Attachment_4_Continuation_of_Section_B.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Watercraft ANS Decontamination Facility Vallecito
Solicitation number
140R4022R0023
Issued by

About this file

This document is a price schedule attachment for a federal solicitation seeking a watercraft aquatic nuisance species decontamination facility at Vallecito Reservoir. The solicitation issued by the Department of the Interior Bureau of Reclamation seeks lump sum pricing and unit prices for various construction line items to build the decontamination facility, including mobilization, removal of existing features, reinforced concrete, metal work, guard posts and fencing, decontamination and restroom buildings, watercraft decontamination equipment, water and electrical systems, earthwork, aggregate, screening rock, exterior improvements, a manhole structure, and a propane tank and piping system. The total proposed price according to the schedule is $0.00.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule B

Watercraft ANS Decontamination Facility
Vallecito Reservoir,Pine River Project - Colorado
PRICE SCHEDULE
CLINSectionSupplies or ServicesQuantityUnitUnit PriceAmount
1WBR 1452.232-81Mobilization and Preparatory WorkFor the lump sum of-
202 41 07Removal and Disposal of Existing FeaturesFor the lump sum of-
303 30 00Reinforced concrete60cubic yards--
405 50 00Miscellaneous MetalFor the lump sum of-
505 50 00Guard Posts, Railing and Privacy BarrierFor the lump sum of-
606 10 00ANS Decontamination Equipment and Restroom BuildingFor the lump sum of-
711 11 26Watercraft Decontamination EquipmentFor the lump sum of-
822 11 16Furnishing and Laying 1-inch Polyethylene TubingFor the lump sum of-
922 11 16Water Supply EquipmentFor the lump sum of-
1022 13 19Furnishing and Laying 4-inch and Smaller PVC Pipe340Linear Feet--
1126 05 02Complete Electrical SystemFor the lump sum of-
1231 23 11EarthworkFor the lump sum of-
1331 23 11Class 6 Aggregate Base75cubic yards--
1431 23 11Screened Rock50cubic yards--
1532 17 10Exterior ImprovementsFor the lump sum of-
1633 05 3148-inch Manhole StructureFor the lump sum of-
1743 41 14Propane Tank and Gas Piping SystemFor the lump sum of-

Total for Price Schedule $0.00

File details come from the government source that posted it. Updated .