This document package includes construction drawings and hazardous materials assessments for modernizing elevators at the Marion VA Medical Center in Marion, Illinois. The project involves upgrading four existing overhead traction elevators located in buildings 1 and 38 through mechanical, electrical, communication, and HVAC system improvements. Minor architectural and asbestos abatement work is also included. The solicitation will be a service-disabled veteran-owned small business set-aside advertised on November 5, 2020, with a period of performance of approximately 255 calendar days from notice to proceed. The construction value is estimated between $1-5 million. The applicable NAICS code is 236220 with a $39.5 million size standard. Questions must be submitted in writing by the specified deadline.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPLACE/MODERNIZE

ELEVATORS 1-4

MARION, IL. 62959

657A5-19-903

07-13-2020

NO. DESCRIPTION DATE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS:

BLDG. 1, 38

Office of

Construction and Facilities

Management o n e e i g h t h i n c h o n e f o o t

B

A

C

D

E

F t h r e e i n c h e s e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

CONSTRUCTION DOCUMENTS

PLAN

NORTH

ACTUAL

NORTH

FULLY SPRINKLERED

Department of

Veterans Affairs

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned

Small Business

SDVOSB

CVE

MR PROJECT NO: 0509-0004

B

A

C

D

E

F

KEYPLAN

BLDG

SPS

STORAGE

TRAILER

OFFICE

TRAILER

RAMP

TRAILER

CANOPY

Riverfront Safety & Health

11140 Towne Sqaure, Suite 100

St. Louis, MO. 63123 HA-101

JR CD

ASBESTOS CONTAINING MATERIALS

LEGEND

Building 1 - First and Second Floors

Asbestos floor tile and/or underlying asbestos mastic present.

Do not disturb, protect as necessary.

Asbestos floor tile and/or underlying asbestos mastic and asbestos pipe insulation and/or associated asbestos mudded fittings present. Do not disturb, protect as necessary.

KEY NOTES

GLOBAL NOTES

Double wrap, transport, and dispose of assumed asbestos elevator fire doors. General contractor to install temporary fall protection railing system, all floors. Nondestructive removal of fire doors by others.

Asbestos containing stucco material covers all external walls

A1

A2

UP UP

UP

LOBBY

SURGERY

SERVICE

VISIT COORD.

102A

VISIT COORD.

103A

ANTI-COAG

103B

CHIEF OF

SURGERY

103C

WAITING

CLOSET

RECEPTION

PATIENT

106A

PATIENT

106B

PATIENT

106C

PATIENT

106D

PATIENT

107A

PATIENT

107B

PATIENT

107C

PATIENT

107D

TOILET

107E

PATIENT

LOCKER

SURGERY

SERVICE

109A

LINEN

110A

SOILED

LINEN

110B

SURGERY

SERVICE

110C

CLOSET

110D

TOILET

HANDICAPPED

TOILET

PATIENT

113A

PATIENT

113B

PROCEDURE/PATIENT

113C

PYXIS

PROCEDURE/PAIN

PATIENT

EDUCATION &

CONSULTING

TOILET

116A

CORRIDOR

M.O.D.

STAIR

S102-01

CLOSET

118A

BATH

118B

CLOSET

119B

DENTIST

OFFICE

119A

DENTIST

RECEPTION

119C

DENTIST

WAITING

STAIR

S101-01

R.R. WOMEN

CLOSET

FEC

FEC

FEC

STAIR

S104-01

STAIR

S105-01

WAITING

103D

ELEVATOR

P-7

STAIR

S106-01

A1

A2

Tectonic Copyright 2007

UP

UP

DN

UP

UP

EXAM

EXAM

201A

WAITING ROOM

ONCOLOGY

HEMATOLOGY

HOSPITALIST

203 204A 204B

MED/SURG

SPECIALTY

CLERKS

ELEC CLOSET

H.A.C.

ELECTRICAL

PATIENT TOILET

CONSULT/TEACHING

VIEWING

SOILED UTILITY

CLEAN UTILITY

EQUIPMENT

CLOSET

STAIR

S204-01

CONTROL

PROCEDURE

SCRUB

EQUIPMENT &

LOGISTIC

STORAGE

RECOVERY

NURSE STATION

RECEPTION

PHYSICIAN'S

NURSE/TECH

WAITING ROOM

221A

STAFF

LOCKER

224A

LOCKER

224B

STAFF TOILET

224C

STAIR

S202-01

NURSE CALL

EQUIPMENT

CARDIOLOGY

STORAGE

CARDIOLOGY

CARDIOLOGY

PHARMACY

PHARMACY

231A

STAIR

S201-01

I.V. PUMP

STORAGE

FEC

FEC

STAIR

S205-01

STAIR

S203-01

CLOSET

ELEVATOR

P-7

A1

A2

Building 1 - FIRST FLOOR

Building 1 - SECOND FLOOR

A1

A1

Building 1 - Floor 1 & 2 - Environmental Design

Phasing: For building 1, elevators 1 and 2, and building 38, elevators 3 and 4, one elevator in each building set must be operational at all times. Only two elevators may be worked on at the same time, one from each building set. Elevators #2 and #4 are the priority (with elevator #4 as the highest priority) and are to be worked on first. After these elevators have been completed, inspected, and returned to full operation, elevators #1 and #3 shall be worked on.

Work that impacts asbestos containing materials is to be performed by a licensed abatement contractor and within a negative pressure containment.

Old asbestos stucco present on exterior walls of building, locations generally not shown, protect as necessary.

MARION, IL. 62959

657A5-19-903

07-13-2020

NO. DESCRIPTION DATE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS:

BLDG. 1, 38

Office of

Construction and Facilities

Management o n e e i g h t h i n c e f o o t

B

A

C

D

E

F t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

CONSTRUCTION DOCUMENTS

PLAN

NORTH

ACTUAL

NORTH

FULLY SPRINKLERED

Department of

Veterans Affairs

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned

Small Business

SDVOSB

CVE

MR PROJECT NO: 0509-0004

B

A

C

D

E

F

KEYPLAN

BLDG

SPS

STORAGE

TRAILER

OFFICE

TRAILER

RAMP

TRAILER

CANOPY

Riverfront Safety & Health

11140 Towne Sqaure, Suite 100

St. Louis, MO. 63123 HA-102

JR CD

ASBESTOS CONTAINING MATERIALS

LEGEND

Building 1 - Third and Fourth Floors

Asbestos floor tile and/or underlying asbestos mastic present.

Do not disturb, protect as necessary.

Asbestos floor tile and/or underlying asbestos mastic and asbestos pipe insulation and/or associated asbestos mudded fittings present. Do not disturb, protect as necessary.

KEY NOTES

GLOBAL NOTES

Double wrap, transport, and dispose of assumed asbestos elevator fire doors. General contractor to install temporary fall protection railing system, all floors. Nondestructive removal of fire doors by others.

Asbestos containing stucco material covers all external walls

A1

A2

Tectonic Copyright 2007

DN

DN

DN

DN

F E

C

FEC

FEC

FEC

RECEPTION/NURSES

STATION

WORK AREA

301A

BIO-MED EQUIP

BATH

302A

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

ELECTRICAL

SOILED UTILITY

PATIENT

BEDROOM

NOURISHMENT

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

ANTE

ANTE

EQUIP.

ANTE

NURSE MANAGER

OFFICES

STAFF R.R.

NURSES STATION

EQUIP

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

PHAR. MED

SOILED LINEN

ELEC.

FAMILY

CONSULTATION

MULTI-PURPOSE

VISITOR LOUNGE

LOCKER

OFFICE

OXYGEN

STORAGE

PHARMACY

LOGISTICS

NOURISHMENT

NURSE MANAGER

PATIENT

BEDROOM

PATIENT

BEDROOM

344A

PATIENT

BEDROOM

NURSES STATION

PATIENT

BEDROOM

ICU 1 BED

ICU 1 BED

ICU 1 BED

ICU 1 BED

ICU 1 BED

ANTE RM

ICU 1 BED

NURSES STATION

ICU 1 BED

STAFF LOCKER

SOILED UTILITY

ELEC. CLOSET

2 BEDS

PATIENT

BEDROOM

PATIENT

BEDROOM

PATIENT

BEDROOM

BATH

313A

BATH

314B

ISOLATION

314A

ISOLATION

315A

BATH

315B

ISOLATION

317A

BATH

317B

EQUIPMENT

ALCOVE

318A

EQUIPMENT

318B

DICTATION

320A

BATH

323A

BATH

324A

VISITOR'S TOILET

STAIR

S301-01

ELECTRICAL

339A

BATH

342A

BATH

343A

CLEAN LINEN

345B

SOILED LINEN

345C

STAFF R.R.

345D

LOCKER

345A

OXYGEN

STORAGE

345E

STAIR

S305-01

BATH

361A

BATH

362A

BATH

363A

BATH

364A

BATH

304A

BATH

305A

BATH

309A

BATH

311A

BATH

312A

BATH

322A

STAIR

S304-01

STAIR

S302-01

STAIR

S303-01

CLOSET

325A

STORAGE

313B

HAC

CLOSET

HAC

ELEVATOR

P-7

CORRIDOR

P-7A

A1

A2

FEC

TRASH CLOSET

LOUNGE

H.A.C.

PATIENT

RESTROOM

WASH

STERIS

ENDOSCOPY

OFFICE

STORAGE

STERILE SUPPLY

STORAGE

SOILED UTILITY

RECOVERY ROOM

ELEC.

CLOSET

STORAGE

OPERATING

ROOM NO. 2

CLEAN UTILITY

ROOM

STORAGE

419B

STERILIZER

419A

OPERATING

ROOM NO. 1

SCRUB-UP ROOM

STERILE SUPPLY

ROOM

OPERATING

ROOM NO. 3

Room

OFFICE

413B

STORAGE

417A

WOMENS

401B

WOMENS LOCKER

401C

MENS LOCKER

401D

MENS

401E

STAIR

1-S2

STAIR

S401-01

ELEVATOR

P-7

A1

A2

Building 1 - THIRD FLOOR

Building 1 - FOURTH FLOOR

A1

A1

Building 1 - Floor 3 & 4 - Environmental Design

Phasing: For building 1, elevators 1 and 2, and building 38, elevators 3 and 4, one elevator in each building set must be operational at all times. Only two elevators may be worked on at the same time, one from each building set. Elevators #2 and #4 are the priority (with elevator #4 as the highest priority) and are to be worked on first. After these elevators have been completed, inspected, and returned to full operation, elevators #1 and #3 shall be worked on.

Work that impacts asbestos containing materials is to be performed by a licensed abatement contractor and within a negative pressure containment.

Old asbestos stucco present on exterior walls of building, locations generally not shown, protect as necessary.

MARION, IL. 62959

657A5-19-903

07-13-2020

NO. DESCRIPTION DATE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS:

BLDG. 1, 38

Office of

Construction and Facilities

Management o n e e i g h t h i n c e f o o t

B

A

C

D

E

F t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

CONSTRUCTION DOCUMENTS

PLAN

NORTH

ACTUAL

NORTH

FULLY SPRINKLERED

Department of

Veterans Affairs

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned

Small Business

SDVOSB

CVE

MR PROJECT NO: 0509-0004

B

A

C

D

E

F

KEYPLAN

BLDG

SPS

STORAGE

TRAILER

OFFICE

TRAILER

RAMP

TRAILER

CANOPY

Riverfront Safety & Health

11140 Towne Sqaure, Suite 100

St. Louis, MO. 63123 HA-103

JR CD

ASBESTOS CONTAINING MATERIALS

LEGEND

Asbestos floor tile and/or asbestos mastic present. Do not disturb, protect as necessary.

Asbestos floor tile and/or asbestos mastic and Asbestos pipe insulation present. Do not disturb, protect as necessary.

KEY NOTES

Phasing: For building 1, elevators 1 and 2, and building 38, elevators 3 and 4, one elevator in each building set must be operational at all times. Only two elevators may be worked on at the same time, one from each building set. Elevators #2 and #4 are the priority (with elevator #4 as the highest priority) and are to be worked on first. After these elevators have been completed, inspected, and returned to full operation, elevators #1 and #3 shall be worked on.

Coordinate with general contractor for locations of new uni-strut and/or ceiling anchor placement. Attachments to be placed in brick or structural concrete and require up to 38" self tapping concrete screws or similar.

Demolition of fixtures to include items such as conduit, existing uni-strut, fire pipe, or disconnect switches attached to walls, ceilings, and headers with white lead-based painted brick or concrete substrate.

White lead-based paint is present on concrete ceiling, walls, and headers and brick walls of rooms 501 and 502.

Multiple negative pressure mini-containments are required to maintain operational elevators

GLOBAL NOTES

Building 1 - 5th Floor and Building 38

- Mechanical Room - Asbestos

Drawing

Deduct alternate 3 - Remove asbestos containing stucco using manual procedures and glovebag method - 2 ft²

HEPA vacuum and remove asbestos elevator brake pads - 12 pads and 4 negative air mini-containments.

Do not disturb assumed asbestos containing surfacing material on beam at upper west wall and under concrete cap of building 1 elevator shaft, protect as necessary.

A1

A2

A3

FAN ROOM

STAIR

S501-01

DUCT SPACE

DUCT SPACE

BUILDING 1

ROOF

BUILDING 38

A2A2

A1

A2

A2

Non-asbestos new stucco

Three stage wet decon

Negative pressure mini-containments

A2

Three stage wet decon

Negative pressure mini-containments

A3

Building 1 & 38 - 5th Floor - Environmental Design

MARION, IL. 62959

657A5-19-903

07-13-2020

NO. DESCRIPTION DATE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS:

BLDG. 1, 38

Office of

Construction and Facilities

Management o n e e i g h t h i n c e f o o t

B

A

C

D

E

F t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

CONSTRUCTION DOCUMENTS

PLAN

NORTH

ACTUAL

NORTH

FULLY SPRINKLERED

Department of

Veterans Affairs

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned

Small Business

SDVOSB

CVE

MR PROJECT NO: 0509-0004

B

A

C

D

E

F

KEYPLAN

BLDG

SPS

STORAGE

TRAILER

OFFICE

TRAILER

RAMP

TRAILER

CANOPY

Riverfront Safety & Health

11140 Towne Sqaure, Suite 100

St. Louis, MO. 63123 HA-104

JR CD

KEY NOTES

GLOBAL NOTES

Building 1 - 5th Floor and Building 38 -

Mechanical Room - Lead Abatement

Install/anchor uni-strut or ceiling attachments at locations coordinated with the general contractor into brick or structural concrete substrates with lead based paint and within negative pressure containment - 15 each

Remove electrical/mechanical/fire protection fixtures at locations coordinated with the general contractor and within a negative pressure containment - 20 ft²

Protect lead-based paint on walls, Do not disturb existing uni-strut, protect as required.

Deduct alternate 3: At window air conditioner opening, remove white lead-based paint within opening and 6" around interior brick face of opening using chemical stripper and within negative air containment - 14 ft²

Deduct alternate 3: As coordinated with the general contractor, install/anchor uni-strut and/or ceiling attachments to brick or concrete substrates with lead-based paint. Perform work within negative air containment - 5 each

Deduct alternate 3: Do not penetrate substrates or affix drain system attachments to white painted (lead-based) concrete or brick substrates, protect as necessary

L1

L2

L3

L4

L5

L6

FAN ROOM

STAIR

S501-01

DUCT SPACE

DUCT SPACE

BUILDING 1

ROOF

BUILDING 38

L1 L2

L2

L3

L3

L5

Three stage wet decon Negative pressure containment

Building 1 - 5th Floor and Building 38 -

Mechanical Room - Lead Abatement

L4

L6

L3

Building 1 & 38 - 5th Floor - Environmental Design

Phasing: For building 1, elevators 1 and 2, and building 38, elevators 3 and 4, one elevator in each building set must be operational at all times. Only two elevators may be worked on at the same time, one from each building set. Elevators #2 and #4 are the priority (with elevator #4 as the highest priority) and are to be worked on first. After these elevators have been completed, inspected, and returned to full operation, elevators #1 and #3 shall be worked on.

Coordinate with general contractor for locations of new uni-strut and/or ceiling anchor placement. Attachments to be placed in brick or structural concrete and require up to 38" self tapping concrete screws or similar.

Demolition of fixtures to include items such as conduit, existing uni-strut, fire pipe, or disconnect switches attached to walls, ceilings, and headers with white lead-based painted brick or concrete substrate.

White lead-based paint is present on concrete ceiling, walls, and headers and brick walls of rooms 501 and 502.

Multiple negative pressure mini-containments are required to maintain operational elevators

MARION, IL. 62959

657A5-19-903

07-13-2020

NO. DESCRIPTION DATE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS:

BLDG. 1, 38

Office of

Construction and Facilities

Management o n e e i g h t h i n c e f o o t

B

A

C

D

E

F t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

CONSTRUCTION DOCUMENTS

PLAN

NORTH

ACTUAL

NORTH

FULLY SPRINKLERED

Department of

Veterans Affairs

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned

Small Business

SDVOSB

CVE

MR PROJECT NO: 0509-0004

B

A

C

D

E

F

KEYPLAN

BLDG

SPS

STORAGE

TRAILER

OFFICE

TRAILER

RAMP

TRAILER

CANOPY

Riverfront Safety & Health

11140 Towne Sqaure, Suite 100

St. Louis, MO. 63123 HA-105

JR CD

ASBESTOS CONTAINING MATERIALS

LEGEND

Asbestos floor tile and/or asbestos mastic present. Do not disturb, protect as necessary.

Asbestos floor tile and/or asbestos mastic and Asbestos pipe insulation present. Do not disturb, protect as necessary.

KEY NOTES

GLOBAL NOTES

Double wrap, transport, and dispose of assumed asbestos elevator fire doors. General contractor to install temporary fall protection railing system, all floors. Nondestructive removal of fire doors to be performed by others.

Lead based painted "old" plaster ceiling is present above suspended ceiling, protect painted plaster as necessary.

A1

Building 38 - Ground Floor

L1

CARPENTER

SHOP

CORR.

CB2-38

ENGINEERING

MECH.

ENGINEERING

AUDIOLOGY

VENDING

CLEAN LINEN

006A

RETAIL STOR.

005A

CLEAN LINEN

FIBER OPTIC

006B

CORR.

CB3-38

CORR.

CB1-38

A1

CARPENTER

SHOP

CORR.

CB2-38

ENGINEERING

MECH.

ENGINEERING

AUDIOLOGY

VENDING

CLEAN LINEN

006A

RETAIL STOR.

005A

CLEAN LINEN

FIBER OPTIC

006B

CORR.

CB3-38

CORR.

CB1-38

A1

Building 38 - GROUND FLOOR

Building 38 - FIRST FLOOR

L1

L1

A1

A1

Building 38 - Ground and First Floors - Environmental Design

Phasing: For building 1, elevators 1 and 2, and building 38, elevators 3 and 4, one elevator in each building set must be operational at all times. Only two elevators may be worked on at the same time, one from each building set. Elevators #2 and #4 are the priority (with elevator #4 as the highest priority) and are to be worked on first. After these elevators have been completed, inspected, and returned to full operation, elevators #1 and #3 shall be worked on.

Work that impacts asbestos containing materials is to be performed by a licensed abatement contractor and within a negative pressure containment.

Old asbestos stucco present on exterior walls of building, locations generally not shown, protect as necessary.

MARION, IL. 62959

657A5-19-903

07-13-2020

NO. DESCRIPTION DATE

Drawing Title

Approved: Project Director

Project Title

Date

Location

Checked

Building Number

Project Number

Drawing Number

Drawn

CONSULTANTS:

BLDG. 1, 38

Office of

Construction and Facilities

Management o n e e i g h t h i n c e f o o t

B

A

C

D

E

F t h r e e i n c h e e f o o t o n e a n d o n e h a l f i n c h e e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t

VA FORM 08-6231

1 2 3 4 5 6 87 9

97 8654321

CONSTRUCTION DOCUMENTS

PLAN

NORTH

ACTUAL

NORTH

FULLY SPRINKLERED

Department of

Veterans Affairs

PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE

WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE

PROFESSIONAL ENGINEER.

Miller-Remick LLC

1010 KINGS HIGHWAY SOUTH

CHERRY HILL, NEW JERSEY 08034

PHONE: (856)429-4000

FAX: (856)429-5002

M.E.P. & Structural Engineering

A Service Disabled Veteran Owned

Small Business

SDVOSB

CVE

MR PROJECT NO: 0509-0004

B

A

C

D

E

F

KEYPLAN

BLDG

SPS

STORAGE

TRAILER

OFFICE

TRAILER

RAMP

TRAILER

CANOPY

Riverfront Safety & Health

11140 Towne Sqaure, Suite 100

St. Louis, MO. 63123 HA-106

JR CD

ASBESTOS CONTAINING MATERIALS

LEGEND

Asbestos floor tile and/or asbestos mastic present. Do not disturb, protect as necessary.

Asbestos floor tile and/or asbestos mastic and Asbestos pipe insulation present. Do not disturb, protect as necessary.

KEY NOTES

GLOBAL NOTES

Double wrap, transport, and dispose of assumed asbestos elevator fire doors. General contractor to install temporary fall protection railing system, all floors. Nondestructive removal of fire doors to be performed by others.

A1

Building 38 - Second, Third, and

Fourth Floors

WAIT.

EXAM.

EXAM

EXAM.

EXAM.

EXAM.

EXAM.

WAIT.

WAIT.

HAC

CLINIC NURSES

R.R.

STOR.

214A

RECEPTIONIST

CORR.

C203-38

CORR.

C201-38

ELEC.

STOR.

INPATIENT

DIETETIC

CLINICAL

DIETITION

INPATIENT

DIETETIC

217A

MECH.

CORR.

C204-38

WOMEN

HAC

MEN

STOR.

236A

FIBER OPTIC

236B

STRESS LAB

CORR.

C202-38

A1

DUMBWAITER

EQUIPMENT

STORAGE

SPD MGR.

STERILE/

NONSTERILE

DISPATCH

INVENTORY

MANANGEMENT

SPECIALIST

ANTE

308A

EQUIP. WASH

ETO

DECONTAMINATION

INVENTORY MGMT

STERILIZER

304A

IRM

312A

MALE

LOCKER

CORR.

C301-38

FEMALE

LOCKER

CORR.

C302-38

HAC

A1

MED. VAC.

MED. AIR

ROOFROOF

A1

Building 38 - SECOND FLOOR Building 38 - THIRD FLOOR

Building 38 - FOURTH FLOOR

Building 38 - Second, Third, and Fourth Floors - Environmental Design

Phasing: For building 1, elevators 1 and 2, and building 38, elevators 3 and 4, one elevator in each building set must be operational at all times. Only two elevators may be worked on at the same time, one from each building set. Elevators #2 and #4 are the priority (with elevator #4 as the highest priority) and are to be worked on first. After these elevators have been completed, inspected, and returned to full operation, elevators #1 and #3 shall be worked on.

Work that impacts asbestos containing materials is to be performed by a licensed abatement contractor and within a negative pressure containment.

Old asbestos stucco present on exterior walls of building, locations generally not shown, protect as necessary.

1-Cover Sheet
GI001
GI001
2-Hazardous Materials
HA-100
Sheets and Views
Model
Model
Model
Model
Model
Model
Model
Sheets and Views
Sheets and Views
Sheets and Views
Sheets and Views
Sheets and Views
Sheets and Views
HA-101
Sheets and Views
Model
Model
Model
Model
Model
Model
Sheets and Views
Sheets and Views
Sheets and Views
Sheets and Views
Sheets and Views
HA-102
Sheets and Views
Model
Model
Model
Model
Model
Sheets and Views
Sheets and Views
Sheets and Views
Sheets and Views
HA-103
Sheets and Views
Model
Model
Model
Model
Sheets and Views
Sheets and Views
Sheets and Views
HA-104
Sheets and Views
Model
Model
Model
Sheets and Views
Sheets and Views
HA-105
Sheets and Views
Model
Model

Sheets and Views

HA-106
Sheets and Views
Model
3-Arch-ICRA
A-100
A-100
A-100
A-101
A-101
A-101
A-102
A-102
A-102
4-Mechanical
M-001
M-001
5-Electrical
E-001
E-001
XX151
E-002
E-002
E-002
ED-101
ED-101
ED-101
E-101
E-101
E-101
E-102
E-102
E-102
E-501
E-501
E-501
E-502
E-502
E-502
E-601
E-601
E-601

File details come from the government source that posted it. Updated .