Attachment 4 Definition of Coefficient.docx
DOCX document 16 KB Posted
- Solicitation number
- 12805B24R0001
About this file
This document is an attachment defining the "Coefficient" that will be used in a Job Order Contract (JOC) Indefinite Delivery Indefinite Quantity (IDIQ) contract opportunity. The Coefficient is a competitively bid adjustment factor that will be applied to the Unit Prices listed in the Construction Task Catalog. The Coefficient includes various business costs such as office overhead, insurance and bonding, profit, administrative services, and financing, as well as project-related costs like project management, permitting, safety equipment, and cleaning. The Coefficient will be used in the solicitation for a JOC IDIQ contract at the National Bio and Agro-Defense Facility (NBAF) in Manhattan, Kansas, issued by the United States Department of Agriculture's Agricultural Research Service.
View the file
Other files
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 15 – Definition of Coefficient Adjustment Factor. Used interchangeably with “Coefficient” is a competitively bid adjustment to be applied to the Unit Prices listed in the Construction Task Catalog.
The Adjustment Factors Include:
The Adjustment Factors include the following costs, unless specifically excluded by the terms of the Contract Documents:
BUSINESS COSTS:
1. Office overhead, including, but not limited to, office space, office equipment, office and management personnel, office supplies, and employee transportation.
1. Insurance and bonding.
1. Profit.
1. Job Order development services, Owner meetings, and other administrative services required by the Contract Documents.
1. Subcontractor's overhead and profit.
1. Cost of financing the work.
1. Business risks such as the risk of a lower than expected volume of work, smaller than anticipated Job Orders, poor Subcontractor performance, and inflation or material cost fluctuations.
PROJECT RELATED COSTS:
1. Project trailer, equipment and supplies, and portable toilets for Contractor’s use.
1. Project management and project supervision.
1. Services required to complete project filings and obtain permits.
1. Preparation and modification of sketches, drawings, submittals, as-built drawings, and other project records.
1. Incidental engineering and architectural services.
1. Gang boxes and storage containers for Contractor's tools, equipment and materials.
1. Basic safety and warning signage, minor barricades (e.g., construction tape, etc.) and personnel safety equipment (e.g., hard hats, safety harnesses with lifeline or cabling, protective clothing, safety glasses, face shields, etc.).
1. Meeting Owner’s security requirements.
1. All taxes for which a waiver is not available including material sales tax and equipment rental.
1. Removing and returning Owner's furniture and furnishings (e.g. chairs, tables, pictures, etc. but excluding modular furniture, furnishings fastened to the wall or floor, safes and other furniture requiring disassembly).
1. Sealing windows doors, and other openings with plastic to contain construction dust and debris within the work area, or to protect existing surfaces.
1. Working in extreme temperatures (below or above normal) or adverse conditions such as rain, wind, sleet or snow.
1. Costs resulting from inadequate supply of building materials, fuel, electricity, or skilled labor.
1. Daily clean-up.
1. Final professional clean-up.