have affected the overall performance of previous or ongoing projects.

C. The Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources, including sources outside of the Government. Other sources may include but are not limited to past performance information retrieved through the (CPARS), for Contractors who are part of a partnership or joint venture identified in the offeror’s proposal, inquiries of owner representative(s), and any other known sources not provided by the offeror.

D. In evaluating past performance, the government reserves the right to give greater consideration to information on those contracts deemed most relevant to the effort described in this solicitation. Common aspects of relevancy include similarity of service/support, complexity, dollar value, contract type, and degree of subcontract/teaming.

Table 1. Past Performance Relevancy Ratings

Rating Definition

Very Relevant

Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Relevant Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Somewhat Relevant

Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires

Not Relevant Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

E. Past performance evaluation will allow the government to assess the offeror’s ability to perform the effort described in this solicitation based on the offeror’s demonstrated present and past performance. The assessment process will result in an overall performance confidence assessment of Substantial Confidence, Satisfactory Confidence, Limited Confidence, No Confidence or Neutral/Unknown Confidence.

Table 2. Performance Confidence Assessments

Rating Description Substantial Confidence

Based on the offeror’s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Satisfactory Confidence

Based on the offeror’s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Limited Confidence

Based on the offeror’s recent/relevant performance record, the Government has low expectations that the offeror will successfully perform the required effort.

No Confidence Based on the offeror’s recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.

Neutral/Unknown Confidence

No recent/relevant performance record is available, or the offeror’s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.

F. In evaluating price, the government may use various price analysis techniques and procedures to determine price reasonableness. Price will be evaluated for Price Reasonableness. The Government reserves the right to evaluate proposals and award a contract without discussions (except clarifications as described FAR Overhaul 15.202(a)(2)(i-iv)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a performance and price standpoint. The Government will evaluate price based on the total price.

IV. EVALUATION AND BASIS FOR AWARD:

A. RFO 15.103-1 shall apply to the government’s evaluation of proposals. The factors that shall be used to evaluate offers are Past Performance and Price. Past Performance is significantly more important than Price.

B. Discussions: The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in RFO 15.202(a)(2)(i-iv)). Offerors should not automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer.

Communication conducted to resolve minor or clerical errors would not constitute discussions. The Government reserves the right to conduct discussions if the Contracting Officer later determines them necessary.

C. The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation, will be most advantageous to the Government, past performance, and price considered. The proposals must conform to the RFP's requirements and be evaluated to represent the Best Value to the Government. The Best Value is the most advantageous offer, consistent with the Government's stated importance of evaluation criteria.

This may result in award being made to a high-rated, higher-priced offeror where the Contracting Officer determines that it is worth the price premium to do so.

D. Offerors must provide all requested information for each factor. Proposals must separately address each of the factors as applicable to be considered responsive to this RFP. It is the contractor’s responsibility to ensure the submitted proposal is in the proper format and that the information provided is clearly understood and free of ambiguities (Reference Proposal Preparation and Format Instruction).

E. To determine which proposal represents the best overall value, the Government will conduct a tradeoff analysis, comparing the strengths and weaknesses of the competing proposals to determine which proposal represents the best value to the Government and thus shall receive contract award.

F. The Government reserves the right to accept other than the lowest priced offer.

The right is also reserved to reject any and all offers. The basis of the award will be a conforming offer, the price or cost of which may or may not be the lowest. If other than the lowest offer, it must be sufficiently more advantageous than the lowest offer to justify the payment of additional amounts.

G. Award will result in a firm-fixed-price contract. It is the Offeror’s responsibility to ensure the submitted price proposal includes all costs for total project requirements and completion in accordance with the specifications and drawings herein. The Offeror assumes all risk for omissions in prime and/or subcontractor proposals.

H. The Government evaluation team will consider all information provided in the proposal individually. Once these individual analyses are completed, the team will meet and determine a rating by consensus decision.

I. Exceptions to the contractual terms and conditions of the solicitation (e.g., standard company terms and conditions) may result in a determination to reject a proposal.

J. Failure to submit all the data in the format indicated in this section may be cause for determining a proposal incomplete and, therefore, not considered for evaluation and for subsequent award.

K. A Determination of Responsibility will be accomplished for the apparent awardee prior to processing the award. Information obtained from government and commercial systems will be used to determine responsibility. Any information received by the Government that would be cause for an adverse Determination of Responsibility will make the offeror ineligible for award.

SDVOSB Verification: The Government will review SBA certification database (https://certifications.sba.gov/) to confirm Service-Disabled Veteran-owned Small Business (SDVOSB) status certification for the submitted proposals. Evaluations will be performed on proposals submitted by verified SDVOSBs only. Subsequent confirmation of SDVOSB certification status will be performed for the apparent award. For a Joint Venture to be considered eligible as a SDVOSB if the joint venture 13 CFR 128.402 and the managing joint venture partner makes the representations under paragraph (c) of this clause. A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph 852.219-74(d) of the clause will be performed by the aggregate of the joint venture participants. Failure of a prospective SDVOSB to meet these certification requirements by the SBA shall result in elimination from consideration. Joint Venture -- Any offeror submitting a proposal as a joint venture must provide a certification from each SDVOSB joint partner, signed by an authorized official of each partner to the joint venture, stating that the parties to the joint venture:

1) have entered into a joint venture agreement that fully complies with paragraph

(c) of 13 CFR § 128.402; and

2) will perform the contract in compliance with the joint venture agreement. Failure to submit the certification with the offeror’s proposal will render the offeror ineligible for award.

https://veterans.certify.sba.gov/

L. Limitations on Subcontracting Certificate. The prospective offeror must complete certification -- 852.219-75 VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction (Jan 2023) (DEVIATION). See Attachment 2.

M. To be eligible for an award, if applicable, offerors must have submitted the required Federal Contractor Veterans’ Employment Report (VETS-4212 Report) with respect to the preceding fiscal year if the contractor was subject to the reporting requirements in accordance with 52.222-37.

N. Safety or Environmental Violations and Experience Modification Rate (EMR):

a. Offerors shall submit information pertaining to their past Safety and

Environmental record. The information must contain a certification that the bidder/offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, a Bidder/Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.

b. Offerors shall submit information regarding their current Experience

Modification Rate (EMR). This information shall be obtained from the Bidder’s/Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If a Bidder/Offeror’s EMR is above 1.0, the Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the EMR, and the anticipated date the EMR may be reduced to 1.0 or below.

c. Self-insured contractors or other contractors who cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation.

d. Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.

e. If the NCCI cannot issue an EMR because the Bidder/Offeror lacks insurance history, the Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead and include a letter from the NCCI indicating that is has assigned Bidder/Offeror a Unity Rating of 1.0.

f. The above information, along with other information obtained from

Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility.

g. This requirement applies to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.

2.3 GENERAL SOLICITATION INFORMATION

I. GENERAL PROPOSAL INFORMATION

A. PROPOSAL MATERIALS

Proposal materials consisting of drawings, specifications, contract forms, and any issued Amendments will be posted at www.sam.gov. This is the only official location where these documents can be obtained, and updates are posted. No ‘hard copy’ proposal materials are available.

B. WAGE DETERMINATION:

Wages for all contractors and subcontractors must comply with Construction Wage Rate Requirements (Reference 52.222-6 for further information). The current determination is General Decision AL20260098 dated 1/2/2026, Attachment 5. Be advised the determination that is current at the time of the contract award is the determination that will apply to the contract. Current determinations are always available at https://sam.gov.

II. DATABASE REGISTRATION INFORMATION

A. SYSTEM FOR AWARD MANAGEMENT REGISTRATION

The System for Award Management (SAM) is the Official U.S. Government system that consolidated the capabilities of the Central Contractor Registration (CCR including FedReg), Online Representations and Certifications Application (ORCA), and the Excluded Parties List System (EPLS). Federal Acquisition Registrations require that federal contractors register in SAM at www.sam.gov and enter all mandatory information into the system.

Please Note: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services.

Contracting Officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.

B. THE EXCLUDED PARTIES LIST SYSTEM (EPLS)

To ensure that the individuals or businesses providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and 1128A of the Social Security Act regarding federal health care programs, the contractor is required to check http://www.sam.gov/ https://sam.gov/ http://www.sam.gov/ the Excluded Parties List System (EPLS) located at www.sam.gov for each person or business providing services under this contract. During the performance of this contract, the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities.

C. VETS-4212 REPORTING REQUIREMENT

Contractors are required to submit a required annual Form VETS-4212, Federal Contractor Veterans' Employment Report in all cases where the contractor or subcontractor has received an award of $150,000 or more in any fiscal year.

Contracting Officers are prohibited from awarding a contract to a contractor that has not submitted a required VETS-4212 Report with respect to the preceding fiscal year if the contractor was subject to the reporting requirement of 38 U.S.C. 4212(d). Submit this report as soon as possible, if not already submitted, to avoid delays in the contract award process.

For more information on this requirement and/or for completing the web-based reporting form, visit https://www.dol.gov/agencies/vets/programs/vets4212.

Certifications and Other Statements of Offerors, and FAR clause 52.222-37, Employment Reports on Veterans (JUN 2020) under the General Conditions.

III. BONDING INFORMATION

A. BID GUARANTEE

A bid guarantee is required in an amount not less than 20 percent of the proposal price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount by the proposal submission date and time shall require rejection in all cases except those listed in Federal Acquisition Regulation (FAR) 28.101-4. Bid Bonds must be provided using Standard Form 24 (see FAR 28.106-1), and the form must be a scanned copy of an original (no whiteouts, clear signatures, seals must be evident and visible) and contain the proper solicitation number, proposal due date, and be from a corporate surety listed in Department of Treasury Circular 570.

Individual sureties have to be acceptable to the Contracting Officer (see FAR 28.203) and be accompanied by Standard Form 28 Affidavit of Individual Surety.

B. PERFORMANCE AND PAYMENT BONDS

In accordance with Contract Clause 52.228-15 and FAR 28.102, Contractors are reminded that any amount awarded between $35,000.00 to $150,000 shall require a Payment Bond (SF 25A) or an Irrevocable Letter of Credit (ILC), and awards exceeding $150,000.00 shall require both Payment and Performance Bonds (SF 25). Payment and Performance bonds are due no later than 10 days after notification of award as instructed by the contracting officer. The bonds shall contain no whiteouts or other corrections. Payment and Performance bonds are required in the penal sum of 100% of the contract's price.

http://www.sam.gov/ http://www.dol.gov/agencies/vets/programs/vets4212

IV. SECURITY/BADGING

A. Contractor employee (s) may be required to obtain security screenings and/or ID badges for employees through VA prior to the start of any work on site depending upon length of work time on site. The contractor must coordinate badge requests with the respective Contracting Officer Representative (COR). Any PIV Badging requires two

(2) trips to a VA facility and the time required to complete the necessary paperwork.

One trip is for completing the electronic fingerprinting, and the other to pick up the PIV Badge.

B. ROSTER: Within 15 days after issuance of the notice to proceed or as agreed to with the Contracting Officer, the Contractor should provide a roster of Contractor and Subcontractor employees to the COR to begin their background investigation.

C. FORMS: Contractor personnel will need to complete the forms listed below depending upon the length of facility access needed:

D. Employee access for less than 6 months: Fingerprint request form (PIV Office Fingerprint Request Form (Updated 3-1-2020)) and SAC form (SAC FORM (NEW)) Any VA PIV facility can take fingerprints; not necessarily where the work is to be performed.

E. Employee access for les greater than 6 months: Fingerprint request form, SAC form, Contractor Background Investigation Request (Contractor Background Investigation Request Form 06-03-2021), OPM optional form 306 (of306) Personnel shall submit all required information related to their background investigations utilizing the Office of Personnel Management’s (OPM) Electronic Questionnaire for Investigations Processing (e-QIP) after receiving an email notification from the Security and Investigation Center (SIC). Emails will be sent to employees requiring completion.

F. BADGING STEPS: After completing forms, the following steps need to be followed to obtain a badge.

1) Fingerprints: Need to schedule fingerprinting in coordination PIV Office. Fingerprint request form and SAC form must be brought to the PIV office along with two forms of valid ID when Contractor gets fingerprinted. Contractor informs COR of employees that have been fingerprinted and sends COR all the required forms.

Only electronic fingerprints are authorized.

2) Adjudication: COR submits the paperwork to the required office for adjudication.

COR receives confirmation that the Contractor is favorably adjudicated, or contractor answers follow up questions. The Contractor, when notified of an unfavorably adjudicated background investigation on a Contractor employee as determined by the Government, shall withdraw the employee from consideration in working under the contract.

3) Sponsor: COR will let the Contractor know when they have been sponsored.

4) Badging: Contractor schedules an appointment using https://portal.usaccess.gsa.gov/scheduler. Note: This link is best used in Google Chrome. Contractor personnel must bring two forms of valid ID when picking up a badge.

C. COMPLIANCE: Failure to comply with the Contractor personnel security investigative requirements may result in loss of physical and/or logical access to the VA Facility and systems by Contractor and Subcontractor employees. Employees must follow all HSPD-12 policies and procedures and use and protect their assigned identity credentials per VA policies and procedures, display their badges at all times, and return the identity credentials upon termination of their relationship with VA.

NOTE: VA SECURITY PROCEDURES ARE SUBJECT TO CHANGE WITHOUT NOTICE.

V. INVOICES:

A. All payments by the Government to the contractor will be made in accordance with:

FAR 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR

AWARD MANAGEMENT (OCT 2018)

B. Invoices shall be submitted per FAR 52.232-5 Payments under Fixed-Price

Construction Contracts (May 2014) and 852.232-70 Payments Under Fixed-Price Construction Contracts (Without NAS-CPM) (NOV 2018). For detailed instructions, refer to Attachment 6 Invoicing.

https://gcc02.safelinks.protection.outlook.com/?url=https%3A%2F%2Fportal.usaccess.gsa.gov%2Fscheduler&data=05%7C02%7C%7Ce36d9f33ce144b6c603b08dd131b1f72%7Ce95f1b23abaf45ee821db7ab251ab3bf%7C0%7C0%7C638687729419852310%7CUnknown%7CTWFpbGZsb3d8eyJFbXB0eU1hcGkiOnRydWUsIlYiOiIwLjAuMDAwMCIsIlAiOiJXaW4zMiIsIkFOIjoiTWFpbCIsIldUIjoyfQ%3D%3D%7C0%7C%7C%7C&sdata=UymXGgaOPR20eif3lR%2FO4vYKb1afhgI%2FRc8tWiLs%2FQw%3D&reserved=0

FAR

Number

Title Date

52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH

LANGUAGE

APR 1991

52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY APR 1991

52.215-1 INSTRUCTIONS TO OFFERORS—COMPETITIVE

ACQUISITION (DEVIATION NOV 2025)

NOV 2021

52.228-1 BID GUARANTEE SEP 1996

52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID

GUARANTEE)

FEB 2021

852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE

RESOLUTION

OCT 2018

852.233-71 ALTERNATE PROTEST PROCEDURE OCT 2018

2.4 52.216-1 TYPE OF CONTRACT (APR 1984)(DEVIATION NOV 2025)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.5 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—

CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .