Attachment 4 - DRAWING - FIRST FLOOR PLAN.pdf
PDF 251 KB Posted
- Attached to
- N063--702 MS Waco PACS Project Federal contract opportunity
- Solicitation number
- 36C25922Q0560
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25922Q0560 A0002.docx | DOCX document | |
| 36C25922Q0560 A0001.docx | DOCX document | |
| 36C25922Q0560.docx | DOCX document | |
| Attachment 2 - 52.204-26 Covered Telecommunications Equipment or Services-Representation.docx | DOCX document | |
| Attachment 3 - DRAWING - BASEMENT FLOOR PLAN.pdf | ||
| Attachment 5 - DRAWING - SECOND FLOOR PLAN.pdf | ||
| Attachment 1 - 702 MS Waco PACS Project SOW.rtf | RTF text file |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN DN
UP UP
UP
UP UP
UP
EXISTING
ELEVATOR
EXISTING
ELEVATOR
ELECTRICAL
ROOM
SENIOR
SUPERVISOR
MANAGER
OFFICE
EXECUTIVE
CONFERENCE
ROOM
STORAGE
SITE
MANAGER
OFFICE
RECEPTION
PROGRAM
SUPERVISOR
OFFICE
SUPERVISOR
MANAGER
OFFICE
VISITORS
OFFICE
SUPERVISOR
MANAGER
OFFICE
ELECTRICAL
ROOM
LOW
VOLTAGE
SUPERVISOR
MANAGER
OFFICE
SUPERVISOR
MANAGER
OFFICE
IT
SUPERVISOR
OFFICE
IT STAFF
WORK AREA
COMPUTER
ROOM
BREAK ROOM
OPEN OFFICE
226A
OPEN OFFICE
213ACORRIDOR
TELECOM
ROOM
HAC
219B
205A
AR
EA
O F
RE
FU
GE
OPEN OFFICE
226C
OPEN OFFICE
226B
OPEN OFFICE
213C
OPEN OFFICE
213B
300118
21125
15 61
4 126
100100100
100 100 100 100
PROGRAM
PROGRAM
PROGRAM
PROGRAM
PROGRAM
PROGRAM
EXIT 1
67 OCCUPANTS
EXIT 2
37 OCCUPANTS
EXIT 3
36 OCCUPANTSEXIT 5
36 OCCUPANTS
EXIT 6
37 OCCUPANTS
FEC
FEC
FECFEC
VEND.
FEC FEC
FEC
1 HR RATED PARTITION NOT
REQUIRED PER CODE. PARTITION
RATED AT REQUEST OF OWNER
FOR PROTECTION OF EQUIPMENT
CONTAINED IN COMPUTER ROOM.
EXIT NOT REQUIRED FOR THIS
FLOOR OR THIS ROOM PER
CODE. MAINTAINED FOR
CONVENIENCE BY REQUEST OF
PM/ COTR. A SIGN SHALL BE
PLACED ON DOOR, "NOT A
REQUIRED EXIT."
REQUIRED EXIT AND ACCESSIBLE
EXIT ACCESS PATH 219A
BASEMENT FLOOR
OCCUPANCY TYPE/ LOAD LEGEND
1 HR FIRE BARRIER
FIRE EXTINGUISHER & CABINET LOCATIONS - RECESSED
(MOUNTED 3' 3" TO B.O. CABINET)
MAXIMUM OCCUPANCY LOAD CALCULATIONS
NOT AVAILABLE
FEC
FIRST FLOOR
PROPOSED OCCUPANCY
USE: ASSEMBLY AREA
USE: STORAGE, MECHANICAL, ELECTRICAL, & TELECOM
AREAS
NOTE: REFER TO CODE SUMMARY SHEET A0.01 FOR MORE INFORMATION
USE: BUSINESS
OCCUPANT LOAD FACTOR PER NFPA TABLE 7.3.1.2120 100
AREA OF ROOM (SF.)
OCCUPANT LOAD
TRAVEL DISTANCE
WC
REQUIRED
8 15 (12)
TOTAL PLUMBING FIXTURE COUNT
PROVIDED
5 10 (8)
7 10 (8)
MALE FEMALE MALE FEMALE
15 (12)
10 (8)LAVS
DRINKING FOUNTAINS
SERVICE SINK 1 3 (2)
EXISTING OCCUPANCY
SECOND FLOOR
BASEMENT FLOOR
FIRST FLOOR
SECOND FLOOR
TOTAL
TOTAL
NOTE: 1. ( ) INDICATES THE NUMBER OF PLUMBING FIXTURES THAT ARE
EXISTING IN THE FIRST & SEOND FLOORS. THIS FIXTURE COUNT
IS INCLUDED IN THE TOTAL NUMBER OF FIXTURES PROVIDED.
2.THE HIGHER OCCUPANT NUMBER OF DESIGN VS. PROGRAM
LOAD WAS UTILIZED IN MAXIMUM OCCUPANT LOAD
CALCULATIONS ABOVE.
LEGEND
EXISTING SPACES TO REMAIN
EXISTING WALLS, STAIRS, & COLUMNS TO REMAIN
AREAS INCLUDED IN PHASE 3A PROJECT SCOPE
EXISTING DOOR & FRAME TO REMAIN
AREAS INCLUDED IN PHASE 3B PROJECT SCOPE
2.PROVIDE TEMPORARY WALL & DOOR IN PHASE 3A (AS
SHOWN ON PLAN). TEMPORARY DOOR 200 IS FOR
CONSTRUCTION ACCESS ONLY. GC TO PROVIDE DOOR
HARDWARE AND SIGN THAT AUTHORIZES ONLY
CONSTRUCTION PERSONNEL.
1.MAINTAIN EXISTING OCCUPANCIES IN AREAS THAT ARE NOT
IN SCOPE OF WORK.
NOTES:
CONCRETE INFILL (REFER TO STRUCT. DWGS)
4.DEMO TEMPORARY WALL IN PHASE 3B.
NEW DOOR IN EXISTING FRAME
NEW DOOR & FRAME
NEW ACCESS CONTROL DOORS
EXISTING ACCESS CONTROL DOORS
3.EXISTING DOOR IN LOBBY 123 TO REMAIN FOR STAFF
ENTRANCE DURING PHASE 3A CONSTRUCTION. ELEVATORS
ARE TO REMAIN IN OPERATION FOR ACCESS TO UPPER
FLOORS DURING PHASE 3A CONSTRUCTION.
4800 MEMORIAL DRIVE
WACO, TEXAS 76710
ARCHITECT/ ENGINEERS DRAWING TITLE: Project Title:
Location:
Date:
Project Number
Drawing Number
CONSULTANTS:
Date:
Building Number
PROJECT MANAGER:
CENTRAL TEXAS
VETERANS
HEALTHCARE
SYSTEM
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
F
E
D
C
B
A
Revisions:
TASK ORDER NO.
CODE PLAN, FIRST FLOOR - REFERENCE
ONLY
A0.03
HRC BASEMENT RENOVATION -
PHASE 3A & 3B
674A4-10-243
FEBRUARY 18, 2011
FEBRUARY 18, 2011
BID DOCUMENTS
1/8" = 1'-0"1
CODE PLAN, FIRST FLOOR -
REFERENCE ONLY
PLAN NORTHTRUE NORTH
AMENDMENT MAY 26, 2011 (REPLACES FEBRUARY 18, 2011) 05/ 26 /11