Attachment 3 Seed Project Wage Determination WA20240120 09-06-2024.docx

DOCX document 22 KB Posted

Attached to
Z1DA--VISN 20 General Construction MATOC Replacement Construction Services
Solicitation number
36C26024R0087
Issued by

About this file

This document is a Davis-Bacon Wage Determination for construction projects in Clark and Skamania Counties, Washington, effective September 6, 2024. The wage determination establishes minimum hourly rates for various construction trades, ranging from $18.25 for landscape laborers to $63.01 for metal roof installers. Key wage requirements include Executive Order provisions mandating minimum wages of $17.20 per hour for contracts entered on or after January 30, 2022, and $12.90 per hour for contracts awarded between January 1, 2015 and January 29, 2022.

The wage determination covers multiple construction job classifications across trades such as electricians ($57.35/hour), pipefitters ($58.47/hour), sheet metal workers ($53.60/hour), and various laborer and operator roles. The document also includes provisions for paid sick leave under Executive Order 13706, requiring contractors to provide 1 hour of paid sick leave for every 30 hours worked, up to 56 hours annually. This wage determination appears related to the Department of Veterans Affairs Veterans Health Administration's VISN 20 General Construction MATOC Replacement Construction Services solicitation (36C26024R0087).

View the file

Other files

File Type Posted
36C26024R0087 0013 Attach 1 RFP Questions 7.9.25.docx DOCX document
36C26024R0087 0013.docx DOCX document
36C26024R0087 0012 - SF 1442 Block 19 Continuation Page .docx DOCX document
36C26024R0087 0012.docx DOCX document
Attachment 6 Seed Project Price Breakout Revised 6.16.25.xlsx XLSX spreadsheet
36C26024R0087 0010.docx DOCX document
36C26024R0087 0010 Attachment 2 VAAR 852.219-75 VA notice of LOS.docx DOCX document
36C26024R0087 0010 Attachment 3 Red Line As builts - existing receway.pdf PDF
36C26024R0087 0010 Attachment 4 Existing Plumbing P2.4.pdf PDF
36C26024R0087 0010 Attachment 5 Ceiling Plan -A7.1.pdf PDF
36C26024R0087 0010 Attachment 8 Vancouver Site for 648-22-100 Dental.pdf PDF
36C26024R0087 0010 Attachment 1 Seed Project questions and Answers 6.16.25.docx DOCX document
36C26024R0087 0010 Attachment 6 Specification Section 232500 HVAC Water Treatment.pdf PDF
36C26024R0087 0010 Attachment 7 Specification Section 275223 Nurse Call.pdf PDF
36C26024R0087 0009.docx DOCX document
36C26024R0087 0008.docx DOCX document
36C26024R0087 0008 Attach 1 RFP Questions 5.29.25.docx DOCX document
36C26024R0087 0007.docx DOCX document
36C26024R0087 0006.docx DOCX document
Attachment 8 A-dec-DV5 Compressor and Dry Vacuum cut sheet.pdf PDF
36C26024R0087 0006 Attach 2 Photos of B20 Mech RM 237.pdf PDF
Attachment 5 Past Performance Questionnaire 5.9.25.docx DOCX document
Attachment 1 648-22-100 VA Vancouver Consolidate Dental B20 4.23.25.pdf PDF
Attachment 9 VANC Dental B20 Drawings AD101 A-601 and A-603 response to prebid questions.pdf PDF
36C26024R0087 0006 Attach 4 Seed Project Question and Answers.docx DOCX document
36C26024R0087 0006 Attach 1 RFP Questions 5.7.25.docx DOCX document
36C26024R0087 0006 Attach 3 Site Visit Sign in Sheet.pdf PDF
Attachment 6 Seed Project Price Breakout Revised 5.6.25.xlsx XLSX spreadsheet
Attachment 7 Dental Air Compressor AC-1specs.pdf PDF
36C26024R0087 0005 Attach 2 VAAR 852.219-75 VA Notice of LOS - Certicate of Compliance for Services and Construction Jan 2023 Deviation.docx DOCX document
36C26024R0087 0005 Attach 1 RFP Questions 4 24 25.docx DOCX document
36C26024R0087 0005.docx DOCX document
36C26024R0087 0004 Attachment 2 CON MATOC pre-proposal meeting attendees.docx DOCX document
36C26024R0087 0004 Attachment 1 RFP Questions 4 22 25.docx DOCX document
36C26024R0087 0004.docx DOCX document
RFP Questions 4.14.25.docx DOCX document
36C26024R0087 0003.docx DOCX document
36C26024R0087 Conformed 4.10.25.docx DOCX document
RFP Questions 4.10.25.docx DOCX document
36C26024R0087 0002.docx DOCX document
Panographic backing detail.docx DOCX document
Attachment 5 Past Performance Questionnaire 4.10.25.docx DOCX document
36C26024R0087 0001.docx DOCX document
36C26024R0087 4.1.25.docx DOCX document
Attachment 6 Seed Project Price Breakout.xlsx XLSX spreadsheet
Attachment 1 648-22-100 VA Vancouver Consolidate Dental B20-Specs.pdf PDF
Attachment 2 648-22-100 VA Vancouver Consolidate Dental B20 Drawing signatures.pdf PDF
36C26024R0087.docx DOCX document
Attachment 5 Past Performance Questionnaire 11.5.24.docx DOCX document
Attachment 4 648-22-100 Vancouver WA consolidate Dental Building B20 - MATOC Seed Project SOW 10.9.24.docx DOCX document
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"General Decision Number: WA20240120 09/06/2024

State: Washington

Construction Type: Building

Counties: Clark and Skamania Counties in Washington.

BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).

Note: Contracts subject to the Davis-Bacon Act are generally required to pay at least the applicable minimum wage rate required under Executive Order 14026 or Executive Order 13658.

Please note that these Executive Orders apply to covered contracts entered into by the federal government that are subject to the Davis-Bacon Act itself, but do not apply to contracts subject only to the Davis-Bacon Related Acts, including those set forth at 29 CFR 5.1(a)(1).

|If the contract is entered |· Executive Order 14026 | |into on or after January 30, | generally applies to the | |2022, or the contract is | contract. | |renewed or extended (e.g., an |· The contractor must pay | |option is exercised) on or | all covered workers at | |after January 30, 2022: | least $17.20 per hour (or | | | the applicable wage rate | | | listed on this wage | | | determination, if it is | | | higher) for all hours | | | spent performing on the | | | contract in 2024. | |If the contract was awarded on|· Executive Order 13658 | |or between January 1, 2015 and| generally applies to the | |January 29, 2022, and the | contract. | |contract is not renewed or |· The contractor must pay all| |extended on or after January | covered workers at least | |30, 2022: | $12.90 per hour (or the | | | applicable wage rate listed| | | on this wage determination,| | | if it is higher) for all | | | hours performing on that | | | contract in 2024. |

The applicable Executive Order minimum wage rate will be adjusted annually. If this contract is covered by one of the Executive Orders and a classification considered necessary for performance of work on the contract does not appear on this wage determination, the contractor must still submit a conformance request.

Additional information on contractor requirements and worker protections under the Executive Orders is available at http://www.dol.gov/whd/govcontracts.

Modification Number Publication Date 0 05/24/2024 1 07/12/2024 2 09/06/2024

ASBE0036-006 04/03/2023

Rates Fringes

HEAT & FROST INSULATOR

(Includes Duct, Pipe and Mechanical Systems)..............$ 59.32 21.11

BRWA0001-020 06/01/2023

Rates Fringes

BRICKLAYER.......................$ 50.77 17.68

BRWA0001-023 06/01/2023

Rates Fringes

TILE FINISHER....................$ 36.91 16.05

TILE SETTER......................$ 45.63 16.50

CARP0503-004 06/01/2023

Rates Fringes

CARPENTER, Excludes Form Work....$ 45.80 19.65

DRYWALL HANGER...................$ 44.74 19.45

ELEC0048-030 01/01/2023

Rates Fringes

ELECTRICIAN......................$ 57.35 27.54

ENGI0302-042 06/01/2023

Rates Fringes

OPERATOR: Bulldozer D9 & under..................$ 54.47 25.57

ENGI0302-053 06/01/2023

Rates Fringes

OPERATOR: Blade Finish..........$ 53.42 25.57

ENGI0302-054 06/01/2023

Rates Fringes

OPERATOR: Grader/Blade..........$ 54.13 25.57 OPERATOR: Paver (Asphalt, Aggregate, and Concrete).........$ 54.13 25.57

ENGI0302-058 06/01/2023

Rates Fringes

OPERATOR: Loader Overhead 6 yards but not including 8 yards...........$ 55.80 25.57 Overhead under 6 yards......$ 55.09 25.57

IRON0029-014 07/03/2023

Rates Fringes

IRONWORKER.......................$ 43.27 33.07

LABO0242-015 06/01/2023

Rates Fringes

LABORER: Form Stripping.........$ 44.53 14.40

LABO0242-018 06/01/2023

Rates Fringes

LABORER: Jackhammer..............$ 45.61 14.40

LABO0242-020 06/01/2023

Rates Fringes

LABORER: Nozzle Person...........$ 47.95 14.40

LABO0252-017 06/01/2023

Rates Fringes

Laborer, Mason Tender Brick......$ 44.53 14.40

LABO0335-007 06/01/2023

Rates Fringes

LABORER: Fire Watch.............$ 35.44 14.40

LABO0335-012 06/01/2023

Rates Fringes

LABORER: Hod Carrier............$ 39.56 14.40

LABO0335-020 06/01/2023

Rates Fringes

LABORER: Mason Tender - Cement/Concrete..................$ 39.56 14.40

PAIN0300-003 07/01/2023

Rates Fringes

PAINTER..........................$ 37.80 13.63

PLAS0555-008 06/01/2023

Rates Fringes

CEMENT MASON/CONCRETE FINISHER...$ 43.33 19.95

PLUM0026-015 06/01/2024

Rates Fringes

PIPEFITTER.......................$ 58.47 31.90

ROOF0153-007 02/01/2024

Rates Fringes

ROOFER, Excludes Metal Roofs.....$ 48.01 16.44

SFWA0669-001 01/01/2024

Rates Fringes

SPRINKLER FITTER.................$ 46.18 26.98

* SHEE0016-010 07/01/2024

Rates Fringes

SHEET METAL WORKER...............$ 53.60 29.61

* SHEE0066-013 07/01/2023

Rates Fringes

METAL ROOF INSTALLER.............$ 63.01 31.69

TEAM0174-009 06/01/2023

Rates Fringes

TRUCK DRIVER: Concrete Truck....$ 50.63 24.32

TEAM0589-002 06/01/2023

Rates Fringes

TRUCK DRIVER: Dump Truck 16 to 30 yard capacity......$ 49.88 24.32 Less than 16 yard capacity..$ 49.04 24.32

* UAVG-WA-0001 03/01/2024

Rates Fringes

OPERATOR: Concrete Pump.........$ 52.92 22.63

* UAVG-WA-0002 03/01/2024

Rates Fringes

OPERATOR: Drill.................$ 56.42 21.15

* UAVG-WA-0009 03/01/2024

Rates Fringes

OPERATOR: Crane.................$ 55.44 16.90

SUWA2018-020 03/01/2024

Rates Fringes

FORM WORKER......................$ 29.71 14.84

LABORER: Common or General......$ 34.00 6.48

LABORER: Concrete Saw Chain.....$ 35.03 10.86

LABORER: Landscape..............$ 18.25 0.00

LABORER: Pipelayer..............$ 32.17 11.49

LABORER: Grade Checker...........$ 31.86 12.98

OPERATOR:

Backhoe/Excavator/Trackhoe.......$ 35.85 7.71

OPERATOR: Bobcat/Skid Steer/Skid Loader................$ 40.53 9.56

OPERATOR: Mechanic..............$ 40.77 15.91

OPERATOR: Oiler.................$ 36.39 16.62

OPERATOR: Roller................$ 42.04 12.79

PLUMBER..........................$ 42.47 19.17

WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.

Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.

Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.

Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses (29CFR 5.5 (a) (1) (iii)).

The body of each wage determination lists the classification and wage rates that have been found to be prevailing for the cited type(s) of construction in the area covered by the wage determination. The classifications are listed in alphabetical order of ""identifiers"" that indicate whether the particular rate is a union rate (current union negotiated rate for local), a survey rate (weighted average rate) or a union average rate (weighted union average rate).

Union Rate Identifiers

A four letter classification abbreviation identifier enclosed in dotted lines beginning with characters other than ""SU"" or ""UAVG"" denotes that the union classification and rate were prevailing for that classification in the survey. Example:

PLUM0198-005 07/01/2014. PLUM is an abbreviation identifier of the union which prevailed in the survey for this classification, which in this example would be Plumbers. 0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. 07/01/2014 is the effective date of the most current negotiated rate, which in this example is July 1, 2014.

Union prevailing wage rates are updated to reflect all rate changes in the collective bargaining agreement (CBA) governing this classification and rate.

Survey Rate Identifiers

Classifications listed under the ""SU"" identifier indicate that no one rate prevailed for this classification in the survey and the published rate is derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As this weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SULA2012-007 5/13/2014. SU indicates the rates are survey rates based on a weighted average calculation of rates and are not majority rates. LA indicates the State of Louisiana. 2012 is the year of survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. 5/13/2014 indicates the survey completion date for the classifications and rates under that identifier.

Survey wage rates are not updated and remain in effect until a new survey is conducted.

Union Average Rate Identifiers

Classification(s) listed under the UAVG identifier indicate that no single majority rate prevailed for those classifications; however, 100% of the data reported for the classifications was union data. EXAMPLE: UAVG-OH-0010 08/29/2014. UAVG indicates that the rate is a weighted union average rate. OH indicates the state. The next number, 0010 in the example, is an internal number used in producing the wage determination. 08/29/2014 indicates the survey completion date for the classifications and rates under that identifier.

A UAVG rate will be updated once a year, usually in January of each year, to reflect a weighted average of the current negotiated/CBA rate of the union locals from which the rate is based.

State Adopted Rate Identifiers

Classifications listed under the ""SA"" identifier indicate that the prevailing wage rate set by a state (or local) government was adopted under 29 C.F.R §1.3(g)-(h). Example: SAME2023-007 01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.

01/03/2024 reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can be:

* an existing published wage determination

* a survey underlying a wage determination

* a Wage and Hour Division letter setting forth a position on a wage determination matter

* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests for summaries of surveys, should be with the Wage and Hour National Office because National Office has responsibility for the Davis-Bacon survey program. If the response from this initial contact is not satisfactory, then the process described in 2.) and 3.) should be followed.

With regard to any other matter not yet ripe for the formal process described here, initial contact should be with the Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations Wage and Hour Division U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an interested party (those affected by the action) can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

The request should be accompanied by a full statement of the interested party's position and by any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board U.S. Department of Labor 200 Constitution Avenue, N.W.

Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

END OF GENERAL DECISION"

File details come from the government source that posted it. Updated .