Attachment-3G_Exhibit_G_CDRLS_Option_Period_6.pdf
PDF 2 MB Posted
- Attached to
- Sniper Comprehensive Advanced Targeting Pod (CATP2) Support and Sustainment Option Years 6 & 7
- Solicitation number
- FA8540-26-R-0001
About this file
This document is a Contract Data Requirements List (CDRL) table of contents and individual data item forms for the Sniper CATP IDIQ contract (FA8540-23-D-001) with Lockheed Martin Missiles & Fire Control, establishing the EW-A Sniper program. The CDRL specifies 51 data deliverables (G000-G050) required under this Indefinite Delivery/Indefinite Quantity (IDIQ) contract.
The deliverables encompass technical documentation, program management artifacts, and compliance reports across multiple categories: test planning and procedures (test plans, test/inspection reports, security test plans); engineering and design data (specifications, engineering drawings, bill of materials); software documentation (requirements specifications, product specifications, version descriptions, vulnerability assessments); program management (integrated master schedules, status reports, configuration management plans, quality program plans, supply chain risk management plans); logistics and support (technical manuals, training materials, maintenance documentation); security and safety (safety assessment reports, security evaluation documents, anti-tamper plans, counterfeit prevention plans); and administrative items (conference minutes, presentation materials, contract change proposals). Submission frequencies vary from one-time deliverables (ONE/R) to recurring requirements (monthly, quarterly, semiannually). Most deliverables are distributed to AFLCMC/WNY (the requiring office) with varying distribution statements (D, E, or A classifications). Approval timelines typically require contractor revision and resubmission within 30 days of government comments, with initial submissions due 60 days after delivery order receipt unless otherwise specified in individual task descriptions.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
2/18/2025 2:03:20 PM EST CDRL Table of Contents Sniper CATP IDIQ CDRL CY29-G
CONTRACT #: FA8540-23-D-001
CONTRACTOR: LOCKHEED MARTIN MISSILES &
FIRE CONTROL
SET NAME: Sniper CATP IDIQ-CY29-G SYSTEM ITEM: Sniper
PROGRAM: EW-A - Sniper
DATA ITEM REQUIRING OFFICE AUTHORITY/TITLE/SUBTITLE SOW PARAGRAPH
G000 AFLCMC/WNY N/A See BLK 16
Non-Deliverable CDRL
G001 AFLCMC/WNY DI-NDTI-80566A/T PWS Para 4.4.2, 4.4.3
Test Plan
G002 AFLCMC/WNY DI-MGMT-81861B/T PWS Para 4.3.5.2
Integrated Program Management Data and Analysis Report
(IPMDAR)
Integrated Master Schedule
G003 406 SCMS/GUEE TMCR 86-01R PWS Para 4.4.2, 4.6.6
Air Force Technical Manual Contract Requirements (TMCR)Contractor Logistic Support
Depot Level and Commodity Technical Manual
G004 AFLCMC/WNY DI-MGMT-82143/T PWS Para 4.5.2
Naval Aviation Cybersecurity Strategy Implementation Plan
G005 AFLCMC/WNY DI-MGMT-80501 PWS Para 4.6.2, 4.6.7.4
Contractor’s Corrective Action Plan
G008 AFLCMC/WNY DI-ILSS-80872/T PWS Para 4.6.7.1, 4.6.7.2, 4.6.10.3
Training Materials
Type 1 Training - Maintenance
G009 AFLCMC/WNY DI-IPSC-82252A PWS Para 4.5.6
Software Vulnerability Assessment Report (SVAR)
G010 AFLCMC/WNY DI-ADMN-81373 PWS Para 4.4.2, 4.4.3, 4.5.6
Presentation Material
G011 AFLCMC/WNY DI-SESS-80639 PWS Para 4.4.2, 4.4.3, 4.4.4, 4.6.5.14.2, Engineering Change Proposal (ECP)
G012 AFLCMC/WNY DI-MGMT-81468A PWS Para 4.3.4
Contract Funds Status Report (CFSR)
G013 AFLCMC/WNY DI-SESS-80858D PWS Para 4.3.3
Supplier's Configuration Management Plan
G014 AFLCMC/WNY TMCR 86-01Q/T PWS Para 4.4.2, 4.4.3, 4.6.6
Air Force Technical Manual Contract Requirements (TMCR)Contractor Logistic Support
G015 AFLCMC/WNY DI-SESS-81254C PWS Para 4.4.2
Request for Nomenclature (DD Form 61)
G016 AFLCMC/WNY DI-ENVR-81840 PWS Para 4.4.2.1
Programmatic Environmental Safety and Health Evaluation
G017 AFLCMC/WNY DI-IPSC-81433A PWS Para 4.4.2, 4.4.3
Software Requirements Specification (SRS)
G018 AFLCMC/WNY DI-IPSC-81431A PWS Para 4.4.2, 4.4.3
System/Subsystem Specification (SSS)
G019 AFLCMC/WNY DI-IPSC-81441A/T PWS Para 4.4.2, 4.4.3, 4.6.5.11
Software Product Specification (SPS)
G020 AFLCMC/WNY DI-IPSC-81442A PWS Para 4.4.2, 4.4.3
Software Version Description (SVD)
G021 AFLCMC/WNY DI-AVCS-80700A PWS Para 4.4.2, 4.4.3
Computer Software Product End Items
G022 AFLCMC/WNY DI-MGMT-81398C PWS Para 4.6.7.2
Hazardous Materials Management Program (HMMP) Plan
G023 AFLCMC/WNY DI-MGMT-81453B PWS Para 4.2.3, 4.4.2, 4.4.3, 4.6.5.8
Data Accession List (DAL)
G024 AFLCMC/WNY DI-MISC-80711A PWS Para 4.4.1, 4.4.2, 4.4.3, 4.5.1, 4.5.4, Scientific and Technical Reports
G025 AFLCMC/WNY DI-MISC-81174 PWS Para 4.4.2, 4.4.3
Frequency Allocation Data
G026 AFLCMC/WNY DI-MISC-81454D PWS Para 4.4.2, 4.4.3, 4.6.5.11
Computer Program Identification Number (CPIN) Catalog Information
G027 AFLCMC/WNY DI-NDTI-80603A PWS Para 4.4.2, 4.4.3
Test Procedure
G028 AFLCMC/WNY DI-NDTI-80809B PWS Para 4.4.2, 4.4.3 6
Test/Inspection Report
G029 AFLCMC/WNY DI-MISC-80508B PWS Para 4.4.7
Technical Report - Study/Services
Anti-Tamper (AT) Plan
G030 AFLCMC/WNY DI-MISC-81832 PWS Para 4.6.8
Counterfeit Prevention Plan
G031 AFLCMC/WNY DI-MISC-81762A PWS Para 4.5.3
Security Evaluation Document (SED)
G032 AFLCMC/WNY DI-SAFT-80102C/T PWS Para 4.4.2, 4.4.3
Safety Assessment Report (SAR)
G033 AFLCMC/WNY DI-SESS-81000F/T PWS Para 4.4.6
Product Engineering Design Data and Associated Lists
G034 AFLCMC/WNY DI-SESS-80640E/T PWS Para 4.4.5, 4.7.3
Request for Variance (RFV)
G035 AFLCMC/WNY DI-PSSS-81656B/T PWS Para 4.4.5.14.3, 4.7.2
Bill Of Materials (BOM) for Logistics and Supply Chain Risk Mgt
G036 AFLCMC/WNY DI-SESS-81785A /T PWS Para 4.4
Systems Engineering Management Plan (SEMP)
G037 AFLCMC/WNY DI-SESS-81003F PWS Para 4.4
Commercial Engineering Design Data and Associated Lists
G038 AFLCMC/WNY DI-ADMN-81250B PWS Para 4.4.2, 4.4.3
Conference Minutes
G039 AFLCMC/WNY DI-ILSS-80872/T PWS Para 4.4.2, 4.4.3, 4.6.10.3
Training Materials
G040 AFLCMC/WNY DI-MGMT-80368A/T PWS Para 4.3.5.5
Status Report
G041 AFLCMC/WNY DI-MGMT-82144/T PWS Para 4.5.7
Naval Aviation Program Protection Implementation Plan
G042 AFLCMC/WNY DI-MGMT-82256/T PWS Para. 4.6.5.4
Supply Chain Risk Management (SCRM) Plan
G044 AFLCMC/WNY DI-QCIC-81722/T PWS Para 4.3.5.6
Quality Program Plan (QPP)
G045 AFLCMC/WNY DI-MGMT-81749B PWS Ref: 4.6.11
Distribution of DoD Depot Maintenance Workload (50/50) Report
G046 AFLCMC/WNY DI-ADMN-81401C IAW PWS Para 4.3.4
Contract Change Proposals (CCPs)
G047 AFLCMC/WNY DI-MGMT-81843 PWS Para. 4.5.5
Information Assurance Test Report
G048 AFLCMC/WNX DI-NDTI-81351 PWS Para 4.5.8
Security Test Plan
G049 AFLMCMC/WNX DI-SESS-81757A/T PWS Para 4.4.2
Design Review Information Package (DRIP)
G050 AFLCMC/WNX DI-MGMT-80441D PWS Para 3.2
Government Property Inventory Report
Sniper CATP IDIQ CDRL CY29-G
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT
D
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
Sniper
E. CONTRACT/PR NO.
FA8540-23-D-001
F. CONTRACTOR
LOCKHEED MARTIN MISSILES & FIRE CONTROL
1. DATA ITEM NO.
G000
2. TITLE OF DATA ITEM
Non-Deliverable CDRL
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
N/A
5. CONTRACT REFERENCE
See BLK 16
6. REQUIRING OFFICE
AFLCMC/WNY
7. DD 250 REQ
NA
9. DIST STATEMENT
REQUIRED
TBD
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
N/A
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
Draft
Final
Reg Repro
16. REMARKS
Use the CDRL for Non-CDRL Deliverables data associated with the program
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/02/14
I. APPROVED BY
MOLTON.JUSTIN.M.1512308453
J. DATE
2025/02/18
18. ESTIMATED
TOTAL PRICE
DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED Page 1 of 1 Pages
17. PRICE GROUP
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
X028
B. EXHIBIT
D
C. CATEGORY:
TDP TM OTHER ENG
D. SYSTEM/ITEM
Sniper
E. CONTRACT/PR NO.
FA8540-23-D-001
F. CONTRACTOR
LOCKHEED MARTIN MISSILES & FIRE CONTROL
1. DATA ITEM NO.
G001
2. TITLE OF DATA ITEM
Test Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-NDTI-80566A/T
5. CONTRACT REFERENCE
PWS Para 4.4.2, 4.4.3
6. REQUIRING OFFICE
AFLCMC/WNY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
E
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
60DADO
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A Draft
Final
Reg Repro
16. REMARKS
Block 4: DID paragraphs 4.3, 4.9.5, 4.9.7.c, 4.9.8.c-f not required.
Blocks 4, 7, 9, 14: Refer to CDRL General Notes for instructions.
Block 8: The Requiring Office will provide approval or disapproval/comments within 45 days of receipt (first submission), and within 30 days of receipt thereafter. Extent of approval requirements include format and content. The Contractor shall revise and resubmit within 30 days of disapproval/comments receipt. Approved draft shall serve as the final submission.
Block 9: For test plans that are not for software, the Distribution Statement E reason is "Administrative or Operational Use, Proprietary Information (DFARS Government Purpose Rights)". For test plans that include the test of software, the Distribution Statement E reason is "Administrative or Operational Use, Software Documentation, Proprietary Information (DFARS Government Purpose Rights)".
Block 12: Date Of First Submission may be changed as specified by PWS paragraph 4.2.1 (Data Management).
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/02/14
I. APPROVED BY
MOLTON.JUSTIN.M.1512308453
J. DATE
2025/02/18
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
X028
B. EXHIBIT
D
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
Sniper
E. CONTRACT/PR NO.
FA8540-23-D-001
F. CONTRACTOR
LOCKHEED MARTIN MISSILES & FIRE CONTROL
1. DATA ITEM NO.
G002
2. TITLE OF DATA ITEM
Integrated Program Management Data and Analysis Report
(IPMDAR)
3. SUBTITLE
Integrated Master Schedule
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81861B/T
5. CONTRACT REFERENCE
PWS Para 4.3.5.2
6. REQUIRING OFFICE
AFLCMC/WNY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
QRTLY
12. DATE OF FIRST SUBMISSION
60DADO
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A Draft
Final
Reg Repro
16. REMARKS
Blocks 4, 7, 9, 14: Refer to CDRL General Notes for instructions.
Block 4: DID Formats 1-5 and 7 not required. DID section 3.7.1.3.4 (Detail Schedules), paragraph 3.7.1.3.5.8 (Driving Path), paragraph
3.7.1.3.5.14 (Free Float/Slack), section 3.7.1.3.6 (Schedule Risk Assessment), section 3.7.1.3.7.3 (Required IMS Fields), paragraph
3.7.1.3.9 (Retention of Historical Performance), paragraph 3.7.1.4 (Monthly Analysis), and section 3.7.2 (Optional Contents of the IMS) not required
Blocks 8: The Requiring Office will provide approval or disapproval/comments within 45 days of receipt (first submission), and within 30 days of receipt thereafter. The Contractor shall revise and resubmit within 30 days of disapproval/comments receipt.
Extent of approval requirements include format and content.
Block 9: The Distribution Statement D reason is "Administrative or Operational Use".
Block 12: "Date Of First Submission may be changed as specified by PWS paragraph 4.2.1 (Data Management)."
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/02/14
I. APPROVED BY
MOLTON.JUSTIN.M.1512308453
J. DATE
2025/02/18
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
X028
B. EXHIBIT
D
C. CATEGORY:
TDP TM X OTHER
D. SYSTEM/ITEM
Sniper
E. CONTRACT/PR NO.
FA8540-23-D-001
F. CONTRACTOR
LOCKHEED MARTIN MISSILES & FIRE CONTROL
1. DATA ITEM NO.
G003
2. TITLE OF DATA ITEM
Air Force Technical Manual Contract Requirements (TMCR)Contractor Logistic Support
3. SUBTITLE
Depot Level and Commodity Technical Manual
4. AUTHORITY (Data Acquisition Document No.)
TMCR 86-01R
5. CONTRACT REFERENCE
PWS Para 4.4.2, 4.6.6
6. REQUIRING OFFICE
406 SCMS/GUEE
7. DD 250 REQ
DD
9. DIST STATEMENT
REQUIRED
BLK16
10. FREQUENCY
SEMIA
12. DATE OF FIRST SUBMISSION
See Blk 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16 Draft
Final
Reg Repro
16. REMARKS
Air Force Technical Manual Contract Requirements (TMCR) for AN/AAQ-33 Sniper Dated 19 May 2016 forms part of this CDRL
BLOCK 4: General and specific Technical Manual requirements are contained in the
TM-86-01R
BLK 7: The Wide Area Workflow (WAWF) is to be used for final inspection and acceptance by the 406 SCMS/GUEE.
BLK 8: Approval IAW TM-86-01R, Para 16.
BLK 9: Distribution Statement provided in TM-86-01R, Paragraph 9
NOTE: TECHNICAL DATA SHALL NOT BE TRANSMITTED VIA EMAIL. ALL
TRANSMISSION OF TECHNICAL DATA SHALL BE VIA MAIL OR EXPRESS DELIVERY
SERVICES.
Final delivery due semi-annually to USAF.
Blks 10 - 15, See TM 86-01R
Data Call: GUEE-21-13
NSN: N/A
MIPR # N/A
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/02/14
I. APPROVED BY
MOLTON.JUSTIN.M.1512308453
J. DATE
2025/02/18
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
X028
B. EXHIBIT
D
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
Sniper
E. CONTRACT/PR NO.
FA8540-23-D-001
F. CONTRACTOR
LOCKHEED MARTIN MISSILES & FIRE CONTROL
1. DATA ITEM NO.
G004
2. TITLE OF DATA ITEM
Naval Aviation Cybersecurity Strategy Implementation Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-82143/T
5. CONTRACT REFERENCE
PWS Para 4.5.2
6. REQUIRING OFFICE
AFLCMC/WNY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
E
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
60DADO
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A Draft
Final
Reg Repro
16. REMARKS
Block 3: Plan may have a different name as long as the content meets the requirement of DI-MGMT-82143/T
Block 4: The following Data Item Description paragraphs are not required: 1, 2, 3.2.1, 3.2.4, 3.2.5, 3.2.6, 3.3.1. For paragraphs
3.2 and 3.4.1 replace the phrase “system development” with “system sustainment”.
Blocks 4, 7, 9, 14: Refer to CDRL General Notes for instructions.
Block 8: The Requiring Office will provide approval or disapproval/comments within 45 days of receipt (first submission), and within 30 days of receipt thereafter. Extent of approval requirements include format and content per the Data Item Description. The Contractor shall revise and resubmit within 30 days of disapproval/comments receipt. Approved draft shall serve as the final submission.
Block 9: The Distribution Statement E reasons are “Critical Technology, Export Controlled, Proprietary Information (DFARS Government Purpose Rights)”.
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/02/14
I. APPROVED BY
MOLTON.JUSTIN.M.1512308453
J. DATE
2025/02/18
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
X028
B. EXHIBIT
D
C. CATEGORY:
TDP TM OTHER ENG
D. SYSTEM/ITEM
Sniper
E. CONTRACT/PR NO.
FA8540-23-D-001
F. CONTRACTOR
LOCKHEED MARTIN MISSILES & FIRE CONTROL
1. DATA ITEM NO.
G005
2. TITLE OF DATA ITEM
Contractor’s Corrective Action Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-80501
5. CONTRACT REFERENCE
PWS Para 4.6.2, 4.6.7.4
6. REQUIRING OFFICE
AFLCMC/WNY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
ASGEN
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A Draft
Final
Reg Repro
16. REMARKS
Blocks 7, 9, 14: Refer to CDRL General Notes/Instructions for instructions.
Block 8: The Requiring Office will provide approval or disapproval/comments within 10 business days of receipt. Extent of approval requirements include format and content per the Data Item Description. The Contractor shall revise and resubmit within 10 business days of disapproval/comments receipt. Approved draft shall serve as the final submission.
Block 9: Distribution Statement D reasons are: “Administrative or Operational Use, Contractor Performance Evaluation, Vulnerability Information”.
Block 10: Submission required when MTBME not achieved for two consecutive quarters, or if notified of Deficiency Report the contractor is responsible for.
Block 12: “Submit within 60 business days of MTBME not achieved for two consecutive quarters.”
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/02/14
I. APPROVED BY
MOLTON.JUSTIN.M.1512308453
J. DATE
2025/02/18
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
X028
B. EXHIBIT
D
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
Sniper
E. CONTRACT/PR NO.
FA8540-23-D-001
F. CONTRACTOR
LOCKHEED MARTIN MISSILES & FIRE CONTROL
1. DATA ITEM NO.
G008
2. TITLE OF DATA ITEM
Training Materials
3. SUBTITLE
Type 1 Training - Maintenance
4. AUTHORITY (Data Acquisition Document No.)
DI-ILSS-80872/T
5. CONTRACT REFERENCE
PWS Para 4.6.7.1, 4.6.7.2, 4.6.10.3
6. REQUIRING OFFICE
AFLCMC/WNY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
60DADO
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A Draft
Final
Reg Repro
16. REMARKS
Block 4: DID is tailored as follows:
a. Paragraph 10.1: Delete paragraph in its entirety and replace with, "The training materials shall be suitable for the purpose of indoctrinating and training maintenance personnel. The materials shall contain sufficient written or audio-visual instructions to guide students through all specified classroom lectures and hands-on training. Existing manufacturer's training and service manuals can be used in so far as they meet specified requirements. The role of the instructor will involve interaction with the students, answering questions and providing supplemental training when necessary. The training materials should be for students with a prerequisite knowledge of electronics theory, use of general electronic test equipment, and a basic knowledge of hand tools."
Blocks 4, 7, 9, 14: Refer to CDRL General Notes for instructions
Block 14: Refer to CDRL General Notes for instructions.
Blocks 8: The Requiring Office will provide approval or disapproval/comments within 45 days of receipt (first submission), and within 30 days of receipt thereafter. The Contractor shall revise and resubmit within 30 days of disapproval/comments receipt.
Extent of approval requirements include format and content. The final documentation shall be delivered concurrent with:
a . Scheduled Operational Test and Evaluation (OT&E) and Qualification OT&E activities.
b . Initial activation of each site
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/02/14
I. APPROVED BY
MOLTON.JUSTIN.M.1512308453
J. DATE
2025/02/18
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
X028
B. EXHIBIT
D
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
Sniper
E. CONTRACT/PR NO.
FA8540-23-D-001
F. CONTRACTOR
LOCKHEED MARTIN MISSILES & FIRE CONTROL
1. DATA ITEM NO.
G009
2. TITLE OF DATA ITEM
Software Vulnerability Assessment Report (SVAR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-82252A
5. CONTRACT REFERENCE
PWS Para 4.5.6
6. REQUIRING OFFICE
AFLCMC/WNY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
E
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
See Blk 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A Draft
Final
Reg Repro
16. REMARKS
Blocks 4, 7, 9, 14: Refer to CDRL General Notes for instructions.
Block 8: The Requiring Office will provide approval or disapproval/comments within 45 days of receipt (first submission), and within 30 days of receipt thereafter. The Contractor shall revise and resubmit within 30 days of disapproval/comments receipt. Extent of approval requirements include format and content. Approved draft shall serve as the final submission.
Block 9: The Distribution Statement E reasons are “Critical Technology, Export Controlled, Proprietary Information (DFARS Government Purpose Rights)”.
Block 12: The date of the first submission shall be as specified on the Delivery Order, Subtask, or Government-approved Integrated Master Schedule (in that order). When no date is specified, submit within 60 days of the Delivery Order or Subtask that requires this CDRL.
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/02/14
I. APPROVED BY
MOLTON.JUSTIN.M.1512308453
J. DATE
2025/02/18
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
X028
B. EXHIBIT
D
C. CATEGORY:
TDP TM OTHER ENG
D. SYSTEM/ITEM
Sniper
E. CONTRACT/PR NO.
FA8540-23-D-001
F. CONTRACTOR
LOCKHEED MARTIN MISSILES & FIRE CONTROL
1. DATA ITEM NO.
G010
2. TITLE OF DATA ITEM
Presentation Material
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ADMN-81373
5. CONTRACT REFERENCE
PWS Para 4.4.2, 4.4.3, 4.5.6
6. REQUIRING OFFICE
AFLCMC/WNY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
60DADO
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A Draft
Final
Reg Repro
16. REMARKS
Blocks 4, 7, 9, 14: Refer to CDRL General Notes for instructions. In addition, distribute one copy to each attendee that has provided a valid email address.
Block 10: Refer to individual Delivery Orders for clarification on Frequency of Submissions.
Block 12: When Presentation Material is associated with a meeting, deliver within 10 business days after meeting. Otherwise, the Date Of First Submission may be changed as specified by PWS paragraph 4.2.1 (Data Management)."
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/02/14
I. APPROVED BY
MOLTON.JUSTIN.M.1512308453
J. DATE
2025/02/18
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
X028
B. EXHIBIT
D
C. CATEGORY:
TDP TM OTHER ENG
D. SYSTEM/ITEM
Sniper
E. CONTRACT/PR NO.
FA8540-23-D-001
F. CONTRACTOR
LOCKHEED MARTIN MISSILES & FIRE CONTROL
1. DATA ITEM NO.
G011
2. TITLE OF DATA ITEM
Engineering Change Proposal (ECP)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80639
5. CONTRACT REFERENCE
PWS Para 4.4.2, 4.4.3, 4.4.4, 4.6.5.14.2,
6. REQUIRING OFFICE
AFLCMC/WNY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
E
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
60DADO
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A Draft
Final
Reg Repro
16. REMARKS
Block 3: SED may have a different name as long as the content meets the requirement of DI-MISC-81762A
Blocks 4, 7, 9, 14: Refer to CDRL General Notes for instructions.”
Block 8: The Requiring Office will provide approval or disapproval/comments within 45 days of receipt (first submission), and within 30 days of receipt thereafter. The Contractor shall revise and resubmit within 30 days of disapproval/comments receipt. Extent of approval requirements include format and content. Approved draft shall serve as the final submission.
Block 9: The Distribution Statement E reasons are “Critical Technology, Export Controlled”.
Block 10. Submit for every Government or Contractor proposed change to the Functional Baseline. Submit for every Contractor proposed change to the Allocated or Product Baseline when said change requires Government funding.
Block 12: Put "Date Of First Submission may be changed as specified by PWS paragraph 4.2.1 (Data Management)."
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/02/14
I. APPROVED BY
MOLTON.JUSTIN.M.1512308453
J. DATE
2025/02/18
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
X028
B. EXHIBIT
D
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
Sniper
E. CONTRACT/PR NO.
FA8540-23-D-001
F. CONTRACTOR
LOCKHEED MARTIN MISSILES & FIRE CONTROL
1. DATA ITEM NO.
G012
2. TITLE OF DATA ITEM
Contract Funds Status Report (CFSR)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-MGMT-81468A
5. CONTRACT REFERENCE
PWS Para 4.3.4
6. REQUIRING OFFICE
AFLCMC/WNY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
E
10. FREQUENCY
MTHLY
12. DATE OF FIRST SUBMISSION
60 DADO
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
N/A
11. AS OF DATE
See Blk 16
13. DATE OF SUBSEQUENT
SUBMISSION
MTHLY
Draft
Final
Reg Repro
16. REMARKS
Blocks 7, 8, 9, 12,14: Refer to CDRL General Notes for instructions.
Block 9: The Distribution Statement E reason is "Administrative or Operational Use".
Block 11: The Contractor shall establish the needed cut-off date for reporting as needed in order to meet Block 10 and 12 requirements, and shall include the cut-off date in the report.
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/02/14
I. APPROVED BY
MOLTON.JUSTIN.M.1512308453
J. DATE
2025/02/18
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
X028
B. EXHIBIT
D
C. CATEGORY:
TDP TM OTHER ENG
D. SYSTEM/ITEM
Sniper
E. CONTRACT/PR NO.
FA8540-23-D-001
F. CONTRACTOR
LOCKHEED MARTIN MISSILES & FIRE CONTROL
1. DATA ITEM NO.
G013
2. TITLE OF DATA ITEM
Supplier's Configuration Management Plan
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-80858D
5. CONTRACT REFERENCE
PWS Para 4.3.3
6. REQUIRING OFFICE
AFLCMC/WNY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASGEN
12. DATE OF FIRST SUBMISSION
60DADO
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A Draft
Final
Reg Repro
16. REMARKS
Blocks 4, 7, 9, 14: Refer to CDRL General Notes/Instructions for instructions.”
Block 8: The Requiring Office will provide approval or disapproval/comments within 30 business days of receipt. Extent of approval requirements include content per the Data Item Description.
The Contractor shall revise and resubmit within 30 business days of disapproval/comments receipt. Approved draft shall serve as the final submission
Block 9: Distribution Statement D reasons are: “Administrative or Operational Use”.
Block 10 & 13: After 1st Submission-no submission is require unless there’s a change to the Functional Baseline/Specification
Block 12: "Date Of First Submission may be changed as specified by PWS paragraph 4.2.1 (Data Management)." as the Block 12 note within Block 16
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/02/14
I. APPROVED BY
MOLTON.JUSTIN.M.1512308453
J. DATE
2025/02/18
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
X028
B. EXHIBIT
D
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
Sniper
E. CONTRACT/PR NO.
FA8540-23-D-001
F. CONTRACTOR
LOCKHEED MARTIN MISSILES & FIRE CONTROL
1. DATA ITEM NO.
G014
2. TITLE OF DATA ITEM
Air Force Technical Manual Contract Requirements (TMCR)Contractor Logistic Support
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
TMCR 86-01Q/T
5. CONTRACT REFERENCE
PWS Para 4.4.2, 4.4.3, 4.6.6
6. REQUIRING OFFICE
AFLCMC/WNY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
E
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
See Blk 16
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
See Blk 16 Draft
Final
Reg Repro
16. REMARKS
Sniper CATP2 is a revision of the existing data.
Blocks 4, 7, 9, 14: Refer to CDRL General Notes for instructions.
Block 8: Approval IAW TMCR 86-01Q
Block 13 Subsequent submittals NLT 30 days after updates are made BLOCK 9: Distribution statement provided in para 9 of the TMCR 86- 01Q/T.
CONTRACT DATA
BLOCKS 10-16, See TM-86-01Q/R Data Call: GUEE-16-017
NSN:
MIPR#
NOTE: TECHNICAL DATA SHALL NOT BE TRANSMITTED VIA EMAIL. ALL
TRANSMISSION OF TECHNICAL DATA SHALL BE VIA MAIL OR
EXPRESS DELIVERY SERVICES
Frequency of delivery every 180 days Source Data and TCTO's should align with each OFP release.
1. Draft Due Date: 30 days before SW release.
2. Final Due Date: 30 days after Gov comments.
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/02/14
I. APPROVED BY
MOLTON.JUSTIN.M.1512308453
J. DATE
2025/02/18
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
X028
B. EXHIBIT
D
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
Sniper
E. CONTRACT/PR NO.
FA8540-23-D-001
F. CONTRACTOR
LOCKHEED MARTIN MISSILES & FIRE CONTROL
1. DATA ITEM NO.
G015
2. TITLE OF DATA ITEM
Request for Nomenclature (DD Form 61)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-SESS-81254C
5. CONTRACT REFERENCE
PWS Para 4.4.2
6. REQUIRING OFFICE
AFLCMC/WNY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
60DDO
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A Draft
Final
Reg Repro
16. REMARKS
Blocks 7, 9, 10, 11,14: Refer to CDRL General Notes for instructions.
Blocks 8: The Requiring Office will provide approval or disapproval/comments within 45 days of receipt (first submission), and within 30 days of receipt thereafter. The Contractor shall revise and resubmit within 30 days of disapproval/comments receipt.
Extent of approval requirements include format and content. Approved draft shall serve as the final submission.
Block 9: The Distribution Statement D reason is "Administrative or Operational Use".
Block 10: This will only be placed onto delivery orders where needed.
The date of the first delivery shall be in accordance with the Government approved Integrated Master Schedule. If no delivery is specified, delivery is 90 days after receipt of order.
Block 12: "Date Of First Submission may be changed as specified by PWS paragraph 4.2.1 (Data Management)."
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/02/14
I. APPROVED BY
MOLTON.JUSTIN.M.1512308453
J. DATE
2025/02/18
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
X028
B. EXHIBIT
D
C. CATEGORY:
TDP TM OTHER OTHER
D. SYSTEM/ITEM
Sniper
E. CONTRACT/PR NO.
FA8540-23-D-001
F. CONTRACTOR
LOCKHEED MARTIN MISSILES & FIRE CONTROL
1. DATA ITEM NO.
G016
2. TITLE OF DATA ITEM
Programmatic Environmental Safety and Health Evaluation
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-ENVR-81840
5. CONTRACT REFERENCE
PWS Para 4.4.2.1
6. REQUIRING OFFICE
AFLCMC/WNY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
D
10. FREQUENCY
ASREQ
12. DATE OF FIRST SUBMISSION
60DADO
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
ASREQ
Draft
Final
Reg Repro
16. REMARKS
Blocks 4, 7, 9, 14: Refer to CDRL General Notes for instructions.
Block 8: The Requiring Office will provide approval or, disapproval/comments within 45 days of receipt (first submission), and within 30 days of receipt thereafter. The Contractor shall revise and resubmit within 30 days of disapproval/comments receipt.
Extent of approval requirements include format and content
Block 9: The Distribution Statement D reason is "Administrative or Operational Use."
Block 12,13: "Date Of First Submission may be changed as specified by PWS paragraph 4.2.1 (Data Management)."
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/02/14
I. APPROVED BY
MOLTON.JUSTIN.M.1512308453
J. DATE
2025/02/18
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
X028
B. EXHIBIT
D
C. CATEGORY:
TDP TM OTHER ENG
D. SYSTEM/ITEM
Sniper
E. CONTRACT/PR NO.
FA8540-23-D-001
F. CONTRACTOR
LOCKHEED MARTIN MISSILES & FIRE CONTROL
1. DATA ITEM NO.
G017
2. TITLE OF DATA ITEM
Software Requirements Specification (SRS)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81433A
5. CONTRACT REFERENCE
PWS Para 4.4.2, 4.4.3
6. REQUIRING OFFICE
AFLCMC/WNY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
E
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
60DADO
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A Draft
Final
Reg Repro
16. REMARKS
Block 3: Place the Title of the covered Computer Software Configuration Item on the Title Page.
Blocks 4, 7, 9, 14: Refer to CDRL General Notes for instructions.”
Block 8: The Requiring Office will provide approval or disapproval/comments within 45 days of receipt (first submission), and within 30 days of receipt thereafter. The Contractor shall revise and resubmit within 30 days of disapproval/comments receipt. Extent of approval requirements include content but not format. Approved draft shall serve as the final submission.
Block 10: When multiple Computer Software Configuration Items (CSCIs) are required for a system to operate, submit One/R for each
CSCI.
Block 9: The Distribution Statement E reasons are “Critical Technology, Software Documentation, Export Controlled, Proprietary Information (DFARS Restricted Rights)”.
Block 12: "Date Of First Submission may be changed as specified by PWS paragraph 4.2.1 (Data Management)."
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/02/14
I. APPROVED BY
MOLTON.JUSTIN.M.1512308453
J. DATE
2025/02/18
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
X028
B. EXHIBIT
D
C. CATEGORY:
TDP TM OTHER ENG
D. SYSTEM/ITEM
Sniper
E. CONTRACT/PR NO.
FA8540-23-D-001
F. CONTRACTOR
LOCKHEED MARTIN MISSILES & FIRE CONTROL
1. DATA ITEM NO.
G018
2. TITLE OF DATA ITEM
System/Subsystem Specification (SSS)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81431A
5. CONTRACT REFERENCE
PWS Para 4.4.2, 4.4.3
6. REQUIRING OFFICE
AFLCMC/WNY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
E
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
60DADO
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A Draft
Final
Reg Repro
16. REMARKS
Blocks 4, 7, 9, 14: Refer to CDRL General Notes/Instructions for instructions.”
Block 8: The Requiring Office will provide approval or disapproval/comments within 45 days of receipt (first submission), and within 30 days of receipt thereafter. The Contractor shall revise and resubmit within 30 days of disapproval/comments receipt. Extent of approval requirements include content but not format. Approved draft shall serve as the final submission
Block 9: The Distribution Statement E reasons are “Critic al Technology, Software Documentation, Export Controlled, Proprietary Information (DFARS Government Purpose Rights)”.
Block 12: Date Of First Submission may be changed as specified by PWS paragraph 4.2.1 (Data Management)."
15. TOTAL 0 0 0
G. PREPARED BY
CARITHERS.DIANE.M.1075543472
H. DATE
2025/02/14
I. APPROVED BY
MOLTON.JUSTIN.M.1512308453
J. DATE
2025/02/18
18. ESTIMATED
TOTAL PRICE
(1 Data Item)
Form Approved OMB No. 0704-0188
The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO.
X028
B. EXHIBIT
D
C. CATEGORY:
TDP TM OTHER ENG
D. SYSTEM/ITEM
Sniper
E. CONTRACT/PR NO.
FA8540-23-D-001
F. CONTRACTOR
LOCKHEED MARTIN MISSILES & FIRE CONTROL
1. DATA ITEM NO.
G019
2. TITLE OF DATA ITEM
Software Product Specification (SPS)
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
DI-IPSC-81441A/T
5. CONTRACT REFERENCE
PWS Para 4.4.2, 4.4.3, 4.6.5.11
6. REQUIRING OFFICE
AFLCMC/WNY
7. DD 250 REQ
LT
9. DIST STATEMENT
REQUIRED
E
10. FREQUENCY
ONE/R
12. DATE OF FIRST SUBMISSION
60DADO
14. DISTRIBUTION
a. ADDRESSEE
b. COPIES
8. APP CODE
A
11. AS OF DATE
N/A
13. DATE OF SUBSEQUENT
SUBMISSION
N/A Draft
Final
Reg Repro
16. REMARKS
Blocks 4, 7, 9, 14: Refer to CDRL General Notes for instructions.”
Block 4: Include the executable code. Otherwise, the Government will accept SPS content and level of detail comparable to the SPS for E3.4 P2.540A (77429705 Rev AW 18 Jan 2019).
Block 8: The Requiring Office will provide approval or disapproval/comments within 45 days of receipt (first submission), and within 30 days of receipt thereafter. The Contractor shall revise and resubmit within 30 days of disapproval/comments receipt. Extent of approval requirements include format and content. Approved draft shall serve as the final submission.
Block 9: For OFP or Sniper Laptop Control System (SLCS), the Distribution Statement E reasons are “Critical Technology, Software Documentation, Export Controlled, Proprietary Information (DFARS Restricted Rights)”.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .