About this file
This is a Statement of Work for a flooring replacement project at the NRS Rhinelander Laboratory, a federally owned USDA facility located at 5985 County Highway K, Rhinelander, Wisconsin. The contractor must prepare the existing concrete subfloor and install approximately 2,400 square feet of new luxury vinyl tile flooring with select baseboard cove and associated trim. The scope includes preparation of concrete and adjacent walls per manufacturer requirements, professional installation with proper tie-ins to adjacent rooms, and repair and recoating of any damage to walls, trim, and existing flooring caused during installation. The contractor is responsible for moving and returning office contents to their original locations as incidental work.
The period of performance is 60 days from Notice to Proceed. Key contractor requirements include demonstrated experience in luxury vinyl flooring installation, current Wisconsin construction licensing, and full insurance coverage. Site access is available between 8:00 AM and 4:30 PM on weekdays, excluding Federal Holidays, with access outside these hours available only with written permission from the Contracting Officer's Representative (COR). Three primary deliverables are specified: mobilization of all equipment and materials, preparation of the concrete subfloor and adjacent walls, and installation of the new luxury vinyl tile flooring system with baseboards and trim. The deliverables section includes a floor plan showing the project area highlighted in yellow across multiple hallways and rooms on the first floor.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 260316 Q and A.docx | DOCX document | |
| 260302 SF 30.pdf | ||
| Attachment 1 - Solicitation 12445526Q0034.pdf | ||
| Attachment 5 - Wage Determination WI20260011 Oneida County.pdf | ||
| Attachment 2 - Schedule of Items.xlsx | XLSX spreadsheet | |
| Attachment 4 - Specifications.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
US Department of Agriculture (USDA)
Statement of Work
NRS Rhinelander 1st Floor - Flooring Replacement 5985 Hwy K, Rhinelander, WI
Contents Project
General Information
1.0 Scope of Work
2.0 Background
Contractor Requirements
3.0 Technical Requirements / Tasks
4.0 Deliverables / Schedule
Site Photos
Project NRS Rhinelander 1st Floor - Flooring Replacement
General Information
1.0 Scope of Work
The NRS Rhinelander 1st Floor - Flooring Replacement shall consist preparation of existing concrete and installation of new luxury vinyl tile, select baseboards, and associated trim necessary to complete a professional installation. See Photo 1 for specifics on project area.
2.0 Background
The NRS Rhinelander Laboratory a federally owned facility located at 5985 County Highway K, Rhinelander, WI.
The government shall furnish access to the site between the hours of 8:00AM – 4:30PM on weekdays excluding Federal Holidays. Access to the site may be obtained outside of these hours with permission from the COR.
Contractor Requirements
3.0 Technical Requirements / Tasks
Contactor shall be:
• Experienced in Luxury Vinyl Flooring installation.
• Licensed in the state of Wisconsin for construction.
• Fully Insured.
4.0 Deliverables / Schedule
Period of Performance for all Key Deliverables: 60 days from Notice to Proceed Key Deliverables
Item No. Deliverable Objective 001 Mobilization Mobilize all equipment and material necessary to complete to the scope of work to the site.
002 Preparation for New
Flooring Prepare the concrete subfloor and adjacent walls per new flooring and cove manufacture requirements. Moving office contents to their original location will be incidental to this line item.
003 Install New Luxury Vinyl Tile
Installation of approximately 2400 sq. ft. new luxury vinyl floor, select baseboard cove, and necessary trim and accessories required for a professional installation and tie in with adjacent rooms. Repair and recoat any damage caused to adjacent finishings such as walls, trim, and flooring. Returning office contents to their original location will be incidental to this line item.
Photo 1: 1st Floor Plan with Room Numbers and Project Area Highlighted
Photo 2: North-South Running Hallway (Looking North)
Photo 3: East-West Running Hallway (Looking East)
Photo 4: Typical Cove Base Replacement Area
Photo 5: Stairwell Landing
Photo 6: Typical Cleanout Cover (Access to Remain) and adjacent concrete repairs required
Photo 7: Existing Drain (to remain)
Photo 8: Existing Access Cover (to remain)
Photo 9: Room 18