Attachment 3 - Drawings pt1 Modernize Elevators Marion.pdf
PDF 5 MB Posted
- Attached to
- Y1DA--Modernize Elevators 1 through 4 Marion IL VAMC (P/N 657A5-19-903) (VA-20-00084527)
- Solicitation number
- 36E77621B0001
About this file
This document provides details on a federal construction solicitation for modernizing elevators at the Marion VA Medical Center in Marion, Illinois. The solicitation will be issued as an Invitation for Bid for a firm-fixed-price design-bid-build contract to modernize four existing overhead traction elevators located in buildings 1 and 38. The scope of work includes mechanical, electrical, communication, and HVAC system upgrades to the elevator systems as well as upgrades to electrical power distribution and minor architectural and hazardous material mitigation activities. The solicitation will be set aside for Service-Disabled Veteran-Owned Small Businesses and advertised on November 5, 2020, with a period of performance of approximately 255 calendar days from notice to proceed. The estimated value of construction is between $1 million and $5 million. All questions must be submitted in writing by the specified due date.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36E77621B0001 0004.docx | DOCX document | |
| 36E77621B0001 0003.docx | DOCX document | |
| Responses to Technical Questions Marion 20210108 .docx | DOCX document | |
| 36E77621B0001 0002.docx | DOCX document | |
| New Price Schedule.docx | DOCX document | |
| 36E77621B0001 0001.docx | DOCX document | |
| 36E77621B0001.docx | DOCX document | |
| Attachment 4 - Drawings pt2 Modernize Elevators Marion.pdf | ||
| Attachment 9 - Release of Claims.docx | DOCX document | |
| Attachment 8 - Contractor Safety and Environmental Record Evaluation Form.docx | DOCX document | |
| Attachment 7 - Wage Determination Marion - 20201113.pdf | ||
| Attachment 5 - Drawings pt3 Modernize Elevators Marion.pdf | ||
| Attachment 6 - Drawings pt4 Modernize Elevators Marion.pdf | ||
| Attachment 1 - Final SOW 657A5-19-903 Modernize Elevators.pdf | ||
| Attachment 2 - Specifications Modernize Elevators Marion.pdf |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
COVER SHEET & DRAWING INDEX
GI001
DSSF
REPLACE/MODERNIZE
ELEVATORS 1-4
657A5-19-903
NO. DESCRIPTION DATE
BLDG. 1, 38
B
A
C
D
E
F
1 2 3 4 5 6 87 9
97 8654321
CONSTRUCTION DOCUMENTS
FULLY SPRINKLERED
Department of Veterans Affairs
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned Small Business
MR PROJECT NO: 0509-0004
B
A
C
D
E
F
REPLACE/MODERNIZE
ELEVATORS 1-4
MARION, IL. 62959
657A5-19-903
07-13-2020
NO. DESCRIPTION DATE
Drawing Title
Approved: Project Director
Project Title
Date
Location
Checked
Building Number
Project Number
Drawing Number
Drawn
CONSULTANTS:
BLDG. 1, 38
Office of
Construction and Facilities
Management o n e e i g h t h i n c h o n e f o o t
B
A
C
D
E
F t h r e e i n c h e s e f o o t o n e a n d o n e h a l f i n c h e s e f o o t o n e i n c e f o o t t h r e e q u a r t e r s i n c e f o o t o n e h a l f i n c e f o o t t h r e e e i g h t h s i n c e f o o t o n e q u a r t e r i n c e f o o t
VA FORM 08-6231
1 2 3 4 5 6 87 9
97 8654321
CONSTRUCTION DOCUMENTS
PLAN
NORTH
ACTUAL
NORTH
FULLY SPRINKLERED
Department of
Veterans Affairs
PRINTS OF THIS DRAWING SHALL NOT BE USED FOR ANY PURPOSE
WHATSOEVER WITHOUT THE SEAL AND SIGNATURE OF THE
PROFESSIONAL ENGINEER.
Miller-Remick LLC
1010 KINGS HIGHWAY SOUTH
CHERRY HILL, NEW JERSEY 08034
PHONE: (856)429-4000
FAX: (856)429-5002
M.E.P. & Structural Engineering
A Service Disabled Veteran Owned
Small Business
SDVOSB
CVE
MR PROJECT NO: 0509-0004
B
A
C
D
E
F
KEYPLAN
BLDG
SPS
STORAGE
TRAILER
OFFICE
TRAILER
RAMP
TRAILER
CANOPY
Riverfront Safety & Health
11140 Towne Sqaure, Suite 100
St. Louis, MO. 63123
Building 1 - Basement and Ground- Environmental Design
HA-100
JR CD
ASBESTOS CONTAINING MATERIALS
LEGEND
Building 1 - Basement and Ground Floor
Asbestos floor tile and/or underlying asbestos mastic present.
Do not disturb, protect as necessary.
Asbestos floor tile and/or underlying asbestos mastic and asbestos pipe insulation and/or associated asbestos mudded fittings present. Do not disturb, protect as necessary.
KEY NOTES
Phasing: For building 1, elevators 1 and 2, and building 38, elevators 3 and 4, one elevator in each building set must be operational at all times. Only two elevators may be worked on at the same time, one from each building set. Elevators #2 and #4 are the priority (with elevator #4 as the highest priority) and are to be worked on first. After these elevators have been completed, inspected, and returned to full operation, elevators #1 and #3 shall be worked on.
Work that impacts asbestos containing materials is to be performed by a licensed abatement contractor and within a negative pressure containment.
Old asbestos stucco present on exterior walls of building, locations generally not shown, protect as necessary.
GLOBAL NOTES
Double wrap, transport, and dispose of assumed asbestos elevator fire doors. General contractor to install temporary fall protection railing system, all floors. Nondestructive removal of fire doors by others.
Asbestos containing stucco material covers all external walls
Asbestos pipe insulation present, protect as necessary.
A1
A2
A3
MECHANICAL
Building 1 - BASEMENT
EMS
ELECTRICAL
EXAM
RESTROOM
EXAM
DOCTOR OFFICE
EMS STORAGE
MECHANICAL
IT
R.R. WOMEN
MORGUE
ORTHO CLINIC
ORTHO CLINIC
WORK ROOM
RESTROOM
BDG EXAM
CHEMOTHERAPY
EXAM
EXAM
EXAM
WAITING
H.A.C.
ELECTRICAL
CLOSET
RESP. PFT.
AUTOPSY
033A
MORGUE
STORAGE
033B
TOILET
033C
EXAM
035A
EXAM
035B
EXAM
035C
HEMATOLOGY/ONCOLOGY
035D
RECEPTION
035E
EXAM
035F
DR OFFICE
036A
STORAGE
038A
EXAM
043A
RESP. OFFICE
046A
PATIENT
EDUCATION
046B
RESP. STORAGE
046C
CORRIDOR
CB8-01
CORRIDOR
CB9-01
STAIRS
SB2-01
STAIRS
SB1-01
CORRIDOR
CB1-01
CORRIDOR
CB5-01
CORRIDOR
CB6-01
STAIRS
SB6?-01?
CORRIDOR
CB7-01
STAIRS
SB5-01
MECH ELEV
STAIRS
SB4-01
RESTROOM
038B
ELEVATOR
P-7
FEC
FFC
FEC
FEC
FEC
REGISTRATION
FILE
FILE
AUDIOLOGY
PULMONARY/
RESPIRATORY
REGISTRATION
001A
Room
Room
Room
Room
007A
Room
014A
Room
013A
Room
009A
Room
Room
010A
Room
Room
008C
Room
Room
008B
Room
008A
RESTROOM
Room
Room
Room
Room
Room
CB3-01
ELEC
SWITCHGEAR
STORAGE
P-001
A2
A3
Building 1 - GROUND FLOOR
A1
A1
A2
A3
A3
A1
A1
| 1-Cover Sheet |
| GI001 |
| GI001 |
| 2-Hazardous Materials |
| HA-100 |
| Sheets and Views |
| Model |
| Model |
| Model |
| Model |
| Model |
| Model |
| Model |
| Sheets and Views |
| Sheets and Views |
| Sheets and Views |
| Sheets and Views |
| Sheets and Views |
| Sheets and Views |
| HA-101 |
| Sheets and Views |
| Model |
| Model |
| Model |
| Model |
| Model |
| Model |
| Sheets and Views |
| Sheets and Views |
| Sheets and Views |
| Sheets and Views |
| Sheets and Views |
| HA-102 |
| Sheets and Views |
| Model |
| Model |
| Model |
| Model |
| Model |
| Sheets and Views |
| Sheets and Views |
| Sheets and Views |
| Sheets and Views |
| HA-103 |
| Sheets and Views |
| Model |
| Model |
| Model |
| Model |
| Sheets and Views |
| Sheets and Views |
| Sheets and Views |
| HA-104 |
| Sheets and Views |
| Model |
| Model |
| Model |
| Sheets and Views |
| Sheets and Views |
| HA-105 |
| Sheets and Views |
| Model |
| Model |
Sheets and Views
| HA-106 |
| Sheets and Views |
| Model |
| 3-Arch-ICRA |
| A-100 |
| A-100 |
| A-100 |
| A-101 |
| A-101 |
| A-101 |
| A-102 |
| A-102 |
| A-102 |
| 4-Mechanical |
| M-001 |
| M-001 |
| 5-Electrical |
| E-001 |
| E-001 |
| XX151 |
| E-002 |
| E-002 |
| E-002 |
| ED-101 |
| ED-101 |
| ED-101 |
| E-101 |
| E-101 |
| E-101 |
| E-102 |
| E-102 |
| E-102 |
| E-501 |
| E-501 |
| E-501 |
| E-502 |
| E-502 |
| E-502 |
| E-601 |
| E-601 |
| E-601 |
File details come from the government source that posted it. Updated .