Attachment 4 - Drawings pt2 Modernize Elevators Marion.pdf
PDF 2 MB Posted
- Attached to
- Y1DA--Modernize Elevators 1 through 4 Marion IL VAMC (P/N 657A5-19-903) (VA-20-00084527)
- Solicitation number
- 36E77621B0001
About this file
This document package includes construction drawings and hazardous materials assessments for modernizing elevators at the Marion VA Medical Center in Marion, Illinois. The project involves upgrading four existing overhead traction elevators located in buildings 1 and 38 through mechanical, electrical, communication, and HVAC system improvements. Minor architectural and asbestos abatement work is also included. The solicitation will be a service-disabled veteran-owned small business set-aside advertised on November 5, 2020, with a period of performance of approximately 255 calendar days from notice to proceed. The construction value is estimated between $1-5 million. The applicable NAICS code is 236220 with a $39.5 million size standard. Questions must be submitted in writing by the specified deadline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77621B0001 0004.docx | DOCX document | |
| 36E77621B0001 0003.docx | DOCX document | |
| Responses to Technical Questions Marion 20210108 .docx | DOCX document | |
| 36E77621B0001 0002.docx | DOCX document | |
| New Price Schedule.docx | DOCX document | |
| 36E77621B0001 0001.docx | DOCX document | |
| 36E77621B0001.docx | DOCX document | |
| Attachment 9 - Release of Claims.docx | DOCX document | |
| Attachment 8 - Contractor Safety and Environmental Record Evaluation Form.docx | DOCX document | |
| Attachment 7 - Wage Determination Marion - 20201113.pdf | ||
| Attachment 5 - Drawings pt3 Modernize Elevators Marion.pdf | ||
| Attachment 6 - Drawings pt4 Modernize Elevators Marion.pdf | ||
| Attachment 1 - Final SOW 657A5-19-903 Modernize Elevators.pdf | ||
| Attachment 2 - Specifications Modernize Elevators Marion.pdf | ||
| Attachment 3 - Drawings pt1 Modernize Elevators Marion.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPLACE/MODERNIZE
ELEVATORS 1-4
MARION, IL. 62959
657A5-19-903
07-13-2020
NO. DESCRIPTION DATE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS:
BLDG. 1, 38
Office of
Construction and Facilities
Management o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
CONSTRUCTION DOCUMENTS
PLAN
NORTH
ACTUAL
NORTH
FULLY SPRINKLERED
Department of
Veterans Affairs
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned
Small Business
SDVOSB
CVE
MR PROJECT NO: 0509-0004
B
A
C
D
E
F
KEYPLAN
BLDG
SPS
STORAGE
TRAILER
OFFICE
TRAILER
RAMP
TRAILER
CANOPY
Riverfront Safety & Health
11140 Towne Sqaure, Suite 100
St. Louis, MO. 63123 HA-101
JR CD
ASBESTOS CONTAINING MATERIALS
LEGEND
Building 1 - First and Second Floors
Asbestos floor tile and/or underlying asbestos mastic present.
Do not disturb, protect as necessary.
Asbestos floor tile and/or underlying asbestos mastic and asbestos pipe insulation and/or associated asbestos mudded fittings present. Do not disturb, protect as necessary.
KEY NOTES
GLOBAL NOTES
Double wrap, transport, and dispose of assumed asbestos elevator fire doors. General contractor to install temporary fall protection railing system, all floors. Nondestructive removal of fire doors by others.
Asbestos containing stucco material covers all external walls
A1
A2
UP UP
UP
LOBBY
SURGERY
SERVICE
VISIT COORD.
102A
VISIT COORD.
103A
ANTI-COAG
103B
CHIEF OF
SURGERY
103C
WAITING
CLOSET
RECEPTION
PATIENT
106A
PATIENT
106B
PATIENT
106C
PATIENT
106D
PATIENT
107A
PATIENT
107B
PATIENT
107C
PATIENT
107D
TOILET
107E
PATIENT
LOCKER
SURGERY
SERVICE
109A
LINEN
110A
SOILED
LINEN
110B
SURGERY
SERVICE
110C
CLOSET
110D
TOILET
HANDICAPPED
TOILET
PATIENT
113A
PATIENT
113B
PROCEDURE/PATIENT
113C
PYXIS
PROCEDURE/PAIN
PATIENT
EDUCATION &
CONSULTING
TOILET
116A
CORRIDOR
M.O.D.
STAIR
S102-01
CLOSET
118A
BATH
118B
CLOSET
119B
DENTIST
OFFICE
119A
DENTIST
RECEPTION
119C
DENTIST
WAITING
STAIR
S101-01
R.R. WOMEN
CLOSET
FEC
FEC
FEC
STAIR
S104-01
STAIR
S105-01
WAITING
103D
ELEVATOR
P-7
STAIR
S106-01
A1
A2
Tectonic Copyright 2007
UP
UP
DN
UP
UP
EXAM
EXAM
201A
WAITING ROOM
ONCOLOGY
HEMATOLOGY
HOSPITALIST
203 204A 204B
MED/SURG
SPECIALTY
CLERKS
ELEC CLOSET
H.A.C.
ELECTRICAL
PATIENT TOILET
CONSULT/TEACHING
VIEWING
SOILED UTILITY
CLEAN UTILITY
EQUIPMENT
CLOSET
STAIR
S204-01
CONTROL
PROCEDURE
SCRUB
EQUIPMENT &
LOGISTIC
STORAGE
RECOVERY
NURSE STATION
RECEPTION
PHYSICIAN'S
NURSE/TECH
WAITING ROOM
221A
STAFF
LOCKER
224A
LOCKER
224B
STAFF TOILET
224C
STAIR
S202-01
NURSE CALL
EQUIPMENT
CARDIOLOGY
STORAGE
CARDIOLOGY
CARDIOLOGY
PHARMACY
PHARMACY
231A
STAIR
S201-01
I.V. PUMP
STORAGE
FEC
FEC
STAIR
S205-01
STAIR
S203-01
CLOSET
ELEVATOR
P-7
A1
A2
Building 1 - FIRST FLOOR
Building 1 - SECOND FLOOR
A1
A1
Building 1 - Floor 1 & 2 - Environmental Design
Phasing: For building 1, elevators 1 and 2, and building 38, elevators 3 and 4, one elevator in each building set must be operational at all times. Only two elevators may be worked on at the same time, one from each building set. Elevators #2 and #4 are the priority (with elevator #4 as the highest priority) and are to be worked on first. After these elevators have been completed, inspected, and returned to full operation, elevators #1 and #3 shall be worked on.
Work that impacts asbestos containing materials is to be performed by a licensed abatement contractor and within a negative pressure containment.
Old asbestos stucco present on exterior walls of building, locations generally not shown, protect as necessary.
MARION, IL. 62959
657A5-19-903
07-13-2020
NO. DESCRIPTION DATE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS:
BLDG. 1, 38
Office of
Construction and Facilities
Management o n e e i g h t h i n c e f o o t
B
A
C
D
E
F t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
CONSTRUCTION DOCUMENTS
PLAN
NORTH
ACTUAL
NORTH
FULLY SPRINKLERED
Department of
Veterans Affairs
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned
Small Business
SDVOSB
CVE
MR PROJECT NO: 0509-0004
B
A
C
D
E
F
KEYPLAN
BLDG
SPS
STORAGE
TRAILER
OFFICE
TRAILER
RAMP
TRAILER
CANOPY
Riverfront Safety & Health
11140 Towne Sqaure, Suite 100
St. Louis, MO. 63123 HA-102
JR CD
ASBESTOS CONTAINING MATERIALS
LEGEND
Building 1 - Third and Fourth Floors
Asbestos floor tile and/or underlying asbestos mastic present.
Do not disturb, protect as necessary.
Asbestos floor tile and/or underlying asbestos mastic and asbestos pipe insulation and/or associated asbestos mudded fittings present. Do not disturb, protect as necessary.
KEY NOTES
GLOBAL NOTES
Double wrap, transport, and dispose of assumed asbestos elevator fire doors. General contractor to install temporary fall protection railing system, all floors. Nondestructive removal of fire doors by others.
Asbestos containing stucco material covers all external walls
A1
A2
Tectonic Copyright 2007
DN
DN
DN
DN
F E
C
FEC
FEC
FEC
RECEPTION/NURSES
STATION
WORK AREA
301A
BIO-MED EQUIP
BATH
302A
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
ELECTRICAL
SOILED UTILITY
PATIENT
BEDROOM
NOURISHMENT
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
ANTE
ANTE
EQUIP.
ANTE
NURSE MANAGER
OFFICES
STAFF R.R.
NURSES STATION
EQUIP
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
PHAR. MED
SOILED LINEN
ELEC.
FAMILY
CONSULTATION
MULTI-PURPOSE
VISITOR LOUNGE
LOCKER
OFFICE
OXYGEN
STORAGE
PHARMACY
LOGISTICS
NOURISHMENT
NURSE MANAGER
PATIENT
BEDROOM
PATIENT
BEDROOM
344A
PATIENT
BEDROOM
NURSES STATION
PATIENT
BEDROOM
ICU 1 BED
ICU 1 BED
ICU 1 BED
ICU 1 BED
ICU 1 BED
ANTE RM
ICU 1 BED
NURSES STATION
ICU 1 BED
STAFF LOCKER
SOILED UTILITY
ELEC. CLOSET
2 BEDS
PATIENT
BEDROOM
PATIENT
BEDROOM
PATIENT
BEDROOM
BATH
313A
BATH
314B
ISOLATION
314A
ISOLATION
315A
BATH
315B
ISOLATION
317A
BATH
317B
EQUIPMENT
ALCOVE
318A
EQUIPMENT
318B
DICTATION
320A
BATH
323A
BATH
324A
VISITOR'S TOILET
STAIR
S301-01
ELECTRICAL
339A
BATH
342A
BATH
343A
CLEAN LINEN
345B
SOILED LINEN
345C
STAFF R.R.
345D
LOCKER
345A
OXYGEN
STORAGE
345E
STAIR
S305-01
BATH
361A
BATH
362A
BATH
363A
BATH
364A
BATH
304A
BATH
305A
BATH
309A
BATH
311A
BATH
312A
BATH
322A
STAIR
S304-01
STAIR
S302-01
STAIR
S303-01
CLOSET
325A
STORAGE
313B
HAC
CLOSET
HAC
ELEVATOR
P-7
CORRIDOR
P-7A
A1
A2
FEC
TRASH CLOSET
LOUNGE
H.A.C.
PATIENT
RESTROOM
WASH
STERIS
ENDOSCOPY
OFFICE
STORAGE
STERILE SUPPLY
STORAGE
SOILED UTILITY
RECOVERY ROOM
ELEC.
CLOSET
STORAGE
OPERATING
ROOM NO. 2
CLEAN UTILITY
ROOM
STORAGE
419B
STERILIZER
419A
OPERATING
ROOM NO. 1
SCRUB-UP ROOM
STERILE SUPPLY
ROOM
OPERATING
ROOM NO. 3
Room
OFFICE
413B
STORAGE
417A
WOMENS
401B
WOMENS LOCKER
401C
MENS LOCKER
401D
MENS
401E
STAIR
1-S2
STAIR
S401-01
ELEVATOR
P-7
A1
A2
Building 1 - THIRD FLOOR
Building 1 - FOURTH FLOOR
A1
A1
Building 1 - Floor 3 & 4 - Environmental Design
Phasing: For building 1, elevators 1 and 2, and building 38, elevators 3 and 4, one elevator in each building set must be operational at all times. Only two elevators may be worked on at the same time, one from each building set. Elevators #2 and #4 are the priority (with elevator #4 as the highest priority) and are to be worked on first. After these elevators have been completed, inspected, and returned to full operation, elevators #1 and #3 shall be worked on.
Work that impacts asbestos containing materials is to be performed by a licensed abatement contractor and within a negative pressure containment.
Old asbestos stucco present on exterior walls of building, locations generally not shown, protect as necessary.
MARION, IL. 62959
657A5-19-903
07-13-2020
NO. DESCRIPTION DATE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS:
BLDG. 1, 38
Office of
Construction and Facilities
Management o n e e i g h t h i n c e f o o t
B
A
C
D
E
F t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
CONSTRUCTION DOCUMENTS
PLAN
NORTH
ACTUAL
NORTH
FULLY SPRINKLERED
Department of
Veterans Affairs
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned
Small Business
SDVOSB
CVE
MR PROJECT NO: 0509-0004
B
A
C
D
E
F
KEYPLAN
BLDG
SPS
STORAGE
TRAILER
OFFICE
TRAILER
RAMP
TRAILER
CANOPY
Riverfront Safety & Health
11140 Towne Sqaure, Suite 100
St. Louis, MO. 63123 HA-103
JR CD
ASBESTOS CONTAINING MATERIALS
LEGEND
Asbestos floor tile and/or asbestos mastic present. Do not disturb, protect as necessary.
Asbestos floor tile and/or asbestos mastic and Asbestos pipe insulation present. Do not disturb, protect as necessary.
KEY NOTES
Phasing: For building 1, elevators 1 and 2, and building 38, elevators 3 and 4, one elevator in each building set must be operational at all times. Only two elevators may be worked on at the same time, one from each building set. Elevators #2 and #4 are the priority (with elevator #4 as the highest priority) and are to be worked on first. After these elevators have been completed, inspected, and returned to full operation, elevators #1 and #3 shall be worked on.
Coordinate with general contractor for locations of new uni-strut and/or ceiling anchor placement. Attachments to be placed in brick or structural concrete and require up to 38" self tapping concrete screws or similar.
Demolition of fixtures to include items such as conduit, existing uni-strut, fire pipe, or disconnect switches attached to walls, ceilings, and headers with white lead-based painted brick or concrete substrate.
White lead-based paint is present on concrete ceiling, walls, and headers and brick walls of rooms 501 and 502.
Multiple negative pressure mini-containments are required to maintain operational elevators
GLOBAL NOTES
Building 1 - 5th Floor and Building 38
- Mechanical Room - Asbestos
Drawing
Deduct alternate 3 - Remove asbestos containing stucco using manual procedures and glovebag method - 2 ft²
HEPA vacuum and remove asbestos elevator brake pads - 12 pads and 4 negative air mini-containments.
Do not disturb assumed asbestos containing surfacing material on beam at upper west wall and under concrete cap of building 1 elevator shaft, protect as necessary.
A1
A2
A3
FAN ROOM
STAIR
S501-01
DUCT SPACE
DUCT SPACE
BUILDING 1
ROOF
BUILDING 38
A2A2
A1
A2
A2
Non-asbestos new stucco
Three stage wet decon
Negative pressure mini-containments
A2
Three stage wet decon
Negative pressure mini-containments
A3
Building 1 & 38 - 5th Floor - Environmental Design
MARION, IL. 62959
657A5-19-903
07-13-2020
NO. DESCRIPTION DATE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS:
BLDG. 1, 38
Office of
Construction and Facilities
Management o n e e i g h t h i n c e f o o t
B
A
C
D
E
F t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
CONSTRUCTION DOCUMENTS
PLAN
NORTH
ACTUAL
NORTH
FULLY SPRINKLERED
Department of
Veterans Affairs
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned
Small Business
SDVOSB
CVE
MR PROJECT NO: 0509-0004
B
A
C
D
E
F
KEYPLAN
BLDG
SPS
STORAGE
TRAILER
OFFICE
TRAILER
RAMP
TRAILER
CANOPY
Riverfront Safety & Health
11140 Towne Sqaure, Suite 100
St. Louis, MO. 63123 HA-104
JR CD
KEY NOTES
GLOBAL NOTES
Building 1 - 5th Floor and Building 38 -
Mechanical Room - Lead Abatement
Install/anchor uni-strut or ceiling attachments at locations coordinated with the general contractor into brick or structural concrete substrates with lead based paint and within negative pressure containment - 15 each
Remove electrical/mechanical/fire protection fixtures at locations coordinated with the general contractor and within a negative pressure containment - 20 ft²
Protect lead-based paint on walls, Do not disturb existing uni-strut, protect as required.
Deduct alternate 3: At window air conditioner opening, remove white lead-based paint within opening and 6" around interior brick face of opening using chemical stripper and within negative air containment - 14 ft²
Deduct alternate 3: As coordinated with the general contractor, install/anchor uni-strut and/or ceiling attachments to brick or concrete substrates with lead-based paint. Perform work within negative air containment - 5 each
Deduct alternate 3: Do not penetrate substrates or affix drain system attachments to white painted (lead-based) concrete or brick substrates, protect as necessary
L1
L2
L3
L4
L5
L6
FAN ROOM
STAIR
S501-01
DUCT SPACE
DUCT SPACE
BUILDING 1
ROOF
BUILDING 38
L1 L2
L2
L3
L3
L5
Three stage wet decon Negative pressure containment
Building 1 - 5th Floor and Building 38 -
Mechanical Room - Lead Abatement
L4
L6
L3
Building 1 & 38 - 5th Floor - Environmental Design
Phasing: For building 1, elevators 1 and 2, and building 38, elevators 3 and 4, one elevator in each building set must be operational at all times. Only two elevators may be worked on at the same time, one from each building set. Elevators #2 and #4 are the priority (with elevator #4 as the highest priority) and are to be worked on first. After these elevators have been completed, inspected, and returned to full operation, elevators #1 and #3 shall be worked on.
Coordinate with general contractor for locations of new uni-strut and/or ceiling anchor placement. Attachments to be placed in brick or structural concrete and require up to 38" self tapping concrete screws or similar.
Demolition of fixtures to include items such as conduit, existing uni-strut, fire pipe, or disconnect switches attached to walls, ceilings, and headers with white lead-based painted brick or concrete substrate.
White lead-based paint is present on concrete ceiling, walls, and headers and brick walls of rooms 501 and 502.
Multiple negative pressure mini-containments are required to maintain operational elevators
MARION, IL. 62959
657A5-19-903
07-13-2020
NO. DESCRIPTION DATE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS:
BLDG. 1, 38
Office of
Construction and Facilities
Management o n e e i g h t h i n c e f o o t
B
A
C
D
E
F t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
CONSTRUCTION DOCUMENTS
PLAN
NORTH
ACTUAL
NORTH
FULLY SPRINKLERED
Department of
Veterans Affairs
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned
Small Business
SDVOSB
CVE
MR PROJECT NO: 0509-0004
B
A
C
D
E
F
KEYPLAN
BLDG
SPS
STORAGE
TRAILER
OFFICE
TRAILER
RAMP
TRAILER
CANOPY
Riverfront Safety & Health
11140 Towne Sqaure, Suite 100
St. Louis, MO. 63123 HA-105
JR CD
ASBESTOS CONTAINING MATERIALS
LEGEND
Asbestos floor tile and/or asbestos mastic present. Do not disturb, protect as necessary.
Asbestos floor tile and/or asbestos mastic and Asbestos pipe insulation present. Do not disturb, protect as necessary.
KEY NOTES
GLOBAL NOTES
Double wrap, transport, and dispose of assumed asbestos elevator fire doors. General contractor to install temporary fall protection railing system, all floors. Nondestructive removal of fire doors to be performed by others.
Lead based painted "old" plaster ceiling is present above suspended ceiling, protect painted plaster as necessary.
A1
Building 38 - Ground Floor
L1
CARPENTER
SHOP
CORR.
CB2-38
ENGINEERING
MECH.
ENGINEERING
AUDIOLOGY
VENDING
CLEAN LINEN
006A
RETAIL STOR.
005A
CLEAN LINEN
FIBER OPTIC
006B
CORR.
CB3-38
CORR.
CB1-38
A1
CARPENTER
SHOP
CORR.
CB2-38
ENGINEERING
MECH.
ENGINEERING
AUDIOLOGY
VENDING
CLEAN LINEN
006A
RETAIL STOR.
005A
CLEAN LINEN
FIBER OPTIC
006B
CORR.
CB3-38
CORR.
CB1-38
A1
Building 38 - GROUND FLOOR
Building 38 - FIRST FLOOR
L1
L1
A1
A1
Building 38 - Ground and First Floors - Environmental Design
Phasing: For building 1, elevators 1 and 2, and building 38, elevators 3 and 4, one elevator in each building set must be operational at all times. Only two elevators may be worked on at the same time, one from each building set. Elevators #2 and #4 are the priority (with elevator #4 as the highest priority) and are to be worked on first. After these elevators have been completed, inspected, and returned to full operation, elevators #1 and #3 shall be worked on.
Work that impacts asbestos containing materials is to be performed by a licensed abatement contractor and within a negative pressure containment.
Old asbestos stucco present on exterior walls of building, locations generally not shown, protect as necessary.
MARION, IL. 62959
657A5-19-903
07-13-2020
NO. DESCRIPTION DATE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS:
BLDG. 1, 38
Office of
Construction and Facilities
Management o n e e i g h t h i n c e f o o t
B
A
C
D
E
F t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
CONSTRUCTION DOCUMENTS
PLAN
NORTH
ACTUAL
NORTH
FULLY SPRINKLERED
Department of
Veterans Affairs
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned
Small Business
SDVOSB
CVE
MR PROJECT NO: 0509-0004
B
A
C
D
E
F
KEYPLAN
BLDG
SPS
STORAGE
TRAILER
OFFICE
TRAILER
RAMP
TRAILER
CANOPY
Riverfront Safety & Health
11140 Towne Sqaure, Suite 100
St. Louis, MO. 63123 HA-106
JR CD
ASBESTOS CONTAINING MATERIALS
LEGEND
Asbestos floor tile and/or asbestos mastic present. Do not disturb, protect as necessary.
Asbestos floor tile and/or asbestos mastic and Asbestos pipe insulation present. Do not disturb, protect as necessary.
KEY NOTES
GLOBAL NOTES
Double wrap, transport, and dispose of assumed asbestos elevator fire doors. General contractor to install temporary fall protection railing system, all floors. Nondestructive removal of fire doors to be performed by others.
A1
Building 38 - Second, Third, and
Fourth Floors
WAIT.
EXAM.
EXAM
EXAM.
EXAM.
EXAM.
EXAM.
WAIT.
WAIT.
HAC
CLINIC NURSES
R.R.
STOR.
214A
RECEPTIONIST
CORR.
C203-38
CORR.
C201-38
ELEC.
STOR.
INPATIENT
DIETETIC
CLINICAL
DIETITION
INPATIENT
DIETETIC
217A
MECH.
CORR.
C204-38
WOMEN
HAC
MEN
STOR.
236A
FIBER OPTIC
236B
STRESS LAB
CORR.
C202-38
A1
DUMBWAITER
EQUIPMENT
STORAGE
SPD MGR.
STERILE/
NONSTERILE
DISPATCH
INVENTORY
MANANGEMENT
SPECIALIST
ANTE
308A
EQUIP. WASH
ETO
DECONTAMINATION
INVENTORY MGMT
STERILIZER
304A
IRM
312A
MALE
LOCKER
CORR.
C301-38
FEMALE
LOCKER
CORR.
C302-38
HAC
A1
MED. VAC.
MED. AIR
ROOFROOF
A1
Building 38 - SECOND FLOOR Building 38 - THIRD FLOOR
Building 38 - FOURTH FLOOR
Building 38 - Second, Third, and Fourth Floors - Environmental Design
Phasing: For building 1, elevators 1 and 2, and building 38, elevators 3 and 4, one elevator in each building set must be operational at all times. Only two elevators may be worked on at the same time, one from each building set. Elevators #2 and #4 are the priority (with elevator #4 as the highest priority) and are to be worked on first. After these elevators have been completed, inspected, and returned to full operation, elevators #1 and #3 shall be worked on.
Work that impacts asbestos containing materials is to be performed by a licensed abatement contractor and within a negative pressure containment.
Old asbestos stucco present on exterior walls of building, locations generally not shown, protect as necessary.
| 1-Cover Sheet |
| GI001 |
| GI001 |
| 2-Hazardous Materials |
| HA-100 |
| Sheets and Views |
| Model |
| Model |
| Model |
| Model |
| Model |
| Model |
| Model |
| Sheets and Views |
| Sheets and Views |
| Sheets and Views |
| Sheets and Views |
| Sheets and Views |
| Sheets and Views |
| HA-101 |
| Sheets and Views |
| Model |
| Model |
| Model |
| Model |
| Model |
| Model |
| Sheets and Views |
| Sheets and Views |
| Sheets and Views |
| Sheets and Views |
| Sheets and Views |
| HA-102 |
| Sheets and Views |
| Model |
| Model |
| Model |
| Model |
| Model |
| Sheets and Views |
| Sheets and Views |
| Sheets and Views |
| Sheets and Views |
| HA-103 |
| Sheets and Views |
| Model |
| Model |
| Model |
| Model |
| Sheets and Views |
| Sheets and Views |
| Sheets and Views |
| HA-104 |
| Sheets and Views |
| Model |
| Model |
| Model |
| Sheets and Views |
| Sheets and Views |
| HA-105 |
| Sheets and Views |
| Model |
| Model |
Sheets and Views
| HA-106 |
| Sheets and Views |
| Model |
| 3-Arch-ICRA |
| A-100 |
| A-100 |
| A-100 |
| A-101 |
| A-101 |
| A-101 |
| A-102 |
| A-102 |
| A-102 |
| 4-Mechanical |
| M-001 |
| M-001 |
| 5-Electrical |
| E-001 |
| E-001 |
| XX151 |
| E-002 |
| E-002 |
| E-002 |
| ED-101 |
| ED-101 |
| ED-101 |
| E-101 |
| E-101 |
| E-101 |
| E-102 |
| E-102 |
| E-102 |
| E-501 |
| E-501 |
| E-501 |
| E-502 |
| E-502 |
| E-502 |
| E-601 |
| E-601 |
| E-601 |
File details come from the government source that posted it. Updated .