This is a Government Inspection Report template that outlines the quality control and inspection requirements for a titanium ingot acquisition contract. The report covers inspection standards across multiple Statement of Work (SOW) sections including packaging, testing, labeling, and delivery requirements.

The inspection criteria require 100% compliance across all performance areas, with pass/fail ratings assigned by the Contracting Officer Representative (COR). Key requirements include proper packaging in approved drums with polyethylene liners, accurate labeling including GHS labels, submission of Certificates of Analysis, advance notification of packaging operations, and scheduling deliveries 20 business days in advance. The document relates to solicitation SP800025Q0002 for up to 174 metric tons of titanium ingots (Ti-CP-2 and Ti-CP-6-6-2) to be delivered to Hawthorne, Nevada, with an estimated value of $5 million and a 24-month performance period.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Govt Insp report Attachment 4

Government Inspection Report Landry, David E CIV DLA STRATEGIC MATERIALS (US): Landry, David E CIV DLA STRATEGIC MATERIALS (US):

Titanium Ingots Acquisition 2025

Contract Number:Dates of Inspection:
Contractor:COR:

The COR will observe the selected service(s) at any time they determine a need to inspect a service or notices a deficiency. Results of each inspection will be documented on a “Government Inspection Report”. A “pass”, “fail” or “N/A” rating will be assigned to each service inspected. A "pass" rating will be assigned when the Contractor performs a rated service at or above the listed "Acceptable Performance Level (APL)". A “fail” rating will be assigned when the Contractor performs a rated service below the listed "Acceptable Performance Level (APL)". A brief description of the inspection and observed defects will be recorded. The COR will ascertain whether documented deficiencies were corrected and processes implemented to ensure re-occurrence of the deficiency is prevented. A “N/A” rating will be assigned when no work was required to be performed on a specific service. The COR will upload copies of all completed “Government Inspection Reports” into the SPM Application within the Procurement Integrated Enterprise Environment (PIEE), the web based system.

Standard Required Service Action Minimum Frequency APL Required Quality Level Performed Rating Remarks

SOW Section 10
SOW Section C.10.3Package/Re-package in the Continental United States (CONUS) or AlaskaComplyDuring Entire Contract100%
SOW Section C.10.5.3Provide Facility AccessProvide AccessDuring Performance of all Packaging/Re-packaging Operations100%
SOW Section C.10.5.3Package/Re-package only when the Government or the Governments Agents are PresentComplyDuring Performance of all Packaging/Re-packaging Operations100%
SOW Section C.10.5.3Do Not Ship Unsampled LotsComplyDuring Entire Contract100%
SOW Section C.10.5.3Notify COR 30 Days prior to Packaging/Re-packagingProvide Written NotificationPrior to performing any Packaging/Re-packaging Operations100%
SOW Section 11
SOW Section C.11.1Provide Certificate of Analysis (CoA)ProvideAs Required100%
SOW Section C.11.7Submit CoA to the CORSubmit to the CORAs Required100%
SOW Section C.11.9Do not ship Material prior to acceptance of the CoAComplyDuring Entire Contract100%
SOW Section 12
SOW Section C.12.2Package in Approved DrumsSatisfyDuring Entire Contract100%
SOW Section C.12.2.1.6Package in Approved Polyethylene LinersSatisfyDuring Entire Contract100%
SOW Section C.12.2.2Do Not exceed UN weight rating on each drumSatisfyDuring Entire Contract100%
SOW Section C.12.3Use Approved PalletsSatisfyDuring Entire Contract100%
SOW Section C.12.3Band/Shrink wrap all drums on Approved PalletsSatisfyDuring Entire Contract100%
SOW Section C.12.3.3Attach a copy of the SDS to Each LotSatisfyDuring Entire Contract100%
PWS Section C.12.3.4Package all Material Per Section C.12 of the SOWSatisfyDuring Entire Contract100%
SOW Section 13
SOW Section C.13Label all Drums Per Secion C.13 of the SOWSatisfyDuring Entire Contract100%
SOW Section C.13.2Provide all required Information on Each LabelSatisfyDuring Entire Contract100%
SOW Section C.13.4Attach Three labels on Each Drum Per Section C.13.4 of the SOWSatisfyDuring Entire Contract100%
SOW Section C.13.5Attach GHS Labels on Each Drum (as required)SatisfyDuring Entire Contract100%
SOW Section 14
SOW Section C.14.2Label and Transport Radioactive Material Per NRC Part 71 (as required)ComplyDuring Entire Contract100%
SOW Section C.14.3Comply with DLA-SM's ESOHMS PolicyComplyWhen on-site at a Government Facility100%
SOW Section 16
SOW Section C.16.1.1Satisfy the "Truck Lot Receiving Procedures" of Section C.16.1.1 of the SOWSatisfyPrior To and At Delivery of Every Truckload100%
SOW Section C.16.1.4Schedule all Deliveries a Minimum of 20 Business Days before Delivering with the CORSatisfyPrior to All Deliveries100%
SOW Section C.16.1.4Receive Approval for All Shipping from the CORSatisfyPrior to All Shipping100%
SOW Section 17
SOW Section C.17.5Remove Rejected material from Government Property within 90 DaysComplyAs Material is Rejected100%

COR Remarks

Contractor Remarks

Contractor Sign/Date: COR Sign/Date: