This document is a comprehensive set of mechanical, electrical, and lightning protection design drawings and specifications for tornado damage repairs at the USDA Agricultural Research Service's US Horticultural Research Laboratory in Fort Pierce, Florida.

The project includes five bid options covering renovation work across multiple greenhouse facilities and ancillary sites (Picos Farm and Leesburg Farm). Bid Option #2 involves mechanical system repairs to greenhouses 110-122 with natural gas piping installations and equipment connections. Bid Option #3 extends mechanical work to additional greenhouses (105-106, 111-112) with expanded piping systems. Bid Option #4 addresses a hoop house structure at Picos Farm with mechanical floor plans for heating and ventilation systems. Bid Option #5 covers greenhouse work at Leesburg Farm with similar mechanical provisions. The mechanical scope includes unit heaters, exhaust fans, evaporative cooling pads, air handling units, heat pumps, controls systems, and associated piping and ductwork. All work must comply with NEC, NFPA, and local codes with proper coordination between trades, gravity drainage priority, aluminum piping supports, and comprehensive as-built documentation requirements.

Electrical work encompasses new panelboards (ranging from 60A to 100A main breakers), branch circuits for greenhouse equipment (unit heaters, exhaust fans, lights), receptacles with GFI protection, access control systems for greenhouses 101-102, lighting fixtures (vapor-tight 4-foot LED strips with emergency battery packs), and a complete fire alarm system. Lighting plans include motion-sensor controls in corridors with automatic shutoff after 20 minutes, manual weatherproof switches for greenhouse control, and separate circuits per greenhouse per the detailed panel schedules provided. The electrical design also includes grounding, bonding to existing infrastructure, underground conduits at greenhouse sites, and water-tight junction boxes. Lightning protection per NFPA 780 requires air terminals on all greenhouse roof ridges bonded to copper clad ground rods with aluminum down conductors. The contract documents specify contractor responsibility for field verification, coordination with equipment manufacturers, phased demolition and construction per the provided phasing plan, and protection of existing systems throughout the project duration.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

SCREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

125 GREENHOUSE

AIR COND.

GREENHOUSE

GREENHOUSE

AIR COND.

GREENHOUSE

AIR COND.

GREENHOUSE

AIR COND.

GREENHOUSE

STORAGE BUILDING

STORAGE BUILDING

GREENHOUSE

GREENHOUSE

116 GREENHOUSE

GREENHOUSE

UH-1

UH-1

UH-1

UH-1

UH-1

UH-1

UH-1

UH-1

HF

HF

HF

HF

HF

HF

HF

HF

ECP-1

ECP-1

ECP-1

EF-1 EF-1 EF-1 EF-1 EF-1 EF-1

EF-1 EF-1 EF-1

EF-1 EF-1 EF-1

EF-1

1" NATURAL GAS

PIPING

3/4" NATURAL GAS

PIPING

3/4" NATURAL GAS

PIPING

1" NATURAL GAS

PIPING

3/4" NATURAL GAS

PIPING

3/4" NATURAL GAS

PIPING

3/4" NATURAL GAS

PIPING

3/4" NATURAL GAS

PIPING

1" NATURAL GAS

PIPING

TYP. 1" ISOLATION

VALVE

ECP-1

PPM

REVISIONS

Agricultural

Service Research

DESCRIPTION

SHEET

DATE

U

NO.

DEPM

SAFETY & HEALTH

REAL PROPERTY

A

DATE

PROJECT NO.

SUSDA

BY

AGRICULTURAL RESEARCH SERVICE

OF

DESIGNER

PROJECT MANAGER

JOB #

CHECKED BY

A-E FIRM

J:\ gre en wo od \20

Jo bs \48

US

DA

To rna do

Da ma ge Re pa ir F

t. P ier ce

FL

\07 W ork ing

Fo lde r\M ec h\M -10

3.d wg

Ap r 2

7,

- 1

0:0 2a m c P.A.

FIRMTHE

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson M Adams

ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT

USDA AGRICULTURAL RESEARCH SERVICE

US HORTICULTURAL RESEARCH LABORATORY

REPAIR TORNADO DAMAGE

FT. PIERCE, FL

MECHANICAL PLAN

RENOVATION - BID OPTION #2

M-103 80 10804/27/26

BP

JH

JGM

SOUTHEAST AREA

STONEVILLE, MS

XXX

XXX

XXX

XXX

XXX

GENERAL NOTES

SCALE:

MECHANICAL PLAN: RENOVATION - BID OPTION #2

3/32"=1'-0"

M-103

1. ALL WORK (MATERIALS, EQUIPMENT, DEVICES, COMPONENTS, SYSTEMS, SUPPORTS, ETC.) MUST COMPLY WITH THE REQUIREMENTS OF ALL CODES, CODE AMENDMENTS, AND ORDINANCES AS USED, ADOPTED

AND/OR ENFORCED BY THE LOCAL JURISDICTION, COUNTY AND STATE.

2. ALL WORK IS TO BE FABRICATED AND/OR ERECTED USING CONTRACTOR'S FIELD MEASUREMENTS FOR

PROPER COORDINATION WITH WORK OF OTHER TRADES.

3. ALL CONTRACT DOCUMENTS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENTS OR GEOMETRICAL RELATIONSHIPS OF THE WORK. THEY ARE NOT INTENDED TO SPECIFY OR SHOW EVERY OFFSET, SEQUENCE, DEVICE, OPTION, FITTING, OR COMPONENT. DO NOT SCALE DRAWINGS FOR

FABRICATION PURPOSES.

4. COORDINATE PLACEMENT OF ALL WORK WITH OTHER TRADES. DO NOT LOCATE, POSITION OR INSTALL ANY WORK IN SUCH A WAY THAT SYSTEM COMPONENTS OR ACCESS DOORS WILL BE INACCESSIBLE, UNUSABLE OR UN-MAINTAINABLE AFTER CONSTRUCTION IS COMPLETED.

5. GRAVITY DRAINAGE SYSTEMS HAVE PRIORITY WITH REGARD TO ROUTING. COORDINATE INSTALLATION OF WORK SO AS NOT TO INHIBIT THE INSTALLATION OR REQUIRED SLOPES FOR GRAVITY DRAINAGE

SYSTEMS.

6. ALL WORK MUST BE SUPPORTED FROM STRUCTURE ABOVE, FROM WALLS, OR FROM THE FLOOR UNLESS OTHERWISE INDICATED. DO NOT USE THE INSTALLED WORK OF OTHER TRADES FOR SUPPORT OR

BRACING. ALL PIPING SUPPORTS SHALL BE CONSTRUCTED OF ALUMINUM.

7. ALL LOW VOLTAGE WIRING FOR CONTROLS, ETC. SHALL BE INSTALLED IN CONDUIT. MATERIALS AND

INSTALLATION MUST COMPLY WITH NEC, NFPA, STATE AND LOCAL CODES AND ORDINANCES.

8. ALL PIPE PENETRATIONS THRU WALLS MUST BE PROVIDED WITH METAL SLEEVES OR THIMBLES.

SLEEVES AND THIMBLES SHALL BE AT LEAST 3/8 INCH LARGER THAN THE OUTSIDE DIAMETER OF THE PIPING PLUS INSULATION. CAULK BETWEEN SLEEVE AND PIPE WITH FLEXIBLE CAULKING MATERIAL

(RATED FOR SURFACE TEMPERATURE OF PIPE OR INSULATION) TO ALLOW MOVEMENT OF PIPE.

9. MAINTAIN MARKED AS-BUILTS THAT INDICATE FINAL ROUTING OF ALL VALVES, BELOW GRADE PIPING, ETC.

10. DEMOLITION AND NEW CONSTRUCTION SHALL BE PHASED IN ACCORDANCE WITH THE PHASING PLAN.

KEYPLAN

NTS

AREA OF WORK

LEGEND:

POINT OF CONNECTION

1" ISOLATION VALVE

N

SCALE: 3/32" = 1'-0"

16' 8' 0 16'

EXISTING 2" NATURAL

GAS PIPING

DAC-1

2" NATURAL GAS

PIPING

2" NATURAL GAS

PIPING

DAC-1

james harreld

SS042726

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

SCREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

125 GREENHOUSE

AIR COND.

GREENHOUSE

GREENHOUSE

AIR COND.

GREENHOUSE

AIR COND.

GREENHOUSE

AIR COND.

GREENHOUSE

STORAGE BUILDING

STORAGE BUILDING

GREENHOUSE

110 GREENHOUSE

GREENHOUSE

SCREENHOUSE

104 GREENHOUSE

GREENHOUSE

UH-1

UH-1

UH-1

UH-1

UH-1

UH-1

UH-1

UH-1

UH-1

UH-1

UH-1

UH-1

UH-1

HF

HF

HF

HF

HF

HF

HF

HF

HF

HF

HF

HF

ECP-1

ECP-1 ECP-1

EF-1 EF-1 EF-1 EF-1 EF-1 EF-1

EF-1 EF-1 EF-1 EF-1 EF-1 EF-1EF-1 EF-1 EF-1

EF-1 EF-1 EF-1

EF-1

DAC-1

1" NATURAL GAS

PIPING

3/4" NATURAL GAS

PIPING

3/4" NATURAL GAS

PIPING

1" NATURAL GAS

PIPING

3/4" NATURAL GAS

PIPING

3/4" NATURAL GAS

PIPING

3/4" NATURAL GAS

PIPING

3/4" NATURAL GAS

PIPING

3/4" NATURAL GAS

PIPING

3/4" NATURAL GAS

PIPING

1" NATURAL GAS

PIPING

1" NATURAL GAS

PIPING

2" NATURAL GAS

PIPING

EF-1

ECP-1

ECP-1 ECP-1

PPM

REVISIONS

Agricultural

Service Research

DESCRIPTION

SHEET

DATE

U

NO.

DEPM

SAFETY & HEALTH

REAL PROPERTY

A

DATE

PROJECT NO.

SUSDA

BY

AGRICULTURAL RESEARCH SERVICE

OF

DESIGNER

PROJECT MANAGER

JOB #

CHECKED BY

A-E FIRM

J:\ gre en wo od \20

Jo bs \48

US

DA

To rna do

Da ma ge Re pa ir F

t. P ier ce

FL

\07 W ork ing

Fo lde r\M ec h\M -10

4.d wg

Ap r 2

7,

- 1

0:0 2a m c P.A.

FIRMTHE

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson M Adams

ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT

USDA AGRICULTURAL RESEARCH SERVICE

US HORTICULTURAL RESEARCH LABORATORY

REPAIR TORNADO DAMAGE

FT. PIERCE, FL

MECHANICAL PLAN

RENOVATION - BID OPTION #3

M-104 81 10804/27/26

BP

JH

JGM

SOUTHEAST AREA

STONEVILLE, MS

XXX

XXX

XXX

XXX

XXX

GENERAL NOTES

SCALE:

MECHANICAL PLAN: RENOVATION - BID OPTION #3

3/32"=1'-0"

M-104

1. ALL WORK (MATERIALS, EQUIPMENT, DEVICES, COMPONENTS, SYSTEMS, SUPPORTS, ETC.) MUST COMPLY WITH THE REQUIREMENTS OF ALL CODES, CODE AMENDMENTS, AND ORDINANCES AS USED, ADOPTED

AND/OR ENFORCED BY THE LOCAL JURISDICTION, COUNTY AND STATE.

2. ALL WORK IS TO BE FABRICATED AND/OR ERECTED USING CONTRACTOR'S FIELD MEASUREMENTS FOR

PROPER COORDINATION WITH WORK OF OTHER TRADES.

3. ALL CONTRACT DOCUMENTS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENTS OR GEOMETRICAL RELATIONSHIPS OF THE WORK. THEY ARE NOT INTENDED TO SPECIFY OR SHOW EVERY OFFSET, SEQUENCE, DEVICE, OPTION, FITTING, OR COMPONENT. DO NOT SCALE DRAWINGS FOR

FABRICATION PURPOSES.

4. COORDINATE PLACEMENT OF ALL WORK WITH OTHER TRADES. DO NOT LOCATE, POSITION OR INSTALL ANY WORK IN SUCH A WAY THAT SYSTEM COMPONENTS OR ACCESS DOORS WILL BE INACCESSIBLE, UNUSABLE OR UN-MAINTAINABLE AFTER CONSTRUCTION IS COMPLETED.

5. GRAVITY DRAINAGE SYSTEMS HAVE PRIORITY WITH REGARD TO ROUTING. COORDINATE INSTALLATION OF WORK SO AS NOT TO INHIBIT THE INSTALLATION OR REQUIRED SLOPES FOR GRAVITY DRAINAGE

SYSTEMS.

6. ALL WORK MUST BE SUPPORTED FROM STRUCTURE ABOVE, FROM WALLS, OR FROM THE FLOOR UNLESS OTHERWISE INDICATED. DO NOT USE THE INSTALLED WORK OF OTHER TRADES FOR SUPPORT OR

BRACING. ALL PIPING SUPPORTS SHALL BE CONSTRUCTED OF ALUMINUM.

7. ALL LOW VOLTAGE WIRING FOR CONTROLS, ETC. SHALL BE INSTALLED IN CONDUIT. MATERIALS AND

INSTALLATION MUST COMPLY WITH NEC, NFPA, STATE AND LOCAL CODES AND ORDINANCES.

8. ALL PIPE PENETRATIONS THRU WALLS MUST BE PROVIDED WITH METAL SLEEVES OR THIMBLES.

SLEEVES AND THIMBLES SHALL BE AT LEAST 3/8 INCH LARGER THAN THE OUTSIDE DIAMETER OF THE PIPING PLUS INSULATION. CAULK BETWEEN SLEEVE AND PIPE WITH FLEXIBLE CAULKING MATERIAL

(RATED FOR SURFACE TEMPERATURE OF PIPE OR INSULATION) TO ALLOW MOVEMENT OF PIPE.

9. MAINTAIN MARKED AS-BUILTS THAT INDICATE FINAL ROUTING OF ALL VALVES, BELOW GRADE PIPING, ETC.

10. DEMOLITION AND NEW CONSTRUCTION SHALL BE PHASED IN ACCORDANCE WITH THE PHASING PLAN.

11. PROVIDE TEMPORARY GAS AND DOMESTIC WATER. UTILITY PATH IS SHOWN ON P-100.

KEYPLAN

NTS

AREA OF WORK

LEGEND:

POINT OF CONNECTION

1" ISOLATION VALVE

N

SCALE: 3/32" = 1'-0"

16' 8' 0 16'

UH-2

ECP-2

UH-2

EF-2 EF-2

HF

HF

DAC-1

GREENHOUSE GREENHOUSESCREENED

AREA

EF-2EF-2

PPM

REVISIONS

Agricultural

Service Research

DESCRIPTION

SHEET

DATE

U

NO.

DEPM

SAFETY & HEALTH

REAL PROPERTY

A

DATE

PROJECT NO.

SUSDA

BY

AGRICULTURAL RESEARCH SERVICE

OF

DESIGNER

PROJECT MANAGER

JOB #

CHECKED BY

A-E FIRM

J:\ gre en wo od \20

Jo bs \48

US

DA

To rna do

Da ma ge Re pa ir F

t. P ier ce

FL

\07 W ork ing

Fo lde r\M ec h\M -10

5.d wg

Ap r 2

7,

- 1

0:0 2a m c P.A.

FIRMTHE

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson M Adams

ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT

USDA AGRICULTURAL RESEARCH SERVICE

US HORTICULTURAL RESEARCH LABORATORY

REPAIR TORNADO DAMAGE

FT. PIERCE, FL

MECHANICAL PLAN

RENOVATION - BID OPTION #4

M-105 82 10804/27/26

BP

JH

JGM

SOUTHEAST AREA

STONEVILLE, MS

XXX

XXX

XXX

XXX

XXX

SCALE:

GREENHOUSE MECHANICAL PLAN

BID OPTION #4

1/4"=1'-0"

M-105

SCALE:

BID OPTION #4 MECHANICAL FLOOR PLAN HOOP HOUSE

1/4"=1'-0"

M-105

8'0 2' 4' 12'

SCALE: 1/4"= 1'-0"

GREENHOUSE

HOOP HOUSE

KEYPLAN - PICOS FARM SITE

NTS

ACCESSORY / STORAGE SPACE

UH-3

ECP-3 ECP-3

HF

3/4" GAS PIPING

EF-2 EF-2

PPM

REVISIONS

Agricultural

Service Research

DESCRIPTION

SHEET

DATE

U

NO.

DEPM

SAFETY & HEALTH

REAL PROPERTY

A

DATE

PROJECT NO.

SUSDA

BY

AGRICULTURAL RESEARCH SERVICE

OF

DESIGNER

PROJECT MANAGER

JOB #

CHECKED BY

A-E FIRM

J:\ gre en wo od \20

Jo bs \48

US

DA

To rna do

Da ma ge Re pa ir F

t. P ier ce

FL

\07 W ork ing

Fo lde r\M ec h\M -10

6.d wg

Ap r 2

7,

- 1

0:0 2a m c P.A.

FIRMTHE

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson M Adams

ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT

USDA AGRICULTURAL RESEARCH SERVICE

US HORTICULTURAL RESEARCH LABORATORY

REPAIR TORNADO DAMAGE

FT. PIERCE, FL

MECHANICAL PLAN

RENOVATION - BID OPTION #5

M-106 83 10804/27/26

BP

JH

JGM

SOUTHEAST AREA

STONEVILLE, MS

XXX

XXX

XXX

XXX

XXX

SCALE:

GREENHOUSE MECHANICAL PLAN

- BID OPTION #5

3/32"=1'-0"

M-106

SCALE: 3/32" = 1'-0"

16' 8' 0 16'

KEYPLAN

NTS

GREENHOUSES PESTICIDE BLDG

EXISTING CHILLER TO

REMAIN

EXISTING

CONDENSING

UNIT TO REMAIN

HP-1

AHU-1

AC-1

HP-4 HP-5

HP-3

HP-2

AHU-2

AHU-4 AHU-5

AHU-3

1 1

1 1

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

SCREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

GREENHOUSE

125 GREENHOUSE

AIR COND.

GREENHOUSE

GREENHOUSE

AIR COND.

GREENHOUSE

AIR COND.

GREENHOUSE

AIR COND.

GREENHOUSE

STORAGE BUILDING

STORAGE BUILDING

PPM

REVISIONS

Agricultural

Service Research

DESCRIPTION

SHEET

DATE

U

NO.

DEPM

SAFETY & HEALTH

REAL PROPERTY

A

DATE

PROJECT NO.

SUSDA

BY

AGRICULTURAL RESEARCH SERVICE

OF

DESIGNER

PROJECT MANAGER

JOB #

CHECKED BY

A-E FIRM

J:\ gre en wo od \20

Jo bs \48

US

DA

To rna do

Da ma ge Re pa ir F

t. P ier ce

FL

\07 W ork ing

Fo lde r\M ec h\M -40

1.d wg

Ap r 2

7,

- 1

0:0 2a m c P.A.

FIRMTHE

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson M Adams

ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT

USDA AGRICULTURAL RESEARCH SERVICE

US HORTICULTURAL RESEARCH LABORATORY

REPAIR TORNADO DAMAGE

FT. PIERCE, FL

ENLARGED MECHANICAL

M-401 84 10804/27/26

BP

JH

JGM

SOUTHEAST AREA

STONEVILLE, MS

XXX

XXX

XXX

XXX

XXX

SCALE:

ENLARGED MECHANICAL PLAN - BID OPTION #1

3/32"=1'-0"

M-401N

SCALE: 3/32" = 1'-0"

16' 8' 0 16'

AREA OF WORK

GENERAL NOTES

1. ALL WORK (MATERIALS, EQUIPMENT, DEVICES, COMPONENTS, SYSTEMS, SUPPORTS, ETC.) MUST COMPLY

WITH THE REQUIREMENTS OF ALL CODES, CODE AMENDMENTS, AND ORDINANCES AS USED, ADOPTED

AND/OR ENFORCED BY THE LOCAL JURISDICTION, COUNTY AND STATE.

2. ALL WORK SHALL BE FABRICATED AND/OR ERECTED USING CONTRACTOR'S FIELD MEASUREMENTS FOR

PROPER COORDINATION WITH WORK OF OTHER TRADES.

3. ALL CONTRACT DOCUMENTS ARE DIAGRAMMATIC AND INDICATE THE GENERAL ARRANGEMENTS OR GEOMETRICAL RELATIONSHIPS OF THE WORK. THEY ARE NOT INTENDED TO SPECIFY OR SHOW EVERY OFFSET, SEQUENCE, DEVICE, OPTION, FITTING, OR COMPONENT. DO NOT SCALE DRAWINGS FOR

FABRICATION PURPOSES.

4. COORDINATE PLACEMENT OF ALL WORK WITH OTHER TRADES. DO NOT LOCATE, POSITION OR INSTALL ANY WORK IN SUCH A WAY THAT SYSTEM COMPONENTS OR ACCESS DOORS WILL BE INACCESSIBLE, UNUSABLE OR UN-MAINTAINABLE AFTER CONSTRUCTION IS COMPLETED.

5. GRAVITY DRAINAGE SYSTEMS HAVE PRIORITY WITH REGARD TO ROUTING. COORDINATE INSTALLATION OF WORK SO AS NOT TO INHIBIT THE INSTALLATION OR REQUIRED SLOPES FOR GRAVITY DRAINAGE

SYSTEMS.

6. ALL WORK SHALL BE SUPPORTED FROM STRUCTURE ABOVE, FROM WALLS, OR FROM THE FLOOR UNLESS OTHERWISE INDICATED. DO NOT USE THE INSTALLED WORK OF OTHER TRADES FOR SUPPORT OR

BRACING. ALL PIPING SUPPORTS SHALL BE CONSTRUCTED OF ALUMINUM.

7. ALL LOW VOLTAGE WIRING FOR CONTROLS, ETC. SHALL BE INSTALLED IN CONDUIT. MATERIALS AND

INSTALLATION MUST COMPLY WITH NEC, NFPA, STATE AND LOCAL CODES AND ORDINANCES.

8. ALL PIPE PENETRATIONS THRU WALLS MUST BE PROVIDED WITH METAL SLEEVES OR THIMBLES.

SLEEVES AND THIMBLES SHALL BE AT LEAST 3/8 INCH LARGER THAN THE OUTSIDE DIAMETER OF THE PIPING PLUS INSULATION. CAULK BETWEEN SLEEVE AND PIPE WITH FLEXIBLE CAULKING MATERIAL

(RATED FOR SURFACE TEMPERATURE OF PIPE OR INSULATION) TO ALLOW MOVEMENT OF PIPE.

9. MAINTAIN MARKED AS-BUILTS THAT INDICATE FINAL ROUTING OF ALL VALVES, BELOW GRADE PIPING, ETC.

10. DEMOLITION AND NEW CONSTRUCTION SHALL BE PHASED IN ACCORDANCE WITH THE PHASING PLAN.

KEYED NOTES

1. PROVIDE AIR HANDLING UNIT MOUNTED FROM ABOVE. MOUNT UNIT AT THE SAME HEIGHT OF EXISTING

EQUIPMENT. RECONNECT TO EXISTING DUCTWORK AND CONDENSATE PIPING.

2. PROVIDE GROUND MOUNTED PACKAGED HEAT PUMP. RECONNECT TO EXISTING DUCT WORK.

PLAN- BID OPTION #1

UNIT HEATER SCHEDULE (EACH)

FAN

(HP)

UH-1 NATURAL GAS 2/3 SEE NOTES

REMARKSMARK TYPE INPUT

(BTUH)

75,000

VOLTAGE

120/1

AMPS

3.7

OUTPUT

(BTUH)

62,250

FAN

(CFM)

THERMAL

EFFICIENCY

83%

NOTES:

1. INTERGRATE WITH GREENHOUSE CONTROL SYSTEM.

2. PROVIDE WITH MOUNTING KIT.

3. EQUIPMENT SHALL COMPLY WITH THE "BUY AMERICAN ACT".

EVAPORATIVE COOLING PAD

MARK CONSTRUCTION TROUGH LENGTH GPM

ECP-1 ONE PIECE PVC 36' 68.3

REMARKSHEIGHT

4'

EAT

DB(°F) WB(°F)

95 78

LAT

DB(°F) WB(°F)

83 83

MEDIA

THICKNESS

6"

MAX. FACE

VELOCITY

125STAINLESS STEEL AND PVC

NOTES:

1. INTERLOCK ECP CONTROL WITH GREENHOUSE MASTER CONTROLLER.

2. INSTALL SYSTEM IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS.

3. PROVIDE WITH SUMP PUMP 110 VAC.

4. CONNECT TO ADJACENT DOMESTIC WATER LINE FOR MAKE UP WATER SUPPLY

SEE NOTES

GREENHOUSE FAN SCHEDULE

MARK MATERIAL DIAMETER TYPE RPM

EF-1 ALUMINUM 36" SIDEWALL PROP 10500 495 0.1"

AIRFLOW

(CFM)

E.S.P.

(IN W.G.) DRIVE

BELT

MOTOR

HP

1/2

VOLTS

PHASE

REMARKS

SEE NOTE 1,2,3

NOTES:

1. PROVIDE SINGLE-SPEED MOTOR.

2. PROVIDE WITH SLANT WALL HOUSING

3. PROVIDE WITH ALUMINUM BACKDRAFT SHUTTER.

EF-3 ALUMINUM 30" 5770 450 .1" BELT 1/4 208 3

UH-2 ELECTRIC 1/40 SEE NOTES10,200 208/3 8.310,200 380N/A

ECP-2 ONE PIECE PVC 22' 68.34' 95 78 83 83 6" 125STAINLESS STEEL AND PVC SEE NOTES

ECP-3 ONE PIECE PVC 6' 68.34' 95 78 83 83 6" 125STAINLESS STEEL AND PVC SEE NOTES

UH-3 PROPANE 2/3 SEE NOTES75,000 120/1 3.762,250 96183%

GREENHOUSE AIR CURTAIN SCHEDULE

MARK NOZZLE WIDTH AIR VOLUME POWER

DAC-1 111" 3500 CFM 1.5 KW 120 LBS

WEIGHT

MOTOR

HP

3 @ 1/2

VOLTS

PHASE

REMARKS

ALL

NOTES:

1. PROVIDE SINGLE-SPEED MOTOR.

2. PROVIDE WITH DOOR ACTIVATION.

NOZZLE VELOCITY

3,300 FPM

REMARKS

1. PROVIDE AND INSTALL REFRIGERANT SUPPLY AND RETURN LINES PER MANUFACTURER'S RECOMMENDATIONS.

HP-1 AIR-COOLED 46180 34476 15.2 95 230/3 18.1 30 251 ALL

MARK SYSTEM TYPE

COOLING

CAPACITY

(BTU/HR)

SENSIBLE

CAPACITY

(BTU/HR)

SEER

OUTDOOR

TEMPERATURE

(F)

VOLTS/

PHASE MCA MOCP WEIGHT

(LBS) REMARKS

HEAT PUMP SCHEDULE

REMARKS

1. AHU SHALL HAVE MERV 8 RATED FILTERS.

2. PROVIDE WITH THERMOSTAT BY UNIT MANUFACTURER.

AHU-1 HORIZONTAL DUCTED 1600 46184 34476 80 67 59.70 57.6 46170 70 86 170 230/1 9.0 15 ALL

TOTAL

(BTU/HR)

SENSIBLE

(BTU/HR)

EAT

(db °F)

EAT

(wb °F)

LAT

(db °F)

LAT

(wb °F)

TOTAL

(BTU/HR)

EAT

(db °F)

LAT

(db °F)

CAPACITY AIRSIDE CAPACITY AIRSIDE

VOLTS/

PHASE MCA MOCP

MARK UNIT TYPE AIRFLOW

(CFM)

COOLING HEATING

UNIT WT

(LBS)

ELECTRICAL DATA

REMARKS

AIR HANDLING UNIT SCHEDULE

HP-2 AIR-COOLED 56927 42229 14.30 95 230/3 28.2 35 251 ALL

HP-3 AIR-COOLED 23030 16647 16.00 95 230/1 13 20 174 ALL

HP-4

HP-5

AHU-2 HORIZONTAL DUCTED 1900 56927 42229 80 67 59.1 57.2 52500 70 86 170 230/1 9.0 15 ALL

AHU-3 HORIZONTAL DUCTED 700 23030 16647 80 67 57.6 56.1 22200 70 88 140 230/1 5.0 15 ALL

AHU-4

AIR-COOLED 46180 34476 15.2 95 230/3 18.1 30 251 ALL

AHU-5 HORIZONTAL DUCTED 1600 46184 34476 80 67 59.70 57.6 46170 70 86 170 230/1 9.0 15 ALL

AIR-COOLED 23030 16647 16.00 95 230/1 13 20 174 ALL

HORIZONTAL DUCTED 700 23030 16647 80 67 57.6 56.1 22200 70 88 140 230/1 5.0 15 ALL

PACKAGED UNIT SCHEDULE

SA

FLOW

(CFM)

ESP

(IN H2O)

TSP

(IN H2O)

FAN

SPEED

(RPM)

PACKAGED

MARK TYPE

1200AC-1

SUPPLY AIRFLOW DATA

2.0 2.5 1241

TOTAL

MBH

SENS

MBH EAT °F LAT °F

DX COOLING

CAPACITY AIR SIDE

36.8 25.5 90

EER

OPER.

WEIGHT

(LBS) REMARKS

FILTER

MERV 8 400 SEE NOTES

MCA

208/1

SEER2 VOLTS/

PHASEEAT °F

(DB/WB)

LAT °F

(DB/WB)

AIR SIDE

80/67 59.0/57.0

KW

ELECTRIC HEATING

CAPACITY

NOTES:

1. PROVIDE DOUBLE WALL CONSTRUCTION

2. PROVIDE WITH HORIZONTAL DISCHARGE.

3. PROVIDE WITH UNIT MICROPROCESSOR CONTROLLER CAPABLE OF STANDALONE OPERATION WITH INTEGRAL SCHEDULE AND OPERATIONS SETPOINTS (ADJ.). LOCATE MICROPROCESSOR CONTROL ADJACENT TO

THERMOSTAT.

4. PROVIDE BAROMETRIC RELIEF.

- 68

MOP

706011.27 11.0 13.8

REMARKS

1. AHU SHALL HAVE MERV 8 RATED FILTERS.

2. PROVIDE WITH THERMOSTAT BY UNIT MANUFACTURER.

WMU-1 WALL MOUNTED 1700 600 230/3 39 60 ALL

VOLTS/

PHASE MCA MOCP

MARK UNIT TYPE AIRFLOW

(CFM)

UNIT WT

(LBS)

ELECTRICAL DATA

REMARKS

PACKAGED WALL MOUNT UNIT SCHEDULE

VARIABLE

CAPACITY ECU

COMPRESSOR

TYPE

EER

67000

COOLING

CAPACITY

(BTU/HR)

EF-2 ALUMINUM 36" SIDEWALL PROP 10500 495 0.1" BELT 1/2 208 1 SEE NOTE 1,2,3

SEE NOTE 1,2,3

HF ALUMINUM 18" CEILING MOUNTED HORIZONTAL 2000 1100 NA DIRECT 1/15 115 1 SEE NOTE 1

SIDEWALL PROP

PPM

REVISIONS

Agricultural

Service Research

DESCRIPTION

SHEET

DATE

U

NO.

DEPM

SAFETY & HEALTH

REAL PROPERTY

A

DATE

PROJECT NO.

SUSDA

BY

AGRICULTURAL RESEARCH SERVICE

OF

DESIGNER

PROJECT MANAGER

JOB #

CHECKED BY

A-E FIRM

J:\ gre en wo od \20

Jo bs \48

US

DA

To rna do

Da ma ge Re pa ir F

t. P ier ce

FL

\07 W ork ing

Fo lde r\M ec h\M -60

1.d wg

Ap r 2

7,

- 1

0:0 2a m c P.A.

FIRMTHE

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson M Adams

ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT

USDA AGRICULTURAL RESEARCH SERVICE

US HORTICULTURAL RESEARCH LABORATORY

REPAIR TORNADO DAMAGE

FT. PIERCE, FL

MECHANICAL SCHEDULES

M-601 85 10804/27/26

BP

JH

JGM

SOUTHEAST AREA

STONEVILLE, MS

XXX

XXX

XXX

XXX

XXX

TEMPERATURE SENSOR

GREENHOUSE BAY

CONTROLLER INPUT/

OUTPUT SUMMARY

AN

AL

O G

IN

PU

T

AN

AL

O G

O U

TP

U

T

BI

N

AR

Y

IN

PU

T

BI

N

AR

Y

O U

TP

U

T

HUMIDITY SENSOR

FAN #1 START/STOP

FAN #2 START/STOP (LOW SPEED)

FAN #2 START/STOP (HIGH SPEED)

VENT WALL MOTOR (OPEN)

VENT WALL MOTOR (CLOSE)

EVAPORATING COOLING WALL START/STOP

UNIT HEATER

WALL VENT WALL OPEN LIMIT

WALL VENT CLOSE WALL LIMIT

X

X

X

X

X

X

X

X

X

X

X

VENT ROOF MOTOR (OPEN)

VENT ROOF MOTOR (CLOSE)

X

X

ROOF VENT WALL OPEN LIMIT

ROOF VENT CLOSE WALL LIMIT

X

X

NOTE: PROVIDE CONTROLLERS AS REQUIRED FOR THE

INPUT/OUTPUT/OUTPUT SUMMARY ABOVE. PROVIDE CENTRAL MONITORING

STATION IN THE GREENHOUSE MANAGERS OFFICE.

RAIN

WEATHER STATION

CONTROLLER INPUT/

OUTPUT SUMMARY

AN

AL

O G

IN

PU

T

AN

AL

O G

O U

TP

U

T

BI

N

AR

Y

IN

PU

T

BI

N

AR

Y

O U

TP

U

T

WIND DIRECTION

WIND SPEED

SOLAR K-LUX

OUTDOOR TEMPERATURE

X

X

X

X

X

NOTE: PROVIDE CONTROLLERS AS REQUIRED FOR THE INPUT/OUTPUT/OUTPUT

SUMMARY ABOVE. WEATHER STATION CONTROLLER TO BE BY SAME

MANUFACTURER TO GREENHOUSE BAY CONTROLLER.

OCCUPIED COOLING: STEPS TO MAINTAIN ADJUSTABLE SETPOINT AS

MEASURED BY TEMPERATURE SENSOR

STEP 1: OPEN SIDE VENTS. STEP 2:

COOLING 1 - ACTIVATE LOW SPEED OF TWO

SPEED FANS.

STEP 3: COOLING 2 - ACTIVATE HIGH SPEED OF TWO SPEED

FANS.

STEP 4: COOLING 3 - ACTIVATE EVAPORATIVE COOLING WALL

SYSTEM.

HEATING: STEPS TO MAINTAIN ADJUSTABLE SETPOINT

STEP 1: CLOSE ROOF AND SIDE VENTS.

STEP 2: HEATING 1 - MODULATE THE NEW ELECTRONIC VALVE

ACTUATOR TO MAINTAIN TEMPERATURE SETPOINT.

CONTROL SYSTEM SHALL MONITOR INDOOR AIR TEMPERATURE AND

HUMIDITY, OUTDOOR AIR TEMPERATURE, RAIN CONDITIONS, WIND DIRECTION

AND SPEED, AND SOLAR KLUX. CONTROL SYSTEM SHALL PROTECT

GREENHOUSE VENTILATION SYSTEMS FROM HIGH WINDS AND RAIN DAMAGE.

PROVIDE MANUAL OVERRIDE FOR ROOF VENTS. PROVIDE ALL WIRING AND

CONTROLS FOR A COMPLETE OPERATIONAL SYSTEM.

SEQUENCE OF OPERATION

ADD ALT #1 CIRC, FANS START/STOP X

EXTERIOR WALL

BACKDRAFT DAMPER

FAN SUPPORT AS PER

MANUFACTURER'S

RECOMMENDATIONS

WIND

DIRECTION

WIND SPEED

RAIN

NORTH

SOLAR K-LUX

OUTDOOR

TEMPERATURE

SECURELY MOUNT THE OUTDOOR

SENSOR AT THE HIGHEST UNOBSTRUCTED

POINT ON THE GREENHOUSE. OBSERVE

NORTH POSITIONING. INSTALL SENSOR

PER MANUFACTURER'S AND GREENHOUSE

MANUFACTURER'S RECOMMENDATIONS.

NEW EXHAUST

FAN

48"

PPM

REVISIONS

Agricultural

Service Research

DESCRIPTION

SHEET

DATE

U

NO.

DEPM

SAFETY & HEALTH

REAL PROPERTY

A

DATE

PROJECT NO.

SUSDA

BY

AGRICULTURAL RESEARCH SERVICE

OF

DESIGNER

PROJECT MANAGER

JOB #

CHECKED BY

A-E FIRM

J:\ gre en wo od \20

Jo bs \48

US

DA

To rna do

Da ma ge Re pa ir F

t. P ier ce

FL

\07 W ork ing

Fo lde r\M ec h\M -60

2.d wg

Ap r 2

7,

- 1

0:0 2a m c P.A.

FIRMTHE

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson M Adams

ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT

USDA AGRICULTURAL RESEARCH SERVICE

US HORTICULTURAL RESEARCH LABORATORY

REPAIR TORNADO DAMAGE

FT. PIERCE, FL

MECHANICAL DETAILS

M-602 86 1084/27/26

BP

JH

JGM

SOUTHEAST AREA

STONEVILLE, MS

XXX

XXX

XXX

XXX

XXX

MIN

MIN

3.5"

2" MIN

6.5"

SCALE:

CONDENSATE DRAIN P-TRAP DETAIL

NOT TO SCALE

DRAIN PAN

DRAIN LINE SHALL BE AT LEAST THE

SAME SIZE AS THE NIPPLE ON THE

DRAIN PAN. SEE PLANS FOR SIZES.

UNION

PITCH DOWN TOWARD

FLOOR DRAIN. SPILL AT

FLOOR DRAIN.

UNION FOR DRAINING

CLEAN OUT

5/8" DIAMETER EXPANSION BOLTS

TYP. (6)

UNIT HEATER SHALL BE SECURED TO

WALL WITH A MINIMUM OF TWO BRACKETS

PER MANUFACTURER'S

RECOMMENDATIONS.

UNIT HEATER

TWO 5/8" DIAMETER BOLTS, EACH SIDE OF

FRAME WITH LOCK WASHERS.

AIR OUTLET

SCALE:

ELECTRIC UNIT HEATER DETAIL

NOT TO SCALE

NOTE:

INSULATE ALL CONDENSATE PIPING.

M602

M602

SCALE:

WEATHER STATION DETAIL

NOT TO SCALE

M602

SCALE:

WALL FAN MOUNTING DETAIL

NOT TO SCALE

M-602

STRAIGHT RACK

& PINION

INSECT SCREEN

RIDGE VENT MOTOR

ROOF VENT

SCALE:

ROOF VENT DETAIL

NOT TO SCALE

M602

SCALE:

EVAPORITIVE COOLING PAD & PUMP DETAIL

NOT TO SCALE

M602

HOSE BIBB

SUMP PUMP

FLOAT

SUMP TANK

FLOAT VALVE

1/2" MAKE-UP WATER

SHUT-OFF VALVE

120V POWER TO

STARTER

2-1/2" DRAIN

HOSE BIBB

PVC BALL VALVE

PVC UNION

MEDIA

PIPE SIZED PER

MANUFACTURER'S

RECOMMENDATIONS

FRAME SUPPORT

(TYP.)

HANG FROM ROOF STRUCTURE

PER GREENHOUSE MFG.

RECOMMENDATION

CHAIN (TYP. OF 4)

HORIZONTAL FLOW FAN

ADJUST HEIGHT FOR

OPTIMUM TEMPERATURE

DISTRIBUTION

SCALE:

HAF DETAIL

NOT TO SCALE

M602

HEATER

UNIT

SCALE:

GAS FIRED UNIT HEATER DETAIL

NOT TO SCALEM602

GAS CONTROL VALVE BALL VALVE

8" DIRT LEG W/CAP

UNION

TYPE B GAS VENT

SCALE:

PIPE HANGER DETAILS

N.T.S

M-602

12" MIN

12" MIN

U-CLAMP OR

CONDUIT CLAMP

GALVANIZED IRON

TRAPEZE OR

UNISTRUT

16 GAUGE GALVANIZED

SHEET SHIELD

WRAPPED FULLY

AROUND INSULATION

INSULATION

PIPE

PROVIDE A SECTION OF HIGH

COMPRESSION STRENGTH

INSULATION AT EACH HANGER

POINT. INSULATION SHALL BE HALF

ROUND AND EXTEND 2" BEYOND

GALVANIZED SHIELD EACH WAY.

16 GAUGE GALVANIZED

SHEET SHIELD

WRAPPED FULLY

AROUND INSULATION

INSULATION

PIPE

M

SPD

GFI

TC

PES

J

PNL

C

PB

T

1. DEVICES NOTED AS 'GFI' SHALL BE GROUND FAULT CIRCUIT INTERRUPTING DEVICES.

2. DEVICES NOTED AS 'WP' SHALL BE WEATHERPROOF WHILE-IN-USE.

3. PROVIDE UNSWITCHED POWER TO THE EMERGENCY BATTERY PACKS.

4. 'W/E' DENOTES PROVIDED WITH EQUIPMENT.

5. MINIMUM RACEWAY SIZE SHALL BE 3/4". INCREASE RACEWAY SIZE AS REQUIRED TO LIMIT RACEWAY FILL RATIO TO LESS THAN 40% FULL.

6. THE ELECTRICAL CONTRACTOR SHALL CAREFULLY COORDINATE WORK WITH OTHER TRADES THROUGH THE GENERAL CONTRACTOR AND SHALL

BE RESPONSIBLE FOR SECURING SPACE REQUIREMENTS FOR ELECTRICAL EQUIPMENT AND CORRECT ROUGH-IN LOCATIONS OF ELECTRICAL

CONNECTIONS.

7. VERIFY DOOR SWINGS WITH ARCHITECTURAL DRAWINGS BEFORE ROUGHING IN WALL SWITCHES. SWITCHES IN THE SAME LOCATION SHALL BE

GANGED TOGETHER IN ONE COMMON BACKBOX AND SHALL HAVE ONE COMMON FACE PLATE.

8. ALL FEEDERS AND BRANCH CIRCUITS SHALL INCLUDE A GREEN INSULATED GROUND CONDUCTOR, SIZED PER THE NATIONAL ELECTRICAL CODE, OR AS SHOWN, CONNECTED TO EACH DEVICE AND OUTLET BOX ON THE CIRCUIT AND TO THE PANELBOARD GROUND BUS. PROVIDE A DEDICATED NEUTRAL CONDUCTOR FOR EACH BRANCH CIRCUIT. MULTIPLE BRANCH CIRCUITS IN ONE RACEWAY REQUIRE ONLY ONE GROUND CONDUCTOR.

9. VERIFY LUMINAIRE, CEILING MOUNTED OCCUPANCY SENSOR LOCATIONS WITH ARCHITECTURAL REFLECTED CEILING PLANS FOR EXACT LOCATIONS AND DIMENSIONS PRIOR TO INSTALLATION. VERIFY EXACT LOCATIONS OF MOTORS AND EQUIPMENT BEFORE ROUGHING-IN.

10. "PROVIDE" IS AN INCLUSIVE TERM USED TO DESCRIBE ASPECTS OF THE WORK TO BE ACCOMPLISHED, AND IS HEREBY DEFINED TO REQUIRE TO STORE, FURNISH, INSTALL, MOUNT, CONNECT, CONTROL AND POWER EQUIPMENT INDICATED, AS WELL AS ALL APPURTENANCES REQUIRED TO MAKE ELECTRICAL SYSTEMS OPERATE AS INDICATED WITHIN THESE DRAWINGS AND SPECIFICATIONS AND TO FULFILL THE SCOPE OF WORK.

11. ALL CONDUCTORS SHALL BE COPPER

12. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS, DIMENSIONS AND ELEVATIONS BEFORE PROCUREMENT OF ANY MATERIALS AND

DEVELOPMENT OF ANY SHOP DRAWINGS OR SUBMITTALS.

13. PROVIDE LABELS ON ALL RECEPTACLES, WALL MOUNTED LIGHT SWITCHES/OCCUPANCY SENSORS AND JUNCTION BOXES INDICATING THE SOURCE

PANEL & CIRCUIT(S). TEXT SHALL BE BLACK, 1/4". LABELS ABOVE FINISHED CEILING CAN BE HANDWRITTEN WITH AN INDELIBLE MARKER.

14. CIRCUIT SIZES INDICATED ON THE DRAWINGS ARE MINIMUM REQUIREMENTS.

15. DO NOT CONNECT CONDUCTORS LARGER THAN #10 DIRECTLY TO A RECEPTACLE OR A SWITCH. PROVIDE A JUNCTION BOX TO DOWNSIZE THE

CONDUCTOR TO #12 AT THE DEVICE.

16. FOR INSTALLATION OF LIGHTING SWITCHES, MOUNT CENTERLINE OF BOX AT 46" A.F.F., UNLESS OTHERWISE INDICATED.

GENERAL NOTES:

1.

MASTER NOTES - ELECTRICAL:

THE CONTRACTOR MUST ABIDE BY ALL FEDERAL, STATE, AND/OR

LOCAL CODES. IF A DISCREPANCY BETWEEN CODES OCCURS, THE

MOST STRINGENT SHALL PREVAIL.

2. THE CONTRACTOR MUST FIELD VERIFY EXISTING CONDITIONS PRIOR TO

THE COMMENCEMENT OF ANY WORK. SHOULD DISCREPANCIES BE

DISCOVERED, THE CONTRACTOR MUST VERIFY INTENT WITH THE

ENGINEER/CONTRACTING OFFICER BEFORE PROCEEDING.

3. COORDINATE LOCATIONS OF ALL CEILING MOUNTED DEVICES WITH

OTHER TRADES PRIOR TO INSTALLATION.

4. COORDINATE ALL ROUGH-IN REQUIREMENTS FOR GOVERNMENT

FURNISHED EQUIPMENT WITH THE OWNER PRIOR TO BEGINNING

WORK. THESE DRAWINGS ARE BASED ON EXISTING BUILDING

CONSTRUCTION DRAWINGS, SITE SURVEYS, AND OWNER

FURNISHED EQUIPMENT SPECIFICATIONS.

5. RECEPTACLES MUST NOT BE CONNECTED IN A FEED-THRU

MANNER. WIRE CONNECTIONS IN

RECEPTACLE BOXES MUST BE MADE IN A PIGTAIL MANNER AS

SHOWN IN DETAIL 1/E-001.

SYMBOL / KEY DESCRIPTION

KEY NOTE DESIGNATION.

(NOT ALL SYMBOLS MAY APPLY, TYP.)

EP101

GENERAL SYMBOLS LEGEND

LA-1

LA-1

CONDUCTORS IN CONDUIT CONCEALED WITHIN WALL OR CEILING. TIC MARKS INDICATE NUMBER OF CONDUCTORS.

THE EQUIPMENT GROUNDING CONDUCTOR IS NOT SHOWN, BUT SHALL BE PROVIDED. SIZE THE EQUIPMENT GROUNDING CONDUCTOR AND THE CONDUIT PER THE NEC. THE ABSENCE OF TIC MARKS SIGNIFIES THAT TWO CONDUCTORS PLUS AN EQUIPMENT GROUNDING CONDUCTOR SHOULD BE PROVIDED. FOR EXAMPLE, THE MARKINGS TO THE LEFT SIGNIFY

THAT THREE CONDUCTORS PLUS AN EQUIPMENT GROUNDING CONDUCTOR SHOULD BE PROVIDED.

TOP DESIGNATION IS PLAN / ENLARGED PLAN / DETAIL NUMBER.

BOTTOM DESIGNATION IS SHEET LOCATION (STANDARD SYMBOL SCALED DOWN FOR LEGEND).

REVISION TAG DESIGNATION.

THE TEXT INSIDE THE ARC INDICATES THE AWG SIZE OF THE CONDUCTORS THAT SHALL BE RUN IN THE CONDUIT.

THE ABSENCE OF TEXT SIGNIFIES THAT THE CONDUCTORS SHOULD BE #12 AWG.

CIRCUITRY RUN IN STRAIGHT LINE SEGMENTS SIGNIFIES EXPOSED SURFACE-MOUNTED RACEWAY (SEE SPECIFICATIONS).

CONDUCTORS IN CONDUIT CONCEALED BELOW GRADE OR FLOOR. TIC MARKS INDICATE NUMBER OF CONFUCTORS.

THE EQUIPMENT GROUNDING CONDUCTOR IS NOT SHOWN, BUT SHALL BE PROVIDED. SIZE THE EQUIPMENT GROUNDING CONDUCTOR AND THE CONDUIT PER THE NEC. THE ABSENCE OF TIC MARKS SIGNIFIES THAT TWO CONDUCTORS PLUS AN EQUIPMENT GROUNDING CONDUCTOR SHOULD BE PROVIDED. THE MARKINGS TO THE LEFT SIGNIFY THAT THREE CONDUCTORS PLUS AN EQUIPMENT GROUNDING CONDUCTOR SHOULD BE PROVIDED.

HOMERUN TO PANELBOARD. ARC DENOTES CONCEALED CIRCUITRY. TEXT DENOTES PANELBOARD NAME WITH CIRCUIT NUMBER. DEVICES HAVING CIRCUIT NUMBERS LOCATED BESIDE THEM MAY NOT SHOW THE CIRCUIT

NUMBERS AT THE HOMERUN ARROWS.

PARTIAL HOMERUN TO PANELBOARD. COMBINE ALL PARTIAL HOMERUNS THAT ARE ON THE SAME CIRCUIT IN A

JUNCTION BOX PRIOR TO ENTERING THE PANELBOARD.

LOW VOLTAGE CONDUCTORS USED FOR MOTION DETECTOR CIRCUITRY. SEE MANUFACTURER'S

RECOMMENDATIONS FOR CONDUCTOR REQUIREMENTS.

PANELBOARD AND CIRCUIT DESIGNATIONLA1-13

S

ST

T

C

TELEPHONE MOUNTED IN BOX WITH HINGED DOOR

JUNCTION BOX FOR FUTURE TELEPHONE

CELLULAR AMPLIFIER ANTENNA

DUPLEX RECEPTACLE, NEMA 5-20R, MOUNTED 18" A.F.F. TO CENTERLINE OF BOX UNLESS NOTED OTHERWISE.

DUPLEX RECEPTACLE, NEMA 5-20R, MOUNTED WITH BOTTOM OF BOX 2" ABOVE COUNTER BACKSPLASH. WHERE THERE IS NO BACKSPLASH MOUNT 6" ABOVE COUNTER. WHERE RECEPTACLE IS SHOWN IN AN AREA WITH NO

COUNTER, MOUNT 45" A.F.F. TO CENTERLINE OF BOX.

SINGLE RECEPTACLE, NEMA 5-30R, MOUNTED 18" A.F.F. TO CENTERLINE OF BOX UNLESS NOTED OTHERWISE.

DUPLEX RECEPTACLE, NEMA 5-20R, SUSPENDED FROM CEILING. SEE DETAIL 3/E-002.

SYMBOL / KEY

POWER OUTLET AND COMMUNICATIONS LEGEND

J

J

CEILING MOUNTED JUNCTION BOX.

WALL MOUNTED JUNCTION BOX.

FLEX. CONNECTION TO EQUIPMENT.

F-?

NON-FUSED DISCONNECT SWITCH.

TEXT INDICATES AMPACITY/NUMBER

OF POLES/ENCLOSURE TYPE.

MAGNETIC MOTOR STARTER.

PANELBOARD.

VOLTAGE DROP CHART FOR 20A, 1Ø CIRCUITS

VOLTAGE CIRCUIT LENGTH CONDUCTOR SIZE (AWG)

120 >140'

>90'

>50'

<50' #12

#10

#8

#6

277 >330'

>200'

>130'

<130' #12

#10

#8

#6

VOLTAGE DROP CHART NOTES:

1) CIRCUIT SIZES INDICATED ON THE DRAWINGS ARE MINIMUM REQUIREMENTS.

REFER TO THIS CHART FOR UPSIZING CONDUCTORS AS NEEDED.

2) DO NOT CONNECT CONDUCTORS LARGER THAN #10 DIRECTLY TO A RECEPTACLE OR A SWITCH.

PROVIDE A JUNCTION BOX TO DOWNSIZE THE CONDUCTOR TO #12 AT THE DEVICE.

3) FOR CIRCUITS LONGER THAN THOSE LISTED ABOVE, CONSULT WITH THE ENGINEER FOR CONDUCTOR

SIZES.

DESCRIPTION

(42) ELECTRICAL OR COMMUNICATION DEVICE, MH = AT ELEVATION AFF INDICATED (42" AFF SHOWN)

TELEPHONE TERMINAL CABINET OR BACKBOARD

LIGHTING AND SWITCHING LEGEND

SYMBOL / KEY DESCRIPTION SYMBOL / KEY DESCRIPTION

SURFACE MOUNTED OR SUSPENDED FIXTURE.

SURFACE MOUNTED OR SUSPENDED

EMERGENCY FIXTURE.

MD

PASSIVE INFRARED AND ULTRASONIC DUAL

TECHNOLOGY OCCUPANCY SENSOR WITH A 26'

RADIAL COVERAGE. SURFACE MOUNTED TO CEILING.

POWER PACK SURFACE MOUNTED TO CEILING.

HORSEPOWER RATED SWITCH WITH THERMAL

OVERLOADS (MANUAL MOTOR STARTER).

SINGLE -POLE, SINGLE-THROW SWITCH.

S2

S3

S3P

DOUBLE POLE.

THREE WAY.

THREE POLE.

SYMBOL / KEY SYMBOL / KEYDESCRIPTION DESCRIPTION

ACP

ML

M

PX

PB

F

F

F PUSH TO EXIT BUTTON.

MAGNETIC LOCK.

POWER SUPPLY.PSACCESS CONTROL PANEL.

FIRE ALARM AND ACCESS LEGEND

MANUAL PULL STATION. MOUNT

48"A.F.F. TO CENTERLINE OF BOX.

STROBE. MOUNT 80" A.F.F. TO

BOTTOM OF BOX.

COMBINATION HORN & STROBE.

MOUNT 80"A.F.F. TO BOTTOM OF BOX.

MOTION DETECTOR TO

RELEASE MAGNETIC LOCK.

CR CARD READER.

PUSH BUTTON.

SYMBOL / KEY SYMBOL / KEYDESCRIPTION DESCRIPTION

ONE-LINE DIAGRAM, SCHEDULE, AND DISTRIBUTION LEGEND

FEEDER KEY

DISCONNECT SWITCH DIST

BOARD MTD.

CKT BREAK DIST BOARD MTD.

FUSE DIST BOARD MTD.

FUSED DISC SWITCH 600V & UNDER.

GROUND

XFMR

EQUIPMENT

GENERATOR

METER

SURGE PROTECTION DEVICE.

FUSED DISCONNECT SWITCH.

TEXT INDICATES AMPACITY/NUMBER

OF POLES/ENCLOSURE TYPE;

F-(RATING OF FUSES).

GROUND FAULT INTERRUPTER.

TIMECLOCK

PHOTOELECTRIC SWITCH

JUNCTION BOX

PULL BOX

TRANSFORMER

(PLAN VIEW)

CONTINUATION, UPSTREAM LABEL

LOCAL CONTACTOR

PANELBOARD

(ONE-LINE)

TRANSFER SWITCH

(ATS : AUTOMATIC)

(MTS: MANUAL)

MOTOR

AIR TERMINAL

GR

3/4" X 10' COPPER CLAD STEEL

GROUND ROD DRIVEN W/ TOP

ATLEAST 18" BELOW GRADE.

SA1 c cUPPERCASE INDICATES

TYPE OF FIXTURE

LOWERCASE INDICATES FIXTURES

TO BE CONTROLLED TOGETHER.

LOWERCASE INDICATES GROUP OF

FIXTURES TO BE CONTROLLED BY SWITCH.

PP

6. REFER TO ARCHITECTURAL DETAIL 1/G-103 FOR INFORMATION

REGARDING AREAS OF WORK FOR EACH BID OPTION AND PHASING.

1.

BID OPTION NOTES:

THE CONTRACTOR SHALL PROVIDE SEPARATE PRICING, INCLUDING

ALL DEMOLITION AND NEW WORK, BASED ON THE AREAS SHOWN

ON THE BID OPTION KEY PLAN. NO WORK SHALL BE EXCLUDED

BASED ON AREA BOUNDARIES; THE CONTRACTOR IS RESPONSIBLE

FOR COORDINATING ALL SCOPE NECESSARY TO DELIVER A

COMPLETE AND FUNCTIONAL RESULT FOR EACH BID OPTION.

PPM

REVISIONS

Agricultural

Service Research

DESCRIPTION

SHEET

DATEc P.A.

FIRM

U

NO.

DEPM

SAFETY & HEALTH

REAL PROPERTY

A

DATE

PROJECT NO.

SUSDA

BY

AGRICULTURAL RESEARCH SERVICE

OF

THE

DESIGNER

PROJECT MANAGER

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson M Adams

ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT

USDA AGRICULTURAL RESEARCH SERVICE

US HORTICULTURAL RESEARCH LABORATORY

REPAIR TORNADO DAMAGE

FT. PIERCE, FL

ELECTRICAL LEGEND

E-001 87 10804/27/2026

BP

EH

BTD

FT. PIERCE, FL

XXX

XXX

XXX

XXX

XXX

RECEPTACLE DETAIL NOTES:

A. THESE DRAWINGS ARE BASED ON THE BEST INFORMATION

AVAILABLE AT THE TIME OF DESIGN. COORDINATE WITH THE

MILLWORK CONTRACTOR TO DETERMINE THE EXACT LOCATION

OF OUTLETS BEING PLACED IN AND AROUND MILLWORK.

B. RECEPTACLES SHOWN AS GFI MAY BE NON GFI TYPE

RECEPTACLES IF FED FROM A 20/1 GFI BREAKER OR THE LOAD

SIDE OF A GFI RECEPTACLE IN THE SAME ROOM, ON THE SAME

CIRCUIT AND RATED 20 AMP FEED-THRU CAPACITY. COVER

PLATES SHALL BE CLEARLY MARKED GFI.

C. NON GFI RECEPTACLES SHALL NOT BE CONNECTED IN A

FEED-THRU MANNER. WIRE CONNECTIONS IN RECEPTACLE

BOXES SHALL BE MADE IN A PIGTAIL MANNER AS SHOWN IN

RECEPTACLE DETAIL.

BOND EQUIPMENT GROUND

TO METAL BOX.

SCALE:

RECEPTACLE DETAIL

NONE

E-001

BrandonBurton

4825 BD SEAL 260427

FINISH FLOOR

SUPPORT AND INSTALL ALL CONDUITS

PER THE LATEST EDITION OF THE

NATIONAL ELECTRICAL CODE (NEC)

OUTLET BOXES SHALL BE RIGIDLY AND

SECURELY FASTENED IN PLACE TO

GREENHOUSE STRUCTURE OR BRACES.

SUPPORT GROUPS OF CONDUITS WITH ELECTRICAL STRUT SUPPORTED

BY THREADED RODS ANCHORED TO BUILDING STRUCTURE.

JUNCTION & PULL BOXES SHALL BE

RIGIDLY AND SECURELY FASTENED

IN PLACE TO GREENHOUSE

STRUCTURE OR BRACES.

NOTE: JUNCTION, PULL AND OUTLET BOXES

SHALL BE 4" x 4" x 2-1/8" OR LARGER.

SUPPORT WIRES MUST NOT BE USED FOR SUPPORT OF

CONDUITS. ROD & WIRE FASTENERS (BATWING CLIPS) SHALL

NOT BE USED FOR SUPPORT OF CONDUITS.

SUPPORT SINGLE CONDUITS WITH CONDUIT

HANGER STRAPS AND THREADED RODS

ANCHORED TO BUILDING STRUCTURE.

NOTE: ALL CONDUIT SHALL BE UV-RESISTANT

SCH. 80 PVC. ALL JUNCTION BOXES SHALL BE

WATERTIGHT POLYCARBONATE BOXES WITH

WEATHERPROOF GASKET AND FITTINGS.

CONDUIT INSTALLAITION SHALL COMPLY WITH

THE REQUIREMENTS LISTED IN ARTICLE 352 OF

THE NATIONAL ELECTRICAL CODE.

PLANT TABLE

12/3 UV-RESISTANT SOOW CORD

4" X 4" UV-RESISTANT POLYCARBONATE WATER-TIGHT JUNCTION BOX

STRAIN RELIEF CONNECTOR

JJ

APPROXIMATELY 48" ABOVE TABLE.

VERIFY MOUNTING HEIGHT WITH

OWNER.

RECEPTACLE DROP NOTES:

A. THE COMPLETE RECEPTACLE DROP INSTALLATION

SHALL BE COMPRISED OF COMPONENTS UL LISTED

FOR THE INTENDED PURPOSE.

NEMA L5-20R WATER-TIGHT LOCKABLE

RECEPTACLE

STRAIN RELIEF CONNECTOR

#10 HOMERUN

CONDUCTORS, 3/4"C.

6'-2"

6'-6" 5'-2"

4'

8'-2"

6'-6" 5'-2"

6'

4"x4" JUNCTION BOX ABOVE ACCESSIBLE

CEILING PROVIDED AND INSTALLED BY

CONTRACTOR.

TO ACCESS CONTROL PANEL

CR

NOTES:

COORDINATE ACCESS CONTROL REQUIREMENTS WITH

USDA MAINTENANCE PERSONNEL PRIOR TO INSTALLATION.

UTILIZE 20/1 CIRCUIT BREAKER LOCATED IN PANEL '1GE'.

THE CONTRACTOR SHALL REMOVE THE EXISTING ACCESS

CONTROL SYSTEM AT GREENHOUSE 101 AND 102 IN ITS

ENTIREETY AND PROVIDE A COMPLETE NEW ACCESS

CONTROL SYSTEM FOR GREENHOUSE 101 AND 102. THE

SYSTEM SHALL INCLUDE, BUT IS NOT LIMITED TO CARD

READERS, ELECTROMAGNETIC LOCKS, DOOR POSITION

SWITCHES, REQUEST-TO-EXIT DEVICES, POWER SUPPLIES,

CONTROL MODULES, ASSOCIATED WIRING, AND ALL

REQUIRED ACCESSORIES.

CEILING

3/4"C. WITH MULTI-CONDUCTOR ACCESS

CONTROL CABLE, PLENUM RATED TO ALL

DEVICES AT DOOR. ROUTE INDIVIDUAL

CABLES TO APPROPRIATE DEVICES.

CARD READER AS INDICATED ON FLOOR PLAN,

MOUNTED ON ENTRANCE SIDE OF DOOR AT 48"

A.F.F.

PX

M

PUSH-TO-EXIT PUSHBUTTON AS

INDICATED ON FLOOR PLAN,

MOUNTED ON EXIT SIDE OF DOOR

AT 48" A.F.F.

120V

TO FIRE ALARM CONTROL PANEL FOR

FIRE ALARM RELEASE

1"C. CONTAINING ACCESS CONTROL CABLING PER

MANUFACTURER'S INSTALLATION REQUIREMENTS.

3/4"C. CONTAINING CABLING PER MANUFACTURER'S

INSTALLATION REQUIREMENTS.

20A, SINGLE POLE TOGGLE SWITCH USED AS

A DISCONNECT FURNISHED AND INSTALLED

BY THE ELECTRICAL CONTRACTOR.

S

POWER SUPPLY/CONTROLLER MOUNTED ABOVE

ACCESSIBLE CEILING.

ML

PS

ML

SCALE:

GREENHOUSE CONTROLLER, ANNUNCIATOR, AND REMOTE VIEWING DETAIL

NONE

E-002

SCALE:

JUNCTION AND OUTLET BOX DETAIL

NONE

E-002

SCALE:

CEILING MOUNTED SUSPENDED RECEPTACLE DETAIL

NONE

E-002

SCALE:

DOUBLE GREENHOUSE PANEL DETAIL

NONE

E-002

MICROGROW CONTROLLER (ONE FOR EACH

GREENHOUSE). MECHANICAL EQUIPMENT

CONTACTORS/MOTOR STARTERS MOUNTED IN 12"x12"x8"D

GASKETED POLYCARBONATE BOX WITH HINGED COVER

BELOW. COORDINATE CONNECTION REQUIREMENTS WITH

THE MECHANICAL CONTRACTOR AND GREENHOUSE

CONTROLS CONTRACTOR PRIOR TO INSTALLATION. BRANCH CIRCUITS ROUTED ABOVE

ELECTRICAL GUTTER

SCALE:

SINGLE GREENHOUSE PANEL DETAIL

NONE

E-002

ELECTRICAL GUTTER

MICROGROW CONTROLLER. MECHANICAL EQUIPMENT

CONTACTORS/MOTOR STARTERS MOUNTED IN 12"x12"x8"D

GASKETED POLYCARBONATE BOX WITH HINGED COVER BELOW.

COORDINATE CONNECTION REQUIREMENTS WITH THE

MECHANICAL CONTRACTOR AND GREENHOUSE CONTROLS

CONTRACTOR PRIOR TO INSTALLATION. BRANCH CIRCUITS

ROUTED ABOVE

PANEL

1G*

PANEL

EXISTING FEEDER CONDUIT

EXISTING FEEDER CONDUIT

SCALE:

MAG-LOCK ACCESS CONTROL DETAIL

NONE

E-002

STRUCTURE ABOVE

22/2 TC CABLE, 3/4"C.PROCOM

CONTROLLER

GROWLINK

BOX

WEB-ALARM

BOX

NOTE: THE GREENHOUSE ENVIRONMENTAL CONTROL SYSTEM (MICROGROW OR

APPROVED EQUAL) FURNISHED BY THE MECHANICAL CONTRACTOR AND

INSTALLED BY THE ELECTRICAL CONTRACTOR SHALL BE PROGRAMMED AND

COMMISSIONED AS A COMPLETE AND FULLY OPERATIONAL SYSTEM. THE

CONTRACTOR SHALL COORDINATE DIRECTLY WITH THE GREENHOUSE CONTROL

SYSTEM MANUFACTURER AND/OR AUTHORIZED REPRESENTATIVE TO VERIFY ALL

EQUIPMENT REQUIREMENTS, WIRING METHODS, NETWORK ARCHITECTURE,

ANNUNCIATION, AND REMOTE MONITORING FEATURES.

120VAC

LOCATED IN

OFFICE. SEE

EP101 FOR

EXACT

LOCATION

LOCATED IN

OFFICE. SEE

EP101 FOR

EXACT

LOCATION

CAT6A CABLE, 1"C.

120VAC

NOTE: THE CONTRACTOR SHALL

UTILIZE INSULATED POLARIS

LUGS TO EXTEND EXISTING

FEEDER CIRCUITRY AS REQUIRED.

NOTE: THE CONTRACTOR SHALL

UTILIZE INSULATED POLARIS

LUGS TO EXTEND EXISTING

FEEDER CIRCUITRY AS REQUIRED.

NOTE: CONTROL CIRCUITS MAY BE COMBINED

INTO ONE CONDUIT. CONTROL CIRCUITRY

CONDUIT MUST HAVE LESS THAN 40% FILL

RATIO PER THE NATIONAL ELECTRICAL CODE.

TO GREENHOUSE ANNUNCIATOR PANEL. COORDINATE

EXACT REQUIREMENTS WITH GREENHOUSE

CONTROLS CONTRACTOR PRIOR TO INSTALLATION.

TO GREENHOUSE ANNUNCIATOR PANEL. COORDINATE

EXACT REQUIREMENTS WITH GREENHOUSE

CONTROLS CONTRACTOR PRIOR TO INSTALLATION.

PPM

REVISIONS

Agricultural

Service Research

DESCRIPTION

SHEET

DATEc P.A.

FIRM

U

NO.

DEPM

SAFETY & HEALTH

REAL PROPERTY

A

DATE

PROJECT NO.

SUSDA

BY

AGRICULTURAL RESEARCH SERVICE

OF

THE

DESIGNER

PROJECT MANAGER

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson M Adams

ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT

USDA AGRICULTURAL RESEARCH SERVICE

US HORTICULTURAL RESEARCH LABORATORY

REPAIR TORNADO DAMAGE

FT. PIERCE, FL

ELECTRICAL DETAILS

E-002 88 10804/27/2026

BP

EH

BTD

FT. PIERCE, FL

XXX

XXX

XXX

XXX

XXX

1000/3

125/3 125/3

EXISTING PANEL 1VA, 1200A, 208Y/120V, 3Ø, 4W

125/3 125/3 60/3 60/3 125/3 125/3 60/3 90/3 60/3

TO XFMR T14

(300kVA, Z=5.87%)

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

GREENHOUSE 109

AFC: 4,278A

VD(%): 0.53%

[ASSUMED 75']

PANEL '1GC'

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

GREENHOUSE 101 & 102

AFC: 3,623A

VD(%): 1.35%

[ASSUMED 230']

PANEL '1GW'

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

GREENHOUSE 119 & 120

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

GREENHOUSE 113 & 114

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

PANEL '1GM'

[ASSUMED 160'] AFC: 4,684A

VD(%): 0.94%

GREENHOUSE 123 & 124

[ASSUMED 170'] AFC: 4,496A

VD(%): 1.00%

PANEL '1GH'

PANEL '1GK'

[ASSUMED 150'] AFC: 4,888A

VD(%): 0.88%

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

GREENHOUSE 111 & 112

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

GREENHOUSE 110

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

GREENHOUSE 129

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

GREENHOUSE 121

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

GREENHOUSE 117 & 118

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

GREENHOUSE 103

[ASSUMED 130'] AFC: 2,830A

VD(%): 0.93%

PANEL '1GA'

[ASSUMED 190'] AFC: 3,010A

VD(%): 1.28%

PANEL '1GS'

[ASSUMED 145'] AFC: 2,590A

VD(%): 1.03%

PANEL '1GL'

[ASSUMED 100'] AFC: 6,255A

VD(%): 0.59%

PANEL '1GD'

[ASSUMED 145'] AFC: 4,998A

VD(%): 0.85%

PANEL '1GB'

[ASSUMED 225'] AFC: 1,785A

VD(%): 1.60%

PANEL '1GX'

AFC: 14,186A

VD(%): 0.03%

60125 60 60 6090125 125 125 125 125

1000/3

125/3 125/3

EXISTING PANEL 1VB, 1200A, 208Y/120V, 3Ø, 4W

90/3 60/3 60/3 90/3 90/3 60/3 60/3 60/3 125/3

TO XFMR T15

(300kVA, Z=5.87%)

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

GREENHOUSE 109

PANEL '1GG'

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

GREENHOUSE 104

PANEL '1GU'

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

GREENHOUSE 130

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

GREENHOUSE 125 & 126

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

PANEL '1GF'

GREENHOUSE 107 & 108

PANEL '1GN'

PANEL '1GR'

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

GREENHOUSE 128

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

GREENHOUSE 105 & 106

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

GREENHOUSE 122

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

GREENHOUSE 127

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

GREENHOUSE 115

SEE PANEL SCHEDULE

FOR EXACT INFORMATION

GREENHOUSE 131

PANEL '1GV'

PANEL '1GE'

PANEL '1GP'

PANEL '1GJ'

PANEL '1GQ'

PANEL '1GT'

AFC: 14,186A

VD(%): 0.03%

AFC: 2,020A

VD(%): 1.39%

[ASSUMED 195']

AFC: 2,065A

VD(%): 1.35%

[ASSUMED 190']

AFC: 2,727A

VD(%): 1.44%

[ASSUMED 215']

AFC: 4,161A

VD(%): 1.11%

[ASSUMED 190']

AFC: 3,941A

VD(%): 1.20%

[ASSUMED 205']

AFC: 4,240

VD(%): 1.08%

[ASSUMED 185']

AFC: 5,937A

VD(%): 0.32%

[ASSUMED 45']

AFC: 2,270A

VD(%): 1.21%

[ASSUMED 170']

AFC: 2,216A

VD(%): 1.25%

[ASSUMED 175']

AFC: 2,833A

VD(%): 1.38%

[ASSUMED 205']

AFC: 2,890A

VD(%): 1.34%

[ASSUMED 200']

1 1

6090125 60125 90 90 12560 60 60

PPM

REVISIONS

Agricultural

Service Research

DESCRIPTION

SHEET

DATEc P.A.

FIRM

U

NO.

DEPM

SAFETY & HEALTH

REAL PROPERTY

A

DATE

PROJECT NO.

SUSDA

BY

AGRICULTURAL RESEARCH SERVICE

OF

THE

DESIGNER

PROJECT MANAGER

JOB #

CHECKED BY

A-E FIRM

P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943

Johnson M Adams

ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT

USDA AGRICULTURAL RESEARCH SERVICE

US HORTICULTURAL RESEARCH LABORATORY

REPAIR TORNADO DAMAGE

FT. PIERCE, FL

SINGLE LINE DIAGRAM

E-601 89 10804/27/2026

BP

EH

BTD

FT. PIERCE, FL

XXX

XXX

XXX

XXX

XXX

AFC: xxxxxA

EXISTING

NEW

X

1. EXISTING CONDUIT AND CIRCUITRY TO REMAIN

AND BE UTILIZED TO FEED NEW INSTALLATION.

2. EXTEND CIRCUITRY TO NEW PANEL AS

REQUIRED. UTILIZE INSULATED POLARIS LUGS

OR EQUAL (TYPICAL OF ALL PANELS). SPLICE

MUST OCCUR IN ACCESSIBLE LOCATION.

PROVIDE NEMA 4X BOX BELOW PANEL WHERE

SPLICE IS REQUIRED. SEE FEEDER SCHEDULE

FOR WIRE SIZE

CALCULATED AVAILABLE FAULT CURRENT

- (ALL SWITCHBOARDS, SWITCHGEAR, AND

PANELBOARDS SHALL HAVE THE AVAILABLE

FAULT CURRENT AND THE DATE THE

CALCULATION WAS PERFORMED FIELD

MARKED ON THE ENCLOSURE PER NEC

ARTICLES 408.6 AND 110.21(B)(3).) THE

CALCULATIONS SHALL BE UPDATED BY THE

ELECTRICAL ENGINEER ONCE ALL CIRCUITRY

IS INSTALLED AND CIRCUITRY LENGTHS

DOCUMENTED ON THE "AS-BUILT" DRAWINGS.

CALCULATIONS SHOWN ARE BASED ON THE

ASSUMPTIONS LISTED.

VOLTAGE DROP

- THE VOLTAGE DROP IS CALCULATED BASED

ON THE ASSUMPTIONS LISTED.

VD: X.XX%

SCALE:

SINGLE LINE DIAGRAM

NO SCALE

E601

EXISTING

NEW

FEEDER SCHEDULE

ID FEEDER AMPS FEEDER

60 60 4#4, #8(G)

90 90

125 125

4#2, #8(G)

4#1/0, #6(G)

U

D A

S USDA AGRICULTURAL RESEARCH SERVICE

US HORTICULTURAL RESEARCH LABORATORY

REPAIR TORNADO DAMAGE

FT. PIERCE, FL

ELECTRICAL PANEL SCHEDULES

E-701 90 10804/27/2026

BP

EH

BTD

FT. PIERCE, FL

XXX

XXX

XXX

XXX

XXX

PANEL LOCATION: GREENHOUSE CORRIDOR LUG LOCATION: BOTTOM FEED

1GA VOLT: 208Y/120V, 3Ø, 4W MAIN BUS: 60A MAIN BREAKER NEMA 3R ENCLOSURE

BUS: 100A MOUNTING: SURFACE PANELBOARD SCCR RATING (A): 10,000

CIRCUIT

NO.

BREAKER DESCRIPTION

PHASE LOAD (KVA)

DESCRIPTION BREAKER CIRCUIT

NO.AMPS POLES A B C AMPS POLES

1 20 1 LIGHTING 0.3 0.3 GREENHOUSE 110 EF-1 15 3 2

3 20 1 GREENHOUSE 110 CONTROL PANEL 0.5 0.3 - - - 4

5 20 1 SPARE 0.5 0.3 - - - 6

7 20 1 GREENHOUSE 110 RECS. 0.5 0.3 GREENHOUSE 110 EF-1 15 3 8

9 20 1 GREENHOUSE 110 RECS. 0.5 0.3 - - - 10

11 20 1 GREENHOUSE 110 RECS. 0.7 0.3 - - - 12

13 20 1 GREENHOUSE 110 OVERHEAD RECS. 0.5 0.3 GREENHOUSE 110 EF-1 15 3 14

15 20 1 GREENHOUSE 110 OVERHEAD RECS. 0.5 0.3 - - - 16

17 20 1 GREENHOUSE 110 OVERHEAD RECS. 0.5 0.3 - - - 18

19 20 1 GREENHOUSE 110 OVERHEAD RECS. 0.5 0.2 GREENHOUSE 110 UH-1 20 1 20

21 20 1 GREENHOUSE 110 OVERHEAD RECS. 0.4 0.2 GREENHOUSE 110 UH-1 20 1 22

23 20 1 GREENHOUSE 110 OVERHEAD RECS. 0.4 0.5 GREENHOUSE 110 HF 20 1 24

25 20 1 GREENHOUSE 110 ECP SUMP PUMP 0.5 0.5 GREENHOUSE 110 HF 20 1 26

27 20 1 GREENHOUSE 110 ROOF VENT 0.2 0.0 SPARE 30 1 28

29 20 1 GREENHOUSE 110 SIDE VENT 0.2 0.0 SPARE 20 1 30

31 20 1 SPARE 0.0 0.0 SPARE 20 1 32

33 20 1 SPARE 0.0 0.0 SPARE 20 1 34

35 20 1 SPARE 0.0 0.0 SPARE 20 1 36

37 20 1 SPARE 0.0 0.0 SPARE 20 1 38

39 20 1 SPARE 0.0 0.0 SPARE 20 1 40

41 20 1 SPARE 0.0 0.0 SPARE 20 1 42

TOTAL 4.0 3.2 3.7 * GFCI BREAKER

PANEL LOCATION: GREENHOUSE CORRIDOR LUG LOCATION: BOTTOM FEED

1GC VOLT: 208Y/120V, 3Ø, 4W MAIN BUS: 60A MAIN BREAKER NEMA 3R ENCLOSURE

BUS: 100A MOUNTING: SURFACE PANELBOARD SCCR RATING (A): 10,000

CIRCUIT

NO.

BREAKER DESCRIPTION

PHASE LOAD (KVA)

DESCRIPTION BREAKER CIRCUIT

NO.AMPS POLES A B C AMPS POLES

1 20 1 LIGHTING 0.3 0.3 GREENHOUSE 116 EF-1 15 3 2

3 20 1 GREENHOUSE 116 CONTROL PANEL 0.5 0.3 - - - 4

5 20 1 SPARE 0.5 0.3 - - - 6

7 20 1 GREENHOUSE 116 RECS. 0.5 0.3 GREENHOUSE 116 EF-1 15 3 8

9 20 1 GREENHOUSE 116 RECS. 0.5 0.3 - - - 10

11 20 1 GREENHOUSE 116 RECS. 0.7 0.3 - - - 12

13 20 1 GREENHOUSE 116 OVERHEAD RECS. 0.5 0.3 GREENHOUSE 116 EF-1 15 3 14

15 20 1 GREENHOUSE 116 OVERHEAD RECS. 0.5 0.3 - - - 16

17 20 1 GREENHOUSE 116 OVERHEAD RECS. 0.5 0.3 - - - 18

19 20 1 GREENHOUSE 116 OVERHEAD RECS. 0.5 0.2 GREENHOUSE 116 UH-1 20 1 20

21 20 1 GREENHOUSE 116 OVERHEAD RECS. 0.4 0.2 GREENHOUSE 116 UH-1 20 1 22

23 20 1 GREENHOUSE 116 OVERHEAD RECS. 0.4 0.5 GREENHOUSE 116 HF 20 1 24

25 20 1 GREENHOUSE 116 ECP SUMP PUMP 0.5 0.5 GREENHOUSE 116 HF 20 1 26

27 20 1 GREENHOUSE 116 ROOF VENT 0.2 0.0 SPARE 30 1 28

29 20 1 GREENHOUSE 116 SIDE VENT 0.2 0.0 SPARE 20 1 30

31 20 1 SPARE 0.0 0.0 SPARE 20 1 32

33 20 1 SPARE 0.0 0.0 SPARE 20 1 34

35 20 1 SPARE 0.0 0.0 SPARE 20 1 36

37 20 1 SPARE 0.0 0.0 SPARE 20 1 38

39 20 1 SPARE 0.0 0.0 SPARE 20 1 40

41 20 1 SPARE 0.0 0.0 SPARE 20 1 42

TOTAL 4.0 3.2 3.7 * GFCI BREAKER

PANEL LOCATION: GREENHOUSE CORRIDOR LUG LOCATION: BOTTOM FEED

1GE VOLT: 208Y/120V, 3Ø, 4W MAIN BUS: 60A MAIN BREAKER NEMA 3R ENCLOSURE

BUS: 100A MOUNTING: SURFACE PANELBOARD SCCR RATING (A): 10,000

CIRCUIT

NO.

BREAKER DESCRIPTION

PHASE LOAD (KVA)

DESCRIPTION BREAKER CIRCUIT

NO.AMPS POLES A B C AMPS POLES

1 20 1 LIGHTING 0.3 0.3 GREENHOUSE 122 EF-1 15 3 2

3 20 1 GREENHOUSE 122 CONTROL PANEL 0.5 0.3 - - - 4

5 20 1 SPARE 0.5 0.3 - - - 6

7 20 1 GREENHOUSE 122 RECS. 0.5 0.3 GREENHOUSE 122 EF-1 15 3 8

9 20 1 GREENHOUSE 122 RECS. 0.5 0.3 - - - 10

11 20 1 GREENHOUSE 122 RECS. 0.7 0.3 - - - 12

13 20 1 GREENHOUSE 122 OVERHEAD RECS. 0.5 0.3 GREENHOUSE 122 EF-1 15 3 14

15 20 1 GREENHOUSE 122 OVERHEAD RECS. 0.5 0.3 - - - 16

17 20 1 GREENHOUSE 122 OVERHEAD RECS. 0.5 0.3 - - - 18

19 20 1 GREENHOUSE 122 OVERHEAD RECS. 0.5 0.2 GREENHOUSE 122 UH-1 20 1 20

21 20 1 GREENHOUSE 122 OVERHEAD RECS. 0.4 0.2 GREENHOUSE 122 UH-1 20 1 22

23 20 1 GREENHOUSE 122 OVERHEAD RECS. 0.4 0.5 GREENHOUSE 122 HF 20 1 24

25 20 1 GREENHOUSE 122 ECP SUMP PUMP 0.5 0.5 GREENHOUSE 122 HF 20 1 26

27 20 1 GREENHOUSE 122 ROOF VENT 0.2 1.5 DAC-1 30 1 28

29 20 1 GREENHOUSE 122 SIDE VENT 0.2 0.2 FOYER ENTRANCE UH-1 20 1 30

31 20 1 SPARE 0.0 0.2 WALKWAY UH-1 20 1 32

33 20 1 SPARE 0.0 0.0 SPARE 20 1 34

35 20 1 SPARE 0.0 0.0 SPARE 20 1 36

37 20 1 SPARE 0.0 0.0 SPARE 20 1 38

39 20 1 SPARE 0.0 0.0 SPARE 20 1 40

41 20 1 HALLWAY LIGHTING 0.2 0.0 SPARE 20 1 42

TOTAL 4.1 4.7 4.1 * GFCI BREAKER

PANEL LOCATION: GREENHOUSE CORRIDOR LUG LOCATION: BOTTOM FEED

1GG VOLT: 208Y/120V, 3Ø, 4W MAIN BUS: 60A MAIN BREAKER NEMA 3R ENCLOSURE

BUS: 100A MOUNTING: SURFACE PANELBOARD SCCR RATING (A): 10,000

CIRCUIT

NO.

BREAKER DESCRIPTION

PHASE LOAD (KVA)

DESCRIPTION BREAKER CIRCUIT

NO.AMPS POLES A B C AMPS POLES

1 20 1 LIGHTING 0.3 0.3 GREENHOUSE 109 EF-1 15 3 2

3 20 1 GREENHOUSE 109 CONTROL PANEL 0.5 0.3 - - - 4

5 20 1 SPARE 0.5 0.3 - - - 6

7 20 1 GREENHOUSE 109 RECS. 0.5 0.3 GREENHOUSE 109 EF-1 15 3 8

9 20 1 GREENHOUSE 109 RECS. 0.5 0.3 - - - 10

11 20 1 GREENHOUSE 109 RECS. 0.7 0.3 - - - 12

13 20 1 GREENHOUSE 109 OVERHEAD RECS. 0.5 0.3 GREENHOUSE 109 EF-1 15 3 14

15 20 1 GREENHOUSE 109 OVERHEAD RECS. 0.5 0.3 - - - 16

17 20 1 GREENHOUSE 109 OVERHEAD RECS. 0.5 0.3 - - - 18

19 20 1 GREENHOUSE 109 OVERHEAD RECS. 0.5 0.2 GREENHOUSE 109 UH-1 20 1 20

21 20 1 GREENHOUSE 109 OVERHEAD RECS. 0.4 0.2 GREENHOUSE 109 UH-1 20 1 22

23 20 1 GREENHOUSE 109 OVERHEAD RECS. 0.4 0.5 GREENHOUSE 109 HF 20 1 24

25 20 1 GREENHOUSE 109 ECP SUMP PUMP 0.5 0.5 GREENHOUSE 109 HF 20 1 26

27 20 1 GREENHOUSE 109 ROOF VENT 0.2 0.0 SPARE 30 1 28

29 20 1 GREENHOUSE 109 SIDE VENT 0.2 0.0 SPARE 20 1 30

31 20 1 SPARE 0.0 0.0 SPARE 20 1 32

33 20 1 SPARE 0.0 0.0 SPARE 20 1 34

35 20 1 SPARE 0.0 0.0 SPARE 20 1 36

37 20 1 SPARE 0.0 0.0 SPARE 20 1 38

39 20 1 SPARE 0.0 0.0 SPARE 20 1 40

41 20 1 SPARE 0.0 0.0 SPARE 20 1 42

TOTAL 4.0 3.2 3.7 * GFCI BREAKER

PANEL LOCATION: GREENHOUSE CORRIDOR LUG LOCATION: BOTTOM FEED

1GJ VOLT: 208Y/120V, 3Ø, 4W MAIN BUS: 60A MAIN BREAKER NEMA 3R ENCLOSURE

BUS: 100A MOUNTING: SURFACE PANELBOARD SCCR RATING (A): 10,000

CIRCUIT

NO.

BREAKER DESCRIPTION

PHASE LOAD (KVA)

DESCRIPTION BREAKER CIRCUIT

NO.AMPS POLES A B C AMPS POLES

1 20 1 LIGHTING 0.3 0.3 GREENHOUSE 115 EF-1 15 3 2

3 20 1 GREENHOUSE 115 CONTROL PANEL 0.5 0.3 - - - 4

5 20 1 SPARE 0.5 0.3 - - - 6

7 20 1 GREENHOUSE 115 RECS. 0.5 0.3 GREENHOUSE 115 EF-1 15 3 8

9 20 1 GREENHOUSE 115 RECS. 0.5 0.3 - - - 10

11 20 1 GREENHOUSE 115 RECS. 0.7 0.3 - - - 12

13 20 1 GREENHOUSE 115 OVERHEAD RECS. 0.5 0.3 GREENHOUSE 115 EF-1 15 3 14

15 20 1 GREENHOUSE 115 OVERHEAD RECS. 0.5 0.3 - - - 16

17 20 1 GREENHOUSE 115 OVERHEAD RECS. 0.5 0.3 - - - 18

19 20 1 GREENHOUSE 115 OVERHEAD RECS. 0.5 0.2 GREENHOUSE 115 UH-1 20 1 20

21 20 1 GREENHOUSE 115 OVERHEAD RECS. 0.4 0.2 GREENHOUSE 115 UH-1 20 1 22

23 20 1 GREENHOUSE 115 OVERHEAD RECS. 0.4 0.5 GREENHOUSE 115 HF 20 1 24

25 20 1 GREENHOUSE 115 ECP SUMP PUMP 0.5 0.5 GREENHOUSE 115 HF 20 1 26

27 20 1 GREENHOUSE 115 ROOF VENT 0.2 0.0 SPARE 30 1 28

29 20 1 GREENHOUSE 115 SIDE VENT 0.2 0.0 SPARE 20 1 30

31 20 1 SPARE 0.0 0.0 SPARE 20 1 32

33 20 1 SPARE 0.0 0.0 SPARE 20 1 34

35 20 1 SPARE 0.0 0.0 SPARE 20 1 36

37 20 1 SPARE 0.0 0.0 SPARE 20 1 38

39 20 1 SPARE 0.0 0.0 SPARE 20 1 40

41 20 1 SPARE 0.0 0.0 SPARE 20 1 42

TOTAL 4.0 3.2 3.7 * GFCI BREAKER

PANEL LOCATION: GREENHOUSE CORRIDOR LUG LOCATION: BOTTOM FEED

1GL VOLT: 208Y/120V, 3Ø, 4W MAIN BUS: 60A MAIN BREAKER NEMA 3R ENCLOSURE

BUS: 100A MOUNTING: SURFACE PANELBOARD SCCR RATING (A): 10,000

CIRCUIT

NO.

BREAKER DESCRIPTION

PHASE LOAD (KVA)

DESCRIPTION BREAKER CIRCUIT

NO.AMPS POLES A B C AMPS POLES

1 20 1 LIGHTING 0.3 0.3 GREENHOUSE 121 EF-1 15 3 2

3 20 1 GREENHOUSE 121 CONTROL PANEL 0.5 0.3 - - - 4

5 20 1 SPARE 0.5 0.3 - - - 6

7 20 1 GREENHOUSE 121 RECS. 0.5 0.3 GREENHOUSE 121 EF-1 15 3 8

9 20 1 GREENHOUSE 121 RECS. 0.5 0.3 - - - 10

11 20 1 GREENHOUSE 121 RECS. 0.7 0.3 - - - 12

13 20 1 GREENHOUSE 121 OVERHEAD RECS.