Summary: Construction Drawings for USDA Horticultural Research Laboratory Tornado Damage Repair
This document is a comprehensive set of architectural and engineering construction drawings for repair and reconstruction work at the U.S. Department of Agriculture's Horticultural Research Laboratory located in Ft. Pierce, Florida, with a secondary location at Leesburg, Florida. The project addresses tornado damage repair and involves multiple bid options for phased reconstruction work across three primary sites: the Horticulture Lab (2001 S. Rock Rd., Ft. Pierce), Picos Farm (10001 Picos Rd., Ft. Pierce), and Picos Pond near Ft. Pierce, as well as the Leesburg site (23402 USDA Rd., Groveland).
The base bid and Options 1-3 focus on the Ft. Pierce Horticulture Lab and include demolition of existing greenhouses with complete mechanical, electrical, utilities, and communications infrastructure; provision of new greenhouses with all MEP systems and site paving; repair of tornado-damaged roof ridge caps; and replacement of mechanical units in two adjacent storage buildings. Bid Option 4 extends work to the Picos Farm and Pond sites, requiring demolition of two additional greenhouses and replacement metal buildings covering existing mechanical equipment. Bid Option 5 covers the Leesburg site and includes greenhouse demolition with reskinning of one existing greenhouse structure and provision of a new pesticide/storage building with leveled foundation and MEP utilities. The drawings include 108 sheets covering civil, structural, mechanical, electrical, plumbing, and hazardous materials plans, with detailed specifications for concrete foundations, auger cast piles, pre-engineered metal building systems, and comprehensive site improvements including pavement, drainage, and utility infrastructure.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US HORTICULTURAL RESEARCH LABORATORY
AGRICULTURAL RESEARCH SERVICE
U.S. DEPARTMENT OF AGRICULTURE
FT. PIERCE, FLORIDA
USDA
REPAIR TORNADO DAMAGE
BASE BID, DEMOLISH EXISTING GREENHOUSES COMPLETE,
INCLUDING MECHANICAL/ELECTRICAL, UTILITIES, AND
OTHER ELEMENTS IN INDICATED ON DRAWINGS. PROVIDE
GREENHOUSES AS INDICATED INCLUDING ALL
MECHANICAL/ELECTRICAL UTILITIES, COMMUNICATIONS,
CONTROLS, SCREENING, AND SITE PAVING FOR COMPLETE
AND OPERATIONAL GREENHOUSE FACILITIES. DEMOLISH
AND REPLACE MECHANICAL UNITS IN TWO ADJACENT
STORAGE BUILDINGS AS INDICATED. REPAIR TORNADO
DAMAGED ROOF RIDGE CAP AND REPLACE ALL
NECESSARY ELEMENTS.
BID OPTION #4: DEMOLISH TWO ADDITIONAL GREENHOUSES ON THE PICOS
FARM SITE COMPLETE, INCLUDING
MECHANICAL/ELECTRICAL, UTILITIES, AND OTHER
INDICATED ELEMENTS. PROVIDE GREENHOUSES AS
INDICATED INCLUDING ALL MECHANICAL/ELECTRICAL
UTILITIES, COMMUNICATIONS, CONTROLS, SCREENING,
AND SITE PAVING AS INDICATED. DEMOLISH TWO
STRUCTURES HOUSING MECHANICAL EQUIPMENT NEAR
THE POND ON PICOS FARM TO SLAB. THREE
REPLACEMENT METAL BUILDINGS COVERING OVER ALL
EXISTING MECHANICAL EQUIPMENT.
BID OPTION #5: DEMOLISH EXISTING GREENHOUSES AND MECHANICAL
STORAGE BUILDINGS INCLUDING ALL STRUCTURE,
FOUNDATION, MECHANICAL/ELECTRICAL, UTILITIES, AND
ADJACENT PAVING AND SIDEWALKS AS INDICATED.
REMOVE EXISTING GREENHOUSE PANELING FROM THIRD
GREENHOUSE AND RE-SKIN GREENHOUSE ONTO EXISTING
STRUCTURE. PROVIDE PESTICIDE/STORAGE BUILDING ON
EXISTING SLAB WITH LEVELED FOUNDATION AND
MECHANICAL/ELECTRICAL UTILITIES AS INDICATED.
BASE BID & BID OPTIONS #1-4
LOCATION - FT. PIERCE, FL
BID OPTION #5 LOCATION -
LEESBURG, FL
BASE BID AND BID OPTIONS
#1, #2, #3 - HORTICULTURE
LAB & GREENHOUSES
2001 S. ROCK RD.
FT. PIERCE, FL
FT. PIERCE SITE LOCATIONS
BID OPTION #4 - PICOS
POND SITE
10001 PICOS RD
FT. PIERCE, FL
BID OPTION #4 - PICOS
FARM SITE
10001 PICOS RD
FT. PIERCE, FL
LEESBURG, FL
FT. PIERCE, FL - PICOS
FARM AND POND
BID OPTIONS #1, #2, #3
FT. PIERCE, FL -
HORTICULTURE LAB
LEESBURG SITE LOCATIONS (~150 MILES FROM FT. PIERCE SITE)
BID OPTION #5 - LEESBURG SITE
23402 USDA RD, GROVELAND, FL
PPM
REVISIONS
Agricultural
Service Research
DESCRIPTION
SHEET
DATE
U
NO.
DEPM
SAFETY & HEALTH
REAL PROPERTY
A
DATE
PROJECT NO.
SUSDA
BY
AGRICULTURAL RESEARCH SERVICE
OF
DESIGNER
PROJECT MANAGER
JOB #
CHECKED BY
A-E FIRM
c P.A.
FIRMTHE
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson M Adams
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
USDA AGRICULTURAL RESEARCH SERVICE
US HORTICULTURAL RESEARCH LABORATORY
REPAIR TORNADO DAMAGE
FT. PIERCE, FL
TITLE SHEET
G100 1 10804/27/26
BP
BP
JGM
SOUTHEAST AREA
STONEVILLE, MS
XXX
XXX
XXX
XXX
XXX
VICINITY MAP NO SCALE LOCATION MAP NO SCALE BID DESCRIPTION
FLORIDA'S TPIKE
PICOS RD
PRUITT RESEARCH RD
R O
C K
R D
U
SD
A R
D
BRIDGES RD
PICOS RD
AutoCAD SHX Text N
AutoCAD SHX Text N
BrandonBurton
4825 BP STAMP 260427
INDEX OF DRAWINGS
SHEET
NUMBER DRAWING NO. TITLE
INDEX OF DRAWINGS
SHEET
NUMBER DRAWING NO. TITLE
PPM
REVISIONS
Agricultural
Service Research
DESCRIPTION
SHEET
DATE
U
NO.
DEPM
SAFETY & HEALTH
REAL PROPERTY
A
DATE
PROJECT NO.
SUSDA
BY
AGRICULTURAL RESEARCH SERVICE
OF
DESIGNER
PROJECT MANAGER
JOB #
CHECKED BY
A-E FIRM
c P.A.
FIRMTHE
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson M Adams
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
USDA AGRICULTURAL RESEARCH SERVICE
US HORTICULTURAL RESEARCH LABORATORY
REPAIR TORNADO DAMAGE
FT. PIERCE, FL
DRAWING INDEX
G101 2 10804/27/26
BP
BP
JGM
SOUTHEAST AREA
STONEVILLE, MS
XXX
XXX
XXX
XXX
XXX
G100 1 OF 108 TITLE SHEET
G101 2 OF 108 DRAWING INDEX
G102 3 OF 108 KEY PLANS
G103 4 OF 108 BID OPTIONS PLAN - HORTICULTURE LAB
C100 5 OF 108 GENERAL NOTES
C101 6 OF 108 CIVIL PLAN
C102 7 OF 108 LEESBURG DEMO PLAN BID OPTION 5
S100 8 OF 108 STRUCTURAL NOTES
S101 9 OF 108 STRUCTURAL PLAN
S102 10 OF 108 STRUCTURAL PLAN BID OPTION #1
S103 11 OF 108 STRUCTURAL PLAN BID OPTION #2 & #3
S104 12 OF 108 STRUCTURAL PLAN BID OPTION #4
S105 13 OF 108 STRUCTURAL PLAN BID OPTION #4, POND
S106 14 OF 108 LEESBURG STRUCTURAL PLAN: BID OPTION #5
S107 15 OF 108 LEESBURG STRUCTURAL DETAILS
HM101 16 OF 108 HAZARDOUS MATERIALS PLAN - LEESBURG
A001 17 OF 108 LEGENDS AND ABBREVIATIONS
AD101 18 OF 108 DEMOLITION PLAN
AD102 19 OF 108 DEMOLITION PLAN - BID OPTION #1
AD103 20 OF 108 DEMOLITION PLAN - BID OPTION #2
AD104 21 OF 108 DEMOLITION PLAN - BID OPTION #3
AD105 22 OF 108 DEMOLITION PLANS - PICOS FARM - BID OPTION #4
AD106 23 OF 108 DEMOLITION PLANS - PICOS POND - BID OPTION #4
AD107 24 OF 108 DEMOLITION PLANS - LEESBURG - BID OPTION #5
AD201 25 OF 108 DEMOLITION PHOTOS - HORTICULTURE LAB
AD202 26 OF 108 DEMOLITION PHOTOS - PICOS FARM & POND SITES
AD203 27 OF 108 DEMOLITION PHOTOS - LEESBURG
A101 28 OF 108 RENOVATION PLAN
A102 29 OF 108 RENOVATION PLAN - BID OPTION #1
A103 30 OF 108 RENOVATION PLAN - BID OPTION #2
A104 31 OF 108 RENOVATION PLAN - BID OPTION #3
A105 32 OF 108 RENOVATION PLANS - PICOS FARM - BID OPTION #4
A106 33 OF 108 RENOVATION PLANS - PICOS POND - BID OPTION #4
A107 34 OF 108 RENOVATION PLAN - LEESBURG - BID OPTION #5
A121 35 OF 108 ROOF PLAN - HORTICULTURE LAB
A122 36 OF 108 ROOF PLANS - PICO FARM & POND
A123 37 OF 108 ROOF PLANS - LEESBURG SITE
A201 38 OF 108 EXTERIOR ELEVATIONS
A202 39 OF 108 EXTERIOR ELEVATIONS - BID OPTION #1
A203 40 OF 108 EXTERIOR ELEVATIONS - BID OPTION #2
A204 41 OF 108 EXTERIOR ELEVATIONS - BID OPTION #3
A205 42 OF 108 EXTERIOR ELEVATIONS - PICOS FARM
A206 43 OF 108 EXTERIOR ELEVATIONS - PICOS FARM
A207 44 OF 108 EXTERIOR ELEVATIONS - PICOS POND
A208 45 OF 108 EXTERIOR ELEVATIONS - LEESBURG
A301 46 OF 108 SECTIONS
A302 47 OF 108 SECTIONS
A501 48 OF 108 DETAILS
A502 49 OF 108 DETAILS
A503 50 OF 108 DETAILS
A601 51 OF 108 DOOR SCHEDULES & INT. ELEVATION
FA101 52 OF 108 OVERALL SITE FIRE ALARM PLAN
PD100 53 OF 108 OVERALL PLUMBING DEMOLITION PLAN
PD101 54 OF 108 PLUMBING PLAN DEMOLITION
PD102 55 OF 108 PLUMBING PLAN DEMOLITION - BID OPTION #1
PD103 56 OF 108 PLUMBING PLAN DEMOLITION - BID OPTION #2
PD104 57 OF 108 PLUMBING PLAN DEMOLITION - BID OPTION #3
PD105 58 OF 108 PLUMBING PLAN DEMOLITION - BID OPTION #4
PD106 59 OF 108 PLUMBING PLAN DEMOLITION - BID OPTION #5
P-100 60 OF 108 OVERALL PLUMBING PLAN
P-101 61 OF 108 PLUMBING PLAN RENOVATION
P-102 62 OF 108 PLUMBING PLAN RENOVATION - BID OPTION #1
P-103 63 OF 108 PLUMBING PLAN RENOVATION - BID OPTION #2
P-104 64 OF 108 PLUMBING PLAN RENOVATION - BID OPTION #3
P-105 65 OF 108 PLUMBING PLAN BID OPTION #4
P-106 66 OF 108 PLUMBING PLAN BID OPTION #5
P-601 67 OF 108 PLUMBING SCHEDULES
P-602 68 OF 108 PLUMBING DETAILS
MD100 69 OF 108 OVERALL MECHANICAL DEMOLITION PLAN
MD101 70 OF 108 MECHANICAL PLAN DEMOLITION
MD102 71 OF 108 MECHANICAL PLAN DEMOLITION - BID OPTION #1
MD103 72 OF 108 MECHANICAL PLAN DEMOLITION - BID OPTION #2
MD104 73 OF 108 MECHANICAL PLAN DEMOLITION - BID OPTION #3
MD105 74 OF 108 MECHANICAL DEMOLITION PLAN BID OPTION #4
MD106 75 OF 108 MECHANICAL DEMOLITION PLAN BID OPTION #5
MD401 76 OF 108 ENLARGED MECHANICAL DEMOLITION PLAN
M-100 77 OF 108 OVERALL MECHANICAL PLAN
M-101 78 OF 108 MECHANICAL PLAN RENOVATION
M-102 79 OF 108 MECHANICAL PLAN RENOVATION - BID OPTION #1
M-103 80 OF 108 MECHANICAL PLAN RENOVATION - BID OPTION #2
M-104 81 OF 108 MECHANICAL PLAN RENOVATION - BID OPTION #3
M-105 82 OF 108 MECHANICAL PLAN RENOVATION - BID OPTION #4
M-106 83 OF 108 MECHANICAL PLAN RENOVATION - BID OPTION #5
M-401 84 OF 108 ENLARGED MECHANICAL PLAN - BID OPTION #1
M-601 85 OF 108 MECHANICAL SCHEDULES
M-602 86 OF 108 MECHANICAL DETAILS
E-001 87 OF 108 ELECTRICAL LEGEND
E-002 88 OF 108 ELECTRICAL DETAILS
E-601 89 OF 108 SINGLE LINE DIAGRAM
E-701 90 OF 108 ELECTRICAL PANEL SCHEDULES
E-702 91 OF 108 ELECTRICAL PANEL SCHEDULES
ED100 92 OF 108 OVERALL ELECTRICAL DEMOLITION PLAN
ED101 93 OF 108 ENLARGED ELECTRICAL DEMOLITION PLAN
ED102 94 OF 108 BID OPTION #4 ELECTRICAL DEMOLITION PLAN
ED103 95 OF 108 BID OPTION #5 ELECTRICAL DEMOLITION PLAN
ED104 96 OF 108 BID OPTION #5 ELECTRICAL DEMOLITION PLAN
EL101 97 OF 108 BASE BID LIGHTING PLAN
EL102 98 OF 108 BID OPTION #1 LIGHTING PLAN
EL103 99 OF 108 BID OPTION #2 & #3 LIGHTING PLAN
EL201 100 OF 108 NORMAL LIGHTING CALCULATIONS
EL202 101 OF 108 EMERGENCY LIGHTING CALCULATIONS
EL501 102 OF 108 FIXTURE SCHEDULE & DETAILS
EP101 103 OF 108 OVERALL SITE POWER PLAN
EP102 104 OF 108 BID OPTION #4 ELECTRICAL PLAN
EP103 105 OF 108 BID OPTION #5 ELECTRICAL PLAN
EP401 106 OF 108 ENLARGED GREENHOUSE POWER PLAN
EP402 107 OF 108 ENLARGED MAINTENANCE GARAGE POWER PLAN
EY101 108 OF 108 LIGHTNING PROTECTION PLAN
S
FF
A R
D
PICOS RD
S FFA RD
FLORIDA'S TPIKE
BRIDGES RD
U
SD
A R
D
ROOF DAMAGE REPAIR
LOCATION
SCALE:
HORTICULTURE LAB KEYPLAN - BASE BID AND BID OPTIONS #1-3
1"=50'-0"
G101 SCALE:
PICOS FARM KEYPLAN - BID OPTION #4
1"=50'-0"
G101
REPLACE
GREENHOUSE
REPLACE
HOOPHOUSE
SCALE:
PICOS POND KEYPLAN - BID OPTION #4
1"=50'-0"
G101
REPLACE
METAL BUILDINGS
NEW METAL
BUILDING ON
EXISTING SLAB
SCALE:
LEESBURG KEYPLAN - BID OPTION #5
1"=50'-0"
G101
DEMO
GREENHOUSES
RESKIN
GREENHOUSE
NEW
PESTICIDE
BUILDING
LOCATION
DEMO
EXISTING
MECHANICAL
BUILDINGS
N
N
N
N
MAIN RESEARCH
BUILDING
PPM
REVISIONS
Agricultural
Service Research
DESCRIPTION
SHEET
DATE
U
NO.
DEPM
SAFETY & HEALTH
REAL PROPERTY
A
DATE
PROJECT NO.
SUSDA
BY
AGRICULTURAL RESEARCH SERVICE
OF
DESIGNER
PROJECT MANAGER
JOB #
CHECKED BY
A-E FIRM
c P.A.
FIRMTHE
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson M Adams
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
USDA AGRICULTURAL RESEARCH SERVICE
US HORTICULTURAL RESEARCH LABORATORY
REPAIR TORNADO DAMAGE
FT. PIERCE, FL
KEY PLANS
G102 3 10804/27/26
BP
BP
JGM
SOUTHEAST AREA
STONEVILLE, MS
XXX
XXX
XXX
XXX
XXXSCALE:1"=50'-0"
0 50'50' 25'
A B
C
A121
MEP WORK ONLY
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
SCREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
125 GREENHOUSE
AIR COND.
GREENHOUSE
GREENHOUSE
AIR COND.
GREENHOUSE
AIR COND.
GREENHOUSE
AIR COND.
GREENHOUSE
STORAGE BUILDING
STORAGE BUILDING
PPM
REVISIONS
Agricultural
Service Research
DESCRIPTION
SHEET
DATE
U
NO.
DEPM
SAFETY & HEALTH
REAL PROPERTY
A
DATE
PROJECT NO.
SUSDA
BY
AGRICULTURAL RESEARCH SERVICE
OF
DESIGNER
PROJECT MANAGER
JOB #
CHECKED BY
A-E FIRM
J:\ gre en wo od \20
Jo bs \48
US
DA
To rna do
Da ma ge Re pa ir F
t. P ier ce
FL
\07 W ork ing
Fo lde r\A rch
\G
3.d wg
Ap r 2
7,
- 9
:25 am c P.A.
FIRMTHE
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson M Adams
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
USDA AGRICULTURAL RESEARCH SERVICE
US HORTICULTURAL RESEARCH LABORATORY
REPAIR TORNADO DAMAGE
FT. PIERCE, FL
BID OPTIONS PLAN - HORTICULTURE LAB
G103 4 10804/27/26
BP
BP
JGM
SOUTHEAST AREA
STONEVILLE, MS
XXX
XXX
XXX
XXX
XXX
BID OPTION LEGEND
BASE BID
BID OPTION #1
BID OPTION #2
SCALE: 1/16" = 1'-0"
48'8' 16' 32'0
SCALE:
BID OPTIONS PLAN - HORTICULTURE LAB
1/16"=1'-0"
G102
SEE MECH. / ELECT. DWGS
N
NEW SIDEWALK - SEE CIVIL
KEYPLAN
NTS
GENERAL NOTE
WORK DONE ON HORTICULTURE LAB ROOF REPAIRS IS IN
BASE BID.
N
BID OPTION #3
PPM
REVISIONS
Agricultural
Service Research
DESCRIPTION
SHEET
DATE
U
NO.
DEPM
SAFETY & HEALTH
REAL PROPERTY
A
DATE
PROJECT NO.
SUSDA
BY
AGRICULTURAL RESEARCH SERVICE
OF
DESIGNER
PROJECT MANAGER
JOB #
CHECKED BY
A-E FIRM
J:\ gre en wo od \20
Jo bs \48
US
DA
To rna do
Da ma ge Re pa ir F
t. P ier ce
FL
\07 W ork ing
Fo lde r\C ivil
\Dr aw ing s\C
0.d wg Ap r 2 7,
- 8 :58 am c P.A.
FIRMTHE
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson M Adams
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
USDA AGRICULTURAL RESEARCH SERVICE
US HORTICULTURAL RESEARCH LABORATORY
REPAIR TORNADO DAMAGE
FT. PIERCE, FL
GENERAL NOTES
C100 5 10804/27/26
BP
BP
JGM
SOUTHEAST AREA
STONEVILLE, MS
XXX
XXX
XXX
XXX
XXX
DEMOLITION NOTES
D-1 ANY DAMAGE CAUSED BY CONSTRUCTION OPERATIONS SHALL BE REPAIRED TO MATCH THE EXISTING
CONDITIONS AT NO COST TO THE GOVERNMENT.
D-2 AT A MINIMUM, PROVIDE 4' TALL TEMPORARY ORANGE HIGH DENSITY POLYETHYLENE SAFETY FENCE TO
ISOLATE HAZARD AND CONSTRUCTION FROM UNAUTHORIZED ACCESS.
D-3 CARE SHALL BE TAKEN IN ALL OPEN SUB-GRADES TO PREVENT DETERIORATION CAUSED BY WEATHER.
DE-WATER ALL OPEN SUB-GRADES AS REQUIRED TO MAINTAIN STABILITY.
D-4 AT A MINIMUM, PROVIDE TEMPORARY TRAFFIC CONTROL AS REQUIRED FOR PHASING AND CONSTRUCTION.
ALL WORK SHALL CONFORM WITH THE REQUIREMENTS OF THE MANUAL OF UNIFORM TRAFFIC CONTROL
DEVICES (MUTCD). THE CONTRACTOR SHALL PROVIDE ADDITIONAL TRAFFIC CONTROL PER THE
REQUIREMENT OF THE CURRENT EDITION OF THE MANUAL OF UNIFORM TRAFFIC CONTROL DEVISES AS
REQUIRED FOR SAFETY AND CONSTRUCTION STAGING.
D-5 THE CONTRACTOR SHALL CONTROL THE SPREAD OF DUST AND IRRITANTS TO OTHER SPACES, ADJACENT
BUILDINGS AND OUTSIDE OF DESIGNATED WORK AREAS.
D-6 THE CONTRACTOR SHALL PROVIDE CLEAN, STRAIGHT, NEAT CUTS FOR DEMOLITION THAT MINIMIZE IMPACTS AND ADVERSE AFFECTS ON EXISTING FINISHES. COORDINATE THE LOCATION OF THE CUTS TO
ACCOMMODATE FINAL FINISHES.
D-7 IT IS THE CONTRACTOR'S RESPONSIBILITY TO ENSURE THE SAFETY AND STABILITY OF ALL COMPONENTS
DURING CONSTRUCTION.
GENERAL NOTES
GN-1 REVIEW ALL PROJECT DOCUMENTS PRIOR TO START OF CONSTRUCTION. REPORT ANY DISCREPANCIES, ERRORS, INCONSISTENCIES, OR OMISSIONS TO THE CONTRACTING OFFICER PRIOR TO PROCEEDING WITH WORK. DIMENSIONS RELATING TO EXISTING CONSTRUCTION ARE TO BE FIELD VERIFIED. THE CONTRACTOR SHALL IMMEDIATELY COMMUNICATE, IN WRITING, CONCERNS WHERE THEY BELIEVE DESIGN DOCUMENTS ARE INSUFFICIENT, INADEQUATE, OR INCORRECT FOR PERFORMING THE CONSTRUCTION WORK. THE CONTRACTOR IS RESPONSIBLE FOR CORRECTING ANY ERROR AFTER THE START OF CONSTRUCTION
WHICH HAS NOT BEEN BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER.
GN-2 EXISTING UTILITIES ARE SHOWN IN THEIR APPROXIMATE LOCATIONS AS LOCATED AT THE TIME OF THE DESIGN SITE VISIT. THE CONTRACTOR SHALL VERIFY THE LOCATION OF ALL UTILITIES (WHETHER SHOWN OR NOT), NOTE EXISTING CONDITIONS, AND NOTE ANY VARIANCES TO THE CONTRACTING OFFICER PRIOR TO BEGINNING CONSTRUCTION. UNDERGROUND UTILITIES AND OBSTRUCTIONS WERE NOT IDENTIFIED DURING THE DESIGN OF THIS PROJECT. THE EXTENT OF UNDERGROUND UTILITIES IS UNKNOWN. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROTECT ALL EXISTING CONSTRUCTION DURING EXCAVATION, LOCATE ALL EXISTING UTILITIES, AND BEAR ALL EXPENSES OF REPAIR OR REPLACEMENT OF UTILITIES OR OTHER
PROPERTY DAMAGED BY OPERATIONS IN CONJUNCTION WITH THE PERFORMANCE OF THE WORK.
GN-3 COORDINATE WORK WITH ALL TRADES.
GN-4 ALL DETAILS AND SECTIONS ON THE DRAWINGS ARE INTENDED TO BE TYPICAL AND SHALL BE CONSTRUED
TO APPLY TO ANY SIMILAR SITUATION ELSEWHERE ON THE PROJECT EXCEPT WHERE A SEPARATE DETAIL
IS SHOWN.
GN-5 VERIFY EXISTING CONDITIONS, ELEVATIONS, AND LOCATIONS TO BE JOINED BEFORE CONSTRUCTION.
WHEN SPECIFIC INFORMATION IS INCORRECT, MISSING, OR IN CONFLICT, BRING THE CONFLICT TO THE ATTENTION OF THE CONTRACTING OFFICER PRIOR TO BEGINNING WORK RELATED TO THAT ITEM. IF THEY
DIFFER FROM THOSE SHOWN ON THE DRAWINGS, NOTIFY THE CONTRACTING OFFICER SO THAT
MODIFICATIONS CAN BE MADE BEFORE PROCEEDING WITH THE WORK.
GN-6 THE CONTRACTOR SHALL TAKE CARE, BY THE USE OF GRADING, DIVERSION, AND DE-WATERING, TO
PREVENT PONDING OF WATER ON SITE IN AREAS OF STRUCTURAL AND PAVEMENT SUB-GRADES.
GN-7 THE CONTRACTOR SHALL PROVIDE AS-BUILT DRAWINGS OF ALL NEW UTILITIES AND SERVICES.
GN-8 PRODUCTS SHALL BE INSTALLED PER THE MORE STRINGENT REQUIREMENTS OF THE DESIGN DOCUMENTS
OR THE MANUFACTURER'S PRINTED INSTRUCTIONS FOR THE INDICATED APPLICATION. THESE
INSTRUCTIONS SHALL BE MAINTAINED ON SITE FOR THE DURATION OF THE INSTALLATION AT A MINIMUM.
GN-9 AT THE COMPLETION OF GRADING, THE CONTRACTOR SHALL RE-SPREAD 4" OF TOPSOIL ON ALL DISTURBED UNIMPROVED AREAS, AS REQUIRED TO ESTABLISH VEGETATIVE COVER. AT THE COMPLETION OF THE
PROJECT, HAUL EXCESS OFF SITE.
GN-10 TEMPORARY SEED OR STABILIZE ALL AREAS OF EXPOSED EARTH THAT ARE PLANNED TO BE UNFINISHED
OR UNWORKED FOR A PERIOD EXCEEDING 14 DAYS.
GN-11 THE CONTRACTOR IS RESPONSIBLE FOR THE COMPLETE SECURITY OF THE SITE WHILE JOB IS IN
PROGRESS AND UNTIL JOB IS COMPLETED.
GN-12 ALL DEBRIS SHALL BE REMOVED FROM THE PREMISES BY CONTRACTOR AND ALL AREAS SHALL BE LEFT IN
CLEAN CONDITION AT ALL TIMES.
GN-13 CONTRACTOR SHALL TAKE ALL NECESSARY PRECAUTIONS TO ENSURE THE SAFETY OF THE OCCUPANTS
AND WORKERS AT ALL TIMES.
GN-14 THE CONTRACTOR SHALL PROVIDE TEMPORARY WATER, POWER, PHONE, AND TOILET FACILITIES AS
REQUIRED.
GN-15 ALL DIMENSIONS ARE TO ONE SIDE OF WALL UNLESS SHOWN OTHERWISE. DIMENSIONS TAKE PRECEDENCE OVER DRAWINGS. DO NOT SCALE DRAWINGS TO DETERMINE ANY LOCATIONS. THE CONTRACTING OFFICER
SHALL BE NOTIFIED OF ANY DISCREPANCY PRIOR TO CONTINUING WITH WORK.
GN-16 ALL CONSTRUCTION SHALL COMPLY WITH ALL GOVERNING BUILDING CODES AND ORDINANCES.
GN-17 THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL CONSTRUCTION MEANS AND SHALL MAINTAIN THE
STRUCTURAL INTEGRITY OF ANY CONSTRUCTION UNTIL ALL FINISH LOAD CARRYING SYSTEMS ARE
COMPLETE.
PERMIT NOTES
P-1 THE CONTRACTOR SHALL APPLY FOR, OBTAIN AND COMPLY WITH ALL REQUIRED PERMITS.
P-2 COPIES OF ALL PERMITS SHALL BE MAINTAINED ON SITE. HARD COPIES OF ALL PERMITS SHALL BE
PROVIDED TO THE CONTRACTING OFFICER.
SPECIAL CONDITIONS
SC-1 THE CONTRACTOR SHALL CAREFULLY EXAMINE THE CONTRACT DOCUMENTS AND SECURE FROM THE
CONTRACTING OFFICER ADDITIONAL INFORMATION, IF NECESSARY, THAT MAY BE REQUISITE TO A CLEAR
AND FULL UNDERSTANDING OF THE WORK.
SC-2 ANY WORK OR MATERIAL WHICH IS NOT DIRECTLY OR INDIRECTLY NOTED IN THE SPECIFICATIONS AND DRAWINGS, BUT IS NECESSARY FOR THE PROPER EXECUTION OF THE WORK TO BE UNDERSTOOD AS “IMPLIED”, ANY DISCREPANCIES BETWEEN DRAWINGS AND SPECIFICATIONS MUST BE REPORTED TO THE ENGINEER/ARCHITECT FOR CORRECTION AND INTERPRETATION BEFORE THE WORK IS EXECUTED.
SC-3 PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR SHALL MAKE CERTAIN THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED, NO CONSTRUCTION FABRICATION SHALL BEGIN UNTIL THE CONTRACTOR HAS RECEIVED AND THOROUGHLY REVIEWED ALL PLANS AND OTHER DOCUMENTS
APPROVED BY ALL OF THE PERMITTING AUTHORITIES.
SC-4 ALL WORK SHALL BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECS. AND THE REQUIREMENTS AND STANDARDS OF THE LOCAL, STATE, AND FEDERAL GOVERNING AUTHORITIES.
PREPARATION AND SAFETY
PS-1 THE CONTRACTOR SHALL PERFORM ALL WORK IN A SAFE AND ORDERLY MANNER, AVOIDING HAZARDOUS
CONDITIONS.
PS-2 THE CONTRACTOR SHALL ERECT SUITABLE BARRIERS AROUND HAZARDOUS DEMOLITION AND
CONSTRUCTION AREAS TO DETOUR PEDESTRIAN TRAFFIC AND PREVENT NORMAL ACCESS TO SUCH AREAS
BY UNAUTHORIZED PERSON.
PS-3 THE CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH APPLICABLE SAFETY CODES AND
STANDARDS.
CONTRACTOR NOTES
CN-1 THE CONTRACTOR SHALL PROVIDE FULL TIME SUPERVISION AS REQUIRED TO DIRECT THE WORK
REQUIRED.
CN-2 THE CONTRACTOR SHALL PERFORM ALL WORK AS SHOWN OR IMPLIED IN COMPLIANCE WITH ALL STATE OF
FLORIDA AND FEDERAL CODES, RULES, AND REGULATIONS.
FOUNDATION NOTES
FN-1 FOUNDATIONS ARE DESIGNED FOR AN ALLOWABLE GROSS BEARING PRESSURE OF 2200 PSF. FOR FOOTING
FOUNDED APPROXIMATELY 16 INCHES BELOW FINAL GRADE, CONTRACTOR MUST VERIFY BEARING
CAPACITY OF SOIL.
FN-2 THE MAXIMUM ALLOWABLE SOIL PRESSURE FOR REINFORCED CONCRETE SPREAD FOOTINGS BEARING A
MINIMUM OF 18 INCHES BENEATH THE FINISH SUBGRADE ELEVATION IS 2500 PSF.
FN-3 PROTECT PIPES & CONDUITS RUNNING THROUGH WALLS & SLABS WITH 1/2 INCH EXPANSION MATERIAL.
LOWER CONTINUOUS FOOTINGS & GRADE BEAMS PERPENDICULAR TO PIPE RUNS TO ALLOW PIPES TO PASS ABOVE THE FOOTINGS OR THROUGH THE GRADE BEAMS. ALTERNATIVELY, PROVIDE A CONCRETE JACKET IF PIPES ARE LOW ENOUGH TO BE PLACED BELOW THE FOOTINGS & GRADE BEAMS. LOWER FOOTINGS & GRADE BEAMS PARALLEL TO PIPE RUNS TO AVOID SURCHARGE ONTO ADJACENT TRENCH
EXCAVATIONS.
FN-4 MAINTAIN SUBGRADE & FILL MOISTURE CONTENT UNTIL FOUNDATIONS ARE PLACED.
FN-5 DO NOT PLACE FOOTINGS OR SLABS AGAINST SUBGRADE CONTAINING FREE WATER, FROST, OR ICE.
FN-6 MAINTAIN PROPER SITE DRAINAGE DURING CONSTRUCTION TO ENSURE SURFACE RUNOFF AWAY FROM
STRUCTURES & TO PREVENT PONDING OF SURFACE RUNOFF NEAR THE STRUCTURES.
FN-7 KEEP OPEN EXCAVATIONS AROUND BUILDING PERMETER DRY. BACK FILL AGAINST FOUNDATIONS & GRADE
BEAMS AS SOON AS PRACTICAL. PUMP WATER OUT & DRY OPEN EXCVATIONS, IF FLOODED PRIOR TO
BACKFILLING.
BUILDING PAD PREPARATION NOTES
BP-1 THE AREAS TO RECEIVE SELECT FILL SHALL BE STRIPPED OF ALL VEGETATION, EXISTING FILL, & SOFT OR
DISTURBED SOILS. THE EXCAVATED AREA SHALL BE OBSERVED BY THE SOILS ENGINEER PRIOR TO
PLACING DENSITY-CONTROLLED SELECT CLAYEY FILL.
BP-2 THE EXPOSED GRADE SHALL BE SCARIFIED TO A MINIMUM DEPTH OF 8 INCHES, MOISTENED TO A CONTENT OF -2 TO +4 PERCENT OF OPTIMUM & RECOMPACTED TO A MINIMUM OF 95% OF THE ASTM D-698.
BP-3 SELECT FILL, CONSISTING OF SOIL APPROVED BY A SOILS ENGINEER, SHALL BE PLACED IN COMPACTED
LAYERS WITH SUITABLE COMPACTION EQUIPMENT.
BP-4 ANY TRASH & DEBRIS IN THE EXISTING FILL SHALL BE REMOVED DURING GRADING.
BP-5 PLACE SUBSEQUENT LIFTS OF SELECT FILL IN THIN HORIZONTAL LAYERS NOT EXCEEDING EIGHT INCHES
ON LOOSE THICKNESS & COMPACT EACH LIFT TO AT LEAST 95% OF ASTM D-698. MAINTAIN MOISTURE
WITHIN TWO PERCENT ± THE THEORETICAL OPTIMUM.
BP-6 FIELD OBSERVATION & TESTING SHALL BE PERFORMED BY THE SOILS ENGINEER DURING GRADING TO ASSIST THE CONTRACTOR IN OBTAINING THE REQUIRED DEGREE OF COMPACTION & THE PROPER MOISTURE CONTENT. WHERE COMPACTION IS LESS THAN REQUIRED, ADDITIONAL COMPACTIVE EFFORT SHALL BE MADE WITH ADJUSTMENT OF THE MOISTURE CONTENT, AS NECESSARY, UNTIL 95% COMPACTION
IS OBTAINED.
BP-7 FINE GRAINED, LOW COHESION SOILS OF THE TYPE SPECIFIED FOR SELECT FILL MAY BE COMPACTED
USING RUBBER-TIRED, AND/OR PNEUMATIC, ROLLERS, & STRICT MOISTURE CONTROL.
BP-8 VEGETATION OR ASSOCIATED ROOT SYSTEM LOCATED WITHIN THE AREA TO BE GRADED SHALL BE REMOVED DURING GRADING. ANY EXISTING OR ABANDONED UTILITIES LOCATED WITHIN THE AREA SHALL BE REMOVED OR RELOCATED. ALL FILL MATERIALS & DISTURBED SOILS RESULTING FROM GRADING OPERATIONS SHOULD BE REMOVED & PROPERLY RECOMPACTED PRIOR TO FOUNDATION EXCAVATION.
BP-9 THE SOURCE OF SELECT FILL IS UNKNOWN. ALLOW AT LEAST THREE DAYS FOR PROPER TESTING OF
POTENTIAL BORROW AREAS. VERIFY SUITABILITY PRIOR TO PLACEMENT ON SITE.
GEOTECHNICAL/SITE PREPARATION
GT-SP-1 MINIMAL GRADING IS ANTICIPATED TO BE REQUIRED TO ACHIEVE A DESIGN ELEVATION COMPATIBLE WITH
THE SURROUNDING IMPROVEMENTS.
GT-SP-2 POSITIVE GRADING SHALL BE MAINTAINED TO PREVENT THE MOISTURE FROM SATURATING THE SUBGRADE.
GT-SP-3 EXISTING VEGETATION AND THE ROOT MAT SHALL BE REMOVED. COMPLETE STRIPPING OF THE TOPSOIL
SHALL BE PERFORMED IN THE PROPOSED BUILDING AREAS. STRIPPED MATERIALS CONSISTING OF
VEGETATION AND ORGANIC MATERIALS SHOULD BE WASTED OFF SITE OR USED TO VEGETATE
LANDSCAPED AREAS.
SUBGRADE REQUIREMENTS
GT-SR-1 RECEIVING SUBGRADE SHOULD BE SCARIFIED TO A MINIMUM DEPTH OF 8" AND COMPACTED TO A
MINIMUM OF 95% OF MAXIMUM DRY DENSITY ESTABLISHED BY STANDARD PROCTOR (ASTM D-698) GT-SR-2 COMPACTION TEST FREQUENCY FOR SUBGRADE SHALL BE 1 TEST PER 2,000 SF OF PREPARED
SUBGRADE BENEATH STRUCTURE
GT-SR-3 MINIMUM OF 3 TESTS PER LIFT BENEATH STRUCTURE.
FILL MATERIAL REQUIREMENTS
GT-FMR-1 FILL MATERIALS BY ALLOWABLE USCS SOIL CLASSIFICATION TYPE AND LOCATION.
GT-FMR-2 LEAN CLAY (CL) OR CLAYEY SAND (SC) (8<PI<18) ALL LOCATIONS AND ELEVATIONS.
GT-FMR-3 MOISTURE CONTENT OF ALL SOILS SHOULD BE MAINTAINED COMPATIBLE WITH THE LABORATORY
OPTIMUM.
GT-FMR-4 RIVER SAND (SP, SM-SP (NOTE THAT FINES DEFINED AS RIVER SAND PERCENT PASSING THE NO. 200
SIEVE SHALL BE LESS THAN 10 PERCENT)) ALL LOCATIONS AND ELEVATIONS.
FILL COMPACTION REQUIREMENTS
GT-FCR-1 RELOCATED OR IMPORTED SOILS SHOULD BE PLACED IN MAXIMUM LOOSE LIFTS OF 8" COMPACTED TO A
MINIMUM OF 95% OF MAXIMUM DRY DENSITY ESTABLISHED BY STANDARD PROCTOR (ASTM D-698) GT-FCR-2 4" LIFTS IN LOOSE THICKNESS WHEN HAND GUIDED EQUIPMENT (I.E. JUMPING JACK OR PLATE
COMPACTOR) IS USED.
GT-FCR-3 COMPACTION TEST FREQUENCY FOR SUBGRADE SHALL BE 1 TEST PER 2,000 SF PER 8" LOOSE LIFT OF
RELOCATED OR IMPORTED FILL BENEATH STRUCTURE
GT-FCR-4 MINIMUM OF 3 TESTS PER LIFT BENEATH STRUCTURE.
RC-1 ALL CONCRETE DESIGN AND PLACEMENT SHALL BE IN STRICT ACCORDANCE WITH THE
ACI "BUILDING CODE REQUIREMENTS FOR STRUCTURAL CONCRETE," ACI 318.
RC-2 STRUCTURAL CONCRETE SHALL CONFORM TO ACI 301 SPECIFICATIONS AND SHALL
DEVELOP A MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI AT 28 DAYS.
RC-3 CHAMFER ALL EDGES OF EXPOSED CONCRETE 3/4" UNLESS NOTED OTHERWISE.
RC-4 LAP CONTINUOUS REINF. AS NOTED IN LAP SPLICE SCHEDULE. LAP CONT. BOTTOM
STEEL OVER SUPPORT AND CONT. TOP STEEL AT MIDSPAN UNLESS OTHERWISE
SPECIFIED.
RC-5 SLEEVE ALL PENETRATIONS THROUGH BEAMS INDIVIDUALLY. CORE DRILLING SHALL
NOT BE PERMITTED. SUBMIT LOCATION AND SIZE OF SLEEVES THROUGH BEAMS TO
CONTRACTING OFFICER FOR REVIEW PRIOR TO CASTING CONCRETE.
RC-6 ALL EMBEDDED ITEMS SHALL BE SECURELY TIED IN PLACE PRIOR TO CONCRETE
PLACEMENT. GREENHOUSE ANCHOR SIZE AND SPACING PRE MANUFACTURE'S
RECOMMENDATION
RC-7 ALL REINFORCEMENT SHALL BE IN ACCORDANCE WITH ASTM A775 GRADE 60 (UNO).
REINFORCED CONCRETE
4825 AB SEAL 260427
GREENHOUSE
125 GREENHOUSE
AIR COND.
GREENHOUSE
AIR COND.
GREENHOUSE
C J
CJ CJ
10'-0"
'-0
9'-
2"
10'-0" 10'-0"
C J
9'- 2"
10'-0"
GREENHOUSE
GREENHOUSE
GREENHOUSE
EJ
EJ
CJ CJ
CSTR CSTR CSTR
C J
C J
C J
C J
C
ST
R
C J
C J
C J
C J
C
ST
R
C J
C J
C J
C J
C
ST
R
C J
C J
C J
C J
C
ST
R
C J
C J
C J
C J
C
ST
R
C J
C J
EJ EJ
C
ST
R C
ST
R
EJ EJ EJ EJ EJ EJ
'-0
6'- 0"
4'- 0"
10'-0"10'-0"
6'- 0"2J
OI
NT
S
' S
PA
CI
NG
'-4
4'- 0"
SCREENHOUSE
GREENHOUSE
GREENHOUSE
EJ
EJ
C J
C J
C J
C J
C
ST
R
C J
C J
C J
C J
C
ST
R
C J
C J
C J
C J
C
ST
R
C J
C J
C J
C J
C
ST
R
C J
C J
C J
C J
C
ST
R
CJ CJ
CSTR
EJ EJ
6'- 0"
4'- 0"
10'-0"
'-0
3 J
OI
NT
S
' S
PA
CI
NG
4'- 0"
8'-0"
PPM
REVISIONS
Agricultural
Service Research
DESCRIPTION
SHEET
DATE
U
NO.
DEPM
SAFETY & HEALTH
REAL PROPERTY
A
DATE
PROJECT NO.
SUSDA
BY
AGRICULTURAL RESEARCH SERVICE
OF
DESIGNER
PROJECT MANAGER
JOB #
CHECKED BY
A-E FIRM
J:\ gre en wo od \20
Jo bs \48
US
DA
To rna do
Da ma ge Re pa ir F
t. P ier ce
FL
\07 W ork ing
Fo lde r\C ivil
\Dr aw ing s\C
1.d wg Ap r 2 7,
- 8 :59 am c P.A.
FIRMTHE
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson M Adams
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
USDA AGRICULTURAL RESEARCH SERVICE
US HORTICULTURAL RESEARCH LABORATORY
REPAIR TORNADO DAMAGE
FT. PIERCE, FL
CIVIL PLAN
C101 6 10804/27/26
BP
BP
JGM
SOUTHEAST AREA
STONEVILLE, MS
XXX
XXX
XXX
XXX
XXX
SCALE:
CIVIL PLAN: PAVEMENT 1
1/16"=1'-0"
C101
KEYPLAN
NTS
AREA OF WORK
PL
AN
NO
RT
H
NORTH
SCALE:
TYPICAL EXPANSION JOINT DETAIL(EJ)
NONE
C101
18"-#6 DOWEL @ 18" O.C.,
ONE END GREASED
SCALE:
DETAIL "A"
NONE
A
C101
LIQUID JOINT SEALANT
EXISTING STRUCTURE
PREFORMED JOINT FILLER
3/16" ± 1/16"
SCALE:
TYP. ISOLATION JOINT
AT EXISTING STRUCTURE
NONE
C101
NEW PCC PAVEMENT
6X6 W2.9XW2.9 WWR
SCALE:
CONTROL JOINT DETAIL(CJ)
NONE
C101
PREFORMED JOINT FILLER
SCALE:
TYP. CONSTRUCTION JOINT DETAIL(CSTR)
NONE
C101
6X6 W2.9XW2.9 WWR
C
C101 A
C101
B C101
18"-#6 DOWEL @ 18" O.C.
LOW MODULUS
SILICONE SEALANT
CLOSED CELL
POLYETHYLENE
BACKER ROD (1"DIA.)
PRE-MOLDED EXPANSION
JOINT FILLER
SCALE:
DETAIL "C"
NONE
C
C101
CONSTRUCTION JOINT
LOW MODULUS SILICONE
SEALANT
CLOSED CELL
POLYETHYLENE BACKER
ROD (1"DIA.)
SCALE:
DETAIL "B"
NONE
B
C101
SEPARATING TAPE
LIQUID JOINT
SEALANT
* FIRST SAWCUT
** SECOND SAWCUT
3/4"
3/8
1/2
2" (S
AW
ED
O R
FO
RM
ED
1/2"
1/4
1/4 "1/2
2"
3/8"
3/1 6"
±1 /16
1/8"
5/8
2 1 /4"
T
T/
2"
TY
P.
1/2" 1"
3"
2"
TY
P.
T
T/
2"
TY
P.
6X6 W2.9XW2.9 WWR
WORK KEYNOTES
1. MATCH EXISTING PAVEMENT AND ELEVATION.
LEGEND
NEW PAVEMENT AREA
EXPANSION JOINT.
CONTROL JOINT
CONSTRUCTION JOINT
EJ EJ EJ EJ
CJ CJ CJ CJ
CSTR CSTR CSTR
SCALE:
TYPICAL SIDEWALK
PAVEMENT SECTION
NONE
C101
X X X X X X X X X X
#4 (CONT.) 6"6"
8"
VARIES, MIN 10'
#4 (CONT.)
X
REINFORCING 6X6
W2.9XW2.9 WWR
CRUSHED STONE
DAYLIGHT TO
EXISTING GRADE.
SLOPE 4:1
4" CRUSHED STONE BASE
SCALE: 1/16" = 1'-0"
8' 16'0
SIDEWALK
(4" THICK CONC.)
SLOPE (2% MIN.)
GRADE AWAY FROM
GREENHOUSE
1 1/2"R
GRADE AWAY FROM
SLAB 2' @ 5% GRADE AWAY FROM
GREENHOUSE F.F. 10' @ 5%
SCALE:
CIVIL PLAN: PAVEMENT 2
1/16"=1'-0"
C101
C101
C101
C101
340'
1 1
34 JOINTS @ 10' SPACING
PHASING NOTES
1. ALL EXTERIOR WORK THIS SHEET IS BASE BID.
88'-0" +/-
'-0
PPM
REVISIONS
Agricultural
Service Research
DESCRIPTION
SHEET
DATE
U
NO.
DEPM
SAFETY & HEALTH
REAL PROPERTY
A
DATE
PROJECT NO.
SUSDA
BY
AGRICULTURAL RESEARCH SERVICE
OF
DESIGNER
PROJECT MANAGER
JOB #
CHECKED BY
A-E FIRM
J:\ gre en wo od \20
Jo bs \48
US
DA
To rna do
Da ma ge Re pa ir F
t. P ier ce
FL
\07 W ork ing
Fo lde r\C ivil
\Dr aw ing s\C
2.d wg Ap r 2 7,
- 8 :59 am c P.A.
FIRMTHE
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson M Adams
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
USDA AGRICULTURAL RESEARCH SERVICE
US HORTICULTURAL RESEARCH LABORATORY
REPAIR TORNADO DAMAGE
FT. PIERCE, FL
LEESBURG DEMO PLAN
BID OPTION 5
C102 7 10804/27/26
BP
BP
JGM
SOUTHEAST AREA
STONEVILLE, MS
XXX
XXX
XXX
XXX
XXX
SCALE:
BID OPTION #5 CIVIL PLAN: SITE DEMOLITION
1"=10'
C102
KEYPLAN - LEESBURG
NTS
DEMO EXISTING GREENHOUSE
LEGEND
LIMITS OF CONSTRUCTION
LIMITS OF SEEDDING
CONCRETE FOUNDATION TO BE
DEMOLISHED
WORK KEYNOTES
GREENHOUSEGREENHOUSE
SCALE: 1" = 10'
5' 010' 10'
1. CONTRACTOR SHALL VERIFY ALL EXISTING SITE CONDITIONS PRIOR TO BEGINNING WORK.
2. LOCATE AND PROTECT ALL EXISTING UTILITIES. PROVIDE UTILITY LOCATING SERVICES PRIOR TO ANY EXCAVATION.
3. REMOVE AND DEMOLISH EXISTING CONCRETE PAD AND ANY ASSOCIATED FOUNDATIONS, FOOTINGS, OR ANCHORS SUPPORTING THE
FORMER GREENHOUSE.
4. DISPOSE OF DEMOLISHED CONCRETE AND DEBRIS OFF-SITE IN ACCORDANCE WITH ALL LOCAL, STATE, AND FEDERAL REGULATIONS.
5. BACKFILL EXCAVATED AREAS WITH APPROVED STRUCTURAL FILL PLACED IN 6" LIFTS AND COMPACTED TO A MINIMUM OF 95% OF
MAXIMUM DRY DENSITY (ASTM D698) UNLESS NOTED OTHERWISE.
6. FINAL FILL MATERIAL SHALL BE FREE OF ORGANIC MATTER, DEBRIS, AND OVERSIZED ROCK.
7. GRADE SITE TO PROVIDE POSITIVE DRAINAGE AWAY FROM ADJACENT STRUCTURES AND TO DRAIN NATURALLY WITHOUT PONDING.
8. PROVIDE SMOOTH, UNIFORM TRANSITIONS TO ADJACENT EXISTING GRADES.
9. FINAL SURFACE SHALL BE FINE GRADED, FREE OF RUTS, DEPRESSIONS, AND ABRUPT CHANGES IN SLOPE.
10. PLACE A MINIMUM OF 4 INCHES OF TOPSOIL OVER RESTORED AREAS PRIOR TO SEEDING, UNLESS NOTED OTHERWISE.
11. SEED ALL DISTURBED AREAS; WATER AND MAINTAIN UNTIL ESTABLISHED.
12. REPAIR ANY AREAS DAMAGED BY CONSTRUCTION ACTIVITIES TO MATCH EXISTING CONDITIONS.
13. CONTRACTOR SHALL MAINTAIN EROSION AND SEDIMENT CONTROL MEASURES DURING CONSTRUCTION AND UNTIL PERMANENT
STABILIZATION IS ACHIEVED.
14. ALL WORK SHALL COMPLY WITH APPLICABLE CODES, ORDINANCES, AND PROJECT SPECIFICATIONS.
15. CONTRACTOR SHALL COORDINATE WORK TO MINIMIZE DISRUPTION TO SURROUNDING AREAS.
16. FINAL ACCEPTANCE IS SUBJECT TO APPROVAL OF THE CONTRACTING OFFICER.
1. LIMITS OF DEMOLITION, GRADING, AND SEEDING.
2. CAP SUPPLY LINES ABOVE GRADE AT TANK FOR DEMOLISHED GREENHOUSES ONLY. REMOVE
EXISTING SUPPLY LINES FEEDING GREENHOUSE PRIOR TO GREENHOUSE DEMOLITION.
3. DEMOLISH CONCRETE SLAB.
4. DEMOLISH FUEL LINE, BACKFILL, COMPACT, AND ESTABLISH GRASS.
3 3
GENERAL NOTES:
10.8 KIPS
7 KIPS
10.8 KIPS
7 KIPS
PPM
REVISIONS
Agricultural
Service Research
DESCRIPTION
SHEET
DATE
U
NO.
DEPM
SAFETY & HEALTH
REAL PROPERTY
A
DATE
PROJECT NO.
SUSDA
BY
AGRICULTURAL RESEARCH SERVICE
OF
DESIGNER
PROJECT MANAGER
JOB #
CHECKED BY
A-E FIRM
J:\ gre en wo od \20
Jo bs \48
US
DA
To rna do
Da ma ge Re pa ir F
t. P ier ce
FL
\07 W ork ing
Fo lde r\C ivil
\Dr aw ing s\S
0.d wg Ap r 2 7,
- 8 :59 am c P.A.
FIRMTHE
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson M Adams
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
USDA AGRICULTURAL RESEARCH SERVICE
US HORTICULTURAL RESEARCH LABORATORY
REPAIR TORNADO DAMAGE
FT. PIERCE, FL
STRUCTURAL NOTES
S100 8 10804/27/26
BP
BP
JGM
SOUTHEAST AREA
STONEVILLE, MS
XXX
XXX
XXX
XXX
XXX
AFF
AISC
APPROX.
ARCH.
AHU
AWS
BC
bf
BFF
BOT. OR B
BRG
C&C
CJ OR CONST. JT.
CL
C.G.
CLR.
CMU
COL.
COMP.
CONC.
CONT.
CRSI
D
DIA.
db
DCJ
DL.
DO
DWG.
EL.
E.O.S.
EQ.
E.S.
E.W.
EXP.
FD
FIN.
F.F.
GALV.
GR
HSS
JST
JT.
K
KSF
LL
LLH
LLV
MAX.
MECH.
MFR.
MIN.
NO. OR #
O.C.
OF
PL
PSF
PSI
RP
REQ'D
SCH
SJ
STIFF.
TC
T.O.C.
T.O.S.
TYP.
U.N.O.
W/
WWF
W.P.
ABOVE FINISHED FLOOR
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
APPROXIMATE
ARCHITECTURAL
AT
AIR HANDLING UNIT
AMERICAN WELDING SOCIETY
BOTTOM CHORD
FLANGE WIDTH
BELOW FINISHED FLOOR
BOTTOM OR BOTTOM MOST
BEARING
COMPONENT AND CLADDING
CONSTRUCTION JOINT
CENTERLINE
CENTER OF GRAVITY
CLEAR
CONCRETE MASONRY UNIT
COLUMN
COMPOSITE
CONCRETE
CONTINUOUS
CONCRETE REINFORCING STEEL INSTITUTE
DEPTH
DIAMETER
BAR DIAMETER
DOWELED CONTROL JOINT
DEAD LOAD
DITTO
DRAWING
ELEVATION
EDGE OF SLAB
EQUALLY
EACH SIDE
EACH WAY
EXPANSION
FLOOR DRAIN
FINISHED, FINISH
FINISHED FLOOR
GALVANIZED
GALVANIZED STEEL GRATING
HOLLOW STEEL SECTION
POSITIVE MOMENT OF INERTIA
NEGATIVE MOMENT OF INERTIA
JOIST
JOINT
KIP (KILO POUND)
KIPS PER SQUARE FOOT
LIVE LOAD
LONG LEG HORIZONTAL
LONG LEG VERTICAL
MAXIMUM
MECHANICAL
MANUFACTURER
MINIMUM
NUMBER
ON CENTER
OUTSIDE FACE
PLATE
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
RADIUS POINT
REQUIRED
POSITIVE SECTION MODULUS
NEGATIVE SECTION MODULUS
SCHEDULE
SAW JOINT
STIFFENER
TRUSS
THICKNESS
TOP CHORD
TOP OF COLUMN
TOP OF STEEL
TYPICAL
UNLESS OTHERWISE NOTED
WITH
WELDED WIRE FABRIC
WORKING POINT
ABBREVIATIONS
DESIGN CRITERIA
CODES AND STANDARDS
A. BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,
AMERICAN CONCRETE INSTITUTE (ACI), ACI 318-19.
B. MINIMUM DESIGN LOADS FOR BUILDING AND OTHER
STRUCTURES, ASCE 7-22.
C. INTERNATIONAL BUILDING CODE (IBC), 2021
D. STRUCTURAL COMPONENTS IN THIS PROJECT DESIGNED USING
LRFD METHODOLOGY
E. AISI AMERICAN IRON AND STEEL INSTITUTE.
1.0 MINIMUM DESIGN LOADS AND REQUIREMENTS IN ACCORDANCE
WITH IBC, 2021
FLOOR LIVE LOAD
COLLATERAL
ROOF LIVE LOAD (REDUCIBLE)
M&E
WIND DESIGN DATA:
ULTIMATE WIND SPEED
NOMINAL WIND SPEED
RISK CATEGORY
WIND EXPOSURE
COMPONENTS AND CLADDING DESIGN PRESSURE
EARTHQUAKE DESIGN DATA:
SEISMIC IMPORTANCE FACTOR
SS
S1
SITE CLASS
SDS
SD1
SEISMIC DESIGN CATEGORY
SEISMIC RESISTING SYSTEM
DESIGN BASE SHEAR
CS
R
DESIGN METHOD
150 PSF
5 PSF
20 PSF
5 PSF
159 MPH
123.2MPH
II
SEE TABLE 1
SHEET S100
1.0
18 %
4.4 %
15 %
6.2 %
STEEL FRAMES NOT SPECIFICALLY
DETAILED FOR SEISMIC RESISTANCE
0.064W 0.064
3.0
EQUIVALENT LATERAL FORCE
2.0 MATERIALS
CONCRETE (28 DAY STRENGTH)
SLAB ON GRADE / FOUNDATION
REINFORCING:
BARS
WELDED WIRE FABRIC
STRUCTURAL STEEL SHAPES, PLATES AND MISCELLANEOUS SHAPES:
4,000 PSI
ASTM A615/A615M
ASTM A185
BOLTS:
BOLTS
ANCHOR RODS:
ANCHOR RODS
GROUT:
GROUT
ASTM F1554. GRADE 36
2 KSI
STRUCTURAL GENERAL NOTES
ASTM A325 BEARING TYPE N
APPLICABLE SHAPE SERIES ASTM DESIGNATION MIN. YIELD STRESS (FY)
(KSI)
W A992 50 M A36 36 S A36 36 C A36 36
MC A36 36
L A36 36
HSS (RECTANGLE) A500 46
HSS (ROUND) A500 42
PIPE A53 35
PLATES A36 36
PLATES A572 50
BARS A572 42
3.0 CAST-IN-PLACE CONCRETE NOTES
3.1 CONCRETE COVER FOR REINFORCEMENT:
A. CONCRETE DEPOSITED AGAINST AND PERMANENTLY EXPOSED TO
EARTH
B. CONCRETE EXPOSED TO EARTH OR WEATHER:
#5 BARS OR SMALLER
#5 BARS OR LARGER
C. CONCRETE NOT EXPOSED TO WEATHER OR NOT IN CONTACT WITH
GROUND:
SLAB, WALL, AND JOISTS BEAMS
3.2 UNLESS SPECIFICALLY NOTED, SCHEDULED OR DETAILED OTHERWISE
PROVIDE DEVELOPMENT LENGTH FOR REINFORCING IN CONCRETE
COMPONENTS IN ACCORDANCE WITH THE SCHEDULE IN NOTE 3.3
BELOW. THIS SCHEDULE SHALL APPLY TO ALL DEVELOPMENT LENGTHS
NOT OTHERWISE NOTED, DETAILED OR SCHEDULED IN THE DRAWINGS
OR SPECIFICATIONS.
3.3 REINFORCING BAR DEVELOPMENT LENGTHS Ld (f'c = 4000 PSI)
3"
2" 1"
1 1/2"
4.0 FOUNDATION:
STRUCTURAL FOUNDATIONS FOR THE PROJECT WILL BE AUGER CAST PILES SUPPORTING CONCRETE
GRADE BEAMS.
ALL AT GRADE SLABS SHALL BE CONSTRUCTED ON 6 INCH CAPILLARY WATER BARRIER FORM WITH A
10 MIL VAPOR BARRIER.
PROTECT PIPES AND CONDUITS RUNNING THROUGH WALLS AND SLABS WITH 1/2 INCH EXPANSION
MATERIAL.
MAINTAIN SUBGRADE AND FILL MOISTURE CONTENT UNTIL FOUNDATIONS ARE PLACED.
DO NOT PLACE SLAB AGAINST SUBGRADE CONTAINING FREE WATER, FROST, OR ICE.
MAINTAIN PROPER SITE DRAINAGE DURING CONSTRUCTION TO ENSURE SURFACE RUNOFF AWAY
FROM STRUCTURES AND TO PREVENT PONDING OF SURFACE RUNOFF NEAR THE STRUCTURES.
KEEP OPEN EXCAVATIONS AROUND BUILDING DRY. BACKFILL AGAINST GRADE BEAMS AS SOON AS PRACTICAL. PUMP WATER OUT OF OPEN EXCAVATIONS IF FLOODING OCCURS PRIOR TO BACKFILLING.
TENSION AND DEVELOPMENT SPLICE LENGTHS - f'c = 4000 psi CONCRETE
BAR
SIZE
DEVELOPMENT LENGTH SPLICE LENGTH STANDARD 90 DEGREE HOOK
TOP BAR
(INCHES)
OTHER BAR
(INCHES)
TOP BAR
(INCHES)
OTHER BAR
(INCHES)
EMBED
(INCHES)
LEG LENGTH
(INCHES)
BEND DIA.
(INCHES)
#3 19 15 24 22 6 6 2.25 #4 25 19 32 25 8 8 3 #5 31 24 40 31 10 10 3.75 #6 37 29 48 37 12 12 4.5 #7 54 42 70 54 14 14 5.25 #8 62 48 80 25 16 16 6
NOTES:
1. STRAIGHT DEVELOPMENT LENGTH AND SPLICE LENGTHS ARE BASED ON UNCOATED BARS
ASSUMING CENTER TO CENTER BAR SPACING GREATER THAN 3 BAR DIAMETERS WITHOUT TIES OR STIRRUPS OR 2 BAR DIAMETERS WITH TIES OR STIRRUPS, AND CLEAR COVER OF 1 BAR DIAMETER.
2. TOP BARS ARE HORIZONTAL BARS WITH MORE THAN 12 INCHES OF CONCRETE BELOW THE BAR.
3. STANDARD 90 DEGREE HOOK EMBEDMENT LENGTH ARE BASED ON SIDE COVER GREATER THAN
2.5 INCHES AND END COVER GREATER THAN 2 INCHES WITHOUT TIES AROUND HOOKS.
3.4 LAP SPLICE LENGTHS FOR REINFORCING BARS SHALL BE THE SAME AS SHOWN IN THE TABLE.
3.5 WHEN TWO BARS OF DIFFERENT SIZES ARE LAPPED, THE SMALLER SIZE GOVERNS THE LAP
LENGTH UNLESS SPECIFICALLY NOTED OTHERWISE.
3.6 WHEN REINFORCING STEEL IS NOTED AS CONTINUOUS REINFORCING IN GRADE BEAMS, WALLS, SLABS AND/OR BEAMS, SPLICE CONTINUOUS REINFORCING STEEL ONLY WHEN UNAVOIDABLE DUE TO STOCK LENGTHS. STAGGER ALL SPLICES A MINIMUM OF 4'-0". ADJACENT BAR SPLICES ARE NOT ACCEPTABLE. LOCATE THE TOP BAR SPLICES WITHIN THE MIDDLE HALF OF THE SPAN AND LOCATE THE BOTTOM BAR SPLICES AT SUPPORTS, OR BETWEEN SUPPORTS AND 1/3 SPAN POINT, UNLESS NOTED OTHERWISE ON PLANS, DETAILS OR SCHEDULES.
3.7 HORIZONTAL JOINTS WILL NOT BE PERMITTED IN CONCRETE CONSTRUCTION EXCEPT AS SHOWN
ON THE DRAWINGS. VERTICAL JOINTS SHALL OCCUR AT LOCATIONS INDICATED.
3.8 AT CONSTRUCTION JOINTS, CONTACT SURFACES MUST BE CLEAN AND FREE OF LATENCIES AND
INTENTIONALLY ROUGHENED TO A FULL AMPLITUDE OF APPROXIMATELY 1/4 INCH
3.9 PROVIDE FULL EMBEDMENT WITH 90-DEGREE HOOKS FOR ALL DOWELS IF NOT OTHERWISE NOTED.
3.10 CHAMFER ALL EXPOSED TO VIEW CORNERS 3/4", U.N.O.
5.0 GENERAL:
WHERE A SECTION OR DETAIL IS SHOWN FOR ONE CONDITION, IT SHALL ONLY APPLY TO LIKE OR
SIMILAR CONDITIONS.
6.0 POST INSTALLED ADHESIVE ANCHORS:
6.1 POST INSTALLED ADHESIVE ANCHORS SHALL BE STAINLESS STEEL AND SHALL ONLY BE USED WITH THE
WRITTEN CONSENT OF THE CONTRACTING OFFICER. STRENGTH OF ANCHORS SHALL BE BASED UPON
THE REQUIRED STRENGTH OF THE SPECIFIC INSTALLATION AND LOCATION OF ANCHORS.
6.2 INSTALL BOLTS PERPENDICULAR TO THE FACE OF THE CONCRETE. DEVIATION FROM PERPENDICULAR
GREATER THAN 10 DEGREES WILL NOT BE ACCEPTABLE.
6.3 CREATE A TEMPLATE AT EACH BOLT CONNECTION LOCATION PRIOR TO FABRICATING HOLES IN
CONNECTION PLATES. MAKE TEMPLATE BY LOCATING EXISTING REBAR WITH PACHOMETER.
REPOSITION BOLTS A MAXIMUM OF 1-1/2" TO AVOID CONFLICTS WITH EXISTING.
6.4 DRILL HOLES TO DEPTH AND DIAMETER RECOMMENDED BY MANUFACTURER. DO NOT ENLARGE OR
REDIRECT HOLES ALONG THE LENGTH OF THE BOLTS.
6.5 DRILL HOLES IN CONTINUOUS OPERATION. BLOW DUST FROM THE HOLE USING COMPRESSED AIR.
6.6 FILL ABANDONED HOLES WITH EPOXY GROUT.
7.0 DELEGATED DESIGN NOTES:
7.1 THE PRE-ENGINEERED METAL BUILDING SYSTEM AND ITS RELATED STRUCTURAL ELEMENTS & COMPONENTS ARE
DELEGATED DESIGN ENGINEERED SYSTEMS. THE CONTRACTOR SHALL SUBMIT SHOP DRAWINGS THAT ARE SEALED BY A FLORIDA LICENSED ENGINEER, EMPLOYED BY THE CONTRACTOR/MANUFACTURER, INDICATING THAT THE SUPPLIED COMPONENTS ARE IN COMPLIANCE WITH THE CONTRACT DOCUMENTS AND THE SPECIFIED CRITERIA.
PROVIDE A COMPLETE DESIGN ANALYSIS SHOWING ALL CALCULATIONS FOR THE SYSTEMS (PRE-ENGINEERED METAL BUILDING SYSTEM- COLUMNS, TRUSSES, BRACES, PURLINS, MODIFIED FOUNDATION REQUIREMENTS, LAYOUT OF ANCHOR BOLTS AND OTHER EMBEDDED ITEMS). DELEGATED DESIGNS MUST COMPLY WITH THE REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE. ALL SUBMITTALS MUST BE APPROVED BY THE CONTRACTING OFFICER PRIOR TO ANY FABRICATION OR RELATED FIELD CONSTRUCTION. DETAILS SHOWN ON THESE CONSTRUCTION DRAWINGS ARE THE DESIGNER OF RECORD'S ESTIMATE OF REQUIREMENTS BASED ON ANTICIPATED SYSTEMS AND CONFIGURATION. ITEMS SPECIFIED IN THESE CONTRACT DOCUMENTS, SUCH AS THICKNESS AND GAUGES, MUST BE INCORPORATED AS THE MINIMUM ALLOWED. THE LOADS ACTING ON THE STRUCTURE ARE PROVIDED IN THE FIGURE BELOW. FOUNDATION DESIGN IS CONTINGENT ON PEMB LOADS.
CHANGES IN PEMB LOADS GREATER THAN 10% REQUIRE FOUNDATION REDESIGN.
SYMBOLS:
VIEW TITLES:
WALL SECTION MARKBUILDING SECTION MARK
FLOOR PLANS, ELEVATIONS, SECTIONS AND DETAIL VIEWS TITLE
SCALE:
ELEVATIONS,DETAILS, & CALLOUTS
1/8"=1'-0"
S-000
S-100
S-100
S-100
SECTION NUMBER
DWG. NO. WHERE
SECTION IS DRAWN
SECTION NUMBER
DWG. NO. WHERE
SECTION IS DRAWN
DETAIL IDENTIFIER (MODULE LETTER AND NUMBER)
CONTRACTOR MUST FIELD VERIFY ALL SITE CONDITIONS AND DIMENSIONS PRIOR TO BEGINNING WORK.
STRUCTURAL LEGEND
GENERAL NOTE
C
A
SNOW DESIGN DATA:
GROUND SNOW LOAD, Pg
UNIFORM ROOF DESIGN SNOW LOAD
45 PSF
36.3 PSF
GB GRADE BEAM
PC PILE CAP
PVMT PAVEMENT
REINF REINFORCEMENT
STD STANDARD
T t
T&B TOP AND BOTTOM
IP
IN
PEMB PRE-ENGINEERED METAL BUILDING
SP
SN
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
EJ
EJ
EJ
EJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJ
EJ
EJ
EJ
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
EJ
EJ
EJ
EJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJ
EJ
EJ
EJ
C
ST
R C
ST
R
C
ST
R
C J
C J
C J
C J
C J
C J
C
ST
R C
ST
R
C
ST
R
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
EJ
EJ
EJ
EJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJ
EJ
EJ
EJ
C
ST
R C
ST
R
C
ST
R
C J
C J
C J
C J
C J
C J
C
ST
R C
ST
R
C
ST
R
C J
C J
C J
C J
C J
C J
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
EJ
EJ
EJ
EJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJ
EJ
EJ
EJ
C
ST
R C
ST
R
C
ST
R
C J
C J
C J
C J
C J
C J
C
ST
R C
ST
R
C
ST
R
C J
C J
C J
C J
C J
C J
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
EJ
EJ
EJ
EJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJ
EJ
EJ
EJ C
J
C J
C J
C J
C J
C J
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
EJ
EJ
EJ
EJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJ
EJ
EJ
EJ C
J
C J
C J
C J
C J
C J
6'- 0"
6'- 0"
9'- 2"
83'-0"
9'- 2"
9'- 2"
9'- 2"
9'- 2"
9'- 2"
42'-0"
7 JOINTS @ 12' SPACING 3 JOINTS @ 14' SPACING
SLOPE @ .005% SLOPE @ .005%
83'-0" 42'-0"
7 JOINTS @ 12' SPACING 3 JOINTS @ 14' SPACING
SLOPE @ .005% SLOPE @ .005%
83'-0" 42'-0"
7 JOINTS @ 12' SPACING 3 JOINTS @ 14' SPACING
SLOPE @ .005% SLOPE @ .005%
C
ST
R
C J
C J
C J
C J
C
ST
R
C J
C J
C J
C J
C J
C J
C J
C J
PPM
REVISIONS
Agricultural
Service Research
DESCRIPTION
SHEET
DATE
U
NO.
DEPM
SAFETY & HEALTH
REAL PROPERTY
A
DATE
PROJECT NO.
SUSDA
BY
AGRICULTURAL RESEARCH SERVICE
OF
DESIGNER
PROJECT MANAGER
JOB #
CHECKED BY
A-E FIRM
J:\ gre en wo od \20
Jo bs \48
US
DA
To rna do
Da ma ge Re pa ir F
t. P ier ce
FL
\07 W ork ing
Fo lde r\C ivil
\Dr aw ing s\S
1.d wg Ap r 2 7,
- 1 0:1
8a m c P.A.
FIRMTHE
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson M Adams
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
USDA AGRICULTURAL RESEARCH SERVICE
US HORTICULTURAL RESEARCH LABORATORY
REPAIR TORNADO DAMAGE
FT. PIERCE, FL
STRUCTURAL PLAN
S101 9 10804/27/26
BP
BP
JGM
SOUTHEAST AREA
STONEVILLE, MS
XXX
XXX
XXX
XXX
XXX
SCALE:
STRUCTURAL PLAN
1/16"=1'-0" A
S101
KEYPLAN
NTS
AREA OF WORK
PL
AN
NO
RT
H
NORTH
SCALE:
TYPICAL SCREEN/SWALE
PAVEMENT SECTION
NONE
S101
X X X X X X X X X X
SIDEWALK
(4" THICK CONC.)
SLOPE (2% MAX.)
#4 (CONT.) 6"6"
9'-2"
#4 (CONT.)
X
REINFORCING
6X6-W2.9XW2.9
4" CRUSHED STONE BASE
NEW WORK KEYNOTES
1. MATCH EXISTING PAVEMENT AND ELEVATION. (SEE CIVIL)
2. PROVIDE NEW FOUNDATION FOR GREENHOUSE SCREEN
SYSTEM WITH 6" CAST IN PLACE CONCRETE CURB
MATCHING EXISTING STRUCTURE.
3. PROVIDE NEW PAVED SWALE N SCREENED VENTILATION
AREA BETWEEN GREENHOUSES.
CURB (TYP.)
(DETAIL 1/S107)
EXISTING
GREENHOUSE
SLAB
CURB (TYP.)
(DETAIL 1/S107)
EXISTING
GREENHOUSE
SLAB
TOP OF PAVEMENT BEYOND.
SLOPE AT .005%
SLOPE (2% MAX.)
SCALE:
SCREEN/SWALE
PAVEMENT SECTION
NONE
S101
X X X X X X X X X X
#4 (CONT.) 8"8"
6'-0"
#4 (CONT.)
X
REINFORCING
6X6-W2.9XW2.9
4" CRUSHED STONE BASE
CURB (TYP.)
(DETAIL 1/S107)
EXISTING
GREENHOUSE
SLAB
CURB (TYP.)
(DETAIL 1/S107)
EXISTING BASE
TOP OF CURB BEYOND.
8"
8"
X
PROVIDE FOUNDATION CURB
NEW SCREEN ROOM DOOR PROVIDE FOUNDATION CURB
GH WALL GH WALL
EXISTING CONCRETE
FOUNDATION
EXISTING CONCRETE
FOUNDATION
4" PAVED FLUME 4" CRUSHED STONE BASE 6 MIL. VAPOR BARRIERCOMPACTED SUBGRADE
6"X18" DRAINAGE
FRAME
∠3"X6" SS DOOR SILL
PROVIDE 1" X 1" STAINLESS STEEL (SS) MINIMUM 16-GAUGE WIRE MESH TO BE
TYPE 304 OR 316 STAINLESS STEEL. ANCHOR WITH STAINLESS STEEL FASTENERS.
SCALE:
SCREEN ROOM PAVED SWALE ENTRANCE
NONE
S101
SCALE: 1/16" = 1'-0"
48'8' 16' 32'0
1/2" EXPANSION
JOINT MATERIAL
1/2" EXPANSION
JOINT MATERIAL
1/2" EXPANSION
JOINT MATERIAL
1/2" EXPANSION
JOINT MATERIAL
1/2" EXPANSION
JOINT MATERIAL
SLOPE (2% MIN.)
GRADE AWAY FROM
GREENHOUSE
4" SLAB
CURB (TYP.)
(DETAIL 1/S107)
PROVIDE 1" X 1" STAINLESS STEEL (SS)
MINIMUM 16-GAUGE WIRE MESH TO BE
TYPE 304 OR 316 STAINLESS STEEL.
∠ 1" X 2.5" SS FRAME
∠ 1" X 2.5" SS FRAME
FRAME BEYOND
1/4" SS NUT AND BOLT TO
SECURE FRAME. (TYP.OF 4)
CURB , TYP.
SCALE:
DRAINAGE FRAME
NONE
S101
A
A SECTION A - A
WELD ALL
CONNECTIONS AND
GRIND SMOOTH.
LEGEND
NEW PAVEMENT AREA
EXPANSION JOINT.
CONTROL JOINT
CONSTRUCTION JOINT
CURB, TYP., (SEE 1/S107)
EJ EJ EJ EJ
CJ CJ CJ CJ
CSTR CSTR CSTR
83'-8"
S101
S101 2
S101
6" CURB CUT @ 10' O.C
42'-8"
6" CURB CUT @ 10' O.C
S101
S101
S101
S101
S101
S101
S101
S101
S101
S101
S101
S101
SEE DETAIL, 3/S101
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
125 GREENHOUSE
AIR COND.
GREENHOUSE
AIR COND.
GREENHOUSE
AIR COND.
GREENHOUSE
AIR COND.
GREENHOUSE
9'- 2"
9'- 2"
7'- 4"
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
EJ
EJ
EJ
EJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJ
EJ
EJ
EJ
C
ST
R C
ST
R
C
ST
R
C J
C J
C J
C J
C J
C J
C
ST
R C
ST
R
C
ST
R
C J
C J
C J
C J
C J
C J
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
EJ
EJ
EJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJ
EJ
EJ C
J C
J
C J
C J
83'-0" 42'-0"
7 JOINTS @ 12' SPACING 3 JOINTS @ 14' SPACING
SLOPE @ .005% SLOPE @ .005%
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
EJ
EJ
EJ
EJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJ
EJ
EJ
EJ
C
ST
R C
ST
R
C
ST
R
C J
C J
C J
C J
C J
C J
C
ST
R C
ST
R
C
ST
R
C J
C J
C J
C J
C J
C J
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
EJ
EJ
EJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJ
EJ
EJ C
J C
J
C J
C J
42'-0"
3 JOINTS @ 14' SPACING
SLOPE @ .005%
83'-0"
7 JOINTS @ 12' SPACING
SLOPE @ .005%
7'- 4"
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
EJ
EJ
EJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJ
EJ
EJ
42'-0"
3 JOINTS @ 14' SPACING
SLOPE @ .005%
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
EJ
EJ
C
ST
R C
ST
R
C J
C J
C J
C J
C
ST
R C
ST
R
C J
C J
C J
C J
83'-0"
7 JOINTS @ 12' SPACING
SLOPE @ .005%
C
J C
J
C J
C J
PPM
REVISIONS
Agricultural
Service Research
DESCRIPTION
SHEET
DATE
U
NO.
DEPM
SAFETY & HEALTH
REAL PROPERTY
A
DATE
PROJECT NO.
SUSDA
BY
AGRICULTURAL RESEARCH SERVICE
OF
DESIGNER
PROJECT MANAGER
JOB #
CHECKED BY
A-E FIRM
J:\ gre en wo od \20
Jo bs \48
US
DA
To rna do
Da ma ge Re pa ir F
t. P ier ce
FL
\07 W ork ing
Fo lde r\C ivil
\Dr aw ing s\S
2.d wg Ap r 2 7,
- 8 :59 am c P.A.
FIRMTHE
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson M Adams
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
USDA AGRICULTURAL RESEARCH SERVICE
US HORTICULTURAL RESEARCH LABORATORY
REPAIR TORNADO DAMAGE
FT. PIERCE, FL
STRUCTURAL PLAN
BID OPTION #1
S102 10 10804/27/26
BP
BP
JGM
SOUTHEAST AREA
STONEVILLE, MS
XXX
XXX
XXX
XXX
XXX
SCALE:
STRUCTURAL PLAN: BID OPTION #1
1/8"=1'-0"
S102
0 16'8'4' 24'
SCALE: 1/8"= 1'-0"
KEYPLAN
NTS
AREA OF WORK
NEW WORK KEYNOTES
S101
S101
1. PROVIDE PAVED SWALE IN SCREENED VENTILATION AREA BETWEEN
GREENHOUSES.
S101
S101
S1014
S101
S101
S101
LEGEND
NEW PAVEMENT AREA
EXPANSION JOINT.
CONTROL JOINT
CONSTRUCTION JOINT
CURB, TYP., (SEE 1/S107)
EJ EJ EJ EJ
CJ CJ CJ CJ
CSTR CSTR CSTR
S101 1
S101
S1014
S101 1 1
GREENHOUSE
GREENHOUSE
SCREENHOUSE
GREENHOUSE
GREENHOUSE
9'- 2"
14'-2"
5'- 8"
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
EJ
EJ
EJEJEJEJEJEJEJEJEJEJEJEJEJ
EJ
EJ C
J C
J
C J
C J
EJEJEJEJEJEJEJEJEJEJEJEJEJ
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
EJ
EJ
EJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJ
EJ
EJ
C
ST
R C
ST
R
C J
C J
C J
C J
C
ST
R C
ST
R
C J
C J
C J
C J
EJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJ
83'-0"
7 JOINTS @ 12' SPACING
SLOPE @ .005%
83'-0"
7 JOINTS @ 12' SPACING
SLOPE @ .005%
42'-0"
3 JOINTS @ 14' SPACING
SLOPE @ .005%
42'-0"
3 JOINTS @ 14' SPACING
SLOPE @ .005%
83'-8"42'-6"
6" CURB CUT @ 10' O.C
C J
C J
C
ST
R
C J
C J
C
ST
R
C J
C J
6" CURB CUT @ 10' O.C
GREENHOUSE
GREENHOUSE
GREENHOUSE
GREENHOUSE
9'- 2"
9'- 2"
7'-
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
EJ
EJ
EJEJEJEJEJEJEJEJEJEJEJEJEJ
EJ
EJ C
J C
J
C J
C J
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
EJ
EJ
EJEJEJEJEJEJEJEJEJEJEJEJEJ
EJ
EJ C
J C
J
C J
C J
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
EJ
EJ
EJEJEJEJEJEJEJEJEJEJEJEJEJ
EJ
EJ C
J C
J
C J
C J
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
EJ
EJ
EJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJ
EJ
EJ
C
ST
R C
ST
R
C J
C J
C J
C J
C
ST
R C
ST
R
C J
C J
C J
C J
42'-0"
3 JOINTS @ 14' SPACING
SLOPE @ .005%
42'-0"
3 JOINTS @ 14' SPACING
SLOPE @ .005%
EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ EJ
EJ
EJ
EJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJEJ
EJ
EJ
C
ST
R C
ST
R
C J
C J
C J
C J
C
ST
R C
ST
R
C J
C J
C J
C J
83'-0"
7 JOINTS @ 12' SPACING
SLOPE @ .005%
AREA OF WORK
PPM
REVISIONS
Agricultural
Service Research
DESCRIPTION
SHEET
DATE
U
NO.
DEPM
SAFETY & HEALTH
REAL PROPERTY
A
DATE
PROJECT NO.
SUSDA
BY
AGRICULTURAL RESEARCH SERVICE
OF
DESIGNER
PROJECT MANAGER
JOB #
CHECKED BY
A-E FIRM
J:\ gre en wo od \20
Jo bs \48
US
DA
To rna do
Da ma ge Re pa ir F
t. P ier ce
FL
\07 W ork ing
Fo lde r\C ivil
\Dr aw ing s\S
3.d wg Ap r 2 7,
- 8 :59 am c P.A.
FIRMTHE
P.O. BOX 513, GREENWOOD, MISSISSIPPI - (662) 455-4943
Johnson M Adams
ARCHITECTS/ENGINEERS PLANNING SURVEYING MANAGEMENT
USDA AGRICULTURAL RESEARCH SERVICE
US HORTICULTURAL RESEARCH LABORATORY
REPAIR TORNADO DAMAGE
FT. PIERCE, FL
STRUCTURAL PLAN
BID OPTION #2 & #3
S103 11 10804/27/26
BP
BP
JGM
SOUTHEAST AREA
STONEVILLE, MS
XXX
XXX
XXX
XXX
XXX
KEYPLAN
NTS
SCALE: 3/32" = 1'-0"
16' 8' 0 16'
NEW WORK KEYNOTES
1. MATCH EXISTING PAVEMENT AND ELEVATION.
2. PROVIDE NEW PAVED SWALE IN SCREENED VENTILATION AREA BETWEEN
GREENHOUSES.
LEGEND
NEW PAVEMENT AREA
EXPANSION JOINT.
CONTROL JOINT
CONSTRUCTION JOINT
CURB, TYP., (SEE 1/S107)
EJ EJ EJ EJ
CJ CJ CJ CJ
CSTR CSTR CSTR
S101
S101
S101
S101
2 2
S101
S101
S101
S101
S101
S101
S101
S101
S101
SCALE:
STRUCTURAL PLAN: BID OPTION #2
3/32"=1'-0"
S103
SCALE:
STRUCTURAL PLAN: BID OPTION #3
3/32"=1'-0"
S103
'-0
7'-
2" 7'-
2"
24'-8"
'-1
6'-6"
'-6
56'-0" 8'-0" 56'-0"
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C
STR
C
STR
C
STR
C
STR
C
STR
C
STR
C
STR
C
STR
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C
STR
C
STR
C
STR
C
STR
C
STR
C
STR
C
STR
C
STR
C
STR
C
STR
C
STR
C
STR
C
STR
C
STR
C
STR
C
STR
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C
STR
C
STR
C
STR
C
STR
C
STR
C
STR
C
STR
C
STR
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
C J
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
EJ
HP
GREENHOUSE
GREENHOUSE
SCREENED
AREA
HPHP HP
PPM
REVISIONS
Agricultural
Service Research
DESCRIPTION
SHEET
DATE
U
NO.
DEPM
SAFETY & HEALTH
REAL PROPERTY
A
DATE
PROJECT NO.
SUSDA
BY
AGRICULTURAL RESEARCH SERVICE
OF
DESIGNER
PROJECT MANAGER
JOB #
CHECKED BY
A-E FIRM
J:\ gre en wo od \20
Jo bs \48
US
DA
To rna do
Da ma ge Re pa ir F
t. P ier ce
FL
\07 W ork ing
Fo lde r\C ivil
\Dr aw ing s\S
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .