26_27_13_-_Meter_Socket_R1_0001.pdf
PDF 127 KB Posted
- Attached to
- Watercraft ANS Decontamination Facility Vallecito Federal contract opportunity
- Solicitation number
- 140R4022R0023
About this file
This document includes a technical specification section for a meter socket as well as information about a related federal contract opportunity. The technical specification provides requirements for a new 200-amp, 3-phase, 3-wire, 208/120-volt meter socket with a Type 3R enclosure to be installed outdoors at a Watercraft ANS Decontamination Facility at Vallecito Reservoir. It states that the local utility, La Plata Electric Association, will install a new pole with overhead transformers and run secondary conductors in conduit from the new meter location to the pole for a cost of $12,584. The prime contractor must connect to a 200-amp meter loop on the pole.
The related federal contract opportunity is solicitation number 140R4022R0023 for the construction of the Watercraft ANS Decontamination Facility at Vallecito Reservoir issued by the Department of the Interior Bureau of Reclamation. The specification and opportunity details indicate electrical system upgrades are required as part of the facility construction project.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Sol_140R4022R0023_Amd_0001.pdf | ||
| Sign_in_Sheet_for_Site_Visit_9-8-2022_0001.pdf | ||
| 01_51_00_-_Temporary_Utilities_R1_0001.pdf | ||
| 01_14_10_-_Use_of_Site_R1_0001.pdf | ||
| Attachment_3_Wage_Determinations_CO20220001_07082022.pdf | ||
| Attachment_2_Drawings_07062022.pdf | ||
| Attachment_1_Specifications_072022.pdf | ||
| Attachment_4_Continuation_of_Section_B.xlsx | XLSX spreadsheet | |
| Solicitation.pdf | ||
| Sol_140R4022R0023.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Watercraft ANS Decontamination Facility at Vallecito Reservoir .
Meter Socket 26 27 13 - 1
SECTION 26 27 13
METER SOCKET
PART 1 GENERAL
1.01 MEASUREMENT AND PAYMENT
A. Cost:
1. Include in the lump sum price offered in the Price Schedule for Complete
Electrical System, see Section 26 05 02.
1.02 REFERENCES
A. American National Standard Institute (ANSI).
1. ANSI C12.7-1993 Watthour Meter Sockets
B. National Electrical Manufacturers Association (NEMA)
1. NEMA 250-2014 Enclosures For Electrical Equipment (1000 Volts
Maximum)
1.03 REQUIREMENT
A. Reclamation has contacted La Plata Electric Association (LPEA) to provide an estimate to upgrade the existing electrical service at the facility.
1. LPEA’s cost estimate, as of September 1, 2022, is $12,584.00
2. LPEA stated the new service will require LPEA to install a new pole with 3 phase overhead transformers.
3. The prime contractor’s electrician will be required to run secondary conductors in conduit from the new meter on the building and connect to a 200-amp meter loop on the new pole.
4. Reclamation will request LPEA to provide an updated cost estimate prior to the project site visit. LPEA’s updated cost estimate will be provided in an amendment to the solicitation after the project site visit.
B. Meter base:
1. In accordance with LPEA’s requirements and ANSI C12.7.
2. Outdoor, 3-phase, 3-wire.
3. 208/120-volt.
4. Type 3R enclosure in accordance with NEMA 250.
Watercraft ANS Decontamination Facility at Vallecito Reservoir .
Meter Socket 26 27 13 - 2
PART 2 EXECUTION
2.01 INSTALLATION
1. In accordance with manufacturer’s recommendations and as indicated on drawings.
END OF SECTION
File details come from the government source that posted it. Updated .