Attachment 4 ES6200ADC.pdf
PDF 302 KB Posted
- Attached to
- MJU-75/B Countermeasure Flare Federal contract opportunity
- Solicitation number
- FA8213-21-R-3034
About this file
This document contains requirements for a federal solicitation seeking the procurement of MJU-75/B countermeasure flares. The solicitation was issued by the Department of the Air Force Materiel Command Lifecycle Management Center located at Hill Air Force Base. The solicitation seeks the purchase of MJU-75/B magnesium teflon viton countermeasure flares comprised of an aluminum case, safe and initiation device, ignition pellet, and main energetic grain. Prospective offerors are advised that foreign participation is not permitted at the prime contractor level. The solicitation requires first article testing and qualification in accordance with design control activity procedures approved by the cognizant government engineering activity. Existing engineering capability, skills, and manufacturing knowledge by qualified sources require the part be acquired from approved sources retaining necessary data rights, knowledge, or technical data.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ES7650 Oct 2000.pdf | ||
| Section L 16July20.pdf | ||
| SOWSPI.pdf | ||
| DataListMJU75.pdf | ||
| CDRL A.pdf | ||
| FA821321R3034.pdf | ||
| MJU75EquipmentOrderingProcedures.pdf | ||
| MSE Requirements for MJU-75 contract.pdf | ||
| CDRL E.pdf | ||
| CDRL F.pdf | ||
| CDRL C.pdf | ||
| CDRL B.pdf | ||
| Section M 16July20.pdf | ||
| FairOpportunityOrderingProcedures16July2020.pdf | ||
| CDRL H.pdf | ||
| CDRL G.pdf | ||
| Attachment 3 ES7035.pdf | ||
| Attachment 2 WARP.pdf | ||
| Air Specification.docx | DOCX document | |
| FORM158.pdf | ||
| MJU75DD254.pdf | ||
| REPSHIP.pdf | ||
| CDRL D.pdf | ||
| Attachment 5 ES7034.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 4
ES6200
Ammunition Data Cards (End Item Component Listing)
Feb 2020 (revision)
When to Use: When a “Detailed End Item Component Listing” for ADC reporting is specified as a requirement per the Airmunitions Specification.
Text:
Detailed requirements and guidance for the preparation of Ammunition Data
Cards (ADCs) are contained in MIL-STD-1168, DI-MISC-80043 and the Worldwide
Ammunition-data Repository Program (WARP) online user’s manual. Detailed requirements for obtaining and using a manufacturer's identification symbol, which is an integral component of the ammunition lot number, can be found in
MIL-HDBK-1461.
(a) The supplier shall develop and submit ADCs in accordance with the requirements of this clause, MIL-STD-1168, and the user manual located on the
WARP database. The WARP application is accessed through the Munitions
History Program (MHP) website. The ADC requirement is a flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
(b) The supplier shall prepare an ADC for each lot of item(s) being produced under this contract, regardless of whether or not those lots are accepted or rejected by the Government. The ADC shall comply with MIL-STD-1168 and WARP requirements.
(c) Unless otherwise authorized by the Procuring Contracting Officer, the supplier shall include, in the components sections on the ADC representing the deliverable item; all assemblies, sub-assemblies, components, explosives, and propellants contained in and used to produce the end item.
(d) When required by the technical data package, all component lot numbers shall be in accordance with MIL-STD-1168 lot number convention. When not required by technical data package, component lot number may be constructed through producer lot number convention.
e. The flow-down of the requirement for component ADCs generated via WARP is highly encouraged for other items not identified in paragraph (d) above when the prime contractor is purchasing components, assemblies, and subassemblies from subcontractors or vendors.
f. All component RFV/ECPs shall be listed on the ADC for the deliverable item, as well as on the component ADC, when that component is identified in paragraph (d) above. The WARP user manual provides information on the level of detail required.
g. A sample ADC shall be developed and submitted to the WARP system 30 days prior to First Article testing or 30 days prior to production in the event a first article is not required. The WARP ADC program will not allow the submission of additional ADCs until such time as the sample ADC has been approved in the system.
(End of clause)
(ES6200)
File details come from the government source that posted it. Updated .