Attachment 3 - DRAWING - BASEMENT FLOOR PLAN.pdf
PDF 255 KB Posted
- Attached to
- N063--702 MS Waco PACS Project Federal contract opportunity
- Solicitation number
- 36C25922Q0560
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C25922Q0560 A0002.docx | DOCX document | |
| 36C25922Q0560 A0001.docx | DOCX document | |
| Attachment 5 - DRAWING - SECOND FLOOR PLAN.pdf | ||
| Attachment 1 - 702 MS Waco PACS Project SOW.rtf | RTF text file | |
| 36C25922Q0560.docx | DOCX document | |
| Attachment 4 - DRAWING - FIRST FLOOR PLAN.pdf | ||
| Attachment 2 - 52.204-26 Covered Telecommunications Equipment or Services-Representation.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UP UP
UP
UPUP
UPUP
EXISTING
ELEVATOR
EXISTING
ELEVATOR
007A 007B
108D101D
300 1456
MECHANICAL
ROOM
ELECTRICAL
SWITCH GEAR
RM.
RM.
RM.
ELEC.
CLOSET
LUNCH ROOM
135 TELECOM
TRAINING
ROOM
IT PREP LAB
OFFICE
HRC
BUCKS
OFFICE
MAIL ROOM
ELEC.
CLOSET
RM.
RM.
RM.
MECHANICAL
ROOM
IT RECEIVING
SIGNAL
IT PREP LAB
MENS'
RESTROOM
WOMENS'
RESTROOM
ELEVATOR
EQUIPMENT
LOBBY
CORRIDOR
H.A.C.
SUPPLY
CLOSET
CALL CENTER
SHIPPING &
RECEIVING
CALL CENTER
ELECT.
PROGRAM
PROGRAM
100 2573
100241
100137
100134
100136
100 140
100 130
100 365
50 257
EXIT 1
38 OCCUPANTS
EXIT 3
91 TOTAL
OCCUPANTS
EXIT 5
5 OCCUPANTS
EXIT 8
6 OCCUPANTS
EXIT 12
21 OCCUPANTS
EXIT 11
91 TOTAL
OCCUPANTS
EXIT 2
21 OCCUPANTS
EXIT 4
37 OCCUPANTS
EXIT 6
73 TOTAL
OCCUPANTS
EXIT 7
38 OCCUPANTS
EXIT 8
96 TOTAL
OCCUPANTS
EXIT 10
31 OCCUPANTS
EXIT 10
20 OCCUPANTS
EXIT 5
95 TOTAL
OCCUPANTS
EXIT 6
22 OCCUPANTS
DN
FINANCIAL
MANAGEMENT
OFFICE
HUMAN
RESOURCE
OFFICE
HUMAN
RESOURCE
OFFICE
ISO OFFICE
EXIT 9
1 OCCUPANT
CLOSET
EXIT 2
20 OCCUPANTS
TEMP. WALL & DOOR
IN PHASE 3A
FEC FEC
FEC FEC
EXISTING LOADING DOCK
4B
139A138
5B
5A
4A
128 127 126
3B
3A
5B
122 121
139B
LEGEND
EXISTING SPACES TO REMAIN
EXISTING WALLS, STAIRS, & COLUMNS TO REMAIN
AREAS INCLUDED IN PHASE 3A PROJECT SCOPE
EXISTING DOOR & FRAME TO REMAIN
AREAS INCLUDED IN PHASE 3B PROJECT SCOPE
2.PROVIDE TEMPORARY WALL & DOOR IN PHASE 3A (AS
SHOWN ON PLAN). TEMPORARY DOOR 200 IS FOR
CONSTRUCTION ACCESS ONLY. GC TO PROVIDE DOOR
HARDWARE AND SIGN THAT AUTHORIZES ONLY
CONSTRUCTION PERSONNEL.
1.MAINTAIN EXISTING OCCUPANCIES IN AREAS THAT ARE NOT
IN SCOPE OF WORK.
NOTES:
CONCRETE INFILL (REFER TO STRUCT. DWGS)
4.DEMO TEMPORARY WALL IN PHASE 3B.
NEW DOOR IN EXISTING FRAME
NEW DOOR & FRAME
NEW ACCESS CONTROL DOORS
EXISTING ACCESS CONTROL DOORS
3.EXISTING DOOR IN LOBBY 123 TO REMAIN FOR STAFF
ENTRANCE DURING PHASE 3A CONSTRUCTION. ELEVATORS
ARE TO REMAIN IN OPERATION FOR ACCESS TO UPPER
FLOORS DURING PHASE 3A CONSTRUCTION.
BASEMENT FLOOR
OCCUPANCY TYPE/ LOAD LEGEND
1 HR FIRE BARRIER
FIRE EXTINGUISHER & CABINET LOCATIONS - RECESSED
(MOUNTED 3' 3" TO B.O. CABINET)
MAXIMUM OCCUPANCY LOAD CALCULATIONS
NOT AVAILABLE
FEC
FIRST FLOOR
PROPOSED OCCUPANCY
USE: ASSEMBLY AREA
USE: STORAGE, MECHANICAL, ELECTRICAL, & TELECOM
AREAS
NOTE: REFER TO CODE SUMMARY SHEET A0.01 FOR MORE INFORMATION
USE: BUSINESS
OCCUPANT LOAD FACTOR PER NFPA TABLE 7.3.1.2120 100
AREA OF ROOM (SF.)
OCCUPANT LOAD
TRAVEL DISTANCE
WC
REQUIRED
8 15 (12)
TOTAL PLUMBING FIXTURE COUNT
PROVIDED
5 10 (8)
7 10 (8)
MALE FEMALE MALE FEMALE
15 (12)
10 (8)LAVS
DRINKING FOUNTAINS
SERVICE SINK 1 3 (2)
EXISTING OCCUPANCY
SECOND FLOOR
BASEMENT FLOOR
FIRST FLOOR
SECOND FLOOR
TOTAL
TOTAL
NOTE: 1. ( ) INDICATES THE NUMBER OF PLUMBING FIXTURES THAT ARE
EXISTING IN THE FIRST & SEOND FLOORS. THIS FIXTURE COUNT
IS INCLUDED IN THE TOTAL NUMBER OF FIXTURES PROVIDED.
2.THE HIGHER OCCUPANT NUMBER OF DESIGN VS. PROGRAM
LOAD WAS UTILIZED IN MAXIMUM OCCUPANT LOAD
CALCULATIONS ABOVE.
4800 MEMORIAL DRIVE
WACO, TEXAS 76710
ARCHITECT/ ENGINEERS DRAWING TITLE: Project Title:
Location:
Date:
Project Number
Drawing Number
CONSULTANTS:
Date:
Building Number
PROJECT MANAGER:
CENTRAL TEXAS
VETERANS
HEALTHCARE
SYSTEM
o n e e ig h th in c h o n e fo o t 1 th re e in c h e s o n e fo o t o n e a n d o n e h a lf in c h e s o n e fo o t o n e in c h o n e fo o t th re e q u a rt e rs in c h o n e fo o t o n e h a lf in c h o n e fo o t th re e e ig h th s in c h o n e fo o t o n e q u a rt e r in c h o n e fo o t
1 2 3 4 5 6 87 9
F
E
D
C
B
A
97 8654321
F
E
D
C
B
A
Revisions:
TASK ORDER NO.
CODE PLAN, BASEMENT FLOOR
A0.02
HRC BASEMENT RENOVATION -
PHASE 3A & 3B
674A4-10-243
FEBRUARY 18, 2011
FEBRUARY 18, 2011
BID DOCUMENTSPLAN NORTHTRUE NORTH
1/8" = 1'-0"1 CODE PLAN, BASEMENT FLOOR
AMENDMENT MAY 26, 2011 (REPLACES FEBRUARY 18, 2011) 05/ 26 /11
File details come from the government source that posted it. Updated .